German submarine U-3509

Last updated
History
War ensign of Germany (1938-1945).svg Nazi Germany
NameU-3509
Ordered6 November 1943
Builder Schichau-Werke, Danzig
Yard number1654
Laid down29 July 1944
Launched27 September 1944
Commissioned29 January 1945
FateScuttled on 3 May 1945
General characteristics
Class and type Type XXI submarine
Displacement
  • 1,621 t (1,595 long tons) surfaced
  • 2,100 t (2,067 long tons) submerged
Length76.70 m (251 ft 8 in) (o/a)
Beam8 m (26 ft 3 in)
Draught6.32 m (20 ft 9 in)
Propulsion
Speed
  • Surfaced:
  • 15.6 knots (28.9 km/h; 18.0 mph) (diesel)
  • 17.9 knots (33.2 km/h; 20.6 mph) (electric)
  • Submerged:
  • 17.2 knots (31.9 km/h; 19.8 mph) (electric)
  • 6.1 knots (11.3 km/h; 7.0 mph) (silent running motors)
Range
  • 15,500  nmi (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph) surfaced
  • 340 nmi (630 km; 390 mi) at 5 knots (9.3 km/h; 5.8 mph) submerged
Complement5 officers, 52 enlisted
Sensors and
processing systems
Armament
Service record
Part of:
Commanders:
  • Kptlt. Hans Hornkohl [1]
  • August – November 1944
  • Oblt.z.S. / Kptlt. Karl-Heinz Voswinkel [2]
  • 29 January – 14 March 1945
  • Kptlt. Heinz Franke [3]
  • 15 March – 9 April 1945
  • Oblt.z.S. Wilhelm Neitzsch [4]
  • 15 April – 3 May 1945
Operations: None
Victories: None

German submarine U-3509 was a Type XXI U-boat of Nazi Germany's Kriegsmarine during World War II. The Elektroboote submarine was laid down on 29 July 1944 at the Schichau-Werke yard at Danzig, launched on 27 September 1944, and commissioned on 29 January 1945 under the command of Oberleutnant zur See Karl-Heinz Voswinkel.

Contents

U-3509 was a brand new, high technology electric boat which could run constantly submerged rather than having to surface to recharge her batteries every day the way submarines until that point had had to do. However, these advanced vessels were introduced to the Kriegsmarine only late in 1944, much too late to influence the Battle of the Atlantic, and too late for many of them to serve in an offensive capacity at all.

With the end of the war near, training on U-boats had dropped to a minimum due to lack of fuel, falling morale and the effectiveness of allied attacks on U-boat construction and preparation. The exception to this were the new Type XXI boats, which continued to train in the Baltic Sea.

Design

Like all Type XXI U-boats, U-3509 had a displacement of 1,621 tonnes (1,595 long tons) when at the surface and 1,819 tonnes (1,790 long tons) while submerged. She had a total length of 76.70 m (251 ft 8 in), a beam of 8 m (26 ft 3 in), and a draught of 6.32 m (20 ft 9 in). [5] The submarine was powered by two MAN SE supercharged six-cylinder M6V40/46KBB diesel engines each providing 4,000 metric horsepower (2,900 kilowatts ; 3,900 shaft horsepower ), two Siemens-Schuckert GU365/30 double-acting electric motors each providing 5,000 PS (3,700 kW; 4,900 shp), and two Siemens-Schuckert silent running GV232/28 electric motors each providing 226 PS (166 kW; 223 shp). [5]

The submarine had a maximum surface speed of 15.6 knots (28.9 km/h; 18.0 mph) and a submerged speed of 17.2 knots (31.9 km/h; 19.8 mph). When running on silent motors the boat could operate at a speed of 6.1 knots (11.3 km/h; 7.0 mph). When submerged, the boat could operate at 5 knots (9.3 km/h; 5.8 mph) for 340 nautical miles (630 km; 390 mi); when surfaced, she could travel 15,500 nautical miles (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph). [5] U-3509 was fitted with six 53.3 cm (21.0 in) torpedo tubes in the bow and four 2 cm (0.79 in) C/30 anti-aircraft guns. She could carry twenty-three torpedoes or seventeen torpedoes and twelve mines. The complement was five officers and fifty-two men. [5]

Fate

U-3509 was damaged whilst under construction in September 1944 during an air raid, but she was eventually repaired and completed.

U-3509 was scuttled by her crew on 3 May 1945 in the River Weser estuary, Germany.

Related Research Articles

German submarine <i>U-2502</i> German World War II submarine

German submarine U-2502 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. The submarine was laid down on 25 April 1944 at the Blohm & Voss yard at Hamburg, launched on 15 June 1944, and commissioned on 19 July 1944 under the command of Kapitänleutnant Gert Mannesmann, who commanded her until 8 April 1945.

