Nuttby Mountain

Last updated
Nuttby Mountain
Nuttby Mountain, Nova Scotia.jpg
View of nuttby Mountain from Highway 311, showing windturbines and communication towers
Highest point
Elevation 360 m (1,180 ft)
Coordinates 45°33′17.42″N63°13′26.71″W / 45.5548389°N 63.2240861°W / 45.5548389; -63.2240861
Geography
Nuttby Mountain
Location Colchester County, Nova Scotia
Parent range Cobequid Mountains
Topo map NTS 11E11 Tatamagouche
Climbing
Easiest route drive/hike

Nuttby Mountain is a Canadian peak [1] in the Cobequid Mountains and at 360.6 metres is one of the highest elevation points on the mainland portion of Nova Scotia. Its longstanding claim to be the highest peak was disproven in 2017 when it was discovered that Higgins Mountain near Folly Lake is 363.7 metres and an unnamed peak near Hart Lake is 365.02 metres. [2]

Contents

Located west of Route 311 in Colchester County some 20 km north of Truro, the peak is accessible by vehicle using a gated road and is topped by telecommunication towers. A fire lookout tower stood there from 1937 to 2013. [3] A 45-megawatt wind farm was constructed on a 400-acre site on the mountain in 2010. [4] As of 2017 Nova Scotia Power owned 22 Enercon E82 turbines on the site with a total capacity of 50.6 MW. [5]

See also

Related Research Articles

<span class="mw-page-title-main">Mount Carleton</span> Mountain in New Brunswick, Canada

Mount Carleton, at 820 metres (2,690 ft), is the highest peak in the Canadian province of New Brunswick, and the Maritime Provinces. Located in Mount Carleton Provincial Park, it is one of the highlights of the Canadian portion of the International Appalachian Trail. Mount Carleton is also part of the eighth and final section of the Nepisiguit Mi'gmaq Trail. The mountain was named after Thomas Carleton, New Brunswick's first lieutenant governor, and forms part of the Notre Dame Mountains chain, which is visible on Map 24 of the NB Atlas.

<span class="mw-page-title-main">Wind farm</span> Group of wind turbines

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

<span class="mw-page-title-main">Berwick, Nova Scotia</span> Town in Nova Scotia, Canada

Berwick is a Canadian town in Kings County, Nova Scotia. The town is located in the eastern part of the Annapolis Valley on the Cornwallis River. The town site stretches south from the river and Exit 15 of Highway 101 to Highway 1. Berwick occupies 6.80 km2 and has an elevation of 43 m (141 ft) above sea level.

Nova Scotia Power Inc. is a vertically integrated electric utility in Nova Scotia, Canada. It is privately owned by Emera and regulated by the provincial government via the Nova Scotia Utility and Review Board (NSUARB). Nova Scotia Power Inc provides electricity to 520,000 residential, commercial and industrial customers in Nova Scotia.

<span class="mw-page-title-main">Sheet Harbour, Nova Scotia</span> Place in Nova Scotia, Canada

Sheet Harbour is a rural community in Nova Scotia, Canada. It is located in the eastern reaches of the Halifax Regional Municipality, approximately 117 km (73 mi) northeast of the central urban area of the municipality, concentrated on Downtown Halifax and Dartmouth. The community is located along the Marine Drive scenic route on Trunk 7 at its junctions with Route 224 and Route 374. Surrounding the branched harbour which its name is derived from, the community has a population of about 800 and its respective census tract, containing sizable amounts of land around the community, has a population of 3,478 as of the 2011 Census. Two rivers, West River and East River, flow through the community and into the Northwest and Northeast Arms of the harbour respectively. The coastline of the community is heavily eroded and the region in which the community is located has an abundance of lakes. The region has a humid continental climate, congruent with the majority of Nova Scotia, and the ocean significantly influences the temperature.

<span class="mw-page-title-main">Onslow, Nova Scotia</span> Human settlement in Colchester County, Nova Scotia, Canada

Onslow is a rural, unincorporated Canadian community in central Colchester County, Nova Scotia. The community is located along the north bank of the Salmon River, opposite the town of Truro and is largely a farming area. The area was first settled by Acadians and resettled after their expulsion as Onslow Township in 1761 by Irish emigrants under Colonel McNutt. The township is believed to have been named after Arthur Onslow.

<span class="mw-page-title-main">Cape Chignecto Provincial Park</span> Provincial park in Nova Scotia, Canada

Cape Chignecto Provincial Park is a Canadian provincial park located in Nova Scotia. A wilderness park, it derives its name from Cape Chignecto, a prominent headland which divides the Bay of Fundy with Chignecto Bay to the north and the Minas Channel leading to the Minas Basin to the east. The park, which opened in 1998, is the largest provincial park in Nova Scotia. It also anchors one end of the UNESCO Cliffs of Fundy Global Geopark.

Wind power has a history in Canada dating back many decades, particularly on prairie farms. As of December 2021, wind power generating capacity was approximately 14,304 megawatts (MW). Combined with 2,399 MW of solar power generating capacity, this provided about 6.5% of Canada's electricity demand as of 2020. The Canadian Wind Energy Association (CanWEA) has outlined a future strategy for wind energy that would reach a capacity of 55 GW by 2025, meeting 20% of the country's energy needs.

<span class="mw-page-title-main">Cobequid Mountains</span> Canadian mountain range

The Cobequid Mountains, also sometimes referred to as the Cobequid Hills, is a Canadian mountain range located in Nova Scotia in the mainland portion of the province.

