Croydon power stations

Last updated

Croydon Power Stations
Croydon B Powerstation 2.jpg
Croydon B power station's cooling towers in 1973
Croydon power stations
CountryEngland
LocationCroydon, Greater London
Coordinates 51°22′44″N0°07′16″W / 51.3788°N 0.1211°W / 51.3788; -0.1211
StatusA & B: Decommissioned and demolished
Commission date A: 1896, B: 1950, Gas turbine: 2005
Decommission dateA: 1973, B: 1983
Owner(s)As operator
Operator(s)Croydon Corporation
(1896–1948)
British Electricity Authority
(1948–1955)
Central Electricity Authority
(1955–1957)
Central Electricity Generating Board
(1958–1983)
Gas Turbine: Rolls-Royce Power Developments Ltd
Thermal power station
Primary fuel Coal, Gas turbine: natural gas
ChimneysB: 2 (extant)
Cooling towersA: wooden towers plus 2 concrete, B: 6 parabolic concrete
Cooling sourceRecirculating water
Power generation
Units operationalA: 1 × 30 MW; B: 4 × 52.5 MW plus 2 × 70 MW gas turbines; Gas turbine: 1 × 50 MW
Make and modelGas turbine Rolls-Royce Trent
Units decommissionedA & B All
Nameplate capacity Gas turbine 50 MW
Annual net output (See graphs below)
External links
Commons Related media on Commons

grid reference TQ307661

The Croydon power stations refers to a pair of demolished coal-fired power stations and to a gas-fired power station in the Purley Way area of Croydon, London.

Contents

The coal-fired stations operated from 1896 until 1984, and the gas-fired station opened in 2005. Croydon B power station's chimneys have been retained as a local landmark.

Although outside the borough, Beddington Energy Recycling Facility has been included for completeness. Croydon has a long history with the Beddington Sewage Farm, and is a member of the South London Waste Partnership.

History

Croydon A

The first power station built on the site, which would later become known as Croydon A power station, was opened in 1896. [1] The station was designed by Sir Alexander Kennedy [2] and built near Croydon Gas Works by the Croydon Corporation. [3] Three 120kW alternating current (AC) generators were installed by British Thomson Houston. [2] [4] Rotating at 360 rpm the 20 pole alternators generated an alternating current at the American standard of 60Hz. A condition of the contract was that British Thomson Houston would initially run the power station, whose resident engineer was Mr. A L C Fell. His chief assistant Charles Merz took over a year later [5] and who in 1925/6 was consulted for Britain’s National Grid as a pioneer of transmission systems. The corporation took over the operation in 1898 and appointed Mr T H Minshall as their chief engineer. [6]

The electricity was distributed at 2,000v to 5 substations, which dropped the voltage down to 200v. [4] [7] Initially the electricity supplied a small compulsory area of about 12 sq mi (1.3 km2), composed mainly of shops and businesses. Street lighting was also provided by 50 arc lights fed directly from the generating station after rectification to direct current (DC). The standards (lamp-posts) for the arc lights were cast and installed by the local Waddon firm Wenham and Waters Ltd, [8] who also won the contract to light Croydon’s Municipal Building (Town Hall), which opened the same year. [7]

By 1901 the generated power had increased to over 1.8MW, now distributed via 26 substations to supply an area of about 12 sq mi (31 km2) to its nearly 800 customers. [6] Separate generators provided an additional 600kW DC and the steam was recycled through 3 wooden cooling towers. To reduce transmission losses, electricity was transmitted at 5,000v to outlying districts and AC was used there for street lighting. The power station also provided electricity for the trams, the principal route running from Norbury to Purley.

