Tyneside Electrics

Last updated

A 1920-built South Tyneside NER electric unit at Newcastle Central station in 1938. South Tyneside Electric train at Newcastle Central, 1938, geograph-4869768-by-Walter-Dendy,-deceased.jpg
A 1920-built South Tyneside NER electric unit at Newcastle Central station in 1938.

The Tyneside Electrics were the suburban railways on Tyneside that the North Eastern Railway and the London and North Eastern Railway electrified using the third rail system. The North Tyneside Loop was electrified from 1904 onwards and formed one of the earliest suburban electric networks; the South Tyneside line to South Shields via Pelaw was electrified in March 1938. British Railways converted these lines to diesel operation in the 1960s: the line to South Shields in January 1963 [1] and the North Tyneside lines in June 1967 when the electrical supply infrastructure (which dated from 1935) and the rolling stock (which dated from 1937) had become life expired. In addition, the system was losing passengers and suffering from costly vandalism. Since the late 1970s, much of the system has been converted to form the Tyne and Wear Metro.

Contents

Routes

The original lines covered were the North Tyneside Loop from Newcastle Central via Wallsend, North Shields, Whitley Bay and South Gosforth back to Newcastle; the East Coast Main Line (ECML) from Newcastle Central to Benton (providing a short cut to Monkseaton and Whitley Bay), and the Riverside Branch from Byker to Percy Main via Walker.

At Benton the electrified lines diverged from the ECML to join the Blyth and Tyne line (see below). These curved lines were called the South West Curve and South East Curve based on their disposition looking north. The SE Curve had scheduled electric services running over it from time to time, but the SW Curve was used for empty stock movements.

In 1923 the triangular junctions at South Gosforth were electrified in connection with opening of the new car sheds, but were used only for empty stock movements. In the same year, a route was electrified in the Heaton area. This route left the ECML at Benton Bank and ran through the freight yard at Heaton to connect with the Tynemouth lines at Heaton East Junction. It was used for empty stock movements and as an access route to Walker Gate Carriage Works where heavy repairs and overhaul of the electric stock took place. This route was called the "Heaton Independent Lines".

Map

Diagram of the network at its maximum extent during 1938-63. Tyneside Electrics diagram.png
Diagram of the network at its maximum extent during 1938–63.

History

History before electrification

The line through Jesmond, Benton and on to Tynemouth was opened in the 1860s by the Blyth and Tyne Railway (B&T), and the line through Wallsend by the Newcastle and North Shields Railway in 1839. The portion of the East Coast Main Line to Benton had been opened by the York, Newcastle and Berwick Railway in the 1840s. The Newcastle Quayside Branch had been opened by the NER in 1873, and the Riverside Branch in 1879. The junctions at South Gosforth dated back to 1905 and were laid for the Gosforth and Ponteland Branch.

Electrification

North Tyneside Loop
 Before Metro conversion 
BSicon 3HST+1.svg
BSicon 3STRq-.svg
BSicon 3HST+4.svg
Tynemouth
BSicon HST.svg
BSicon HST.svg
North Shields
BSicon HST.svg
BSicon STR+l.svg
BSicon KRZ.svg
BSicon ENDEeq.svg
BSicon HST.svg
BSicon STR.svg
BSicon HST.svg
Percy Main
BSicon lCONTg@Gq.svg
BSicon kABZq2.svg
BSicon KRZu+k3.svg
BSicon xABZqr.svg
BSicon eKRZxl.svg
BSicon POINTERf@g.svg
BSicon exSTR+r.svg
BSicon kABZg+4.svg
BSicon HST.svg
BSicon exHST.svg
Willington Quay
BSicon STR.svg
BSicon HST.svg
BSicon exHST.svg
Point Pleasant
BSicon STR.svg
BSicon HST.svg
BSicon exHST.svg
Carville
BSicon HST.svg
BSicon STR.svg
BSicon exHST.svg
Walker
Benton Junction
on East Coast Main Line
BSicon CONTgq.svg
BSicon KRZlr+lr.svg
BSicon STR+r.svg
BSicon STR.svg
BSicon exHST.svg
St. Anthonys
BSicon HST.svg
BSicon STR+c2.svg
BSicon STR3.svg
BSicon exHST.svg
St. Peters
Heaton Junction
on East Coast Main Line
BSicon STR.svg
BSicon ABZg+1.svg
BSicon STRc4.svg
BSicon exHST.svg
Byker
BSicon STR.svg
BSicon HST.svg
BSicon exSTRc2.svg
BSicon POINTER+2.svg
BSicon exSTR3.svg
BSicon HST.svg
BSicon exSTRc2.svg
BSicon STR.svg
BSicon exSTR3+1.svg
BSicon exSTRc4.svg
BSicon KDSTaq.svg
BSicon ABZgr.svg
BSicon eABZg+1.svg
BSicon exSTRc4.svg
BSicon CONTgq.svg
BSicon ABZgr+r.svg
BSicon STR.svg
BSicon HST.svg
BSicon POINTERg@fq.svg
BSicon STR.svg
BSicon HST.svg
BSicon STR.svg
BSicon HST.svg
BSicon eABZg+l.svg
BSicon exCONTfq.svg
BSicon exKBHFaq.svg
BSicon BS2l.svg
BSicon exSTRr.svg
BSicon BS2c3.svg
BSicon STR.svg
BSicon vHST.svg
BSicon d.svg
BSicon cd.svg
BSicon v-SHI2g+r.svg
BSicon +c.svg
BSicon CONTg.svg
BSicon ABZg+l.svg
BSicon hKRZWaeq.svg
BSicon ABZgr+r.svg
BSicon KBHFe.svg
BSicon CONTf.svg

