The opening of the Metro Blue Line in 2004 marked the beginning of Metro Transit's expansion into rail transit, 50 years after the last Twin Cities Rapid Transit streetcars were taken out of service. Several new rail transit projects are either under construction or in planning stages and more are expected to be explored in the near future. Metro Transit will likely be acquiring a significant amount of rolling stock as these new projects move forward.
The Twin Cities region has two active light rail lines, the Blue Line, and the Green Line, and an extension to the Green Line, the Southwest Corridor, is currently under construction. As of 2020, 64 light rail cars are in service and delivery of 27 additional cars is underway.
Metro Transit placed its order for light rail vehicles (LRVs) for the Blue Line with Bombardier in January 2001, originally for 18 cars, [1] but increased in stages to 24 cars by early 2003. [2] Bombardier constructed a full-scale, half-car mock-up of the Minneapolis version of its Flexity Swift design [3] and this was placed on temporary display on a section of completed track on 5th Street, starting on October 30, 2002, [1] to enable Metro Transit to give the city's residents a hands-on preview of the low-floor design several months before completion of the first actual rail cars. The articulated vehicles use a 70% low-floor design, are 94 ft (29 m) long and can carry 66 seated passengers and 180 standees. [4]
The first light rail vehicle for the Blue Line arrived in Minneapolis in March 2003, [5] and testing of it along the first completed section of the line was underway by June 2003. [6] The line opened on June 26, 2004, with 14 of the 24 Bombardier Flexity Swift LRVs accepted and available for service by then, [7] and all 24 had entered service by the end of the year. In January 2007, the Metropolitan Council announced that three additional vehicles would be purchased, for a total of 27 LRVs on the line. [8]
The Blue Line's Type I LRVs are numbered sequentially from 101 through 127. The Flexity Swift vehicle is an articulated design with three car-body sections, referred to as the A, B and C sections. The markings on the ends of LRVs indicate the vehicle number and section. For example, car 114 is marked 114A on one end and 114B on the other end. Vehicle numbers are also displayed (excluding the section letter) on the sides of the C section, on the doors of the operator cabs and on the roof of the vehicle. Both ends of the vehicle have operator cabs, allowing trains of any length to be operated normally in either direction without the need to turn the train around. The pantograph is located on the B section of the vehicle. Auxiliary power unit, traction inverter, traction motor are supplied by Toshiba. [9]
In 2010, the Metropolitan Council negotiated a contract with Siemens to build up to 109 S70/Avanto light rail vehicles, with the first vehicle arriving in September 2012. Most are intended for the Green Line (initially the Central Corridor route from Minneapolis to Saint Paul) which opened in 2014 and is to be expanded from Minneapolis to Eden Prairie along the Southwest Corridor, though the initial vehicles were used on the Blue Line as part of that route's three-car expansion project. The initial order was for 41 vehicles: 31 for the Green Line [10] and 10 to expand the fleet of the Blue Line, allowing that route to operate three-car trains more consistently. Options for additional vehicles were exercised about a year later as contingency funding from the Central Corridor project opened up. As of 2012, 59 vehicles were on order: 47 for the Green Line and 12 for the Blue. [11]
The initial order had a per-LRV cost of $3,297,714 and a total contract value of $153,211,516. [12] Following the option order, the contract grew to $213 million. The vehicles are being built at Siemens’ facility in Florin, California, near Sacramento. [13] The first vehicle, numbered 201, arrived in September 2012 and underwent some initial testing before being officially unveiled at an event at Target Field on October 10. The first two vehicles had an extended testing period, entering revenue service around the start of 2013. [11]
Forty options remained available, for potential use once the Green Line's southwest extension received funding. Five additional Siemens S70 cars were ordered in October 2015. [14] The first car of this small order arrived in September 2017 [15] and the last later in the fall of 2017, bringing the total number of type II LRVs to 64. [16]