The generating equipment at the station was replaced in 1924, when low pressure equipment of 21 megawatts (MW) and high pressure equipment of 29 MW was installed, giving the station a generating capacity of 50 MW. In 1927 Croydon Corporation adopted the standard supply of 230V AC [9] and in 1928 placed a contract for two additional wooden cooling towers. [10] [11] The first 195 ft (59 m) hyperbolic concrete tower was built in 1930, followed by another in 1933 [12] A 1947 aerial photograph shows the power station with seven wooden and three hyperbolic concrete cooling towers. [13]

The site had expanded from its origins on the north side of Factory Lane ( 51°22′38″N0°06′45″W / 51.377328°N 0.112372°W / 51.377328; -0.112372 ) to the south side ( 51°22′35″N0°06′49″W / 51.376524°N 0.113645°W / 51.376524; -0.113645 ), extending to Wandle Park in the south and the Croydon and Wimbledon railway, to the west that brought coal to the power station. [14] [15] This corresponded with the arrival of English Electric Type 3B locomotive No.692 (a steeplecab design built in 1925) [16] which used an overhead wire electric system, for the shunting of coal. In 1959 this was supplemented with a backup steam locomotive from Littlebrook Power Station, built by W. G. Bagnall in 1946.

Following nationalisation in 1947 the power station was owned by the British Energy Authority, who subsequently opened a new power station (Croydon B) across the Purley Way ( 51°22′50″N0°07′23″W / 51.380447°N 0.123177°W / 51.380447; -0.123177 ). [17]

In 1970, Croydon A was rarely active and was one of the few power stations in the country to still have wooden cooling towers on site but 2 concrete towers were in use at time of closure. [18] It operated until 1973. [17] The two towers closest to the railway were demolished in 1974 by a controlled explosion, [19] but the third tower had to be demolished by hand because it was considered too close to nearby houses. [20]

The generating capacity, maximum load, and electricity generated and sold was as follows: [21] [22]

Croydon A generating capacity, load and electricity produced and sold, 1912–46
YearGenerating capacity, MWMaximum load, MWElectricity generated, GWhElectricity sold, GWh
1912/35.453.8048.6877.069
1918/96.2503.90011.0808.859
1919/206.655.36112.80010.139
1923/414.758.6019.42214.947
1936/758.0038.78186.305112.484
194673.3238.375224.757

Technical specification

In 1923 the AC plant comprised: 1 × 3,000 kW and 2 × 5,000 kW turbo-alternators. [23] The DC supply was generated by 1 × 750 kW and 1 × 1,000 kW reciprocating engines and generators. The total installed generating capacity was 14,750 kW. The boiler plant produced a total of 101,000 lb/hr (12.73 kg/s) of steam. A range of currents and voltages was available: [23]

  • 3-phase AC 230 & 400V
  • 1-phase AC 200 & 400V
  • DC 230 & 460V
  • DC traction current 550V

In 1923 the station generated 16.555 GWh of electricity, some of this was used in the plant, the total amount sold was 12.593 GWh. The revenue from sales of current was £166,345, this gave a surplus of revenue over expenses of £98,742. [23]

By 1963-64 the A station had 1 × 30 MW generator. [24] The steam capacity of the boilers was 775,000 lb/hr (97.6 kg/s). The steam conditions at the turbine stop valve were 265 / 490 psi (18.3 / 33.8 bar) and 416 / 427 °C. The overall thermal efficiency of the A station in 1963-64 was 15.33 per cent. [24]

Electricity output from Croydon A power station during its final years of operation was as follows. [24] [25]

Croydon A annual electricity output GWh.

Croydon B

Croydon B Power Station, 1973 Croydon B Power Station.jpg
Croydon B Power Station, 1973

Planning for a Croydon B power station was begun in 1939, with the architecture designed by Robert Atkinson. However, these plans were delayed by World War II. [26] Immediately after the end of the war, construction work began on the new station. The station was built by Sir Robert McAlpine & Sons, who also used two locomotives during the construction work; the first was Hudswell Clarke No.82, used between 1946 and 1948, the second was Hudswell Clarke No.55, used for the remainder of 1948. [18] The station was finally opened in 1950. [26] Two 300 ft (91 m) chimneys had been built by 1949 [27] [28] and construction had begun on three cooling towers in 1948. [29] Work had started on the sixth in 1949. [27] Sewage water from the Beddington sewage farm was used to cool the steam, [30]   as it had been done at Croydon A since the 1930s. [31] A white sludge built up in the condensers, which had to be manually removed once a month and descaled three or four times a year with acid. The sewage water was fed through a sand filter that reduced the particulates from 100ppm to less than 20ppm, but had little effect on the sludge. The white sludge was mainly calcium phosphate precipitating out in the cooling water. After much work and several years, it was discovered that this could be prevented by making the water more acidic. Chlorine was used because it was relatively cheap, didn’t cause other salts to be precipitated and killed biological microorganisms.

