Mission type | Technology demonstration |
---|---|
COSPAR ID | 1998-067SF |
SATCAT no. | 47929 |
Spacecraft properties | |
Spacecraft type | 1U CubeSat |
Launch mass | 1.3 kg (2.9 lb) |
Dimensions | 10 cm × 10 cm × 10 cm (3.9 in × 3.9 in × 3.9 in) |
Power | watts |
Start of mission | |
Launch date | 20 February 2021, 17:36:50 UTC |
Rocket | Antares |
Launch site | Wallops Island MARS, LP-0A |
Deployed from | ISS |
Deployment date | 14 March 2021, 11:20 UTC |
End of mission | |
Disposal | Deorbited |
Decay date | July 5, 2022 |
Orbital parameters | |
Regime | Low Earth orbit |
Maya-2 was a Filipino nanosatellite. It succeeded Maya-1, the first Filipino nanosatellite, which was deorbited in November 2020.
Maya-2 was a nanosatellite or a 1U-class CubeSat measuring 10 cm × 10 cm × 10 cm (3.9 in × 3.9 in × 3.9 in) and weighing 1.3 kg (2.9 lb). [1] It was the successor to Maya-1 which ended its operations on November 23, 2020. [1] [2] Maya-2 was developed by Filipino students sent to the Kyushu Institute of Technology (KIT) in Japan through the Department of Science and Technology's (DOST) Space Science and Technology Proliferation through University Partnerships (STeP-UP) project under the STAMINA4Space Program. [1]
Maya-2 was developed under the fourth Joint Global Multination Birds Satellite (Birds-4) project initiated by the KIT. [3] Under the program, two other identical CubeSats; a Paraguayan (GuaraniSat-1) and a Japanese satellite (Tsuru). [4]
Maya-2 is part of a series of satellite named after the Chestnut munia (Lonchura atricapilla), one of the various birds known locally in the Philippines as the maya. [4] [5]
A team of three Filipino engineers, Izrael Zenar Bautista, Mark Angelo Purio, and Marloun Sejera, developed Maya-2. The three are DOST scholars pursuing doctorate degrees in space engineering at KIT. Bautista is also the project manager of the Birds-4 program. [6]
Development of Maya-2 began in 2018 but was hampered by the COVID-19 pandemic. [7] By March 2020, Maya-2 was already in its final stage of development [8] and by September of the same year, the satellite was already turned over to the Japan Aerospace Exploration Agency (JAXA). [9]
The build of Maya-2 is relatively more advanced than Maya-1, its predecessor, and has off-the-shelf components. [3] Maya-2 is equipped with instruments which was used for Maya-1 including an Automatic Packet Radio Service Digipeater. Differences from its predecessor include the use of Perovskite solar cells as a power source and a different antenna design. [10] Maya-2 also has an active altitude control instead of the passive control used by its predecessor. [11]
Maya-2 launched to the International Space Station (ISS) through Northrop Grumman's Cygnus NG-15 resupply mission. The S.S. Katherine Johnson Cygnus carrying cargo including Maya-2 was launched to space via the Antares rocket on February 20, 2021, from Pad 0A of the Mid-Atlantic Regional Spaceport in Virginia, United States. The Cygnus spacecraft made a rendezvous with the ISS two days later, berthing to the Unity module of the space station. [12] [13] The satellite was deployed into low Earth orbit from the ISS on March 14, 2021, at around 11:20 UTC. [14] [15] After a 16-month mission, Maya-2 re-entered the atmosphere on July 5, 2022. [16]
The National Institute of Physics (NIP) was established in 1983 by Presidential Executive Order No. 889 which transformed the Department of Physics of the College of Arts and Sciences into one of the seven research and academic institutes of the University of the Philippines Diliman - College of Science.
Technology Education Satellite (TechEdSat) is a successful nano-sat flight series conducted from the NASA Ames Research Center in collaboration with numerous universities. While one of the principal aims has been to introduce young professionals and university students to the practical realm of developing space flight hardware, considerable innovations have been introduced. In addition, this evolving flight platform has tested concepts for Low Earth Orbit (LEO) sample return, as well as planetary nano-sat class mission concepts.
