Castilla docked at the Rota naval base. | |
History | |
---|---|
Spain | |
Name | Castilla |
Namesake | Castilla |
Ordered | 9 May 1997 |
Builder | Empresa Nacional Bazán |
Laid down | 11 December 1997 |
Launched | 14 June 1999 |
Commissioned | 26 June 2000 |
Homeport | Naval Station Rota |
Identification | Pennant number: L52 |
Status | Ship in active service |
General characteristics | |
Class and type | Galicia-class landing platform dock |
Displacement | 13,815 t (13,597 long tons) full load |
Length | |
Beam | 25 m (82 ft 0 in) |
Draught | 5.9 m (19 ft 4 in) |
Propulsion |
|
Speed | 20 knots (37 km/h; 23 mph) maximum |
Range | 6,000 nmi (11,000 km; 6,900 mi) at 12 knots (22 km/h; 14 mph) |
Boats & landing craft carried | 4 LCM-1E |
Capacity | 543 fully-equipped soldiers and 130 APCs or 33 MBTs |
Complement | 189 |
Sensors and processing systems | DA08 air / surface search IRSCAN SATCOM, Link 1, JMCIS |
Armament |
|
Aircraft carried | 4 SH-3D or 6 AB 212 helicopters |
Aviation facilities | 60 m × 25 m (197 ft × 82 ft) flight deck, hangar |
Castilla (L52) is a Galicia-class landing platform dock (LPD), and is the twelfth ship of this name. She is the sister ship to the amphibious warfare vessel Galicia. The vessel is primarily used to transport Spanish marines but is also used for humanitarian aid missions. Launched in 1999 and commissioned in 2000, Castilla took part in Operation Romeo Sierra as part of the Perejil Island crisis in 2002, has participated in multiple military exercises with NATO and provided humanitarian relief in the Caribbean Sea and Gulf of Mexico.
The project began in the Netherlands in 1990 as that country sought a solution to their LPD requirements. Spain joined the project in July 1991 and the definition stage was completed by December 1993. The Galicia class spawned from the joint Enforcer design with Spain's lead ship being authorised on 29 July 1994. The LPDs were designed to transport a battalion of marines and disembark them offshore and general logistic support. Vessels of the class have a full load displacement of 13,815 t (13,597 long tons ; 15,228 short tons ). [1] [lower-alpha 1] The vessels measure 160 metres (524 ft 11 in) long overall and 142 m (465 ft 11 in) between perpendiculars with a beam of 25 m (82 ft 0 in) and a draught of 5.9 m (19 ft 4 in). [1]
The LPDs are powered by four Bazan/Caterpillar 3612 diesel engines in two sets initially creating 9,330 kilowatts (12,512 hp ) [1] though this was later increased to 16,000 kW (22,000 hp), and an 1,100 kW (1,500 hp) electric generator tied to reduction gear. [2] Each vessel has two shafts with 4-metre (13 ft), five-bladed variable pitch propellers. [2] The ships also mount one bow thruster initially capable of 510 kW (680 hp) [1] but was later improved to 1,300 kW (1,800 hp). [2] This gives the ships a maximum speed of 20 knots (37 km/h; 23 mph) and a range of 6,000 nmi (11,000 km; 6,900 mi) at 12 knots (22 km/h; 14 mph). [1] The ships have a 7-megawatt (9,400 hp) electric plant comprising four diesel generators capable of creating 1,520 kW (2,040 hp) and an emergency 715 kW (959 hp) generator. [2]
The Galicia class have a 60 by 25 m (197 by 82 ft) flight deck capable of operating helicopters. [1] The vessels have hangar area for four heavy or six medium helicopters. The LPDs usually sail with six AB 212 or four SH-3D helicopters embarked. [3] They have a 885 m2 (9,530 sq ft) well deck and are capable of operating six landing craft vehicle and personnel (LCVP) or four landing craft mechanized (LCM) or one landing craft utility and one LCVP. [1] Normally, they operate with four LCM-1E craft. [2] Within the ship there is 1,010 m2 (10,900 sq ft) of parking space for up to 130 armoured personnel carriers (APCs) or 33 main battle tanks (MBTs). [1] However, a maximum of 170 vehicles can be carried depending on size. [3] Both ships have capacity for 700 t (690 long tons) of ammunition and stores spread out within the 3,500 m2 (38,000 sq ft) of cargo space between the storerooms, flight deck and hangar. [2] Castilla can transport 404 fully-equipped troops and 72 staff and aircrew. [1] [lower-alpha 2]