The station originally had a generating capacity of 198 MW, but in 1972, a 140 MW gas turbine was installed for peak use, bringing the generating capacity up to 338 MW. [18] The oil-fired gas turbine plant comprised two 70 MW sets with a total capability of 140 MW. [32] These were operated as required at times of peak load. The load factor (the average load as a percentage of the average maximum output capacity) for these machines were generally below 5 per cent. [24]

Once delivered to the station, coal was shunted by locomotives. Croydon B had a fleet of three shunting locomotives, all built by Peckett and Sons with the works numbers No.2103, No.2104 and No.2105. These three steam locomotives were superseded by diesels in the 1960s. [18]

Coal was brought to the station by rail, but during the 1970s coal was sometimes shipped down the coast from Northumberland to Kingsnorth and then transported to Croydon in up to twenty-five 10 ton lorries per day. [33]

It was decommissioned in 1984, [26] and in a disused state was used in the filming of parts of Terry Gilliam's 1985 film Brazil . The station was demolished in 1991 and an IKEA store was opened on the site. The two large chimneys were retained: [26] they are now capped with blue and yellow bands (IKEA's corporate colours), and remain a local landmark. The six cooling towers were demolished in 1985. [34]

Technical specification

By 1963–64 the B station had 4 × 52.5 MW generators. [24] The steam capacity of the boilers was 2,560,000 lb/hr (322.6 kg/s). Steam conditions at the turbine stop valve were 600 psi (41.4 bar) and 454 °C. In 1963-64 the overall thermal efficiency of the B station was 24.58 per cent. [24]

The two gas turbines were each powered by four Bristol-Siddeley Olympus jet engines. These provided a high pressure gas blast which drove the turbines attached to a Parsons 70 MW, 11kV alternator. [32]

Electricity output from Croydon B power station during its final years of operation was as follows. [25]

Croydon B annual electricity output GWh.

Electricity output from Croydon B Gas Turbine plant was as follows. [24] Croydon B Gas Turbine plant annual electricity output GWh.

Gas-fired station

The industry had been privatised in 1989, and in 1999 the secretary of state for trade and industry, Stephen Byers declined to object to a gas-fired power station at Croydon, stating diversity and security needs. [35] At just under 50MW formal consent under section 36 of the Electricity Act 1989 was not required. It was built on part of the old gasworks site, near today’s Waddon Marsh tram-stop that had become British Gas property ( 51°22′35″N0°06′59″W / 51.37644°N 0.11637°W / 51.37644; -0.11637 ). [36]

The gas turbine station started operation in 2005. It was owned by Rolls-Royce Power Developments Ltd and was initially operated by Rolls-Royce Energy. [37] It consists of an open cycle gas turbine (OCGT), a Rolls-Royce Trent engine, and generates 50 MW of electricity. The engine operates on gas at a pressure of 19 bar; the thermal efficiency is about 36 per cent. The machine is used at peak time of demand and runs less than 1000 hours per annum. [37] In 2020 the Environment Agency limited the OCGT to an average of less than 1,500 hours per annum over a rolling 5 year period, and no more than 2,250 in a single year. [38]

In 2009 there was a proposal to use the waste heat from the gas turbine exhaust gases to operate a 35 MW combined heat and power (CHP) system delivering hot water to a district heating system. This would be achieved by taking heat from the exhaust gases at 444 °C and cooling them to 180 °C, using a finned tube heat exchanger. [37]

In 2019 Rockwell Capital announced that it had acquired 100% of White Tower Energy, formerly Rolls-Royce Power Developments Ltd including its 5 natural gas power stations. [39] As of 2020 the gas turbine station is being operated by RWE on behalf of its customer. [40]

Beddington Energy Recycling Facility

Beddington Energy Recycling Facility Beddington Energy Recycling Facility.jpg
Beddington Energy Recycling Facility

