Twin Cities 400

Last updated
400
Twin Cities 400
The 400 steam powered Chicago and North Western 1936.JPG
The 400 of 1936
Overview
Service type Express train
StatusDiscontinued
Locale Minnesota, Wisconsin, Illinois
First serviceJanuary 2, 1935
Last serviceJuly 23, 1963
Former operator(s)
Route
Termini Great Northern Depot,
Minneapolis, Minnesota
North Western Terminal,
Chicago, Illinois
Stops10
Train number(s)400, 401
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Operating speed63 mph (101 km/h) average (1950–1955)
Route map
BSicon KBHFa.svg
419.2 mi
674.6 km
Minneapolis
BSicon hKRZWae.svg
BSicon BHF.svg
408.6 mi
657.6 km
Saint Paul
BSicon hKRZWae+GRZq.svg
BSicon HST.svg
323.1 mi
520 km
Eau Claire
BSicon HST.svg
279.2 mi
449.3 km
Merrillan
BSicon HST.svg
238.9 mi
384.5 km
Wyeville
BSicon hKRZWae.svg
BSicon HST.svg
209.5 mi
337.2 km
Adams
BSicon HST.svg
148 mi
238 km
South Beaver Dam
BSicon BHF.svg
85 mi
137 km
Milwaukee
BSicon HST.svg
61.9 mi
99.6 km
Racine
BSicon STR+GRZq.svg
BSicon HST.svg
12 mi
19 km
Evanston
BSicon KBHFe.svg
0 mi
0 km
Chicago

The 400 [1] (later named the Twin Cities 400 [2] ) was a named passenger train operated by the Chicago and North Western Railway between Chicago and Saint Paul, with a final stop in Minneapolis. The train took its name from the schedule of 400 miles between the cities in 400 minutes, and was also a nod to "The Four Hundred Club", a term coined by Ward McAllister to refer to the social elite of New York City in the late 19th century. [3] It was an express train with limited stops between Chicago and the Twin Cities. The "400" ran from 1935 to 1963 on the Chicago to Twin Cities route. The C&NW later named their other passenger trains using the number "400". [2]

Contents

Background

A lightweight streamlined train, the Pioneer Zephyr, was introduced in 1934 the United States by the Chicago, Burlington and Quincy Railroad. The CB&Q was a competitor to the Chicago and North Western Railway on Chicago to Minneapolis-St.Paul rail service. The C&NW had not invested in the new diesel powered passenger train technology, but decided to upgrade track and motive power for higher speeds with heavyweight, steam-powered trains.

Adams cutoff

The main route between Chicago and the Twin Cities for the C&NW went through Madison, Wisconsin and met the Chicago, St. Paul, Minneapolis and Omaha Railway in Elroy, Wisconsin. The C&NW Chicago to St. Paul Viking train used this route through Madison, taking about 12 hours. In 1910, the Milwaukee, Sparta, and Northwestern Railroad, a subsidiary of the C&NW, began the "Air Line" or "Adams Cutoff" from Adams, Wisconsin towards Sparta, Wisconsin. [4] It began operation in 1911. This railroad met the Omaha Railway in Wyeville, Wisconsin as part of the new route between Milwaukee and St. Paul, but not going through Madison. It became the route for the overnight North Western Limited, which used heavyweight Pullman cars between Chicago and the Twin Cities. [5] The North Western Limited took 12 hours on this route.

Higher speed to Milwaukee

C&NW made their first upgrades in 1934 along the 85-mile (137 km) line between Chicago and Milwaukee, Wisconsin, introducing the 90-minute Pacemaker service to compete with the Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road) which introduced a similar train. [6] [7]

Competition to the Twin Cities

Attention then turned to faster trains to Saint Paul: The CB&Q ran a Zephyr demonstration train between Chicago and the Twin Cities that summer with the intent to run regular service the next year, and the Milwaukee Road introduced similar plans. The C&NW focused on the Adams cutoff route running west from Milwaukee. The railroad also upgraded its locomotives and passenger cars. Four C&NW Class E-2 4-6-2 Pacific locomotives built by American-Schenectady in 1923 were converted to run on oil rather than coal and had other upgrades to help them run at high speed, becoming Class E-2-a engines. The passenger cars got air conditioning and improved suspension parts for a smoother ride.

