German submarine U-3005

Last updated

History
War ensign of Germany (1938-1945).svg Nazi Germany
NameU-3005
Ordered6 November 1943
Builder AG Weser, Bremen
Yard number1164
Laid down21 June 1944
Launched19 August 1944
Commissioned20 September 1944
FateScuttled on 3 May 1945
General characteristics
Class and type Type XXI submarine
Displacement
  • 1,621  t (1,595 long tons) surfaced
  • 1,819 t (1,790 long tons) submerged
Length
  • 76.70 m (251 ft 8 in) (o/a)
  • 60.50 m (198 ft 6 in) (p/h)
Beam
  • 8 m (26 ft 3 in) (o/a)
  • 5.3 m (17 ft 5 in) (p/h)
Height11.30 m (37 ft 1 in)
Draught6.32 m (20 ft 9 in)
Installed power
  • 4,000 PS (2,900 kW; 3,900 shp) (diesel drive)
  • 5,000 PS (3,700 kW; 4,900 shp) (standard electric drive)
  • 226 PS (166 kW; 223 shp) (silent electric drive)
Propulsion
Speed
  • Surfaced:
  • 15.6 knots (28.9 km/h; 18.0 mph) (diesel)
  • 17.9 knots (33.2 km/h; 20.6 mph) (electric)
  • Submerged:
  • 17.2 knots (31.9 km/h; 19.8 mph) (electric)
  • 6.1 knots (11.3 km/h; 7.0 mph) (silent running motors)
Range
  • 15,500 nmi (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph) surfaced
  • 340 nmi (630 km; 390 mi) at 5 knots (9.3 km/h; 5.8 mph) submerged
Test depth280 m (920 ft)
Complement57–60 crewmen
Sensors and
processing systems
Armament
Service record
Part of:
Identification codes: M 42 792
Commanders:
  • Oblt.z.S. Walter Sitek [1]
  • 20 September 1944 – 10 January 1945
  • Kptlt. Johannes Hinrichs [2]
  • 11 January – 5 May 1945
Operations: None
Victories: None

German submarine U-3005 was a Type XXI U-boat (one of the " Elektroboote ") of Nazi Germany's Kriegsmarine , built for service in World War II. She was ordered on 6 November 1943, and was laid down on 21 June 1944 at AG Weser, Bremen, as yard number 1164. She was launched on 19 August 1944, and commissioned under the command of Oberleutnant zur See Walter Sitek on 20 September 1944. [3]

Contents

Design

Like all Type XXI U-boats, U-3005 had a displacement of 1,621 tonnes (1,595 long tons) when at the surface and 1,819 tonnes (1,790 long tons) while submerged. She had a total length of 76.70 m (251 ft 8 in) (o/a), a beam of 8 m (26 ft 3 in), and a draught of 6.32 m (20 ft 9 in). [4] The submarine was powered by two MAN SE supercharged six-cylinder M6V40/46KBB diesel engines each providing 4,000 metric horsepower (2,900 kilowatts ; 3,900 shaft horsepower ), two Siemens-Schuckert GU365/30 double-acting electric motors each providing 5,000 PS (3,700 kW; 4,900 shp), and two Siemens-Schuckert silent running GV232/28 electric motors each providing 226 PS (166 kW; 223 shp). [4]

The submarine had a maximum surface speed of 15.6 knots (28.9 km/h; 18.0 mph) and a submerged speed of 17.2 knots (31.9 km/h; 19.8 mph). When running on silent motors the boat could operate at a speed of 6.1 knots (11.3 km/h; 7.0 mph). When submerged, the boat could operate at 5 knots (9.3 km/h; 5.8 mph) for 340 nautical miles (630 km; 390 mi); when surfaced, she could travel 15,500 nautical miles (28,700 km; 17,800 mi) at 10 knots (19 km/h; 12 mph). [4] U-3005 was fitted with six 53.3 cm (21.0 in) torpedo tubes in the bow and four 2 cm (0.79 in) C/30 anti-aircraft guns. She could carry twenty-three torpedoes or seventeen torpedoes and twelve mines. The complement was five officers and fifty-two men. [4]

Fate

U-3005 was scuttled on 3 May 1945, at Kiel as part of Operation Regenbogen. The wreck was later raised and broken up. [3]

Related Research Articles

German submarine U-3010 was a Type XXI U-boat of Nazi Germany's Kriegsmarine.

German submarine U-2508 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 13 June 1944 at the Blohm & Voss yard at Hamburg, as yard number 2508. She was launched on 19 August 1944, and commissioned under the command of Oberleutnant zur See Uwe Christiansen on 26 September 1944.