The LPDs are armed with two Oerlikon Contraves 20 mm (0.79 in) cannon but can be fitted with four. They also mount six Sippican Hycor SRBOC MK36 chaff launchers. The Galicia class is equipped with KH 1007 air/surface search radar and AN/TPX-54 (V) Mk-XII (mode 4) identification friend or foe. [2] Castilla has a complement of 189. [1] [lower-alpha 3]
Ordered on 9 May 1997, the vessel's keel was laid down on 11 December 1997 at the Empresa Nacional Bazán shipyards in Ferrol. Named Castilla for the historic region of Spain, the LPD was launched on 14 June 1999 and was commissioned by the Spanish Navy (Armada Española) on 26 June 2000. She is the sister ship to Galicia and is home ported at Naval Station Rota. [1]
Castilla participated in Operation Romeo Sierra in Perejil Island on 17 July 2002 during the Perejil Island crisis. The LPD took part in the cleanup following the wreck of the tanker Prestige and the resulting oil spill from December 2002 to February 2003. [2] In 2002–2003 the ship underwent a refit that improved the vessel's command, control and communications capabilities. [1] In July 2003, Castilla transported the Spanish Legion to Ash Shuahyabah, United Arab Emirates as part of Operation IF, returning in September. The ship was then sent to provide humanitarian aid to Haiti as part Operation Mar Caribe from October to December 2004. [2]
On 28 October 2004, Castilla deployed to Cap-Haïtien, Haiti, and delivered some marines. [4] Castilla participated in the NATO military exercise Operation Loyal Mariner 2005, as the flagship of the sea elements. [5] Spain sent Castilla to New Orleans as part of NATO's Hurricane Katrina relief operation in Louisiana, in mid-September 2005. [6] Castilla participated in the NATO exercises Operation Brilliant Mariner 2006, as the flagship of the sea elements, [7] and the NATO exercise Operation Steadfast Jackpot 2006. [8]
Spain dispatched Castilla on 22 January 2010 to aid in relief efforts after the 7.0 magnitude 12 January 2010 Haiti earthquake as part of Operación Hispaniola. The mission was announced on 19 January 2010, with the ship transporting a field hospital, 50 medical officers and 450 troops. [9] Also on board were three helicopters, [10] and several fast boats. [11] Castilla left Naval Station Rota on 22 January, carrying 423 troops, and 4 helicopters, headed for Petit-Goâve, Haiti. [12] On 1 February, Castilla arrived at San Juan, Puerto Rico to pick up additional supplies. [13] [14] On 4 February, Castilla arrived at Petit-Goâve. [13] As of 5 February, landing craft from the ship began disgorging equipment. [15] Castilla was expected to remain on-station at Petit-Goâve for three months. [16]
On 10 May 2010, Castilla was tasked to assist the motor yacht Sagamar, with its 33-year-old injured crew member. The team from Castilla successfully extracted the injured, began medical treatment and disembarked him in the Azores for further medical treatment. [17]
In February 2021, Castilla took the role of the flagship in European Union's Operation Atalanta, fighting piracy. It was the flagship for four months. It also conducted exercises with JS Ariake of the Japan Maritime Self-Defense Force. [18]
The Albion-class landing platform dock is a class of amphibious warfare ship in service with the Royal Navy. The class consists of two vessels, HMS Albion and HMS Bulwark, ordered in 1996 to replace the ageing Fearless class. Both ships were built by BAE Systems Marine at the former Vickers Shipbuilding and Engineering yard in Barrow-in-Furness. Albion was commissioned in 2003 and Bulwark in 2004. Each of the ships has a crew of 325 and can accommodate up to 405 troops. Thirty-one large trucks and thirty-six smaller vehicles and main battle tanks can be carried inside the vehicle deck. To disembark troops and vehicles, the vessels are equipped with eight landing craft. As of 2024, both vessels were in reserve.
