Nauru International Port

Last updated
Nauru International Port
Boat Harbour (15219488877).jpg
Nauru Port in 2014, prior to redevelopment
Nauru International Port
Click on the map for a fullscreen view
Location
Country Nauru
Location Aiwo District
Coordinates 0°31′45″S166°54′38″E / 0.52904°S 166.91054°E / -0.52904; 166.91054 (Port of Nauru)
Details
OpenedTBD
Operated by Nauru Maritime Port Authority
Owned by Government of Nauru
No. of wharfs 1
Employees60
Statistics
Website
https://www.nauruport.com/

The Nauru International Port is a seaport which is currently under construction on Nauru in the Pacific Ocean. With an anticipated opening in 2021, it will become the country's first international seaport and improve commerce and connectivity for the island nation. The $79.59 million USD project will be a climate change-proof port which will be vital in receiving necessary supplies such as fuel, food, and medical supplies. [1] The new port, which was originally expected to open in December 2020, is anticipated to fit Nauru's needs until at least 2050. [2]

Contents

History

Nauru had planned for a large, maritime port for over a century. [3] To receive supplies, large ships would dock offshore and ferry cargo containers to the 111-year-old Aiwo Boat Harbor in a process that was unsafe, difficult, and inefficient. [4] [5]

After the project was greenlighted in September 2019, [6] construction of the port began the following month at the site of the aged harbor with funding from the Asian Development Bank, Green Climate Fund, the governments of Australia and Nauru, and the Nauru Sustainable and Climate Resilient Connectivity Project. [7] [8] In preparation for the anticipated 2021 opening sixty local workers were trained in modern port practices such as safety, maintenance and stevedoring. [4]

By March 2022 the second family moved into a newly constructed house as part of the Red Zone Rehabilitation Project. As part of the scheme, families whose property was encroached upon by the enlargement of the port area were given a house with a construction cost of $64,000 AUD paid for by the Nauruan government. It was anticipated that 250 individuals would receive a new home as part of the program. [9] The $2.3m project addresses safety concerns related to living close to the construction site and the already-unsafe conditions of the structures which were originally built in the early to mid-twentieth century to house Chinese and Caroline Islanders brought to Nauru by the British to work in the phosphate industry. [10] In May of that year the ADB provided another $15 million grant to cover additional costs caused by the COVID-19 pandemic. [11]

Related Research Articles

<span class="mw-page-title-main">Asian Development Bank</span> Regional development bank

The Asian Development Bank (ADB) is a regional development bank established on 19 December 1966, which is headquartered in 6 ADB Avenue, Mandaluyong, Metro Manila 1550, Philippines. The bank also maintains 31 field offices around the world to promote social and economic development in Asia. The bank admits the members of the UN Economic and Social Commission for Asia and the Pacific, and non-regional developed countries. Starting with 31 members at its establishment, ADB now has 68 members.

<span class="mw-page-title-main">Nauru</span> Small island country in Oceania

Nauru, officially the Republic of Nauru and formerly known as Pleasant Island, is an island country and microstate in Micronesia, part of Oceania in the Central Pacific. Its nearest neighbour is Banaba of Kiribati, about 300 km (190 mi) to the east.

<span class="mw-page-title-main">Economy of Nauru</span>

The economy of Nauru is tiny, based on a population in 2019 of only 11,550 people. The economy has historically been based on phosphate mining. With primary phosphate reserves exhausted by the end of the 2010s, Nauru has sought to diversify its sources of income. In 2020, Nauru's main sources of income were the sale of fishing rights in Nauru's territorial waters, and revenue from the Regional Processing Centre.

Transportation in Nauru includes pedestrian, bicycle, automobile, train, and airplane. An international port is currently under construction.

Transport in Turkmenistan includes roadways, railways, airways, seaways, and waterways, as well as oil-, gas-, and water pipelines. Road-, rail-, and waterway transport fall under the jurisdiction of the Ministry of Industry and Communications.

<span class="mw-page-title-main">Economy of Tuvalu</span>

Tuvalu is a Polynesian island nation located in the Pacific Ocean, midway between Hawaii and Australia, with a population of 11,192 per the 2017 census. The economy of Tuvalu is constrained by its remoteness and lack of economies of scale. Government revenues largely come from fishing licences ; direct grants from international donors ; and income from the Tuvalu Trust Fund. The lease of its highly fortuitous .tv Top Level Domain (TLD) also contributes revenue. The sale of stamps since the independence of Tuvalu in 1976 has been an important source of revenue for the country and government. However, such revenue has significantly declined in recent years. Tuvalu has hardly any tourism. It has no tour guides, tour operators or organised activities and no cruise ships visit.