The space program of the Philippines is currently maintained by the Philippine Space Agency (PhilSA) together with various agencies under the Department of Science and Technology (DOST). The space program includes space research and development, and is funded through the National SPACE Development Program (NSDP) by the DOST and received an initial budget of ₱1 billion in 2020.
The Philippine Space Agency (PhilSA) is the national space agency of the Philippines.
Diwata-1 also known as PHL-Microsat-1 was a Philippine microsatellite launched to the International Space Station (ISS) on March 23, 2016, and was deployed into orbit from the ISS on April 27, 2016. It was the first Philippine microsatellite and the first satellite built and designed by Filipinos. It was followed by Diwata-2, launched in 2018.
The Philippine Earth Data Resource and Observation Center, also known as the PEDRO Center is an organization tasked in operating satellite ground stations.
NG-11, previously known as OA-11, is the twelfth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its eleventh flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 17 April 2019 at 20:46:07 UTC. This is the last mission from the extended CRS-1 contract; follow-up missions are part of the CRS-2 contract. Cygnus NG-11 was also the first mission to load critical hardware onto Cygnus within the last 24 hours prior to launch, a new Antares feature.
Diwata-2 or Diwata-2B is a Philippine microsatellite launched on October 29, 2018. It is the first satellite launched under the STAMINA4Space program.
The Philippine Scientific Earth Observation Microsatellite (PHL-Microsat) was a satellite program carried by the Department of Science and Technology (DOST) of the Philippines in cooperation with the Tohoku and Hokkaido Universities of Japan.
Maya-1 was a Filipino nanosatellite. It was developed under the Philippine Scientific Earth Observation Microsatellite program (PHL-Microsat) and was jointly implemented by the University of the Philippines and the Department of Science and Technology as part of the Kyushu Institute of Technology-led multinational second Joint Global Multi-nations Birds Satellite (Birds-2). Maya-1 was the first nanosatellite of the Philippines.
BHUTAN-1 was the first Bhutanese nanosatellite to be launched into space. The satellite was built during Kyushu Institute of Technology's Birds-2 program. The Birds program helps countries fly their first satellite. BHUTAN-1 was launched into orbit aboard the SpaceX CRS-15 mission on 29 June 2018. It was deployed from the Kibō module of the International Space Station (ISS) on 10 August 2018. The satellite had cameras to image the Earth.
The Space Technology and Applications Mastery, Innovation and Advancement is a space technology program by the Philippine government. It is considered as the successor program to the Philippine Scientific Earth Observation Microsatellite (PHL-Microsat) program, a cooperation between the Philippine government and Japanese universities to develop microsatellites. The program is funded under the Department of Science and Technology.
UiTMSAT-1 was a Malaysian nanosatellite, built primarily by Universiti Teknologi MARA (UiTM) as part of the multi-nation Birds-2 project. The 1U CubeSat was launched into space on 29 June 2018 and deployed from the International Space Station (ISS) on 10 August 2018.
Raavana-1 was the first Sri Lankan satellite. The CubeSat-sized satellite was launched as part of the Cygnus NG-11 mission to the ISS on 17 April 2019. On 17 June 2019, the satellite was deployed into orbit from the ISS.
NG-14, previously known as OA-14, was the fifteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its fourteenth flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission was launched on 3 October 2020, at 01:16:14 UTC.
NG-15, previously known as OA-15, was the fifteenth launch of the Northrop Grumman robotic resupply spacecraft Cygnus and its fourteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 20 February 2021 at 17:36:50 UTC. This is the fourth launch of Cygnus under the CRS-2 contract.
GuaraníSat-1 was the first Paraguayan satellite. The nanosatellite's development was part of a collaboration between the Paraguayan Space Agency and the fourth Joint Global Multination Birds Satellite (Birds-4) multi-national project initiated by the Kyushu Institute of Technology of Japan.
The Multispectral Unit for Land Assessment (MULA) is a planned Filipino satellite. Upon completion it will become the largest Filipino-made satellite.
Cosmic X-ray Background Nanosatellite-2 was a satellite and mission developed by the Morehead State University to follow up on the CXBN mission launched in 2012. It was an improved version of the previous spacecraft and it increased the precision of measurements of the cosmic X-ray background in the 30-50 keV range and helped to improve understanding of the early universe.