In the early 1900s, tramway competition caused a large and rapid decline in the number of passengers using the North Eastern Railway's local services in the north Tyneside area. The number of passengers using these services declined from 9,847,000 in 1901, to 5,887,000 in 1903. In 1903, in response to this, and in an effort to win back the lost passengers, the NER decided to electrify their suburban network north of the River Tyne with a 600  Volt DC third-rail system. They hired the electrical engineer Charles H. Merz as a consultative engineer for the project, and contracted the British Thomson-Houston company to supply the electrical equipment. [2]

The North Tyneside Loop, including the Riverside Branch, and a short stretch of the East Coast Main Line was electrified in stages between February and July 1904. The original electrified route was not quite a loop however, as the northern leg of the route ran over the former Blyth and Tyne Railway, whose Newcastle terminus was at New Bridge Street; an isolated terminus with no rail connection to Newcastle Central, meaning services initially ran from Newcastle Central via Tynemouth to New Bridge Street. In 1909, New Bridge Street was closed, and a connection was constructed to an extended Manors station, in order to create a full loop, however despite this. it was not until 1917 that a full Central to Central loop service began. [2]

The electrified stretch of the East Coast Main Line between Heaton and Benton Junction was used by certain limited stop 'express' services between Newcastle and the coast. [2]

The electrification, and the improved service it enabled, succeeded in the aim of reversing the decline in passengers numbers, which rose steadily, and topped the ten million mark in 1913, exceeding the highest pre-electrification totals. It also substantially reduced the running cost of the service, which was reduced to less than half the cost per train mile of the steam service it replaced. [2]

In 1923, the NER was grouped into the London and North Eastern Railway (LNER). Electrification of the South Tyneside line from Newcastle to South Shields was announced by the LNER in 1935 and electric services began in the spring of 1938. [2]

Decline and de-electrification

Falling passenger numbers, rising costs, and the need to renew life expired infrastructure and rolling stock, meant that the Tyneside Electric network was de-electrified in the 1960s under British Rail, and converted to diesel operation. The Newcastle-South Shields line was de-electrified in 1963, and the north Tyneside routes were de-electrified in 1967. [2]

Successor

In the late-1970s much of the former Tyneside Electric network was incorporated, in modified form, into the Tyne and Wear Metro: The North Tyneside Loop (minus the Riverside Branch which was closed in 1973), plus the South Shields branch was incorporated into the Metro. A new underground section under Newcastle and Gateshead and new bridges were added, part of the former Ponteland Branch was also included, and the network was re-electrified with overhead lines. [2]

Rolling stock

North Eastern Railway

Preserved 1904 NER electric Motor Parcel Van No. 3267 in the Stephenson Railway Museum North Eastern Railway Parcels Van.jpg
Preserved 1904 NER electric Motor Parcel Van No. 3267 in the Stephenson Railway Museum

The North Eastern Railway began using electric multiple units between New Bridge Street and Benton on 29 March 1904 and from 25 July 1904 over the entire route from Newcastle Central via Percy Main to Tynemouth, returning to New Bridge Street via Jesmond. [3] [4] The railway was electrified with a third rail at 600 V DC. [3] One hundred electric multiple unit cars, built in NER's York workshop, were equipped by British Thompson-Houston (BTH) with BTH and Westinghouse equipment. Two motor parcels vans were used with passenger coaches on workman's trains. In 1909-15 an additional 11 motor cars and 11 trailers were built. [3]

