British submarine H20 in drydock, East Boston, 1915. The vessel later joined the Chilean Navy as Fresia. | |
History | |
---|---|
Chile | |
Name | H6 |
Builder | Fore River Yard, Quincy, Massachusetts |
Launched | 26 July 1915 |
Acquired | 1917 |
Renamed | Fresia, 1924 |
Stricken | 1945 |
General characteristics | |
Class and type | H-class submarine |
Displacement |
|
Length | 150 ft 9 in (45.9 m) |
Beam | 15 ft 9 in (4.8 m) |
Draught | 12 ft 4 in (3.8 m) |
Propulsion |
|
Speed |
|
Range |
|
Complement | 22 |
Armament |
|
The Chilean submarine Fresia was an H-class submarine of the Chilean Navy. The vessel was originally ordered by the United Kingdom's Royal Navy as HMS H20, but was handed over to Chile in 1917 as H6.
Fresia was a single-hulled submarine, with a pressure hull divided into five watertight compartments. The submarine had a length of 150 feet 9 inches (45.9 m) overall, a beam of 15 feet 9 inches (4.8 m) and a draught of 12 feet 4 inches (3.8 m). She displaced 363 long tons (369 t) on the surface and 434 long tons (441 t) submerged. The H-class submarines had a crew of 22 officers and enlisted men. [1]
The submarine had two propellers, each of which was driven by a 240- horsepower (180 kW) diesel engine as well as a 320-horsepower (239 kW) electric motors. This arrangement gave Fresia a maximum speed of 13 knots (24 km/h; 15 mph) while surfaced and 10.5 knots (19.4 km/h; 12.1 mph) submerged. She had a range of 1,750 nmi (3,240 km; 2,010 mi) at 7 knots (13 km/h; 8.1 mph) while on the surface and 30 nmi (56 km; 35 mi) at 5 kn (9.3 km/h; 5.8 mph) while submerged. The boat had a capacity of 17.5 long tons (17.8 t) of fuel oil. The H-class submarines were equipped with four 18-inch (457 mm) torpedo tubes in the bow and carried eight torpedoes. [1]
H20 was a H-class submarine built by Fore River Yard of Quincy, Massachusetts. She was launched on 25 August 1915. Because the United States was neutral (having not yet entered World War I), H20 along with sister ships H11, H12, H13, H14, H15, H16, H17, H18, and H19 were all interned by the United States government. As a result, H20 was never commissioned into the Royal Navy. Instead, she and H13, H16, H17, H18, and H19 were transferred to the Chilean Navy as partial recompensation for the appropriation of two 28,000-ton dreadnoughts (Almirante Latorre and Almirante Cochrane). Originally named H6 when turned over to Chile in 1917, she was renamed Fresia in 1924. She served with the Chilean Navy until she was stricken in 1945.
USS R-23 (SS-99) was an R-class coastal and harbor defense submarine built for the United States Navy during World War I.
USS R-26 (SS-103) was an R-class coastal and harbor defense submarine built for the United States Navy during World War I.
USS R-25 (SS-102) was an R-class coastal and harbor defense submarine built for the United States Navy during World War I.
USS R-27 (SS-104) was an R-class coastal and harbor defense submarine built for the United States Navy during World War I.
USS H-6 (SS-149) was a H-class submarine originally built for the Imperial Russian Navy. Six of these were not delivered pending the outcome of the Russian Revolution of 1917 before being purchased by the United States Navy on 20 May 1918.
USS H-9 (SS-152) was a H-class submarine originally built for the Imperial Russian Navy. Six of these were not delivered pending the outcome of the Russian Revolution of 1917 before being purchased by the United States Navy on 20 May 1918.
USS C-1 (SS-9) was the lead ship of her class of submarines built for the United States Navy in the first decade of the 20th century.
USS C-4 (SS-15) one of five C-class submarines built for the United States Navy in the first decade of the 20th century.
HMS R1 was one of 10 R-class submarine built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1923.
HMS R2 was one of 10 R-class submarine built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1923.
HMS R3 was one of 10 R-class submarine built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1923.
HMS R4 was one of 10 R-class submarine built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1934.
HMS R7 was one of 10 R-class submarine built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1923.
HMS R8 was one of 10 R-class submarine built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1923.
HMS R9 was one of 10 R-class submarine built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1923.
HMS R12 was one of 10 R-class submarines built for the Royal Navy during the First World War. The boat was not completed before the end of the war and was sold for scrap in 1923.
The Chilean submarine Guacolda was an H-class submarine of the Chilean Navy. The vessel was originally ordered by the United Kingdom's Royal Navy as HMS H13, but was handed over to Chile in 1917 as H1.
The Chilean submarine Tegualda was an H-class submarine of the Chilean Navy. The vessel was originally ordered by the United Kingdom's Royal Navy as HMS H16, but was handed over to Chile in 1917 as H2.
The Chilean submarine Guale was an H-class submarine of the Chilean Navy. The vessel was originally ordered by the United Kingdom's Royal Navy as HMS H18, but was handed over to Chile in 1917 as H4.
The Chilean submarine Quidora was an H-class submarine of the Chilean Navy. The vessel was originally ordered by the United Kingdom's Royal Navy as HMS H19, but was handed over to Chile in 1917 as H5.