<span class="mw-page-title-main">Pacific Islands Forum</span> Intergovernmental organization of island nations in the Pacific Ocean

The Pacific Islands Forum (PIF) is an inter-governmental organization that aims to enhance cooperation among countries and territories of Oceania, including formation of a trade bloc and regional peacekeeping operations. It was founded in 1971 as the South Pacific Forum (SPF), and changed its name in 1999 to "Pacific Islands Forum", so as to be more inclusive of the Forum's Oceania-spanning membership of both north and south Pacific island countries, including Australia. It is a United Nations General Assembly observer.

<span class="mw-page-title-main">Environmental issues in Afghanistan</span>

Environmental issues in Afghanistan are monitored by the National Environmental Protection Agency (NEPA). They predate the political turmoil of the past few decades. Forests have been depleted by centuries of grazing and farming, practices which have only increased with modern population growth.

<span class="mw-page-title-main">Vizhinjam International Seaport Thiruvananthapuram</span> Port under construction in Kerala, India


The Vizhinjam International Seaport Thiruvananthapuram (VIST)(Malayalam:വിഴിഞ്ഞം അന്താരാഷ്ട്ര തുറമുഖം തിരുവനന്തപുരം) is India's first deep-water mega container transshipment port, which is under construction. It is a multi-purpose,all-weather, green port located 16 kilometres (9.9 mi) away from the Trivandrum International Airport at Vizhinjam, Thiruvananthapuram, the capital city of Kerala. It is also the first automated port in India and the sole port in the country to be located adjacent to an international shipping route. Being a greenfield seaport, it provides flexibility in design and future expansion. The seaport will be connected by India's third-longest railway tunnel, presently under construction phase.

<span class="mw-page-title-main">China–Pakistan Economic Corridor</span> Network of infrastructure projects

China–Pakistan Economic Corridor (CPEC) is a 3,000 km Chinese infrastructure network project in construction in Pakistan. This sea-and-land-based corridor is aimed to secure and reduce the passage for China's energy imports from the Middle East, by avoiding the existing route from the Straits of Malacca between Malaysia and Indonesia, which, in case of war could be blockaded, and thus hamper the Chinese energy-dependent economic avenues. Developing a deep water port at Gwadar in the Arabian Sea and a well built road and rail line from this port to Xinjiang region in western China would be a shortcut for boosting the trade between Europe and China. In Pakistan, it aims to overcome an electricity shortfall, infrastructural development and modernize transportation networks. Along with shifting it from an agricultural based economic structure to industrial based.

<span class="mw-page-title-main">South Asia Subregional Economic Cooperation</span>

The South Asia Subregional Economic Cooperation (SASEC) Program, set up in 2001, brings together Bangladesh, Bhutan, India, Maldives, Myanmar, Nepal, and Sri Lanka in a project-based partnership to promote regional prosperity by improving cross-border connectivity, boosting trade among member countries, and strengthening regional economic cooperation. As of June 2020, SASEC countries have implemented 61 regional projects worth over $13 billion in the energy, transport, trade facilitation, economic corridor development, and information and communications technology (ICT) sectors. The Manila, Philippines-based Asian Development Bank (ADB) serves as the Secretariat for the SASEC member countries.

Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2023, a total of 277 turbines are expected to be built and produce a capacity of 3.6 GW, enough to power 6 million homes.

<span class="mw-page-title-main">BBIN</span> Subregional initiative in South Asia

The Bangladesh, Bhutan, India, Nepal (BBIN) Initiative is a subregional architecture of countries in Eastern South Asia, a subregion of South Asia. It meets through official representation of member states to formulate, implement and review quadrilateral agreements across areas such as water resources management, connectivity of power, transport, and infrastructure.

<span class="mw-page-title-main">East African Crude Oil Pipeline</span> Pipeline from Uganda to Tanzanian coast

The East African Crude Oil Pipeline (EACOP), also known as the Uganda–Tanzania Crude Oil Pipeline (UTCOP), is a 1,443 km crude oil pipeline in planning since 2013, with a foundation stone nominally under construction since 2017 and intended to transport crude oil from Uganda's Tilenga and Kingfisher oil fields to the Port of Tanga, Tanzania on the Indian Ocean.