Service history

A test run was made on December 30, 1934, but the regular train started on January 2, 1935. Time dubbed the 400, "the fastest train scheduled on the American Continent, fastest in all the world on a stretch over 200 mi." [8] While the 400 implied "400 miles in 400 minutes", Chicago to St. Paul was 408.6 miles (657.6 km) in 420 minutes (7 hours), with the station stop at St. Paul and the last leg to Minneapolis taking another 30 minutes. [9] The 400s had priority over all other trains; the employee timetable specified that "Freight trains, transfer trains, and switch engines must clear the schedules of Nos. 400 and 401 [by] fifteen (15) minutes." Other 400 trains would receive similar instructions in later years, and the rule remained in effect for most of the Twin Cities 400's existence. [10]

On the first day the train reached 91 miles per hour (146 km/h). [8] On April 28 the schedule was shortened by 30 minutes to reach the mile-a-minute pace the line promised, and matching the 6½-hour pace of the newly introduced Milwaukee Road Hiawatha and the Burlington's Twin Cities Zephyr . This included a 75-minute schedule between Chicago and Milwaukee, averaging 68 mph (109 km/h) there and 63 mph (101 km/h) overall. [11] One day in late 1935 the 400 needed to make up time and reached 108 mph (174 km/h). Later, streamlined diesel trains were said to reach 112 mph (180 km/h).

C&NW renamed the first 400 to Twin Cities 400 in late 1941 as the C&NW prepared to rename almost all of its passenger trains as part of the 400 fleet, including the Flambeau 400 , Minnesota 400 , Peninsula 400 , Shoreland 400, Valley 400 and the later Kate Shelley 400 .

From 1950 to 1955 the train ran its shortest schedule, 6¼ hours between St. Paul and Chicago, an average of over 65 mph (105 km/h). In 1952 the railroad installed automatic train stop along the eastern half of the route from Chicago to Wyeville due to regulations from the Interstate Commerce Commission. This allowed the train to run at 95 to 100 mph (153 to 161 km/h) there, although the western part of the line did not get upgrades and was limited to 79 mph (127 km/h). The pace reverted to a 6½-hour schedule in 1955 and in 1960 to the 7-hour pace established in 1935. C&NW ceased running the Twin Cities 400 in 1963 and all intercity passenger service on C&NW ended with the formation of Amtrak in 1971. Today, the Twin Cities to Chicago route is served by the Amtrak Borealis , which takes about seven hours. The route is also covered by the Seattle/Portland-to-Chicago Empire Builder . Both trains run on the former Milwaukee Road, now Canadian Pacific.

July 1959 derailment

On July 30, 1959, the Twin Cities 400 left the rails between Knapp and Menomonie in Dunn County, Wisconsin. [12] Fifty people were taken to area hospitals with injuries out of the 115 passengers.

Equipment

The 400 was notable for fast trains of its day in that it originally ran with rebuilt or upgraded, rather than new equipment. This stood in stark comparison to the Milwaukee Road's Hiawatha and the Burlington Zephyrs , each of which first ran with brand new locomotives and cars. Each 400 train required two steam locomotives, which were swapped partway through the trip, primarily because some grease fittings on the train could not withstand the entire journey at high speed.

The steam locomotives were upgraded to feature a 45° lamp on top of the boiler just ahead of the smokestack. These lights were intended to announce the approach of the train and could be seen for a great distance in rural areas. In 1937, one locomotive was equipped with a prototype Mars light, the first ever put into use. The three-million-candela lamp had a gyrating reflector which traced a figure-8 pattern ahead of the engine.

C&NW updated the train in 1939 with two pairs of EMD E3A locomotives and lightweight streamlined passenger cars. [13] Two engines were required because the diesels didn't have as much power as the older steam locomotives. However, they were extremely reliable, with only one major breakdown in the first two years of service. These were followed by E6 locomotives in 1941, and E7s in 1947. E8s saw some service in the 1950s, though they were initially purchased for other routes.