The Blue Line's original first-generation fleet of 27 Bombardier Flexity Swift LRVs and the Siemens "type II" LRVs are mechanically, but not electronically, compatible, so while the two generations are able to run on the tracks at the same time and either type would be able to push a malfunctioning unit of the other type, multiple-unit consists may only be assembled of one type. [17]
The type II LRVs weigh 50 tons (100,000 lb or 45.4 t), which is about 6,000 lb (2,700 kg) lighter than the earlier Bombardier units. The cars have improved heating systems and better sound insulation to provide a quieter ride. They also feature LED lighting rather than the previous vehicles' fluorescent tubes. Rear-facing cameras connected to video screens in the operator cab replaced rear-view mirrors in the newer design. [18]
In 2016, Metro Transit placed an order for 27 more Siemens S70 [lower-alpha 1] LRVs for its planned Southwest Corridor expansion. [20] These used a modified center-truck design that allowed sideways-facing seating in the center section, [21] for better passenger flow. [19] In 2018, Siemens adopted a new model number, S700, for S70 LRVs that used the new center-section design, and in 2020 it retroactively applied the new designation to all previous S70 LRVs built to the new design; as a result, all of Metro Transit's type III LRVs (301–327) are now Siemens model S700. [19] [22] The first two S700 vehicles arrived in May 2020. [23]
Model | Type I LRVs LF-70 (Flexity Swift) | Type II LRVs S70 | Type III LRVs S700 [lower-alpha 1] (on order) |
---|---|---|---|
Fleet numbers | 101–127 | 201–264 | 301–327 |
Manufacturer | Bombardier | Siemens | |
Build location | Thunder Bay, Ontario | Sacramento, California | |
Length per car | 93 ft 11+15⁄16 in (28.65 m) | 94.3 ft (28,700 mm) | |
Width | 8 ft 8+5⁄16 in (2.65 m) | ||
Empty weight | 48.5 t (107,000 lb) | 46.7 t (103,000 lb) | 46.5 t (103,000 lb) |
Body shell material | Aluminum alloy | Steel | |
Line voltage | Overhead line , 750 V DC | ||
Traction | Toshiba 2-level IGBT–VVVF 190 hp (140 kW) 3-phase AC induction motor (totally enclosed/outer-fan cooling) | Siemens 2-level IGBT–VVVF 170 hp (130 kW) 3-phase AC induction motor (totally enclosed/self-ventilating) | |
Maximum speed | 55 mph (89 km/h) | 59 mph (95 km/h) |
Since the completion of three-car station extensions in winter 2010, Metro Transit operates one-, two- and three- car trains on the Blue Line, depending on the time of day and ridership needs. Many stations on the line were initially built to be capable of serving only one- or two-car trains, as a cost-saving measure; all of the shorter platforms were designed and built with future extension in mind, and currently all stations are capable of serving three-car trains. The Green Line was built with three-car platforms at all stations.
The number of LRVs in the first-generation fleet limited three-car operations during peak rush hours, as 27 cars did not allow operation of high frequencies with longer trains. In spring and summer 2010, three-car trains were only used for special event service, such as Twins games, when lower off-peak frequencies allow operation of longer trains to meet demand. Metro Transit continued operating two-car trains during the morning and evening rush hours until September 2010, when they began operating some 3-car trains during rush hour. However, this required a reduction in frequency so trains would arrive every 10 minutes rather than every 7–8 minutes (though some 2-car service remains at the old frequency). [24] The arrival of Type II LRVs began to allow 3-car trains at high frequencies in 2013.
The Blue Line's Operations and Maintenance Facility (OMF) is located between the Cedar-Riverside and Franklin Avenue stations. The facility was expanded in 2011–2012 to make room for the 12 additional type II LRVs and a Light Rail Support Facility to allow some maintenance not requiring direct access to vehicle chassis to be moved out of the OMF building. The Green Line's Operations and Maintenance Facility is located on the site of the former Diamond Products building in Saint Paul's Lowertown neighborhood, just east of the Union Depot station.
The Twin Cities region currently has one heavy-rail commuter line, the Northstar Line. Though others are planned, none has advanced beyond alternatives analysis at this time.
The Northstar commuter rail line's first five locomotives are the MP36PH-3C, manufactured by MotivePower in Boise, Idaho at a total cost of $13,823,000. The first of the locomotives, #501, was delivered October 3, 2008. [25] The other four arrived around New Years Day of 2009. [26] The locomotives are numbered sequentially 501 through 505.
