History | |
---|---|
Nazi Germany | |
Name | U-3004 |
Ordered | 6 November 1943 |
Builder | AG Weser, Bremen |
Yard number | 1163 |
Laid down | 4 June 1944 |
Launched | 26 July 1944 |
Commissioned | 30 August 1944 |
Fate | Buried in Elbe II U-boat pens in Hamburg |
General characteristics | |
Class and type | Type XXI submarine |
Displacement | |
Length | |
Beam |
|
Height | 11.30 m (37 ft 1 in) |
Draught | 6.32 m (20 ft 9 in) |
Installed power |
|
Propulsion |
|
Speed |
|
Range |
|
Test depth | 280 m (920 ft) |
Complement | 57–60 crewmen |
Sensors and processing systems |
|
Armament |
|
Service record | |
Part of: |
|
Identification codes: | M 42 501 |
Commanders: | |
Operations: | None |
Victories: | None |
German submarine U-3004 was a Type XXI U-boat (one of the " Elektroboote ") of Nazi Germany's Kriegsmarine , built for service in World War II. She was ordered on 6 November 1943, and was laid down on 4 June 1944 at AG Weser, Bremen as yard number 1163. She was launched on 26 July 1944, and commissioned under the command of Kapitänleutnant Helmut Thurmann on 30 August 1944. [3]
Like all Type XXI U-boats, U-3004 had a displacement of 1,621 tonnes (1,595 long tons) when at the surface and 1,819 tonnes (1,790 long tons) while submerged. She had a total length of 76.70 m (251 ft 8 in) (o/a), a beam of 8 m (26 ft 3 in), and a draught of 6.32 m (20 ft 9 in). [4] The submarine was powered by two MAN SE supercharged six-cylinder M6V40/46KBB diesel engines each providing 4,000 metric horsepower (2,900 kilowatts ; 3,900 shaft horsepower ), two Siemens-Schuckert GU365/30 double-acting electric motors each providing 5,000 PS (3,700 kW; 4,900 shp), and two Siemens-Schuckert silent running GV232/28 electric motors each providing 226 PS (166 kW; 223 shp). [4]
The submarine had a maximum surface speed of 15.6 knots (28.9 km/h; 18.0 mph) and a submerged speed of 17.2 knots (31.9 km/h; 19.8 mph). When running on silent motors the boat could operate at a speed of 6.1 knots (11.3 km/h; 7.0 mph). When submerged, the boat could operate at 5 knots (9.3 km/h; 5.8 mph) for 340 nautical miles (630 km; 390 mi); when surfaced, she could travel 15,500 nautical miles (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph). [4] U-3004 was fitted with six 53.3 cm (21.0 in) torpedo tubes in the bow and four 2 cm (0.79 in) C/30 anti-aircraft guns. She could carry twenty-three torpedoes or seventeen torpedoes and twelve mines. The complement was five officers and fifty-two men. [4]
U-3004 was buried in the Elbe II U-boat pens in Hamburg after the German surrender. U-2505 and U-3506 are buried with her also. [3] [5]
U-3004 was scuttled on 2 May 1945, in the Elbe II U-boat pen in Hamburg as part of Operation Regenbogen. [3]
The wreck is located at 53°31′43″N09°57′08″E / 53.52861°N 9.95222°E [3]
German submarine U-3506 was a Type XXI U-boat of Nazi Germany's Kriegsmarine during World War II. The Elektroboote submarine was laid down on 14 July 1944 at the Schichau-Werke yard at Danzig, launched on 28 August 1944, and commissioned on 16 October 1944 under the command of Kapitänleutnant Gerhard Thäter.
German submarine U-2505 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 23 May 1944 at the Blohm & Voss yard at Hamburg, as yard number 2505. She was launched on 27 July 1944, and commissioned under the command of Oberleutnant zur See Joachim Düppe on 7 November 1944.
German submarine U-2520 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 24 August 1944 at the Blohm & Voss yard at Hamburg, as yard number 2520. She was launched on 16 October 1944, and commissioned under the command of Oberleutnant zur See Albrecht Schubart on 25 December 1944.
German submarine U-2541 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 31 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2541. She was launched on 13 January 1945, and commissioned under the command of Oberleutnant zur See Ernst-August Stellmann on 1 March 1945.
German submarine U-3022 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 6 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 1181. She was launched on 30 November 1944, and commissioned under the command of Kapitänleutnant Paul Weber on 25 January 1945.
German submarine U-3044 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 December 1944 at AG Weser, Bremen, as yard number 1203. She was launched on 1 March 1945, and commissioned under the command of Kapitänleutnant Bernhard Jaek on 27 March 1945.
German submarine U-3021 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 26 September 1944 at AG Weser, Bremen as yard number 1180. She was launched on 27 November 1944, and commissioned under the command of Oberleutnant zur See Kurt van Meeteren on 12 January 1945.
German submarine U-3516 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 August 1944 at F Schichau GmbH, Danzig, as yard number 1661. She was launched on 4 November 1944, and commissioned under the command of Kapitänleutnant Hans Wengel on 18 December 1944.
German submarine U-2535 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 19 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2535. She was launched on 16 December 1944, and commissioned under the command of Kapitänleutnant Otto Bitter on 28 January 1945.
German submarine U-3013 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 18 August 1944 at AG Weser, Bremen, as yard number 1172. She was launched on 19 October 1944, and commissioned under the command of Kapitänleutnant Volker Simmermacher on 22 November 1944.
German submarine U-3005 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 June 1944 at AG Weser, Bremen, as yard number 1164. She was launched on 19 August 1944, and commissioned under the command of Oberleutnant zur See Walter Sitek on 20 September 1944.
German submarine U-3530 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. It was ordered on 6 November 1943, and was laid down on 3 November 1944 at F Schichau GmbH, Danzig, as yard number 1675. It was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Wilhelm Brauel on 22 March 1945.
German submarine U-2539 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 27 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2539. She was launched on 6 January 1945, and commissioned under the command of Oberleutnant zur See Erich Jewinski on 21 February 1945.
German submarine U-2543 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 13 November 1944 at the Blohm & Voss yard at Hamburg, as yard number 2543. She was launched on 9 February 1945, and commissioned under the command of Oberleutnant zur See Gottfried Stolzenburg on 7 March 1945.
German submarine U-2544 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 15 November 1944 at the Blohm & Voss yard at Hamburg, as yard number 2544. She was launched on 9 February 1945, and commissioned under the command of Oberleutnant zur See Rudolf Meinlschmidt on 10 March 1945.
German submarine U-3001 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 15 April 1944 at AG Weser, Bremen as yard number 1160. She was launched on 30 May 1944, and commissioned under the command of Oberleutnant zur See Hans Vogel on 20 July 1944.
German submarine U-2523 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 6 September 1944 at Blohm & Voss, Hamburg, as yard number 2523. She was launched on 25 October 1944, and commissioned under the command of Kapitänleutnant Hans-Heinrich Ketels on 26 December 1944.
German submarine U-3003 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 27 May 1944 at AG Weser, Bremen as yard number 1162. She was launched on 18 July 1944, and commissioned under the command of Oberleutnant zur See Ludo Kregelin on 22 August 1944.
German submarine U-3006 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 June 1944 at AG Weser, Bremen, as yard number 1165. She was launched on 25 August 1944, and commissioned under the command of Kapitänleutnant Klaus Popp on 5 October 1944.
German submarine U-3501 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 March 1944 at F Schichau GmbH, Danzig, as yard number 1646. She was launched on 19 April 1944, and commissioned under the command of Oberleutnant zur See Helmut Münster on 29 July 1944.