Route

The train originated at the Chicago and North Western Terminal (now the Ogilvie Transportation Center) on Madison Street in Chicago. It ran to Milwaukee on the lakefront commuter line and stopped at the Lake Front Depot on Wisconsin Avenue. It ran to Wyeville, Wisconsin where it followed the Omaha Road route to St. Paul. It stopped at the Saint Paul Union Depot, and then made the short run to the Minneapolis Great Northern Depot over the Stone Arch Bridge.

The North Western Limited train was an overnight train that also used the Twin Cities 400 route, but taking 9 hours and only stopping at Altoona and Adams between St. Paul and Milwaukee. [1]

The Viking was another named C&NW passenger train that followed a different route, through Elroy, Wisconsin and Madison, Wisconsin, and made limited stops between Chicago and St. Paul. It took roughly 12 hours as a daylight train. [1] The Victory was the overnight train on this route. [1]

Name

Along the routes of the Twin Cities 400 and its sister trains, there were a number of bars titled "400 Club", paying homage to the train and the social status.

Related Research Articles

<span class="mw-page-title-main">Milwaukee Road</span> Class I railroad that operated in the Midwest and Northwest of the United States

The Chicago, Milwaukee, St. Paul and Pacific Railroad (CMStP&P), better known as the Milwaukee Road, was a Class I railroad that operated in the Midwest and Northwest of the United States from 1847 until 1986.

<i>Hiawatha Service</i> Amtrak service between Chicago, IL and Milwaukee, WI

The Hiawatha Service, or simply Hiawatha, is an 86-mile (138 km) train route operated by Amtrak on the western shore of Lake Michigan between Chicago, Illinois, and Milwaukee, Wisconsin. However, the name was historically applied to several different routes that extended across the Midwest and to the Pacific Ocean. As of 2007, twelve to fourteen trains ran daily between Chicago and Milwaukee, making intermediate stops in Glenview, Illinois; Sturtevant, Wisconsin; and Milwaukee Mitchell International Airport. The line is partially supported by funds from the state governments of Wisconsin and Illinois. The line utilizes the CPKC Railway's C&M Subdivision and Metra's Milwaukee District North Line.

<span class="mw-page-title-main">Saint Paul Union Depot</span> Train station in Saint Paul, Minnesota

Saint Paul Union Depot is a historic railroad station and intermodal transit hub in the Lowertown neighborhood of Saint Paul, Minnesota. It serves light rail, intercity rail, intercity bus, and local bus services.

<i>City of Denver</i> (train) Streamlined passenger train of the Union Pacifiic Railroad

The City of Denver was a streamlined passenger train operated by the Union Pacific Railroad between Chicago, Illinois, and Denver, Colorado. It operated between 1936 and 1971. From 1936–1955 the Chicago and North Western Railway handled the train east of Omaha, Nebraska; the Chicago, Milwaukee, St. Paul and Pacific Railroad handled it thereafter. The train was the fastest long-distance train in the United States when it debuted in 1936, covering 1,048 miles (1,687 km) in 16 hours. For almost its entire career its principal competitor was the Chicago, Burlington and Quincy Railroad's Denver Zephyr. When Amtrak assumed operation of most intercity trains in the United States in 1971, it discontinued the City of Denver, preferring to use the Burlington's route between Chicago and Denver.

<i>Hiawatha</i> (train) Fleet of luxury passenger trains originating in Chicago, Il.

The Hiawathas were a fleet of named passenger trains operated by the Chicago, Milwaukee, St. Paul and Pacific Railroad between Chicago and various destinations in the Midwest and Western United States. The most notable of these trains was the original Twin Cities Hiawatha, which served the Twin Cities in Minnesota. The train was named for the epic poem The Song of Hiawatha by Henry Wadsworth Longfellow.

<span class="mw-page-title-main">Chicago and North Western Transportation Company</span> Rail transport company

The Chicago and North Western was a Class I railroad in the Midwestern United States. It was also known as the "North Western". The railroad operated more than 5,000 miles (8,000 km) of track at the turn of the 20th century, and over 12,000 miles (19,000 km) of track in seven states before retrenchment in the late 1970s. Until 1972, when the employees purchased the company, it was named the Chicago and North Western Railway.