German submarine U-2509 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 17 June 1944 at the Blohm & Voss yard at Hamburg, as yard number 2509. She was launched on 27 August 1944, and commissioned under the command of Kapitänleutnant Rudolf Schendel on 21 September 1944.

German submarine U-2515 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 July 1944 at the Blohm & Voss yard at Hamburg, as yard number 2515. She was launched on 22 September 1944, and commissioned under the command of Oberleutnant zur See Gerhard Linder on 19 October 1944.

German submarine U-2541 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 31 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2541. She was launched on 13 January 1945, and commissioned under the command of Oberleutnant zur See Ernst-August Stellmann on 1 March 1945.

German submarine U-3529 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 2 November 1944 at F Schichau GmbH, Danzig, as yard number 1674. She was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Karl-Heinz Schmidt on 22 March 1945.

German submarine U-2527 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 September 1944 at the Blohm & Voss yard at Hamburg, as yard number 2527. She was launched on 7 November 1944, and commissioned under the command of Oberleutnant zur See Hans Götze on 23 December 1944.

German submarine U-3002 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 23 May 1944 at AG Weser, Bremen as yard number 1161. She was launched on 9 July 1944, and commissioned under the command of Kapitänleutnant Helmut Manseck on 6 August 1944.

German submarine U-3019 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 10 September 1944 at AG Weser, Bremen as yard number 1178. She was launched on 7 November 1944, and commissioned under the command of Oberleutnant zur See Ernst-August Racky on 23 December 1944.

German submarine U-3020 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 1 October 1944 at AG Weser, Bremen as yard number 1179. She was launched on 16 November 1944, and commissioned under the command of Oberleutnant zur See Heinrich Mäuerler on 23 December 1944.

German submarine U-3516 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 28 August 1944 at F Schichau GmbH, Danzig, as yard number 1661. She was launched on 4 November 1944, and commissioned under the command of Kapitänleutnant Hans Wengel on 18 December 1944.

German submarine U-3025 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 October 1944 at AG Weser, Bremen, as yard number 1184. She was launched on 9 December 1944, and commissioned under the command of Oberleutnant zur See Hans Vogel on 20 January 1945.

German submarine U-3511 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 14 August 1944 at F Schichau GmbH, Danzig, as yard number 1656. She was launched on 11 October 1944, and commissioned under the command of Oberleutnant zur See Martin Grasse on 18 November 1944.

German submarine U-2546 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 22 November 1944 at the Blohm & Voss yard at Hamburg, as yard number 2546. She was launched on 19 February 1945, and commissioned under the command of Oberleutnant zur See Max Dobbert on 21 March 1945.

German submarine U-3525 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 17 October 1944 at F Schichau GmbH, Danzig, as yard number 1670. She was launched on 23 December 1944, and commissioned under the command of Kapitänleutnant Hans-Ludwig Gaude on 31 January 1945.

German submarine U-3530 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. It was ordered on 6 November 1943, and was laid down on 3 November 1944 at F Schichau GmbH, Danzig, as yard number 1675. It was launched on 26 January 1945, and commissioned under the command of Oberleutnant zur See Wilhelm Brauel on 22 March 1945.

German submarine U-2539 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 27 October 1944 at the Blohm & Voss yard at Hamburg, as yard number 2539. She was launched on 6 January 1945, and commissioned under the command of Oberleutnant zur See Erich Jewinski on 21 February 1945.

German submarine U-3006 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 12 June 1944 at AG Weser, Bremen, as yard number 1165. She was launched on 25 August 1944, and commissioned under the command of Kapitänleutnant Klaus Popp on 5 October 1944.

German submarine U-3032 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 9 November 1944 at AG Weser, Bremen, as yard number 1191. She was launched on 10 January 1945, and commissioned under the command of Oberleutnant zur See Horst Slevogt on 12 February 1945.

German submarine U-3520 was a Type XXI U-boat of Nazi Germany's Kriegsmarine, built for service in World War II. She was ordered on 6 November 1943, and was laid down on 20 September 1944 at F Schichau GmbH, Danzig, as yard number 1665. She was launched on 23 November 1944, and commissioned under the command of Kapitänleutnant Sarto Ballert on 12 January 1945.

References

  1. Helgason, Guðmundur. "Walter Sitek". German U-boats of WWII - uboat.net. Retrieved 20 April 2016.
  2. Helgason, Guðmundur. "Johannes Hinrichs". German U-boats of WWII - uboat.net. Retrieved 20 April 2016.
  3. 1 2 Helgason, Guðmundur. "U-3005". German U-boats of WWII - uboat.net. Retrieved 20 April 2016.
  4. 1 2 3 4 Gröner 1991, p. 85.

Bibliography