History | |
---|---|
Nazi Germany | |
Name | U-3040 |
Ordered | 6 November 1943 |
Builder | AG Weser, Bremen |
Yard number | 1199 |
Laid down | 9 December 1944 |
Launched | 10 February 1945 |
Commissioned | 8 March 1945 |
Fate | Scuttled on 3 May 1945 |
General characteristics | |
Class and type | Type XXI submarine |
Displacement | |
Length | |
Beam |
|
Height | 11.30 m (37 ft 1 in) |
Draught | 6.32 m (20 ft 9 in) |
Installed power |
|
Propulsion |
|
Speed |
|
Range |
|
Test depth | 280 m (920 ft) |
Complement | 57–60 crewmen |
Sensors and processing systems |
|
Armament |
|
Service record | |
Part of: |
|
Identification codes: | M 52 673 |
Commanders: | |
Operations: | None |
Victories: | None |
German submarine U-3040 was a Type XXI U-boat (one of the " Elektroboote ") of Nazi Germany's Kriegsmarine , built for service in World War II. She was ordered on 6 November 1943, and was laid down on 9 December 1944 at AG Weser, Bremen, as yard number 1199. She was launched on 10 February 1945, and commissioned under the command of Oberleutnant zur See Heinz Robbert on 8 March 1945. [2]
Like all Type XXI U-boats, U-3040 had a displacement of 1,621 tonnes (1,595 long tons) when at the surface and 1,819 tonnes (1,790 long tons) while submerged. She had a total length of 76.70 m (251 ft 8 in) (o/a), a beam of 8 m (26 ft 3 in), and a draught of 6.32 m (20 ft 9 in). [3] The submarine was powered by two MAN SE supercharged six-cylinder M6V40/46KBB diesel engines each providing 4,000 metric horsepower (2,900 kilowatts ; 3,900 shaft horsepower ), two Siemens-Schuckert GU365/30 double-acting electric motors each providing 5,000 PS (3,700 kW; 4,900 shp), and two Siemens-Schuckert silent running GV232/28 electric motors each providing 226 PS (166 kW; 223 shp). [3]
The submarine had a maximum surface speed of 15.6 knots (28.9 km/h; 18.0 mph) and a submerged speed of 17.2 knots (31.9 km/h; 19.8 mph). When running on silent motors the boat could operate at a speed of 6.1 knots (11.3 km/h; 7.0 mph). When submerged, the boat could operate at 5 knots (9.3 km/h; 5.8 mph) for 340 nautical miles (630 km; 390 mi); when surfaced, she could travel 15,500 nautical miles (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph). [3] U-3040 was fitted with six 53.3 cm (21.0 in) torpedo tubes in the bow and four 2 cm (0.79 in) C/30 anti-aircraft guns. She could carry twenty-three torpedoes or seventeen torpedoes and twelve mines. The complement was five officers and fifty-two men. [3]
U-3040 was scuttled on 3 May 1945, at Kiel, as part of Operation Regenbogen. The wreck was later raised and broken up. [2]
German submarine U-2508 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 13 June 1944 at the Blohm & Voss yard at Hamburg, as yard number 2508. She was launched on 19 August 1944, and commissioned under the command of Oberleutnant zur See Uwe Christiansen on 26 September 1944.
German submarine U-2520 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 24 August 1944 at the Blohm & Voss yard at Hamburg, as yard number 2520. She was launched on 16 October 1944, and commissioned under the command of Oberleutnant zur See Albrecht Schubart on 25 December 1944.
German submarine U-2541 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 31 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2541. She was launched on 13 January 1945, and commissioned under the command of Oberleutnant zur See Ernst-August Stellmann on 1 March 1945.
German submarine U-3044 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 December 1944 at AG Weser, Bremen, as yard number 1203. She was launched on 1 March 1945, and commissioned under the command of Kapitänleutnant Bernhard Jaek on 27 March 1945.
German submarine U-3002 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 23 May 1944 at AG Weser, Bremen as yard number 1161. She was launched on 9 July 1944, and commissioned under the command of Kapitänleutnant Helmut Manseck on 6 August 1944.
German submarine U-3011 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 August 1944 at AG Weser, Bremen, as yard number 1170. She was launched on 20 October 1944, and commissioned under the command of Kapitänleutnant Otto Tinschert on 21 December 1944.
German submarine U-3025 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 October 1944 at AG Weser, Bremen, as yard number 1184. She was launched on 9 December 1944, and commissioned under the command of Oberleutnant zur See Hans Vogel on 20 January 1945.
German submarine U-2546 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 22 November 1944 at the Blohm & Voss yard at Hamburg, as yard number 2546. She was launched on 19 February 1945, and commissioned under the command of Oberleutnant zur See Max Dobbert on 21 March 1945.
German submarine U-3005 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 June 1944 at AG Weser, Bremen, as yard number 1164. She was launched on 19 August 1944, and commissioned under the command of Oberleutnant zur See Walter Sitek on 20 September 1944.
German submarine U-3518 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 September 1944 at F Schichau GmbH, Danzig, as yard number 1663. She was launched on 11 November 1944, and commissioned under the command of Kapitänleutnant Herbert Brünning on 29 December 1944.
German submarine U-3525 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 17 October 1944 at F Schichau GmbH, Danzig, as yard number 1670. She was launched on 23 December 1944, and commissioned under the command of Kapitänleutnant Hans-Ludwig Gaude on 31 January 1945.
German submarine U-2539 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 27 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2539. She was launched on 6 January 1945, and commissioned under the command of Oberleutnant zur See Erich Jewinski on 21 February 1945.
German submarine U-3001 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 15 April 1944 at AG Weser, Bremen as yard number 1160. She was launched on 30 May 1944, and commissioned under the command of Oberleutnant zur See Hans Vogel on 20 July 1944.
German submarine U-3024 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 October 1944 at AG Weser, Bremen as yard number 1183. She was launched on 6 December 1944, and commissioned under the command of Oberleutnant zur See Ferdinand Blaich on 13 January 1945.
German submarine U-3034 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 November 1944 at AG Weser, Bremen as yard number 1193. She was launched on 21 January 1945, and commissioned under the command of Oberleutnant zur See Wilhelm Prehn on 31 March 1945.
German submarine U-3504 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 30 June 1944 at F Schichau GmbH, Danzig, as yard number 1649. She was launched on 15 August 1944, and commissioned under the command of Kapitänleutnant Karl-Hartwig Siebold on 23 September 1944.
German submarine U-3528 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 26 October 1944 at F Schichau GmbH, Danzig, as yard number 1673. She was launched on 10 January 1945, and commissioned under the command of Kapitänleutnant Heinz Zwarg on 18 March 1945.
German submarine U-3006 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 June 1944 at AG Weser, Bremen, as yard number 1165. She was launched on 25 August 1944, and commissioned under the command of Kapitänleutnant Klaus Popp on 5 October 1944.
German submarine U-3032 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 9 November 1944 at AG Weser, Bremen, as yard number 1191. She was launched on 10 January 1945, and commissioned under the command of Oberleutnant zur See Horst Slevogt on 12 February 1945.
German submarine U-3501 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 March 1944 at F Schichau GmbH, Danzig, as yard number 1646. She was launched on 19 April 1944, and commissioned under the command of Oberleutnant zur See Helmut Münster on 29 July 1944.