Around the time the line began service in November 2009, it was announced that a negotiations were underway with the Utah Transit Authority to acquire a sixth locomotive from their FrontRunner service. [27] This locomotive arrived in December 2009. By June, Metro Transit decided to purchase the UTA locomotive due to high leasing costs and the need to have an extra locomotive for when others are being repaired or inspected. $2.85 million for buying the locomotive and repainting it in Northstar livery came from a $10.1 million contingency fund built into the original cost of the service. [28]
# | Model | Delivery | Notes |
---|---|---|---|
501–505, 512 | MP36PH-3C | 2008–2009 | 503 and 504 seen in the 200th episode of Dirty Jobs , "Locomotive Builder"; 504 was briefly operated by Mike Rowe.; [29] 512 was originally built as Utah Transit Authority #12 for their FrontRunner service, though it never ran in revenue service there. Leased to Metro Transit starting in December 2009, [30] it was intended to be purchased the following summer, [28] though that deal initially fell through. The Metropolitan Council successfully tried again in 2011, [31] appearing in Northstar colors and renumbered 512 in October 2012. [32] |
Northstar currently utilizes eighteen Bombardier Bi-Level Coach cars, [33] a number of which are configured as cab cars. With no straightforward way to turn the trains or locomotives around at the ends of the line, the train is simply run in reverse from Big Lake to Minneapolis. The engineer remotely controls the locomotive from the cab car in the last coach of the train.
# | Model | Delivery | Notes |
---|---|---|---|
601–606 | Bi-Level VII coach (cab car) | 2008-2009 | |
701–712 | Bi-Level VII coach |
Five trains are used during a typical day's operations, each consisting of a single locomotive, two or three regular coaches and a cab car coach. The extra locomotive and coach are available for backup if needed. Northstar platforms were built long enough to accommodate trains of five coaches, which were used for some weekend trains in the early weeks of service.
The maintenance facility for the Northstar Line is located just east of the station in Big Lake, Minnesota.
METRORail is the 22.7-mile (36.5 km) light rail system in Houston, Texas. In 2023, the system had a ridership of 13,883,700, or about 42,900 per weekday as of the fourth quarter of 2023. METRORail ranks as the second most-traveled light rail system in the Southern United States and the 12th most-traveled light rail system in the United States, and has the highest ridership per mile for light rail systems in the Southern US. METRORail is operated by the Metropolitan Transit Authority of Harris County (METRO).
The Metro Blue Line is a 12-mile (19.3 km) light rail line in Hennepin County, Minnesota, that is part of the Metro network. It travels from downtown Minneapolis to Minneapolis–Saint Paul International Airport and the southern suburb of Bloomington. Formerly the Hiawatha Line prior to May 2013, the line was originally named after the Milwaukee Road's Hiawatha passenger train and Hiawatha Avenue, reusing infrastructure from the former and running parallel to the latter for a portion of the route. The line opened June 26, 2004, and was the first light rail service in Minnesota. An extension, Bottineau LRT, is planned to open in 2028.
The Northstar Line is a commuter rail route in the US state of Minnesota. Northstar runs 40 miles (64 km) from Big Lake to downtown Minneapolis at Target Field using existing track and right-of-way owned by the BNSF Railway. Passenger service began on November 16, 2009. The rail line serves part of the Northstar Corridor between Minneapolis and St. Cloud. Planning for the line began in 1997 when the Northstar Corridor Development Authority (NCDA) was formed. The corridor is also served by Interstate 94 and U.S. Highway 10. In 2023, the system had a ridership of 142,200, or about 500 per weekday as of the fourth quarter of 2023.
Metro Transit is the primary public transportation operator in the Minneapolis–Saint Paul area of the U.S. state of Minnesota and the largest operator in the state. Although Metro Transit is one of the smallest transit systems for a large metropolitan area in the United States, it has previously been ranked as one of the best. In 2023, the system had a ridership of 44,977,200, or about 145,600 per weekday as of the fourth quarter of 2023.
The Siemens–Duewag U2 is a type of light rail vehicle (LRV), built by consortium of Siemens, Duewag and Wegmann & Co built between 1968 and 1990.
The SD-100 and SD-160 are light rail vehicles (LRV) that were manufactured by Siemens Mobility between 1992 and 2013 for the North American market. The vehicles were all constructed at the Siemens facility in Florin, California.
The Metro Green Line is an 11-mile (18 km) light rail line that connects the central business districts of Minneapolis and Saint Paul in Minnesota as well as the University of Minnesota. An extension is under construction that will extend the line to the southwest connecting St. Louis Park, Hopkins, Minnetonka and Eden Prairie. The line follows the path of former Metro Transit bus route 16 along University Avenue and Washington Avenue. It is the second light-rail line in the region, after the Blue Line, which opened in 2004 and connects Minneapolis with the southern suburb of Bloomington.
