Dan Patch Corridor

Last updated
Dan Patch Corridor
Overview
Termini
  • Minneapolis
  • Northfield
Service
Type Commuter rail line
Technical
Line length40 miles (64 km)
CharacterCommuter rail
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route map
Dan Patch Map.png

The Dan Patch Corridor is a proposed commuter rail line that would serve a region which runs from Minneapolis to Northfield, Minnesota. The corridor consists of the tracks on the former Minneapolis St. Paul Rochester and Dubuque Electric Traction Company lines, which came to be known as the Dan Patch lines. It was proposed as a passenger rail line in 2000 after being identified as a "Tier One" corridor in the Minnesota Department of Transportation's 2000 Commuter Rail System Plan before being given a study ban during the 2002 Minnesota legislative session. It sat in relative silence until 2008, when bills were introduced in the Minnesota State Legislature to potentially revive discussion. On May 21, 2023, the Minnesota House of Representatives and Minnesota Senate passed an omnibus transit bill that removed the study ban for the Dan Patch line. [1] [2]

Contents

History

For more information on the MStPR&D and the MNS Ry., see the Minneapolis, Northfield and Southern Railway page.

The Dan Patch Corridor was the brainchild of entrepreneur Marion Willis Savage. Incorporated in 1907 as the Minneapolis St. Paul Rochester and Dubuque Electric Traction Company (MStPR&D), the line began service in 1908 as a passenger line running south from Minneapolis. Savage marketed the line as the "Dan Patch Line," a connection from Minneapolis to his farm in Savage, Minnesota, where he housed his famous harness racing horse, Dan Patch. After realizing that his horse was not enough to draw people to his rail line, he began work on Antlers Park, an amusement park on Lake Marion which opened in 1910. The line then experienced steady ridership growth between 1911 and 1915, and revenue obtained from the park was used to extend the line south to Northfield.

Despite the early successes, the MStPR&D began encountering trouble in 1914 when it found itself unable to completely finance several expansion projects, including a southern expansion to Faribault, Minnesota, which ultimately failed. Faced with growing debt, the line began taking on more freight traffic to make payments. The line found itself even further in debt by 1916, when Marion Willis Savage and Dan Patch died within several days of each other. Antlers Park was sold in 1917 to an employee of the MStPR&D, and the rail lines were taken over in 1918 by the Minneapolis, Northfield and Southern Railway (MN&S). [3]

Under the control of the MN&S, the corridor expanded and stretched all the way to Mankato in the south and Randolph, Minnesota, in the east in 1921 by means of a lease agreement between the MN&S and the Chicago Great Western Railway. This encouraged passenger rail traffic between Mankato and Minneapolis, and provided the MN&S with a successful source of revenue that the MStPR&D lacked. In addition to the passenger traffic, the MN&S attracted new freight traffic to the line, and profited from the increased revenue accrued.

This increased emphasis on freight traffic proved to be a lifeline for the MN&S after increased bus and car usage grew in the late 1920s. The loss of passenger traffic resulted in the cut of the Northfield-Mankato and Northfield-Randolph passenger lines by 1931. A halt in all passenger traffic followed soon thereafter in 1942. The lines continued as freight lines after that point. The MN&S was acquired by the Soo Line Railroad in 1982, and they, in turn, were sold to the Canadian Pacific Railway in 1992. [4]

Commuter rail

BSicon KINTa.svg
Minneapolis MultiModal
BSicon STR.svg
BSicon mTHSTxo.svg
Saint Louis Park
BSicon STR.svg
BSicon eABZgr.svg
BSicon HST.svg
Edina
BSicon HST.svg
Bloomington
BSicon WBRUCKE1.svg
Minnesota River
BSicon HST.svg
Savage
BSicon HST.svg
Burnsville
BSicon HST.svg
Lakeville
BSicon KBHFe.svg
Northfield

1998–2002: The line's resurgence

In 1997, at the request of the Minnesota state legislature, the Minnesota Department of Transportation (MnDOT) initiated a study investigating the feasibility of Commuter Rail in Minnesota. The study, released in 1998 and presented to the legislature in 1999, named the Dan Patch corridor as one of the three corridors in Minnesota with the highest potential for success. [5] In 2000, the proposal was included in MnDOT's Commuter Rail System plan as a "Tier One" corridor, again seen as a project with a great likelihood of success. [6] The plan placed the line at the third stage of the Minnesota commuter rail plan, to be developed after the Northstar Corridor from Minneapolis to Big Lake (operational as of 2009) and the Red Rock Corridor running from Minneapolis to Hastings were completed.

2002: Study ban

The plan was still under consideration until 2002, when a bill banning further study on the route was pushed through the Minnesota legislature by two state senators, William Belanger (R-Bloomington) and Roy Terwilliger (R-Edina) who represented parts of the Twin Cities suburban area along the route.