Wind power in Ohio has a long history. As of 2016, Ohio had 545 megawatts (MW) of utility-scale wind power installations, responsible for generating 1.1% of the state's electricity. Over 1000 MW more were under construction or pending approval. Some installations have become tourist attractions. There has been a sudden increase in generating capacity, as the total wind power capacity in the state was just 9.7 MW in 2010. By 2019, there were 738 MW of capacity, which generated 1.71% of Ohio's electricity.

Black Mountain is a mountain located in Washington County, New York, of which its peak is the highest point. Isolated from the rest of the Adirondack Mountains by Lake George, Black Mtn. has the seventh highest topographic prominence of all the mountains in New York. Black Mountain also has the highest elevation of any of the peaks which surround Lake George and offers unobstructed views of the lake from its summit.

There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity. In 2020 they were responsible for 24% of in-state electricity production. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.

Trillium Power Wind 1 (TPW1) is a proposed 450 to 500 megawatt (MW) far-offshore wind farm in the Canadian waters of northeastern Lake Ontario at least 17 to 28 km from the nearest mainland. This renewable energy project is being developed by Trillium Power Wind Corporation, a privately-held, Canadian-owned company headquartered in Toronto, Ontario. The project was placed in moratorium by the Ontario government on February 11, 2011 at exactly the same hour that Trillium Power was completing a $26 Million financing. A larger follow on equity investment of $400 Million was in discussion with two large global pension funds at the time. Had it not been placed in abeyance, TPW1 would have been the first offshore wind farm built in the Great Lakes. Recently, on January 19, 2023, the Ontario Court of Appeal heard an appeal by Trillium Power, focusing on evidence provided by Trillium Power of spoliation in an ongoing litigation by the Ontario Government.

<span class="mw-page-title-main">Grouse Mountain</span> Mountain in British Columbia, Canada

Grouse Mountain is one of the North Shore Mountains of the Pacific Ranges in the District Municipality of North Vancouver, British Columbia, Canada. With a maximum elevation of over 1,200m (4,100ft) at its peak, the mountain is the site of an alpine ski area, Grouse Mountain Resort, which overlooks Metro Vancouver and has four chairlifts servicing 33 runs. In the summer, Grouse Mountain Resort features lumberjack shows, the "Birds in Motion" birds of prey demonstration, a chairlift ride, disc golf, mountain biking, zip lining, tandem paragliding, helicopter tours, and guided ecowalks. Year-round operations include a 100-seat mountaintop theatre and a wildlife refuge. The mountain operates two cable cars, known officially as the Skyride. The Blue Skyride is used mainly for freight transportation, while public access to the mountain top is provided by the Swiss-built Garaventa Red Skyride, which has a maximum capacity of 101 passengers. Summer access is also provided by the 2.9 kilometre Grouse Grind hiking trail, which is open for hiking from May to October. Similar to the nearby Capilano Suspension bridge, Grouse Mountain can be accessed via a free, regular shuttle bus that runs from 'Canada Place' in downtown Vancouver.

<span class="mw-page-title-main">Point Tupper Generating Station</span>

The Point Tupper Generating Station is a 150 MW Canadian electrical generating station located in the community of Point Tupper in Richmond County, Nova Scotia.

Dalhousie Mountain is a Canadian peak in the Cobequid Mountains and the highest elevation point in Pictou County, Nova Scotia.

<span class="mw-page-title-main">Wind turbines on public display</span>

The great majority of wind turbines around the world belong to individuals or corporations who use them to generate electric power or to perform mechanical work. As such, wind turbines are primarily designed to be working devices. However, the large size and height above surroundings of modern industrial wind turbines, combined with their moving rotors, often makes them among the most conspicuous objects in their areas. A few localities have exploited the attention-getting nature of wind turbines by placing them on public display, either with visitor centers on their bases, or with viewing areas farther away. The wind turbines themselves are generally of conventional horizontal-axis, three-bladed design, and generate power to feed electrical grids, but they also serve the unconventional roles of technology demonstration, public relations, and education.

<i>Truro Daily News</i> Weekly newspaper in Truro, Nova Scotia, Canada

The Truro News is a weekly newspaper in Truro, Nova Scotia, Canada, covering Colchester County.

SaltWire Network Inc. is a Canadian newspaper publishing company owned by Postmedia. Saltwire owns 23 daily and weekly newspapers in Atlantic Canada including The Chronicle Herald in Halifax. The company was formed in 2017 via its purchase of 27 newspapers from Transcontinental.

Wreck Cove is the largest hydroelectric system in Nova Scotia with a generating capacity of 215.8 MW. Constructed from 1975 to 1978, south of the Cape Breton Highlands National Park, Wreck Cove collects drainage water from 216 square kilometres (83 sq mi) of the Cape Breton Highlands plateau to generate renewable electricity. It consists of two generating stations: the Gisborne Generating Station, with an installed capacity of 3.5 MW, and the Wreck Cove Generating Station, with an installed capacity of 212 MW, producing on average 318 GWh annually—enough energy to power about 30,000 homes.

References

  1. "Nuttby Mountain". Geographical Names Board of Canada . Natural Resources Canada . Retrieved 11 July 2017.
  2. Riley, Jonathan (January 25, 2017). "Move over Nuttby – Wentworth has mainland's highest point". Truro Daily News. Transcontinental Media. Retrieved 8 July 2017.
  3. Carter, Lyle (January 27, 2014). "Memories of the Nuttby fire tower". Truro Daily News. Transcontinental Media. Retrieved 8 July 2017.
  4. "Nuttby Mountain wind turbines arrive". CBC News. Canadian Broadcasting Corporation. Jul 16, 2010. Retrieved 12 July 2015.
  5. "Wind Farm Directory". Nova Scotia Power. Retrieved 11 July 2017.