The Galicia class are two landing platform dock (LPD) ships in service with the Spanish Navy. Built by Navantia at Ferrol, their mission is to carry out amphibious warfare by transporting the bulk of the Infantería de Marina. These ships have both a large helicopter flight deck and a 885-square-metre (9,530 sq ft) well deck for large landing craft, as well as a 1,000-square-metre (11,000 sq ft) space for up to 33 main battle tanks.
The Foudre-class landing platform dock is a class of landing platform docks designed and constructed for the French Navy. Designated Transport de Chalands de Débarquement, they were intended to replace the ageing Ouragan class and the construction of four vessels was planned. Only two were built and the remaining two were instead reordered as Mistral-class amphibious assault ships. The two ships of the Foudre class, Foudre and Siroco, operated with the French Navy between 1990 and 2014. Replaced by the Mistrals, in 2011 Foudre was sold to the Chilean Navy and Siroco was sold to the Brazilian Navy in 2015.
Juan Carlos I is a multi-purpose aircraft carrier-landing helicopter dock (LHD) in the Spanish Navy. Similar in role to many aircraft carriers, the amphibious landing ship has a ski jump for STOVL operations, and is equipped with the McDonnell Douglas AV-8B Harrier II attack aircraft. The vessel is named in honour of Juan Carlos I, the former king of Spain.
A joint support ship (JSS) is a multi-role naval vessel capable of launching and supporting joint amphibious and airlift operations. It can also provide command and control, sealift and seabasing, underway replenishment, disaster relief and logistics capabilities for combined land and sea operations.
The Canberra class is a ship class of two landing helicopter dock (LHD) ships built for the Royal Australian Navy (RAN). Planning to upgrade the navy's amphibious fleet began in 2000, based on Australian experiences leading the International Force for East Timor peacekeeping operation. With a new climate for growing Australian Navy spending, a desire existed for forward defence capability for landing and supporting troops on Asian territory, that had never existed in Australian history, even with the old Majestic-class light fleet carriers, HMAS Melbourne and HMAS Sydney in the 1970s. In 2004, French company Direction des Constructions Navales (DCN) and Spanish company Navantia were invited to tender proposals, with DCN offering the Mistral-class amphibious assault ship and Navantia proposing the "Buque de Proyección Estratégica" design. The Spanish design was selected in 2007, with Navantia responsible for construction of the ships from the keel to the flight deck, and BAE Systems Australia handling the fabrication of the combat and communications systems. Finally, Siemens (Germany) supplied and fitted the azimuth thrusters.
Galicia (L51) is a Galicia-class landing platform dock (LPD) of the Spanish Navy and is the seventh ship to bear this name. She is the lead ship in her class. The vessel was constructed in Ferrol, Spain and launched in 1997 and commissioned in 1998. Galicia is tasked with transporting Spanish marines, humanitarian aid missions and general logistic support. The LPD has taken part in actions against piracy in the Indian Ocean and off the Somalian coast, provided humanitarian aid following hurricanes and tsunamis and provided support during the COVID-19 pandemic in Spain.
The Type 071 is a class of Chinese amphibious transport dock ships in service with the People's Liberation Army Navy (PLAN). The Type 071 provides the PLAN with capabilities and flexibility not found in its previous landing ships.