On Sunday 11 August 1918 there was a serious fire at the original car shed at Walkergate, [5] which completely destroyed 34 cars and damaged many more. An order for 35 replacement cars was placed and these were built between 1920 and 1922. These were to a different design, with elliptical roofline and more powerful motors. [3] As of July 2012 a powered parcels van built in 1904 is in the National Railway Museum collection and on loan to the Stephenson Railway Museum. [6]

This fire affected rolling stock policy for the rest of the life of the system through to 1967. When the original cars were life-expired in the 1930s, the replacement cars were not, so while new LNER units were built to replace all the stock then in use, the replacement cars were moved on to the newly electrified South Shields line, whose commissioning in 1938 coincided with the arrival of the new LNER stock. In turn, this meant the replacement cars were life-expired in the 1950s, when what was standard electric stock of the time, to the Southern Region pattern with separate compartments, quite different (and to some extent inappropriate) with what had existed before was built. In the early 1960s, the ability to redeploy this quite recent stock to the Southern Region was a significant part of the decision to de-electrify the South Shields line, which they had been principally employed on, leaving the north side lines to run on with the LNER units until they too were life expired some years later and the electric system was closed down.

London and North Eastern Railway

A 1937 LNER unit at Newcastle Central in 1950. North Tyneside 2-Car EMU at Newcastle Central, 1950, geograph-4869724-by-Walter-Dendy,-deceased.jpg
A 1937 LNER unit at Newcastle Central in 1950.

The NER stock remained in service with the LNER after the 1923 grouping. In 1937 the newest ex-NER stock, built in 1920 to replace those vehicles lost in the 1918 fire, was refurbished for use on the newly electrified South Tyneside line. The other NER stock, some of which dated back to 1903–04 was replaced on the North Tyneside lines by new articulated units built by Metropolitan Cammell.

British Railways

The LNER 1937 stock remained in service with British Railways (BR) after nationalisation in 1948. In 1955 BR introduced new stock on the South Tyneside line based on the Southern Region 2–EPB stock and was designated "South Tyneside 1951 Stock". They were electrically identical to the 2–EPB but the body on the motor brake cars had a much larger luggage space to accommodate prams. Minor detail differences were route indicating lights and destination blinds. The 1920 stock was withdrawn and was broken up at Simonside Wagon Works near Tyne Dock in the period 1956–58, although some vehicles were retained for departmental use or saw further service as "Pram Vans".

British Rail 2-EPB train at Newcastle Central in 1960. Newcastle-on-Tyne Station from the Castle geograph-3950092-by-Ben-Brooksbank (cropped).jpg
British Rail 2–EPB train at Newcastle Central in 1960.

When the South Tyneside line was de-electrified in January 1963, all but one of the 1951 EPB stock was transferred to the Southern Region. The exception was Motor Parcels Van E68000 which was transferred to the London Midland Region's Liverpool – Southport line, renumbered M68000 and used for another five years before being withdrawn in 1968. It thus had a service life of just 12 years.

Related Research Articles

<span class="mw-page-title-main">Tyne and Wear Metro</span> Rapid-transit rail network in north-east England

The Tyne and Wear Metro is an overground and underground light rail rapid transit system serving Newcastle upon Tyne, Gateshead, North Tyneside, South Tyneside, and the City of Sunderland. The network opened in stages from August 1980 and now serves a total of 60 stations, with two lines covering 77.5 km (48.2 mi) of track. The Metro can be accessed from a mixture of under ground and above ground stations. It has been described as the "first modern light rail system in the United Kingdom". The system is currently owned and operated by the Tyne and Wear Passenger Transport Executive, thus is fully under public ownership and operation.

<span class="mw-page-title-main">North Eastern Railway (United Kingdom)</span> British railway company, active 1854–1922

The North Eastern Railway (NER) was an English railway company. It was incorporated in 1854 by the combination of several existing railway companies. Later, it was amalgamated with other railways to form the London and North Eastern Railway at the Grouping in 1923. Its main line survives to the present day as part of the East Coast Main Line between London and Edinburgh.

<span class="mw-page-title-main">North Tyneside Steam Railway</span> Visitor attraction in North East England

The North Tyneside Steam Railway and Stephenson Steam Railway are visitor attractions in North Tyneside, North East England. The museum and railway workshops share a building on Middle Engine Lane adjacent to the Silverlink Retail Park. The railway is a standard gauge line, running south for 2 miles (3.2 km) from the museum to Percy Main. The railway is operated by the North Tyneside Steam Railway Association (NTSRA). The museum is managed by Tyne and Wear Archives and Museums on behalf of North Tyneside Council.

