History | |
---|---|
Nazi Germany | |
Name | U-2546 |
Ordered | 6 November 1943 |
Builder | Blohm & Voss, Hamburg |
Yard number | 2546 |
Laid down | 22 November 1944 |
Launched | 19 February 1945 |
Commissioned | 21 March 1945 |
Fate | Scuttled on 3 May 1945 |
General characteristics | |
Class and type | Type XXI submarine |
Displacement | |
Length | |
Beam |
|
Height | 11.30 m (37 ft 1 in) |
Draught | 6.32 m (20 ft 9 in) |
Installed power |
|
Propulsion |
|
Speed |
|
Range |
|
Test depth | 280 m (920 ft) |
Complement | 57–60 crewmen |
Sensors and processing systems |
|
Armament |
|
Service record | |
Part of: |
|
Identification codes: | M 52 482 |
Commanders: | |
Operations: | None |
Victories: | None |
German submarine U-2546 was a Type XXI U-boat (one of the " Elektroboote ") of Nazi Germany's Kriegsmarine , built for service in World War II. She was ordered on 6 November 1943, and was laid down on 22 November 1944 at the Blohm & Voss yard at Hamburg, as yard number 2546. She was launched on 19 February 1945, and commissioned under the command of Oberleutnant zur See Max Dobbert on 21 March 1945. [2]
Like all Type XXI U-boats, U-2546 had a displacement of 1,621 tonnes (1,595 long tons) when at the surface and 1,819 tonnes (1,790 long tons) while submerged. She had a total length of 76.70 m (251 ft 8 in) (o/a), a beam of 8 m (26 ft 3 in), and a draught of 6.32 m (20 ft 9 in). [3] The submarine was powered by two MAN SE supercharged six-cylinder M6V40/46KBB diesel engines each providing 4,000 metric horsepower (2,900 kilowatts ; 3,900 shaft horsepower ), two Siemens-Schuckert GU365/30 double-acting electric motors each providing 5,000 PS (3,700 kW; 4,900 shp), and two Siemens-Schuckert silent running GV232/28 electric motors each providing 226 PS (166 kW; 223 shp). [3]
The submarine had a maximum surface speed of 15.6 knots (28.9 km/h; 18.0 mph) and a submerged speed of 17.2 knots (31.9 km/h; 19.8 mph). When running on silent motors the boat could operate at a speed of 6.1 knots (11.3 km/h; 7.0 mph). When submerged, the boat could operate at 5 knots (9.3 km/h; 5.8 mph) for 340 nautical miles (630 km; 390 mi); when surfaced, she could travel 15,500 nautical miles (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph). [3] U-2546 was fitted with six 53.3 cm (21.0 in) torpedo tubes in the bow and four 2 cm (0.79 in) C/30 anti-aircraft guns. She could carry twenty-three torpedoes or seventeen torpedoes and twelve mines. The complement was five officers and fifty-two men. [3]
U-2546 was scuttled on 3 May 1945, at Kiel as part of Operation Regenbogen. The wreck was later raised and broken up. [2]
German submarine U-3508 was a Type XXI U-boat of Nazi Germany's Kriegsmarine during World War II. The Elektroboote submarine was laid down on 25 July 1944 at the Schichau-Werke yard at Danzig, launched on 22 September 1944, and commissioned on 2 November 1944 under the command of Oberleutnant zur See Detlef von Lehsten.
German submarine U-2522 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 August 1944 at the Blohm & Voss yard at Hamburg, as yard number 2522. She was launched on 22 October 1944, and commissioned under the command of Kapitänleutnant Horst-Thilo Queck on 22 November 1944.
German submarine U-3015 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 25 August 1944 at AG Weser, Bremen, as yard number 1174. She was launched on 27 October 1944, and commissioned under the command of Kapitänleutnant Peter-Ottmar Grau on 17 December 1944.
German submarine U-3510 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 6 August 1944 at F Schichau GmbH, Danzig, as yard number 1655. She was launched on 4 October 1944, and commissioned under the command of Oberleutnant zur See Ernst-Werner Schwirley on 11 November 1944.
German submarine U-3516 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 August 1944 at F Schichau GmbH, Danzig, as yard number 1661. She was launched on 4 November 1944, and commissioned under the command of Kapitänleutnant Hans Wengel on 18 December 1944.
German submarine U-3023 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 3 October 1944 at AG Weser, Bremen, as yard number 1182. She was launched on 2 December 1944, and commissioned under the command of Oberleutnant zur See Erich Harms on 22 January 1945.
German submarine U-3027 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 18 October 1944 at AG Weser, Bremen, as yard number 1186. She was launched on 18 December 1944, and commissioned under the command of Kapitänleutnant Karl Mehne on 25 January 1945.
German submarine U-3507 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 19 July 1944 at F Schichau GmbH, Danzig, as yard number 1652. She was launched on 16 September 1944, and commissioned under the command of Oberleutnant zur See Otto Niethmann on 19 October 1944.
German submarine U-3511 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 August 1944 at F Schichau GmbH, Danzig, as yard number 1656. She was launched on 11 October 1944, and commissioned under the command of Oberleutnant zur See Martin Grasse on 18 November 1944.
German submarine U-3526 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 18 October 1944 at F Schichau GmbH, Danzig, as yard number 1671. She was launched on 23 December 1944, and commissioned under the command of Oberleutnant zur See Kurt Hilbig on 22 March 1945.
German submarine U-3029 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 24 October 1944 at AG Weser, Bremen, as yard number 1188. She was launched on 28 December 1944, and commissioned under the command of Kapitänleutnant Hermann Lamby on 5 February 1945.
German submarine U-3031 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 30 October 1944 at AG Weser, Bremen, as yard number 1190. She was launched on 6 January 1945, and commissioned under the command of Oberleutnant zur See Heinrich Sach on 28 February 1945.
German submarine U-3038 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 1 December 1944 at AG Weser, Bremen, as yard number 1197. She was launched on 7 February 1945, and commissioned under the command of Oberleutnant zur See Matthias Brüning on 4 March 1945.
German submarine U-3039 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 29 November 1944 at AG Weser, Bremen, as yard number 1198. She was launched on 14 February 1945, and commissioned under the command of Kapitänleutnant Günther Ruperti on 8 March 1945.
German submarine U-3530 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. It was ordered on 6 November 1943, and was laid down on 3 November 1944 at F Schichau GmbH, Danzig, as yard number 1675. It was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Wilhelm Brauel on 22 March 1945.
German submarine U-2534 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 23 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2534. She was launched on 11 December 1944, and commissioned under the command of Kapitänleutnant Ulrich Drews on 17 January 1945.
German submarine U-3030 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 2 November 1944 at AG Weser, Bremen as yard number 1189. She was launched on 31 December 1944, and commissioned under the command of Oberleutnant zur See Bernhard Luttmann on 14 February 1945.
German submarine U-2542 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 10 November 1944 at Blohm & Voss, Hamburg, as yard number 2542. She was launched on 22 January 1945, and commissioned under the command of Oberleutnant zur See Otto Hübschen on 5 March 1945.
German submarine U-3006 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 June 1944 at AG Weser, Bremen, as yard number 1165. She was launched on 25 August 1944, and commissioned under the command of Kapitänleutnant Klaus Popp on 5 October 1944.
German submarine U-3009 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 July 1944 at AG Weser, Bremen as yard number 1168. She was launched on 29 September 1944, and commissioned under the command of Kapitänleutnant Karl Schimpf on 10 November 1944.