<span class="mw-page-title-main">Chicago Hub Network</span> Proposed rail lines in the Midwestern US

The Chicago Hub Network is a collection of proposed fast conventional and high-speed rail lines in the Midwestern United States including 3,000 miles (5,000 km) of track. Since the 1990s, there have been multiple proposals to build a network from Chicago to destinations such as Milwaukee, Madison, Minneapolis, Indianapolis, Detroit, Kansas City, St. Louis, Cleveland, Cincinnati, and Louisville. In addition, the rail lines from the Chicago hub would connect through to cities in Canada. Eastern routes from Chicago would also blend into the Ohio Hub network. In addition to providing better connections between Midwestern cities, the projects are intended to reduce or eliminate the operating subsidies that American passenger train routes currently require.

<span class="mw-page-title-main">Milwaukee Road class F7</span> Class of 6 streamlined 4-6-4 steam locomotives

The Milwaukee Road's class "F7" comprised six (#100–#105) high-speed, streamlined 4-6-4 "Baltic" (Hudson) type steam locomotives built by the American Locomotive Company (ALCO) in 1937–38 to haul the Milwaukee's Hiawatha express passenger trains. Following on from the success of the road's class "A" 4-4-2s, the F7s allowed the road to haul heavier trains on the popular Chicago–Twin Cities routes.

<i>Twin Zephyr</i> American trainset

The Twin Zephyrs, also known as the Twin Cities Zephyrs, were a pair of streamlined passenger trains on the Chicago, Burlington and Quincy Railroad (CB&Q), running between Chicago and the Twin Cities of Minneapolis and Saint Paul in Minnesota. It was the second Zephyr service introduced by CB&Q after the record-setting Denver–Chicago "dawn to dusk dash" of the Pioneer Zephyr trainset.

<i>Twin Cities Hiawatha</i> Former passenger train from Chicago to Minneapolis–Saint Paul

The Twin Cities Hiawatha, often just Hiawatha, was a named passenger train operated by the Chicago, Milwaukee, St. Paul and Pacific Railroad, and traveled from Chicago to the Twin Cities. The original train takes its name from the epic poem The Song of Hiawatha by Henry Wadsworth Longfellow. There are a number of Hiawatha-themed names within the city of Minneapolis, the terminus of the original train. The first Hiawatha ran in 1935; in 1939 the Milwaukee Road introduced a second daily trip between Chicago and Minneapolis. The two trains were known as the Morning Hiawatha and Afternoon Hiawatha, or sometimes the AM Twin Cities Hiawatha and PM Twin Cities Hiawatha. The Milwaukee Road discontinued the Afternoon Hiawatha in 1970 while the Morning Hiawatha continued running until the formation of Amtrak in 1971.

<span class="mw-page-title-main">Zip Rail</span> Proposed passenger rail line in Minnesota, US

Zip Rail is a proposed passenger train that would link the Minneapolis–Saint Paul, Minnesota metropolitan area with the city of Rochester, also in the U.S. state of Minnesota. The project was previously branded as Rochester Rail Link.

<i>Minnesota 400</i>

The Minnesota 400 was a streamlined passenger train operated by the Chicago and North Western Railway on its southern Minnesota line between Mankato, Minnesota and Wyeville, Wisconsin. It began running in 1936. In 1950 it was extended to run between Chicago, Illinois and Huron, South Dakota and renamed the Dakota 400. It would be further extended to Rapid City, South Dakota, before being cut back to Mankato, in 1960. This final iteration was named the Rochester 400 and it ceased operation in 1963.

<span class="mw-page-title-main">Lake Front Depot</span>

The Lake Front Depot was a train station in Milwaukee, Wisconsin built in 1889–1890 by the Chicago and North Western Railway (C&NW). It was located near the shore of Lake Michigan at the end of East Wisconsin Avenue, by today's Milwaukee County War Memorial. The structure was built with stone in the Romanesque style, and had a tall clock tower which reached 234 feet (71 m) high. The depot cost $200,000 to build at the time, and eventually served 98 trains a day.