The Port of Payra is a seaport located at Kalapara in Patuakhali, Bangladesh. It was established by an Act of Parliament in 2013. The port was officially inaugurated in 2016. It is located on the Ramnabad Channel near the Bay of Bengal. The port is undergoing several Development and expansion and the project is expected to be completed in 202.

<span class="mw-page-title-main">Climate change in Afghanistan</span> Emissions, impacts and responses of Afghanistan related to climate change

In Afghanistan, climate change has led to a temperature increase of 1.8 °C since 1950. This has caused far-reaching impacts on Afghanistan, culminating from overlapping interactions of natural disasters, conflict, agricultural dependency, and severe socio-economic hardship.

<span class="mw-page-title-main">161 Maiden Lane</span> Residential skyscraper in Manhattan, New York

161 Maiden Lane is an incomplete 670 ft (205 m) tall residential skyscraper in the Financial District of Manhattan, New York City, United States. Designed by Hill West Architects, the building overlooks the East River and topped out in September 2018. The building leans 3 inches (76 mm) to the north as a result of the method used to construct its foundation. As of 2023, only half of the finishes, including windows, have been installed.

Malir Expressway is a 39 km under construction expressway starting from KPT Interchange, passes through Qayyumabad and conclude at the Karachi-Hyderabad Motorway near Kathore, along the Malir River in Karachi, Pakistan. One of the major infrastructure developments in Karachi city which is unviable for the provincial government and detrimental to the city's climate. It was announced that half of it will be opened on 14 August 2023 which has been indefinitely delayed since the Asian Development Bank has withdrawn the funding for the construction ADB decides against financing Karachi’s Malir Expressway; as of right now there is illegal excavation happening on the Malir River bed and the fields of Malir; it is unlikely that Expressway will be completed given the litigation and damage to the only surviving river in Karachi.

The Majuro Track and Field Stadium is a 2,000-capacity Olympic-grade multi-purpose stadium in Majuro, the capital of the Marshall Islands. It is mostly used for track and field and soccer events. The structure also serves as a large seawall in the densely populated part of Majuro which has become inundated with seawater through the effects of climate change, particularly during king tide.

<span class="mw-page-title-main">Brunei Fertilizer Industries</span> Fertilizer company in Brunei

The Brunei Fertilizer Industries (BFI) is a government owned company and producer of ammonia and urea granular fertilizer, located in Sungai Liang Industrial Park (SPARK), Belait District, Brunei. It is claimed to be one of the largest fertilizer facilities in Southeast Asia, and has a production capacity of 1,365,000 tonnes of urea annually. The facility for BFI started being built in May 2018 and 500 jobs was expected be created when the plant is fully operating.

References

  1. "Q&A: How a New Port is Building Skills and Knowledge in Nauru". Asian Development Bank. 8 April 2020. Retrieved 14 August 2021.
  2. "Construction begins on Nauru port project". RNZ. 2 February 2019. Retrieved 14 August 2021.
  3. "Nauru to Get Its 1st International, Climate-Proofed Port". offshore-energy.biz. 30 January 2019. Retrieved 14 August 2021.
  4. 1 2 "Nauru Port Workers to be Trained as Construction Begins on New Port". Loop Nauru. 3 April 2020. Retrieved 14 August 2021.
  5. "Port Upgrade Throwing a Lifeline to the People of Nauru". Asian Development Bank. 27 January 2020. Retrieved 14 August 2021.
  6. "Green light for $US80 million Nauru port development". RNZ. 8 September 2018. Retrieved 14 August 2021.
  7. "Construction Begins for Nauru's First International Port, Supported by ADB". Asian Development Bank. 21 October 2019. Retrieved 14 August 2021.
  8. "Nauru building its first international port". Pacific Island Times. 13 February 2019. Retrieved 14 August 2021.
  9. ""Red Zone" House Handover" (PDF). Nauru Bulletin. 237 (3–2022): 4. 18 March 2022. Retrieved 17 August 2022.
  10. "Location Resettlement Underway" (PDF). Nauru Bulletin. 223 (19–2020): 6. 30 November 2020. Retrieved 17 August 2022.
  11. "ADB provides $15m Additional Grant for Nauru Port". Loop Nauru. 11 May 2022. Retrieved 14 August 2022.