History | |
---|---|
Nazi Germany | |
Name | U-3514 |
Ordered | 6 November 1943 |
Builder | F Schichau GmbH, Danzig |
Yard number | 1659 |
Laid down | 21 August 1944 |
Launched | 21 October 1944 |
Commissioned | 9 December 1944 |
Fate |
|
General characteristics | |
Class and type | Type XXI submarine |
Displacement | |
Length | |
Beam |
|
Height | 11.30 m (37 ft 1 in) |
Draught | 6.32 m (20 ft 9 in) |
Installed power |
|
Propulsion |
|
Speed |
|
Range |
|
Test depth | 280 m (920 ft) |
Complement | 57–60 crewmen |
Sensors and processing systems |
|
Armament |
|
Service record | |
Part of: |
|
Identification codes: | M 49 572 |
Commanders: | |
Operations: | None |
Victories: | None |
German submarine U-3514 was a Type XXI U-boat (one of the " Elektroboote ") of Nazi Germany's Kriegsmarine , built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 August 1944 at F Schichau GmbH, Danzig, as yard number 1659. She was launched on 21 October 1944, and commissioned under the command of Oberleutnant zur See Günther Fritze on 9 December 1944. [3]
Like all Type XXI U-boats, U-3514 had a displacement of 1,621 tonnes (1,595 long tons) when at the surface and 1,819 tonnes (1,790 long tons) while submerged. She had a total length of 76.70 m (251 ft 8 in) (o/a), a beam of 8 m (26 ft 3 in), and a draught of 6.32 m (20 ft 9 in). [4] The submarine was powered by two MAN SE supercharged six-cylinder M6V40/46KBB diesel engines each providing 4,000 metric horsepower (2,900 kilowatts ; 3,900 shaft horsepower ), two Siemens-Schuckert GU365/30 double-acting electric motors each providing 5,000 PS (3,700 kW; 4,900 shp), and two Siemens-Schuckert silent running GV232/28 electric motors each providing 226 PS (166 kW; 223 shp). [4]
The submarine had a maximum surface speed of 15.6 knots (28.9 km/h; 18.0 mph) and a submerged speed of 17.2 knots (31.9 km/h; 19.8 mph). When running on silent motors the boat could operate at a speed of 6.1 knots (11.3 km/h; 7.0 mph). When submerged, the boat could operate at 5 knots (9.3 km/h; 5.8 mph) for 340 nautical miles (630 km; 390 mi); when surfaced, she could travel 15,500 nautical miles (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph). [4] U-3514 was fitted with six 53.3 cm (21.0 in) torpedo tubes in the bow and four 2 cm (0.79 in) C/30 anti-aircraft guns. She could carry twenty-three torpedoes or seventeen torpedoes and twelve mines. The complement was five officers and fifty-two men. [4]
On 9 May 1945, U-3514 surrendered at Bergen, Norway. She was transferred to Lisahally, Northern Ireland on 6 June 1945, arriving on 8 June 1945. [3]
U-3514 was held at Lisahally until January 1946, when she was taken to Moville. She was being held up in reserve just in case one of the Type XXI that had been transferred to the Soviets after the war did not arrive intact. Then on 7 February 1946, she was ordered to be part of Operation Deadlight. Two days later, on 9 February, she left Moville to be towed to her scuttling area, arriving on the morning of 12 February. HMS Loch Arkaig began the scuttling process at 09:36 using her QF 4 in (100 mm) Mark V gun, "Squid" depth charges, and "Shark" shells, [5] fired from the four-inch gun. U-3514 sank at 10:04, becoming the last U-boat sunk during Operation Deadlight. [3]
The wreck is at 56°00′N10°05′W / 56.000°N 10.083°W .
German submarine U-2511 was a Type XXI submarine of Nazi Germany's Kriegsmarine during World War II. The Elektroboot submarine was laid down on 7 July 1944 at the Blohm & Voss yard at Hamburg, launched on 2 September 1944, and commissioned on 29 September 1944 under the command of Kapitänleutnant Adalbert Schnee.
German submarine U-2502 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. The submarine was laid down on 25 April 1944 at the Blohm & Voss yard at Hamburg, launched on 15 June 1944, and commissioned on 19 July 1944 under the command of Kapitänleutnant Gert Mannesmann, who commanded her until 8 April 1945.