The 25MW Beddington Energy Recycling Facility ( 51°23′10″N0°08′39″W / 51.386048°N 0.144148°W / 51.386048; -0.144148 ) was started in 2015 and opened in 2019 at a cost of around £210M. [41] [42] The construction was started in 2016 and completed in 2017 with Lagan Construction and its subcontractors. [43] [44] It was built towards the north east corner of Beddington Farmlands that until December 2022 was used for landfill. [45]

Viridor has a 25 year contract with the South London Waste Partnership, a collaboration between Croydon, Kingston, Merton and Sutton councils to burn non-hazardous residual waste to power a steam turbine and generator. [42] [45] The spent steam is condensed by air and recycled, while the exhaust combustion gases are filtered to remove particulates, nitrous oxide, acid gases (e.g. CO2) and adsorb heavy metals, dioxins, furans and volatile organic compounds before being released into the atmosphere. The ash is used for road fill after removing any metal.

The Valley Park Retail and Leisure Complex

Croydon B's chimneys in 2008 Tram Approaching Waddon Marsh Stop - geograph.org.uk - 1188171.jpg
Croydon B's chimneys in 2008

In 1992, the area was regenerated into what is now known as the Valley Park Retail and Leisure Complex. [46]

Related Research Articles

<span class="mw-page-title-main">Ironbridge power stations</span> Two former power stations in Shropshire, England

The Ironbridge power stations refers to two power stations that occupied a site on the banks of the River Severn at Buildwas in Shropshire, England. The Ironbridge B Power Station was operated by E.ON UK but the site is now owned by Haworth Group. The station stands near the Ironbridge Gorge World Heritage Site. Originally powered by coal, they were converted to use 100% biomass fuel. Ironbridge B Power Station stopped generating electricity on 20 November 2015, with the decommissioning process continuing into 2017. The main phase of the 27-month demolition process began at 11:00 GMT on 6 December 2019, commencing with the four cooling towers.

<span class="mw-page-title-main">Rye House power station</span> Gas power station in Hoddesdon, Hertfordshire

Rye House Power Station is a 715 MW combined cycle gas turbine (CCGT) power station located near Rye House railway station in Hoddesdon, Hertfordshire.

<span class="mw-page-title-main">Aberthaw power stations</span> Two decommissioned power stations in Wales

Aberthaw Power Station refers to two decommissioned coal-fired and co-fired biomass power stations on the coast of South Wales, near Barry in the Vale of Glamorgan. They were located at Limpert Bay, near the villages of Gileston and West Aberthaw. The most recent power station on the site, Aberthaw B Power Station, co-fired biomass and as of 2008 had a generating capacity of 1,560 megawatts (MW). The power station closed on 31 March 2020.

<span class="mw-page-title-main">Littlebrook Power Station</span> Series of four oil and coal-fired power stations in Dartford, Kent

The Littlebrook Power Station were a series of four oil and coal-fired power stations situated on the south bank of the River Thames, next to the Queen Elizabeth 2 Bridge and the Dartford Tunnel in Dartford, Kent. The final power station, Littlebrook D, ceased operating in March 2015, and has now been demolished.

<span class="mw-page-title-main">Brimsdown Power Station</span> Former coal-fired power station in England

Brimsdown Power Station was a coal-fired power station on the Lee Navigation at Brimsdown in Middlesex. The station had seven cooling towers which were visible from a wide area.

<span class="mw-page-title-main">West Ham Power Station</span> Former coal-fired power station in London, England

West Ham Power Station was a coal-fired power station on Bow Creek at Canning Town, in east London. It was often referred to informally as Canning Town Power Station.

<span class="mw-page-title-main">King's Lynn Power Station</span>

King's Lynn Power Station refers to a combined cycle natural gas power station near King's Lynn in Norfolk, commissioned in 1997, and now owned by RWE, and to a coal fired power in King's Lynn in operation from 1899 to 1960. The CCGT station was mothballed on 1 April 2012. It can generate 325 MW of electricity and employed 40 people. The site was reopened on 19 November 2019.