KRI dr. Soeharso is a hospital ship of the Indonesian Navy. It was initially designed and built in 2003 in South Korea as a landing platform dock named KRI Tanjung Dalpele. However, after its launch it was redesignated as a multi-purpose hospital ship. In 2020, dr. Soeharso was used to transport Indonesian crew from cruise ships during the COVID-19 pandemic.
HNLMS Karel Doorman is a multi-function support ship for amphibious operations of the Royal Netherlands Navy, which is also used by the German Navy. The ship replaced both of the navy's replenishment oilers: HNLMS Zuiderkruis and HNLMS Amsterdam. At 204.7 m she is the largest ship in service with the Royal Netherlands Navy.
HNLMS Rotterdam is the lead ship in the Rotterdam-class landing platform dock of the Royal Netherlands Navy. The ship is named after the Dutch city of Rotterdam.
The French ship Siroco (L9012) was a Foudre-class landing platform dock of the Marine Nationale. The vessel was purchased by Brazil in August 2015, being transferred to the Brazilian Navy as the multipurpose amphibious ship Bahia (G40).
Operation Atalanta, formally European Union Naval ForceSomalia, is an ongoing counter-piracy military operation at sea off the Horn of Africa and in the Western Indian Ocean, that is the first naval operation conducted by the European Union (EU), in support of United Nations resolutions 1814, 1816, 1838, and 1846 adopted in 2008 by the United Nations Security Council. Since 29 March 2019, the operational headquarters is located at Naval Station Rota in Spain, having moved from London as a result of the British withdrawal from the EU.
Operación Hispaniola was Spain's military relief operation for Haiti, following the 12 January 2010 earthquake. The mission was expected to last until at least 4 May 2010.
HMAS Canberra (L02) is the first ship of the Canberra-class landing helicopter dock in service with the Royal Australian Navy (RAN) and is the second largest in the Navy, succeeded by its sister ship HMAS Adelaide (L01). Construction of the ship started in Spain in 2008, with the hull launched by Navantia in 2011. The hull was then transported to Australia in late 2012 for completion by BAE Systems Australia. Canberra was commissioned on 28 November 2014.
The LCM-1E is a class of amphibious mechanized landing craft manufactured by Navantia at their factory in San Fernando. These craft are intended to deliver troops and equipment onshore from amphibious assault ships during amphibious assaults. The craft are operated by the Spanish Navy and the Royal Australian Navy, and have been ordered by the Turkish Navy.
Patiño is a replenishment oiler of the Spanish Navy. It was named after the Spanish navy minister José Patiño Rosales, who reorganized the fleet on the orders of Philip V of Spain. The vessel was ordered in 1991 from Navantia and built at their yard in Ferrol, Galicia. The ship entered service with the Spanish Navy in June 1995 and is homeported at Ferrol. Patiño has been deployed with NATO forces around the world, participating in missions in the Kosovo War, the War in Afghanistan along with the European Union's anti-piracy mission to Somalia.
HNLMS Johan de Witt is the second Rotterdam-class landing platform dock of the Royal Netherlands Navy. It is an improved design of Rotterdam, which was designed in conjunction between the Netherlands and Spain. The ship, displacing 16,800 tons, was launched on 13 May 2006. The motto of the ship is Ago Quod Ago, translated as I do what I do.
TCG Anadolu (L-400) is an amphibious assault ship of the Turkish Navy. It is named after the peninsula of Anatolia which forms the majority of the land mass of Turkey. The construction works began on 30 April 2016 at the shipyard of Sedef Shipbuilding Inc. in Istanbul, with the keel being laid on 7 February 2018. TCG Anadolu was commissioned with a ceremony on 10 April 2023.
The Rotterdam class are two landing platform dock (LPD) ships in service with the Royal Netherlands Navy. Built by Damen Schelde Naval Shipbuilding at Vlissingen, their mission is to carry out amphibious warfare by transporting the bulk of the Korps Mariniers. These ships have both a large helicopter flight deck and a well deck for large landing craft, as well as space for up to 33 main battle tanks.