The law (Chapter 393, Sec. 85. Dan Patch Commuter Rail Line; Prohibitions) requires removing all references, other than references for historical purposes, to the Dan Patch commuter rail line from any future revisions to the Metropolitan Council's Transportation Development Guide and Regional Transit Master Plan, the State Transportation Plan, and the Commissioner of Transportation's Commuter Rail System Plan. Additionally, the Metropolitan Council, Commissioner of Transportation, and regional rail authorities must not expend any money for study, planning, preliminary engineering, final design, or construction for the Dan Patch commuter rail line. [7]

2008: Reintroduction

The corridor sat in relative obscurity for six years until discussion began again in the media and among public officials. Congestion along the route and further discussion about transit in general in Minnesota prompted legislators to introduce a bill at the beginning of the 2008 session to lift the ban and allow discussion to continue. [8] [9] The bill was not acted on during the session.

2010 Minnesota State Rail Plan

Under the 2010 Minnesota State Rail Plan, a commuter rail line from Minneapolis to Mankato is proposed. This commuter rail line would run on the Dan Patch Line to Savage before entering Union Pacific's Mankato Subdivision using a new interchange built between the two rail lines.

2014: Name change

The Dan Patch Moratorium has been in law for over a decade, but there may be a way around the gag order; studying inter-city regional rail service instead of commuter rail service on the Dan Patch Corridor. A group of southern Minnesota communities including Northfield, Fairbault, and Owatonna may form a partnership to continue study of the Dan Patch Corridor in the form of inter-city regional rail service from as far south as Iowa to downtown Minneapolis. In addition Northfield has expressed interest in passenger rail service to downtown St. Paul. [10]

2016: Tier 1 Status

The Minnesota Department of Transportation upgraded the Dan Patch Corridor to Tier 1 Status under the 2015 State Rail Plan, meaning the project should be implemented by 2030. Minneapolis, Edina, Bloomington, and Burnsville are open to the proposal of passenger rail on the Dan Patch Corridor, but have no official stance. Savage and Northfield have an official stance supporting the Dan Patch Corridor project, while St. Louis Park and Lakeville have official stances against the project.

2017: Edina Study

The Edina Transportation Commission and consultant Kimley-Horn conducted a study on the pros and cons of passenger rail on the Dan Patch Line. The most suitable station location was determined to be in the Grandview District due to business activity and jobs in the area as well as undeveloped land that could be used for a transit station and transit oriented development.

The majority of public feedback was negative, particularly from residents who live along the route. The study concluded with a recommendation not to pursue passenger rail on the Dan Patch Line at this time (as of 2018).

2023: Gag Order Rescinded

The above referenced 2002: Study Ban "Gag Order" was rescinded in by the Minnesota Legislature in May 2023. [11]

Current commuter corridor

The Dan Patch Corridor from Northfield and Minneapolis broadly parallels the major commuter route of Interstates 35 and 35W, and proponents expect the service to siphon traffic from those highways. The line is proposed to use existing track and right-of-way owned by the Soo Line Railroad, being significantly cheaper than building a new rail corridor. Parts of the rail line are served by Progressive Rail and the Soo Line (doing business as Canadian Pacific Railway). Twin Cities and Western Railroad has trackage rights on the corridor, and owns the Dan Patch Line Bridge to access Port Cargill in Savage. Between Savage and Lakeville the tracks are out of service, having been last used in the early 1990s by the Soo Line.

Related Research Articles

<span class="mw-page-title-main">Edina, Minnesota</span> City in Minnesota, United States

Edina is a city in Hennepin County, Minnesota, United States and a first-ring suburb of Minneapolis. The population was 53,494 at the 2020 census, making it the 18th most populous city in Minnesota.

<span class="mw-page-title-main">Northstar Line</span> Commuter rail route in Minnesota, United States

The Northstar Line is a commuter rail route in the US state of Minnesota. Northstar runs 40 miles (64 km) from Big Lake to downtown Minneapolis at Target Field using existing track and right-of-way owned by the BNSF Railway. Passenger service began on November 16, 2009. The rail line serves part of the Northstar Corridor between Minneapolis and St. Cloud. Planning for the line began in 1997 when the Northstar Corridor Development Authority (NCDA) was formed. The corridor is also served by Interstate 94 and U.S. Highway 10. In 2022, the system had a ridership of 77,100, or about 300 per weekday as of the third quarter of 2023.

Metro Transit is the primary public transportation operator in the Minneapolis–Saint Paul area of the U.S. state of Minnesota and the largest operator in the state. Although Metro Transit is one of the smallest transit systems for a large metropolitan area in the United States, it has previously been ranked as one of the best. In 2022, the system had a ridership of 38,794,700, or about 138,800 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Interstate 494</span> Highway in Minnesota

Interstate 494 (I-494) is an auxiliary Interstate Highway making up part of a beltway of I-94, circling through the southern and western portions of the Minneapolis–Saint Paul metropolitan area in Minnesota. The 42.94-mile (69.11 km) road is coupled with I-694 at each end and composes more than half of the major beltway of the region. I-694/I-494 also act as loop routes for I-35E and I-35W.