<span class="mw-page-title-main">Little Barford Power Station</span>

Little Barford Power Station is a gas-fired power station just north of the village of Little Barford in Bedfordshire, England. It lies just south of the A428 St Neots bypass and east of the Wyboston Leisure Park. The River Great Ouse runs alongside. It was formerly the site of two coal-fired power stations, now demolished. The station is operated by RWE.

<span class="mw-page-title-main">Great Yarmouth Power Station</span> Gas power station in Norfolk, England

Great Yarmouth Power Station is combined cycle gas turbine power station on South Denes Road in Great Yarmouth in Norfolk, England, with a maximum output of 420 MW electricity, opened in 2001. It is built on the site of an oil-fired power station, built in 1958 and closed and demolished in the 1990s. A coal-fired power station was built in Great Yarmouth in 1894 and operated until 1961. The station is operated by RWE.

<span class="mw-page-title-main">Staythorpe Power Station</span> Gas-fired power station in Nottinghamshire, England

Staythorpe C Power Station is a 1,735 MWe gas-fired power station at Staythorpe between Southwell and Newark-on-Trent in Nottinghamshire, England, between the River Trent and Nottingham to Lincoln railway line. The station was handed over to the owner RWE from Alstom Power with full commercial operation being achieved in December 2010. The official opening ceremony attended by Charles Hendry, Minister of State took place on 9 May 2011.

<span class="mw-page-title-main">Hams Hall power stations</span> Series of now demolished coal-fired power stations

Hams Hall Power Station refers to a series of three, now demolished coal-fired power stations, situated in Warwickshire in the West Midlands of England, 9 miles (14 km) northwest of Birmingham city centre.

Acton Lane Power Station was a power station in London NW10. The station, also known as Willesden power station, was located to the south of the Euston to Birmingham railway on a site bounded by Acton Lane, the Grand Union Canal and the Dudding Hill railway line. In later years the site was extended to the south side of the canal. The entire site is now occupied by Willesden Grid Supply Point buildings.

<span class="mw-page-title-main">Taylors Lane Power Station</span>

Taylors Lane Power Station is situated in Willesden, north-west London. The first power station on the site, known as Willesden power station, was coal-fired and operated from 1904 to 1972 and was subsequently demolished. Taylors Lane is now an open cycle gas turbine (OCGT) power station built in 1979.

<span class="mw-page-title-main">Hackney Power Station</span> Power Station in UK

Hackney Power Station was a coal-fired power station situated at Lea Bridge on the River Lee Navigation in London.

Ocker Hill Power Station was situated at Ocker Hill in Tipton, Staffordshire, at a point where the Walsall Canal intersected the L&NWR Wednesbury to Princes End railway line. It was opened in 1902 by the Midland Electric Corporation for Power Distribution Limited (MEC) and supplied electricity at 7 kV two phase 50 Hz to much of the Black Country. At the time of its building it was stated by the Stourbridge County Express that it was planned to be the largest power station in England. Although this may have been the original intention, it was never achieved.

Watford Power Station was a coal-fired power station situated in Watford's Riverside area. The station was built by the Watford Corporation Electricity Department starting with the installation of cables in 1899 with completion around 1900, near the banks of the River Colne. A gas turbine power station was commissioned in 1980.

The Norwich power stations were a sequence of electricity generating stations that provided electric power to the City of Norwich and the wider area between 1893 and 1986. The first station in Duke Street began operating in 1893, a new power station at Thorpe was in service from 1926 to 1967, this was supplemented with a 'high pressure' station, 1937–1975, and finally a gas turbine station operated from 1964–1986.

Ribble Power Station was a coal-fired electricity generating station on the River Ribble in Penwortham near Preston, Lancashire, England. The station was built by the Corporation of Preston to replace a small privately-run generating station in the town. It supplied electricity to Preston and the surrounding area from 1923 until 1976. The station was expanded with new equipment in 1943–47 which remained in operation until the power station was closed in 1976 and was subsequently demolished.