German submarine U-3014 was a Type XXI U-boat of Nazi Germany's Kriegsmarine during World War II. The Elektroboote submarine was laid down on 28 August 1944 at the AG Weser yard at Bremen, launched on 25 October 1944, and commissioned on 17 December 1944 under the command of Kapitänleutnant Karl-Heinz Marbach.

German submarine U-2507 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 4 June 1944 at the Blohm & Voss yard at Hamburg, as yard number 2507. She was launched on 14 August 1944, and commissioned under the command of Kapitänleutnant Paul Siegmann on 8 September 1944.

German submarine U-2512 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 13 July 1944 at the Blohm & Voss yard at Hamburg, as yard number 2512. She was launched on 7 September 1944, and commissioned under the command of Kapitänleutnant Hubert Nordheimer on 10 October 1944.

German submarine U-2520 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 24 August 1944 at the Blohm & Voss yard at Hamburg, as yard number 2520. She was launched on 16 October 1944, and commissioned under the command of Oberleutnant zur See Albrecht Schubart on 25 December 1944.

German submarine U-2541 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 31 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2541. She was launched on 13 January 1945, and commissioned under the command of Oberleutnant zur See Ernst-August Stellmann on 1 March 1945.

German submarine U-3044 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 December 1944 at AG Weser, Bremen, as yard number 1203. She was launched on 1 March 1945, and commissioned under the command of Kapitänleutnant Bernhard Jaek on 27 March 1945.

German submarine U-3529 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 2 November 1944 at F Schichau GmbH, Danzig, as yard number 1674. She was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Karl-Heinz Schmidt on 22 March 1945.

German submarine U-3002 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 23 May 1944 at AG Weser, Bremen as yard number 1161. She was launched on 9 July 1944, and commissioned under the command of Kapitänleutnant Helmut Manseck on 6 August 1944.

German submarine U-3516 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 August 1944 at F Schichau GmbH, Danzig, as yard number 1661. She was launched on 4 November 1944, and commissioned under the command of Kapitänleutnant Hans Wengel on 18 December 1944.

German submarine U-3517 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 September 1944 at F Schichau GmbH, Danzig, as yard number 1662. She was launched on 11 November 1944, and commissioned under the command of Oberleutnant zur See Helmut Münster on 22 December 1944.

German submarine U-3005 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 June 1944 at AG Weser, Bremen, as yard number 1164. She was launched on 19 August 1944, and commissioned under the command of Oberleutnant zur See Walter Sitek on 20 September 1944.

German submarine U-3518 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 September 1944 at F Schichau GmbH, Danzig, as yard number 1663. She was launched on 11 November 1944, and commissioned under the command of Kapitänleutnant Herbert Brünning on 29 December 1944.

German submarine U-3525 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 17 October 1944 at F Schichau GmbH, Danzig, as yard number 1670. She was launched on 23 December 1944, and commissioned under the command of Kapitänleutnant Hans-Ludwig Gaude on 31 January 1945.

German submarine U-3530 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. It was ordered on 6 November 1943, and was laid down on 3 November 1944 at F Schichau GmbH, Danzig, as yard number 1675. It was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Wilhelm Brauel on 22 March 1945.

German submarine U-2539 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 27 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2539. She was launched on 6 January 1945, and commissioned under the command of Oberleutnant zur See Erich Jewinski on 21 February 1945.

German submarine U-3001 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 15 April 1944 at AG Weser, Bremen as yard number 1160. She was launched on 30 May 1944, and commissioned under the command of Oberleutnant zur See Hans Vogel on 20 July 1944.

German submarine U-3528 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 26 October 1944 at F Schichau GmbH, Danzig, as yard number 1673. She was launched on 10 January 1945, and commissioned under the command of Kapitänleutnant Heinz Zwarg on 18 March 1945.

German submarine U-3040 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 9 December 1944 at AG Weser, Bremen, as yard number 1199. She was launched on 10 February 1945, and commissioned under the command of Oberleutnant zur See Heinz Robbert on 8 March 1945.

German submarine U-3501 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 March 1944 at F Schichau GmbH, Danzig, as yard number 1646. She was launched on 19 April 1944, and commissioned under the command of Oberleutnant zur See Helmut Münster on 29 July 1944.

References

  1. Helgason, Guðmundur. "Hans Hornkohl". German U-boats of WWII - uboat.net. Retrieved 27 November 2019.
  2. Helgason, Guðmundur. "Karl-Heinz Voswinkel". German U-boats of WWII - uboat.net. Retrieved 27 November 2019.
  3. Helgason, Guðmundur. "Heinz Franke (Knight's Cross)". German U-boats of WWII - uboat.net. Retrieved 5 May 2015.
  4. Helgason, Guðmundur. "Wilhelm Neitzsch". German U-boats of WWII - uboat.net. Retrieved 27 November 2019.
  5. 1 2 3 4 Gröner 1991, p. 85.

Bibliography