<span class="mw-page-title-main">Saint Paul Union Depot</span> Train station in Saint Paul, Minnesota

Saint Paul Union Depot is a historic railroad station and intermodal transit hub in the Lowertown neighborhood of Saint Paul, Minnesota. It serves light rail, intercity rail, intercity bus, and local bus services.

<span class="mw-page-title-main">Soo Line Railroad</span> American class I railroad

The Soo Line Railroad is one of the primary United States railroad subsidiaries for the CPKC Railway, one of six U.S. Class I railroads, controlled through the Soo Line Corporation. Although it is named for the Minneapolis, St. Paul and Sault Ste. Marie Railroad (MStP&SSM), which was commonly known as the Soo Line after the phonetic spelling of Sault, it was formed in 1961 by the consolidation of that company with two other CPKC subsidiaries: The Duluth, South Shore and Atlantic Railway, and the Wisconsin Central Railway. It is also the successor to other Class I railroads, including the Minneapolis, Northfield and Southern Railway and the Chicago, Milwaukee, St. Paul and Pacific Railroad. On the other hand, a large amount of mileage was spun off in 1987 to Wisconsin Central Ltd., now part of the Canadian National Railway. The Soo Line Railroad and the Delaware and Hudson Railway, CPKC's other major subsidiary, presently do business as the Canadian Pacific Railway (CP). Most equipment has been repainted into the CP scheme, but the U.S. Surface Transportation Board groups all of the company's U.S. subsidiaries under the Soo Line name for reporting purposes. The Minneapolis headquarters are in the Canadian Pacific Plaza building, having moved from the nearby Soo Line Building.

<span class="mw-page-title-main">Minneapolis, Northfield and Southern Railway</span>

The Minneapolis, Northfield and Southern Railway was an 87-mile (140 km) long American shortline railroad connecting Minneapolis and Northfield, Minnesota. It was incorporated in 1918 to take over the trackage of the former Minneapolis, St. Paul, Rochester and Dubuque Electric Traction Company, also known as the Dan Patch Lines. On June 2, 1982, it was acquired by the Soo Line Railroad, which operated it as a separate railroad until merging it on January 1, 1986, along with the Chicago, Milwaukee, St. Paul and Pacific Railroad.

<span class="mw-page-title-main">Twin Cities and Western Railroad</span> Railway line in the United States of America

The Twin Cities and Western Railroad is a railroad operating in the U.S. state of Minnesota which started operations on July 27, 1991. Trackage includes the former Soo Line Railroad "Ortonville Line", originally built as the first part of the Pacific extension of the Milwaukee Road. This main line extends from Hopkins, Minnesota ,to Appleton, Minnesota. The line was originally built between Hopkins and Cologne, Minnesota, in 1876 by Hastings and Dakota Railroad. In 1913, the Milwaukee Road rerouted it, reducing the curves. The line was eventually extended to the Pacific.

<span class="mw-page-title-main">Transportation in Minnesota</span> Overview of transportation in Minnesota

Transportation in the U.S. State of Minnesota consists of a complex network of roadways, railways, waterways and airports. The transportation system is generally overseen by the Minnesota Department of Transportation, a cabinet-level agency of the state government. Additionally, regional governments such as the Metropolitan Council have authority over regional planning for the transportation system and local governments such as cities and counties oversee the local transportation network.

<span class="mw-page-title-main">Target Field station</span> Transit hub in Minneapolis, Minnesota

Target Field station is a multimodal commuter train and light rail station in Minneapolis, Minnesota. Located in the North Loop area of Downtown Minneapolis, the station is named for Target Field, the Minnesota Twins baseball stadium. METRO Blue Line light rail service started on November 14, 2009; Northstar Line commuter rail service started November 16, 2009; METRO Green Line light rail service started on June 14, 2014.

There are several passenger rail projects being discussed in Minnesota. There is one existing commuter rail service in the state, the Northstar Line, and one existing long-distance intercity rail service, the Empire Builder. Future projects include a mixture of short-distance commuter rail and medium-distance regional rail lines which would run from the Twin Cities outward to neighboring states and perhaps Canada.

<span class="mw-page-title-main">Metro Orange Line (Minnesota)</span> Minnesota bus line

The Metro Orange Line is a bus rapid transit line in the Twin Cities, Minnesota operated by Metro Transit. The line operates primarily along Interstate 35W from downtown Minneapolis through Richfield and Bloomington before terminating in Burnsville, Minnesota. The Orange Line provides access to 198,000 jobs with roughly a quarter of them outside downtown Minneapolis. The route serves a mix of stations located in the center of the highway, stations near highway exits, and on-street stations. The line has features typical of bus rapid transit systems with off-board fare payment, articulated buses with extra doors, stations with improved passenger amenities, and transit-only bus lanes on portions of the route.