Blackburn power stations are a series of electricity generating stations that have provided electric power to the town of Blackburn and the wider area from 1895 to the present. The first station in Jubilee Street, Blackburn began operating in 1895. A new larger station known as Blackburn East or Whitebirk power station was commissioned in 1921 and was rebuilt in stages over the period 1942 to 1955. Whitebirk station closed in 1976. The 60 MW Blackburn Mill Combined Cycle Gas Turbine (CCGT) power station has generated electricity since 2002. The Blackburn energy from waste (EfW) plant is currently (2020) being planned.

The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.

References

  1. "GLIAS Walk: Croydon". GLIAS Notes and News - August 2001. Greater London Industrial Archaeology Society.
  2. 1 2 Rowland, John (1960). Progress in Power: The Contribution of Charles Merz and His Associates to Sixty Years of Electrical Development, 1899-1959. Privately published for Merz and McLellan by Newman Neame. p. 15.
  3. "Electric Lighting Orders Confirmation (No. 3) Act". legislation.gov.uk. 11 June 1891. p. 42.
  4. 1 2 The Electrical Review (July - Dec). Vol. 39. IPC Electrical-Electronic Press. 1896. pp. 599–601.
  5. "Croydon Power Station - Graces Guide". www.gracesguide.co.uk. 7 January 2014. Archived from the original on 26 January 2022. Retrieved 14 August 2023.
  6. 1 2 The Electrical Review (July - December). Vol. 49. London: Alabaster, Gatehouse & Co. 1901. p. 553.
  7. 1 2 Electrical Engineer (July - December). Vol. 18. London: Biggs & Co. 1896. p. 314.
  8. "Notes and News 222: Wenham & Waters Limited — A forgotten Croydon engineering company?". www.glias.org.uk. February 2006. Archived from the original on 20 August 2006. Retrieved 14 August 2023.
  9. 7th Annual report of the Electricity Commissioners. London: HMSO. 1927. p. 147.
  10. 7th Annual report of the Electricity Commissioners. London: HMSO. 1927. p. 143.
  11. Electricity: A Practical Trade Journal. Vol. 42. S. Rentelland Company, Limited. 1928. p. 6.
  12. "Hyperbolic cooling tower at Croydon". Concrete and Constructional Engineering. 30 (1): 25–26. January 1935 via Internet Archive.
  13. "Air Photo Mosaics, Sheet 51/3165 N.W (1:1,250)". maps.nls.uk. Ordnance Survey. May 1947. Retrieved 14 August 2023.
  14. "Surrey XIV.9 Beddington; Croydon St John The Baptist (1:2,500)". maps.nls.uk. Ordnance Survey (published 1913). 1911. Retrieved 14 August 2023.
  15. "Surrey XIV.9 Beddington; Croydon St John The Baptist (1:2,500)". maps.nls.uk. Ordnance Survey (published 1947). 1941. Retrieved 14 August 2023.
  16. Edgar, Gordon (18 April 1970). "Steeple Cab Electric". flickr. Retrieved 7 September 2020.
  17. 1 2 Horne, M. A. C. "London Area Power Supply" (PDF). Archived from the original (PDF) on 7 March 2010. Retrieved 12 May 2011.
  18. 1 2 3 4 Latham, J. B. (1970). The Locomotives of Croydon Gas & Electricity Works. Woking: J. B. Latham.
  19. "Addiscombe heritage pages: The Old Croydon Power Station". www.addiscombe.net. Canning and Clyde Residents Association. 10 November 2010. Archived from the original on 13 August 2023. Retrieved 14 August 2023.
  20. vakart (14 March 2014). "Railways around Waddon Marsh (Croydon)". RMweb. Retrieved 14 August 2023.
  21. London County Council. London Statistics (various dates). London: London County Council.
  22. Electricity Commission, Generation of Electricity in Great Britain year ended 31st December 1946. London: HMSO, 1947.
  23. 1 2 3 Electricity Commission (1925). Electricity Supply - 1920-1923. London: HMSO. pp. 26–9, 272–7.
  24. 1 2 3 4 5 6 7 CEGB Statistical Yearbook (various dates). CEGB, London.
  25. 1 2 CEGB Annual Report and Accounts, various years
  26. 1 2 3 4 "Croydon 'B' Power Station, Purley Way, South London". Viewfinder. English Heritage. Archived from the original on 20 January 2011.
