Minety and Ashton Keynes railway station

Last updated

Minety and Ashton Keynes
Site of Minety and Ashton Keynes Station - geograph.org.uk - 40000.jpg
Station site in 2005
Location Minety, Wiltshire, Wiltshire
England
Coordinates 51°36′53″N1°57′06″W / 51.6147°N 1.9516°W / 51.6147; -1.9516 Coordinates: 51°36′53″N1°57′06″W / 51.6147°N 1.9516°W / 51.6147; -1.9516
Grid reference SU034906
Platforms2
Other information
StatusDisused
History
Original company Cheltenham and Great Western Union Railway
Pre-grouping Great Western Railway
Post-groupingGreat Western Railway
Key dates
31 May 1841 (1841-05-31)Opened as Minety
18 August 1905Renamed Minety and Ashton Keynes
2 November 1964 (1964-11-02)Closed

Minety and Ashton Keynes railway station serving the village of Minety in Wiltshire, England, was opened in 1841 on the former Cheltenham and Great Western Union Railway line from Gloucester to Swindon; it was originally called just Minety.

The Cheltenham and Great Western Union connected to the South Wales Railway in Gloucester and to the Great Western Railway at Swindon. The Cheltenham and Great Western Union and the South Wales lines were both later absorbed by the Great Western Railway, which provided the train services on the line. In 1905 the station was renamed Minety & Ashton Keynes. In 1948 the Great Western Railway was nationalised and the station thereafter was owned by British Rail. Although the line remains open the station closed in November 1964 and has been demolished, except for parts of the platforms. [1]

Trains run along what is now called the Golden Valley Line from London Paddington via Reading, Didcot Parkway and Swindon, then past the three closed stations of Purton, Minety and Oaksey Halt to Kemble, continuing to Stroud, Stonehouse, Gloucester and Cheltenham Spa. When engineering work closes the Severn Tunnel, trains from Paddington to Swansea are diverted from the Great Western Main Line and South Wales Main Line via Bristol Parkway, to then run through Minety and via Kemble to Gloucester, then along the Gloucester to Newport Line through Lydney, Chepstow and Caldicot before rejoining the normal line at Severn Tunnel Junction.

Originally built as dual track, British Rail reduced the line between Kemble and Swindon to single track in 1968. Network Rail investigated the options for reinstating the second track, along with the estimated cost (see Golden Valley Line). In the 2011 Budget the Government announced that funding for the redoubling was to be provided [2] and the work was completed in August 2014. [3]

Related Research Articles

Great Western main line English railway line linking London and Bristol

The Great Western main line (GWML) is a main line railway in England, that runs westwards from London Paddington to Bristol Temple Meads. It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. Opened in 1841, it was the original route of the first Great Western Railway which was merged into the Western Region of British Railways in 1948. It is now a part of the national rail system managed by Network Rail with the majority of passenger services provided by the current Great Western Railway franchise.

Severn Tunnel Junction railway station Railway station on the western side of the Severn Tunnel serving the Severnside area of Monmouthshire, South Wales

Severn Tunnel Junction railway station is a minor station on the western side of the Severn Tunnel in the village of Rogiet, Monmouthshire, Wales. It is 123.5 miles (198.8 km) from London Paddington and lies at the junction of the South Wales Main Line from London and the Gloucester to Newport Line.

Golden Valley line

The Golden Valley line is the popular name given to the railway line between Swindon and Gloucester or Cheltenham Spa in England.

Gloucester railway station Railway station in Gloucester, England

Gloucester railway station is a railway station serving the city of Gloucester in England. The station was originally built as the terminus of the Birmingham and Gloucester Railway in 1840, but the arrival of the Bristol and Gloucester Railway and Cheltenham and Great Western Union Railway in 1844, and then conversion to a through station for the South Wales Railway in 1851 resulted in a very complex layout. Subsequent closures and rationalization have left Gloucester with a station that is located off the main Bristol-Birmingham line, Meaning Great Western Railway services must reverse, while Cross-Country and Transport for Wales services continue to Newport.

Stroud railway station

Stroud railway station is a railway station that serves the town of Stroud in Gloucestershire, England. Stroud railway station was designed by Isambard Kingdom Brunel.

Kemble railway station

Kemble railway station is a railway station that serves the village of Kemble in Gloucestershire, England. The station is on the Swindon to Gloucester "Golden Valley" line. Despite its rural location, Kemble station has a high number of passengers, due mainly to the proximity of Cirencester.

Pilning railway station Railway station near Bristol, England

Pilning railway station is a minor station on the South Wales Main Line near Pilning, South Gloucestershire, England. It is 10 miles (16 km) from Bristol Temple Meads and is the last station on the English side before the Severn Tunnel through to Wales. Its three letter station code is PIL. It is managed by Great Western Railway, who provide the two train services per week from the station.

Gloucester–Newport line

The Gloucester–Newport line is a railway line that runs along the west bank of the River Severn in the United Kingdom between Gloucester and Newport.