In addition to the proposed transit projects in the Twin Cities region, there have been some transit corridors that are no longer proposed.

The Northern Lights Express (NLX) is a planned higher-speed rail service that would run 155 miles (249 km) between Minneapolis and Duluth primarily in the U.S. state of Minnesota. A portion of the proposed line would run through neighboring Wisconsin to serve Duluth's "Twin Port" of Superior. Plans are to upgrade an existing BNSF Railway freight line to allow trains to travel at up to 90 miles per hour (145 km/h). The train service is said to provide an alternative to traveling Interstate 35 between Duluth and the Twin Cities or to other destinations along the line such as the casino in Hinckley.

<span class="mw-page-title-main">Fridley station</span>

Fridley station is a commuter rail station in Fridley, Minnesota, located at Main Street NE and 61st Avenue NE. It is served by the Northstar Commuter Rail line. The station features bicycle lockers and two park and ride lots with a total capacity of 611 spaces. The commute time to downtown Minneapolis from this station is about 20 minutes. The station has a single platform on one main track, which is accessible on either side of the tracks through a tunnel.

<span class="mw-page-title-main">Dan Patch Line Bridge</span> Bridge in Minnesota and Savage, Minnesota

The Dan Patch Line Bridge is a railroad swing bridge that carries the Canadian Pacific Railway's MN&S Subdivision across the Minnesota River in the U.S. state of Minnesota. The MN&S Subdivision originated as the Minneapolis, St. Paul, Rochester and Dubuque Electric Traction Company, more commonly known as the Dan Patch Lines. Today's name for the rail line comes from the Minneapolis, Northfield and Southern Railroad, which took over the Dan Patch route after the original railroad fell into bankruptcy. Despite being met by Canadian Pacific rails at either end, the bridge itself is owned by the Twin Cities and Western Railroad which has trackage rights on the CP line to the north. The TC&W purchased the bridge in order to protect a route that may become important in the future.

<span class="mw-page-title-main">Zip Rail</span> Proposed passenger rail line in Minnesota, US

Zip Rail is a proposed passenger train that would link the Minneapolis–Saint Paul, Minnesota metropolitan area with the city of Rochester, also in the U.S. state of Minnesota. The project was previously branded as Rochester Rail Link.

The MN&S Spur is a 18.5-mile (29.8 km) railroad line operated by the Progressive Rail Inc. The route runs through suburbs immediately west of Minneapolis, Minnesota, from MN&S Junction in Crystal south to Auto Club Junction in Bloomington near the Minnesota River. This path is parallel to Minnesota State Highway 100, which is about half a mile east of the rail line.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

Jessica "Jess" Hanson is an American politician serving in the Minnesota House of Representatives since 2021. A member of the Minnesota Democratic-Farmer-Labor Party (DFL), Hanson represents District 55A in the southern Twin Cities metropolitan area, which includes the cities of Burnsville and Savage and parts of Dakota and Scott Counties.

References

  1. Representative Jess Hanson's Twitter, (May 21, 2023)
  2. Minnesota Legislature,
  3. "Minnesota Statewide Historic Railroads Study Project Report, pages 26–32" (PDF). Minnesota Department of Transportation. 2007. Archived from the original (PDF) on June 25, 2008. Retrieved April 9, 2008.
  4. "Minnesota Statewide Historic Railroads Study Project Report, pages 32–35" (PDF). Minnesota Department of Transportation. 2007. Archived from the original (PDF) on June 25, 2008. Retrieved April 9, 2008.
  5. "Twin Cities Metropolitan Commuter Rail Feasibility Study". Minnesota Department of Transportation. 1999. Archived from the original on February 13, 2007. Retrieved April 9, 2008.
  6. "Minnesota Commuter Rail System Plan". Minnesota Department of Transportation. 2000. Archived from the original on June 5, 2008. Retrieved April 10, 2008.
  7. "Minnesota Session Laws – 82nd Legislative Session (2001–2002)". Minnesota House of Representatives. 2002. Archived from the original on February 8, 2009. Retrieved May 4, 2008.
  8. "Southern commuter rail plan gets new life". Minneapolis Star Tribune. February 16, 2008. Retrieved April 10, 2008.
  9. "Dan Patch rail line is getting lip service". The Jordan Independent. 2008. Archived from the original on August 19, 2011. Retrieved April 10, 2008.
  10. Webb, Grace (September 27, 2018). "Northfield City Council to discuss possible intercity regional passenger rail line". Northfield News.
  11. "Dan Patch rail line gag order lifted after two decades". 24 May 2023.