  27. 1 2 "Croydon B Power Station and Cooling Towers under construction". www.britainfromabove.org.uk. Beddington Corner. 16 September 1949. Retrieved 14 August 2023 via Historic England.
  28. Cherry, Bridget; Pevsner, Nikolaus (1 January 2002). London 2: South. Yale University Press. p. 216. ISBN   978-0-300-09651-4.
  29. "The Croydon B Power Station and Cooling Towers under construction". www.britainfromabove.org.uk. Beddington. 9 February 1948. Retrieved 14 August 2023 via Historic England.
  30. Humphris, T. H. (1 January 1977). "The use of sewage effluent as power station cooling water". Water Research. 11 (2): 217–223. Bibcode:1977WatRe..11..217H. doi:10.1016/0043-1354(77)90129-4. ISSN   0043-1354.
  31. "Hyperbolic cooling tower at Croydon". Concrete and Constructional Engineering. 30 (1): 27. January 1935 via Internet Archive.
  32. 1 2 "Notes and news 66: Croydon power station". www.glias.org.uk. February 1980. Archived from the original on 9 May 2015. Retrieved 14 August 2023.
  33. Power Station, Croydon (Coal Supplies) HC Deb 28 March 1973, Hansard, vol 853 cc1491-500,
  34. McQueeney, Kerry (30 October 2003). "Towering achievement". Your Local Guardian. Archived from the original on 14 August 2023. Retrieved 14 August 2023.
  35. Contributor, L. G. C. (26 May 1999). "Clearance to proposal to build 49MW power station at Croydon". Local Government Chronicle (LGC). Archived from the original on 7 August 2023. Retrieved 14 August 2023.{{cite web}}: |last= has generic name (help)
  36. Rolls Royce Power Ventures (13 June 1997). "Planning application to erect 49.9MW gas-fired power station, 67m chimney etc. on British Gas land at Factory Lane, Croydon". publicaccess3.croydon.gov.uk. Retrieved 14 August 2023.
  37. 1 2 3 "The feasibility of conversion and utilisation of the existing Rolls-Royce power plant in Factory Lane" (PDF). Croydon Council. 2009. Archived (PDF) from the original on 28 June 2023. Retrieved 24 January 2020.
  38. Environment Agency (4 June 2020). "Environmental permit review" (PDF). Environment Agency public register (industrial). Archived (PDF) from the original on 23 September 2021.
  39. "Rockland Capital Announces Acquisition of the Whitetower Portfolio". Rockland Capital. 2 May 2019. Archived from the original on 27 November 2022. Retrieved 14 August 2023.
  40. "RWE Embedded Generation UK". RWE. Archived from the original on 14 May 2020. Retrieved 24 January 2020.
  41. "Beddington ERF". www.viridor.co.uk. Archived from the original on 30 June 2022. Retrieved 24 August 2023.
  42. 1 2 insidecroydon (8 February 2021). "Report: Incinerator is 'as polluting as coal-fired power stations'". Inside Croydon. Archived from the original on 8 February 2021. Retrieved 24 August 2023.
  43. "Lagan Construction Group start work at Beddington ERF". Lagan Specialist Contracting. 8 January 2016. Archived from the original on 9 August 2020. Retrieved 24 August 2023.
  44. "Energy from waste facility, Croydon". www.cidon.co.uk. Archived from the original on 21 October 2021.
  45. 1 2 "Waste to energy". South London Waste Partnership. Archived from the original on 3 June 2023. Retrieved 24 August 2023.
  46. "The Former Croydon B Power Station". GLIAS Notes and news — August 2003. Greater London Industrial Archaeology Society.

Further reading

Minshall, F H (1 December 1900). "Street lighting by electric lamps (with special references to the systems in use at Croydon England)". Electrical World and Engineer. 36 (22): 836–839 via Internet Archive.

nPower archive (19 October 2012) [1 December 1972]. "Croydon A station". Historypin. Retrieved 14 August 2023.

nPower archive (22 October 2012) [1970]. "General view of Croydon B power station". Historypin. Retrieved 14 August 2023.