Line 4 (Suzhou Rail Transit)

Last updated

Line 4
SZRT Line 4 icon.svg
PM081.jpg
A train of Suzhou Rail Transit Line 4
Overview
Native name苏州地铁4号线
StatusIn operation
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations38
Service
Type Rapid transit
System Suzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
History
Opened15 April 2017;7 years ago (2017-04-15)
Technical
Line length41.5 km (25.8 mi) (main line)
11.3 km (7.0 mi) (former branch line)
Track gauge 1,435 mm (4 ft 8+12 in)

Line 4 is a line of Suzhou Rail Transit. It runs in a north-south alignment from Longdaobang station in Xiangcheng District's the northern suburbs, to the canal town of Tongli in Wujiang District in the south. [1] The line is 41.5 km long with 31 stations.

Contents

Until October 2024 there was a 11.3 km long branch line with 7 stations. Then the branch line was transferred to the line 7. [2] [3]

History

Groundbreaking occurred on December 31, 2010 in Wujiang, and the line was constructed between 2012 and 2016. [4] Operations started on April 15, 2017.

Opening timeline

SegmentCommencementLengthStation(s)Name
Longdaobang — TongliApril 15, 201741.5 km (25.79 mi)31Phase 1

Stations

Station nameConnectionsDistance
km
Location
EnglishChinese
Longdaobang 龙道浜0.000.00 Xiangcheng
Zhangzhuang 张庄1.291.29
Yaoxiang 姚祥0.832.12
Huolidao 活力岛1.683.80
Sunwu Jinianyuan 孙武纪念园  8  1.445.24
Pinglonglu West 平泷路西1.857.09 Gusu
Sujin 苏锦  6  1.098.18
Suzhou Railway Station 苏州火车站  2   China Railways.svg SZH 0.979.15
Beisita 北寺塔  9  1.4510.60
Chayuanchang 察院场0.9511.55
Leqiao 乐桥  1  0.5412.09
Sanyuanfang 三元坊1.0113.10
Nanmen 南门  5  0.7913.89
Renminqiao South 人民桥南0.6714.56
Tuanjieqiao 团结桥1.0015.56 Wuzhong
Baodai Lu 宝带路  3  0.9816.54
Shihu Donglu 石湖东路  2  1.6018.14
Hongzhuang 红庄  7  1.9020.04
Qingshuwan 清树湾1.6821.72 Wujiang
Huagang 花港2.0423.76
Jiangling Xilu 江陵西路2.9426.70
Jiangxing Xilu 江兴西路1.3928.09
Liuhong Lu 流虹路1.7529.84
Lize Lu 笠泽路0.8130.65
Gujiadang 顾家荡  14  1.1631.81
Suzhouwan East 苏州湾东1.0032.81
Songling Dadao 松陵大道1.1233.93
Wujiang Renmin Guangchang 吴江人民广场1.8935.82
Wujiang Coach Station 吴江汽车站1.8337.65
Pangjin Lu 庞金路1.7339.38
Tongli 同里1.8941.27

Rolling stock

Trains are run in six-car formations, and have a maximum speed of 80 km/h. [1]

Fleet numbersYear BuiltTime in serviceBuilderClassNumber in serviceNo
of
car
AssemblyRolling stockNumberDepotsLine assignedNotes
240 (40 sets)2015-20172017-presentCSR Nanjing PuzhenB240 (40 sets)6Tc+Mp+M - M + Mp+TcPM081040101-044006 (0401-0440)Songling Depot
Yuanhe Yard
Tian'Edang Yard
  4  
60 (10 sets)2023-20242024-presentCRRC Nanjing PuzhenB18 (3 sets)6Tc+Mp+M - M + Mp+TcPM254044101-045006 (0441-0450)Songling Depot
Yuanhe Yard
Tian'Edang Yard
  4  

Notes

    References

    1. 1 2 "苏州轨交4号线及支线开通试运营 打通南北大"动脉"". 无线苏州. April 15, 2017.
    2. "苏州轨道交通4号线及支线预计于2017年4月开通-名城新闻网". news.2500sz.com (in Chinese (China)). Retrieved April 16, 2017.
    3. "苏州轻轨4号线走向基本确定 30个站点抢先看 (The alignment of Line 4, Suzhou Rail Transit was determined)". 搜房网 (in Chinese). July 30, 2010. Retrieved June 13, 2012.
    4. "感觉倍儿爽!苏州地铁4号线吴江段开始试乘". www.xhby.net (in Chinese). May 14, 2016. Retrieved February 3, 2018.