<span class="mw-page-title-main">400 State Trail</span> Rail trail in Southern Wisconsin

The 400 State Trail is a 22-mile (35 km) rail trail between Reedsburg and Elroy, Wisconsin. It is designed for foot, bicycle, equestrian, snowmobile traffic. It is designated as a multi-use trail, offering recreational access to the routes, and is open to the public.

<i>Peninsula 400</i> Former passenger train service

The Peninsula 400 was a daily express passenger train operated by the Chicago and North Western Railway between Chicago and Ishpeming, in Michigan's Upper Peninsula. It operated as a named consist from 1942 to 1969. It was one of the railroad's 400 passenger trains, whose name stemmed from the original '400-mile, 400-minute' express operated by the railroad between Chicago and Minneapolis–St. Paul.

<i>The Hiawatha Story</i>

The Hiawatha Story is a 1970 non-fiction book on railroad history by Jim Scribbins, then an employee of the Chicago, Milwaukee, St. Paul and Pacific Railroad. The book covers the history of the Milwaukee Road's most famous passenger train, the Hiawatha, from its creation in 1934–1935 up through 1970. The book also covered the various other Milwaukee Road trains which carried the name "Hiawatha."

<span class="mw-page-title-main">Altoona Subdivision</span>

The Altoona Subdivision or Altoona Sub is a 90.7-mile (146.0 km) railway line owned and operated by the Union Pacific Railroad in the states of Minnesota and Wisconsin. The line originates in Saint Paul, Minnesota, crosses the St. Croix River on the Hudson Bridge into Hudson, Wisconsin, and eventually terminates in Altoona, Wisconsin where it connects to the Wyeville Subdivision. This subdivision is formerly a Chicago and North Western Railway (C&NW) mainline, on which the Twin Cities 400 operated in the mid 1900s.

The Wyeville Subdivision or Wyeville Sub is a 82.8-mile (133.3 km) railway line owned and operated by the Union Pacific Railroad. It meets the Altoona Subdivision to the west in Altoona, Wisconsin and runs to Wyeville, Wisconsin to the east where it connects with the Adams Subdivision. Construction began in 1868 by the West Wisconsin Railway and was completed in 1872. The line then became part of the Chicago, St. Paul, Minneapolis and Omaha Railway in 1878; the Chicago and North Western Railway acquired control of this road in 1882. The CNW then became part of UP in 1995.

<i>Borealis</i> (train) Amtrak inter-city rail service

The Borealis, referred to as Twin Cities–Milwaukee–Chicago (TCMC) during planning, is an Amtrak inter-city rail service that operates daily between Chicago, Illinois, and Saint Paul, Minnesota, via Milwaukee, Wisconsin. The first service began on May 21, 2024 under the Amtrak Midwest brand.

References

  1. 1 2 3 4 Chicago & North Western Railway Route of the "400" The Streamliners and the Challengers [Time Table]. Rand McNally, January 15, 1939. Chicago, IL
  2. 1 2 Chicago & North Western Railway Through Passenger Schedules [Time Table]. Rand McNally, April 29, 1962. Chicago, IL
  3. Scribbins, Jim (2008) [1982]. The 400 Story. Minneapolis, Minnesota: University of Minnesota Press. ISBN   978-0-8166-5449-9.
  4. History of Monroe County, Wisconsin: Past and Present Including an Account of the Cities, Towns and Villages of the County. Unigraphic. 1912.
  5. The North Western Limited (timetable and pamphlet). Rand McNally, Chicago, IL 1926
  6. Scribbins 2008 , p. 9
  7. S. E. Noble (1936). "New Signaling on the Route of the C & NW "400"". Railway Signaling and Communications. Simmons-Boardman Publishing Corporation. pp. 573–579.
  8. 1 2 "400". Time Magazine Archive. January 14, 1935. Archived from the original on January 5, 2013. Retrieved March 8, 2007.
  9. Scribbins 2008 , p. 10
  10. Scribbins 2008 , p. 17
  11. Scribbins 2008 , p. 25
  12. Line of trees averts tragedy when train derails [ permanent dead link ] Chippewa Herald, reprint August 9, 2009
  13. Railway Age. Simmons-Boardman. 1939. pp. 419–.

Bibliography