South Wales Main Line

The South Wales Main Line, originally known as the London, Bristol and South Wales Direct Railway or simply as the Bristol and South Wales Direct Railway, is a branch of the Great Western Main Line in Great Britain. It diverges from the core London-Bristol line at Royal Wootton Bassett near Swindon, first calling at Bristol Parkway, after which the line continues through the Severn Tunnel into South Wales.

Swindon railway station Railway station in Wiltshire, England

Swindon railway station is on the Great Western Main Line in South West England, serving the town of Swindon, Wiltshire. It is 77 miles 23 chains (124.4 km) down the line from London Paddington and is situated between Didcot Parkway and Chippenham on the main line. It is managed by Great Western Railway, which also operates all the trains.

The Cheltenham and Great Western Union Railway was a railway company intended to link Cheltenham, Gloucester and Swindon, in England. It was authorised in 1836 but it found it very hard to raise money for the construction, and it opened only a part of its line, between Swindon and Cirencester, in 1841. It sold its business to the Great Western Railway, which quickly built the line through to Gloucester in 1845 and Cheltenham in 1847; part of that route was shared with other companies.

Rail services in the West of England refer to passenger rail journeys made in the Bristol commuter area. 26 million passenger rail journeys were made in 2018-19 within the Gloucestershire, Wiltshire and Bristol/Bath region.

South Cerney railway station

South Cerney railway station was on the Midland and South Western Junction Railway in Gloucestershire. The station opened on 18 December 1883 on the Swindon and Cheltenham Extension Railway line from Swindon Town to the temporary terminus at Cirencester Watermoor. The S&CER line amalgamated in 1884 with the Swindon, Marlborough and Andover Railway to form the M&SWJR, and through services beyond Cirencester to the junction at Andoversford with the Great Western Railway's Cheltenham Lansdown to Banbury line, which had opened in 1881, started in 1891.

21st-century modernisation of the Great Western main line

Network Rail plans to spend £5 billion on modernising the Great Western main line, its South Wales branch and other associated lines. The modernisation plans were announced at separate times but their development time-scales overlap in the 2010s. The work includes electrification, resignalling, new rolling stock and station upgrades. According to Network Rail, the modernisation started in June 2010 and was due to end in 2017. As of December 2019, electrification was complete as far west as Cardiff Central, and also from Reading to Newbury.

Rail transport in Cardiff has developed to provide connections to many other major cities in the United Kingdom, and to provide an urban rail network for the city and its commuter towns in southeast Wales. Today, there are three train operating companies in Cardiff: Great Western Railway, CrossCountry and Transport for Wales.

Cirencester branch line Single-track branch railway in Gloucestershire, England

The Cirencester branch line was a five-mile-long single-track branch railway line in Gloucestershire, England that connected Cirencester to the main line at Kemble. It was opened by the Cheltenham and Great Western Union Railway in 1841. The main line was extended from Kemble to a junction near Gloucester in 1845, by the GWR which had taken over the C&GWUR. The branch supported a busy passenger and goods business, but these declined in the 1930s, and closure was threatened in the 1950s. To reduce costs and maintain the viability of the line, lightweight four-wheel diesel railbuses were introduced, and they proved popular. Nevertheless the line's decline was inexorable, passenger service closed in 1964 and the goods service ending the following year.

Tetbury Road railway station was built by the Cheltenham and Great Western Union Railway to serve the Gloucestershire villages of Kemble and Coates, and the town of Tetbury.

Westerleigh Junction

Westerleigh Junction is a railway junction in Gloucestershire, England, where the Cross Country Route (XCR) from York to Bristol Temple Meads meets the South Wales Main Line (SWML) from London Paddington to Swansea, near the village of Westerleigh.

Purton railway station

The Cheltenham and Great Western Union Railway through Purton parish was opened in 1841 and was absorbed by the Great Western Railway in 1843. Purton railway station opened in 1841, in the hamlet of Widham, about 700 metres north of Purton village at the bridge over the Purton-Cricklade road. British Railways closed the station in 1964 but the line remains open. The booking office building survives with a small part of its platform.

The Badminton railway line is a railway line opened in 1903 by the Great Western Railway between Wootton Bassett in Wiltshire and Patchway and Filton, north of Bristol, England. Forming the eastern section of the South Wales Main Line, it shortened the distance between South Wales and London for heavy mineral traffic and for express passenger trains, and relieved congestion on the line through Bath.

References

  1. Oakley, Mike (2004). Wiltshire Railway Stations. Wimborne: The Dovecote Press. pp. 94–95. ISBN   1904349331.
  2. "Chancellor approves Kemble to Swindon railway upgrade". BBC News. 23 March 2011. Retrieved 24 March 2011.
  3. "£45m rail doubling from Kemble completed". Wiltshire Gazette & Herald. 27 August 2014. Retrieved 27 August 2014.
Preceding station Historical railways Following station
Oaksey Halt
Line open, station closed
  Great Western Railway
Cheltenham and Great Western Union Railway
  Purton
Line open, station closed