The Bombardier Flexity Swift is a series of urban and inter-urban tram, light rail and light metro vehicles manufactured by Bombardier Transportation. It is part of the Bombardier Flexity family of rail vehicles, and like the others, Flexity Swift vehicles can be customized to suit the needs and requirements of customers including legacy designs from its acquisition of Adtranz.
The San Diego Trolley is a light rail system operating in the metropolitan area of San Diego. The Trolley's operator, San Diego Trolley, Inc., is a subsidiary of the San Diego Metropolitan Transit System (MTS). The trolley operates as a critical component of the MTS, with connections to and integrated travel tickets with the local bus systems.
The Charlotte Area Transit System (CATS) is the agency responsible for public transportation in the Charlotte metropolitan area. CATS operates bus and rail transit services in Mecklenburg County and surrounding areas. Established in 1999, CATS' bus and rail operations carry about 320,000 riders on an average week. CATS is governed by the Metropolitan Transit Commission and is operated as a department of the City of Charlotte. In 2023, the system had a ridership of 13,476,600, or about 42,600 per weekday as of the fourth quarter of 2023.
The Siemens S70 and its successor, the Siemens S700, are a series of low-floor light-rail vehicles (LRV) and modern streetcars manufactured for the United States market by Siemens Mobility, a division of German conglomerate Siemens AG. The series also includes a European tram-train variant, the Siemens Avanto.
The Southwest LRT is an under–construction 14.5-mile (23.3 km) light rail transit corridor in Hennepin County, Minnesota, with service between Minneapolis and Eden Prairie. The estimated one-way travel time from Southwest Station in Eden Prairie to Target Field Station in Minneapolis is 32 minutes. The Southwest LRT will extend through St. Louis Park, Hopkins and Minnetonka along the route. Major locations on the line will include Bde Maka Ska, Cedar Lake, the Walker Art Center, the Minneapolis Sculpture Garden and Target Field in downtown Minneapolis.
Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.
The Flexity Freedom is a low-floor, articulated light rail vehicle developed by Bombardier Transportation for the North American market. It is marketed as part of the Bombardier Flexity family which includes other models of trams (streetcars) and light metro vehicles. They are produced in facilities in Thunder Bay and Kingston, Ontario, which once produced rolling stock under the names of Canada Car and Foundry (CC&F) and Urban Transportation Development Corporation (UTDC), respectively.
The Alstom Flexity is a family of trams, streetcars and light rail vehicles manufactured by Bombardier Transportation, since 2021 a division of French company Alstom. As of 2015, more than 3,500 Flexity vehicles are in operation around the world in Europe, Asia, Oceania, and North America in 100 cities among 20 countries internationally. Production of the vehicles is done at Bombardier's global production plants and by local manufacturers worldwide through technology transfer agreements.
The Siemens SD-400 and SD-460 are light rail vehicles (LRV) that were manufactured by Siemens Mobility between 1985 and 2005 for the North and South American markets. The SD-400 was built under Siemens' joint venture with Duewag and assembled at both Duewag's factory in Düsseldorf, West Germany and the Siemens factory in Florin, California. Siemens purchased Duewag in 1999 and the SD-460 was assembled entirely at the Siemens factory in California.
The TriMet transit system, serving the Portland metropolitan area in Oregon, owns and operates two different rail transit systems: a light rail system known as MAX, and a commuter rail system known as WES. The fleet of 145 MAX electric light rail vehicles (LRVs) includes five different models, designated by TriMet as "Type 1" through "Type 6". All types are used on all of the MAX lines, but the Type 6 cars – which will gradually replace the Type 1 cars – are still being delivered and have not yet begun to enter service. The comparatively very small WES fleet includes three different types of diesel commuter rail cars.
The Siemens SD660, originally known as the Siemens SD600, is a double-articulated, 70%-low-floor light rail vehicle (LRV) manufactured by Siemens Transportation Systems. It was the first low-floor light rail vehicle to be used in the United States. It first entered service in 1997 with its only operator, TriMet, on the MAX light rail system in Portland, Oregon, United States.
The P2550 is an articulated high-floor electric light rail vehicle manufactured by AnsaldoBreda for the Los Angeles County Metropolitan Transportation Authority's Metro Rail system.