German submarine U-2506 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. The submarine was laid down on 29 May 1944 at the Blohm & Voss yard at Hamburg, launched on 5 August 1944, and commissioned on 31 August 1944 under the command of Kapitänleutnant Horst von Schroeter, who commanded her until 9 May 1945. U-2506 conducted no patrols, and surrendered on 9 May 1945 in Bergen, Norway. She was then transferred to Lerwick on 18 June 1945, then Lisahally on 21 June 1945. She was sunk on 5 January 1946 at 55°37′N07°30′W.
German submarine U-3509 was a Type XXI U-boat of Nazi Germany's Kriegsmarine during World War II. The Elektroboote submarine was laid down on 29 July 1944 at the Schichau-Werke yard at Danzig, launched on 27 September 1944, and commissioned on 29 January 1945 under the command of Oberleutnant zur See Karl-Heinz Voswinkel.
German submarine U-2520 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 24 August 1944 at the Blohm & Voss yard at Hamburg, as yard number 2520. She was launched on 16 October 1944, and commissioned under the command of Oberleutnant zur See Albrecht Schubart on 25 December 1944.
German submarine U-2541 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 31 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2541. She was launched on 13 January 1945, and commissioned under the command of Oberleutnant zur See Ernst-August Stellmann on 1 March 1945.
German submarine U-3002 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 23 May 1944 at AG Weser, Bremen as yard number 1161. She was launched on 9 July 1944, and commissioned under the command of Kapitänleutnant Helmut Manseck on 6 August 1944.
German submarine U-3516 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 August 1944 at F Schichau GmbH, Danzig, as yard number 1661. She was launched on 4 November 1944, and commissioned under the command of Kapitänleutnant Hans Wengel on 18 December 1944.
German submarine U-3011 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 August 1944 at AG Weser, Bremen, as yard number 1170. She was launched on 20 October 1944, and commissioned under the command of Kapitänleutnant Otto Tinschert on 21 December 1944.
German submarine U-3511 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 August 1944 at F Schichau GmbH, Danzig, as yard number 1656. She was launched on 11 October 1944, and commissioned under the command of Oberleutnant zur See Martin Grasse on 18 November 1944.
German submarine U-3005 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 June 1944 at AG Weser, Bremen, as yard number 1164. She was launched on 19 August 1944, and commissioned under the command of Oberleutnant zur See Walter Sitek on 20 September 1944.
German submarine U-3525 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 17 October 1944 at F Schichau GmbH, Danzig, as yard number 1670. She was launched on 23 December 1944, and commissioned under the command of Kapitänleutnant Hans-Ludwig Gaude on 31 January 1945.
German submarine U-3530 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. It was ordered on 6 November 1943, and was laid down on 3 November 1944 at F Schichau GmbH, Danzig, as yard number 1675. It was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Wilhelm Brauel on 22 March 1945.
German submarine U-2539 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 27 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2539. She was launched on 6 January 1945, and commissioned under the command of Oberleutnant zur See Erich Jewinski on 21 February 1945.
German submarine U-2529 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 29 September 1944 at the Blohm & Voss yard at Hamburg, as yard number 2529. She was launched on 13 November 1944, and commissioned under the command of Oberleutnant zur See Karl-Heinrich Feufel on 22 February 1945.
German submarine U-3006 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 June 1944 at AG Weser, Bremen, as yard number 1165. She was launched on 25 August 1944, and commissioned under the command of Kapitänleutnant Klaus Popp on 5 October 1944.
German submarine U-3017 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 2 September 1944 at AG Weser, Bremen as yard number 1176. She was launched on 5 November 1944, and commissioned under the command of Oberleutnant zur See Rolf Lindschau on 5 January 1945.
German submarine U-3035 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 11 November 1944 at AG Weser, Bremen as yard number 1194. She was launched on 24 January 1945, and commissioned under the command of Oberleutnant zur See Ernst-August Gerke on 1 March 1945.
German submarine U-3041 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 7 December 1944 at AG Weser, Bremen as yard number 1200. She was launched on 13 February 1945, and commissioned under the command of Oberleutnant zur See Joachim Vieth on 10 March 1945.
German submarine U-3501 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 March 1944 at F Schichau GmbH, Danzig, as yard number 1646. She was launched on 19 April 1944, and commissioned under the command of Oberleutnant zur See Helmut Münster on 29 July 1944.