<span class="mw-page-title-main">Durham Coast Line</span>

The Durham Coast Line is an approximately 39.5-mile (63.6 km) railway line running between Newcastle and Middlesbrough in North East England. Heavy rail passenger services, predominantly operated Northern Trains, and some freight services operate over the whole length of the line; it provides an important diversionary route at times when the East Coast Main Line is closed. Light rail services of the Tyne and Wear Metro's Green Line also operate over the same tracks between a junction just south of Sunderland station and Pelaw Junction.

<span class="mw-page-title-main">LNER Class ES1</span>

The NER Class ES1 was a class of two steeplecab electric locomotives commissioned by the North Eastern Railway in 1902.

The North Tyneside Loop refers to the railway lines in North Tyneside from Newcastle upon Tyne via Wallsend, North Shields, Whitley Bay, Backworth, Benton and South Gosforth back to Newcastle. Since the 1980s, it has formed part of the Tyne and Wear Metro, albeit in modified form.

<span class="mw-page-title-main">Newcastle and North Shields Railway</span> Former English railway

The Newcastle & North Shields Railway opened in June 1839 from a temporary terminus in Carliol Square in Newcastle upon Tyne to North Shields. The railway was absorbed by the Newcastle & Berwick Railway in November 1844. The Newcastle & Berwick Railway was itself absorbed by the York, Newcastle and Berwick Railway, and this became part of the North Eastern Railway in 1854.

The Blyth and Tyne Railway was a railway company in Northumberland, England, incorporated by Act of Parliament on 30 June 1852. It was created to unify the various private railways and waggonways built to carry coal from the Northumberland coalfield to Blyth and the River Tyne, which it took control of on 1st January 1853. Over time, the railway expanded its network to reach Morpeth (1857/8), North Seaton (1859), Tynemouth (1860/1), Newcastle upon Tyne (1864), and finally Newbiggin-by-the-Sea (1872). It became part of the much larger North Eastern Railway in 1874.

<span class="mw-page-title-main">Gateshead TMD</span> Locomotive maintenance yard in the North of England

Gateshead TMD was a railway traction maintenance depot situated in Gateshead, England. The depot code was 52A during the steam era and GD later on.

<span class="mw-page-title-main">Manors railway station</span> Railway station in Tyne and Wear, England

Manors is a railway station on the East Coast Main Line, which runs between London King's Cross and Edinburgh Waverley. The station serves the Quayside and Shieldfield areas of the city of Newcastle upon Tyne in Tyne and Wear, England. It is owned by Network Rail and managed by Northern Trains. The Metro station of the same name is not directly connected, and located a short walk away.

<span class="mw-page-title-main">Tynemouth Metro station</span> Tyne and Wear Metro station in Tyne and Wear, England

Tynemouth is a Tyne and Wear Metro station, serving the coastal town of Tynemouth, North Tyneside in Tyne and Wear, England. It joined the network as a terminus station on 11 August 1980, following the opening of the first phase of the network, between Haymarket and Tynemouth via Four Lane Ends.

The North Eastern Region was a region of British Railways from 1948, whose operating area could be identified by the orange signs and colour schemes that adorned its stations and other railway buildings. It was merged with the Eastern Region in 1967. It was the near direct post-nationalisation descendant of the North Eastern Railway, that had merged with some other companies to form the LNER in 1923.

<span class="mw-page-title-main">Transport in Tyne and Wear</span> Overview of transport in Tyne and Wear

Tyne and Wear is a metropolitan area covering the cities of Newcastle upon Tyne and Sunderland, as well as North and South Tyneside, Gateshead and Washington.

The Riverside Branch was a 6+12-mile (10.5 km) double-track branch line, which ran between Riverside Junction in Heaton and Percy Main West Junction in Percy Main.

<span class="mw-page-title-main">Heaton railway station</span> Former railway station in England

Heaton railway station was a railway station in Newcastle upon Tyne, England, near the southern boundary of Heaton with Byker. The station was built in the nineteenth century and closed on 11 August 1980.

<span class="mw-page-title-main">Byker railway station</span> Former railway station in Tyne and Wear on the Riverside Branch

Byker was a railway station on the Riverside Branch, which ran between Byker and Willington Quay. The station served Byker in Newcastle upon Tyne.

<span class="mw-page-title-main">Tyneside Tramways and Tramroads Company</span>

Tyneside Tramways and Tramroads Company operated an electric tramway service in Gosforth, Wallsend and North Shields between 1902 and 1930.

<span class="mw-page-title-main">NER electric units</span>

The NER electric units were electric multiple units that ran on the Tyneside Electrics, a suburban system based on the English city of Newcastle upon Tyne. In 1904 the North Eastern Railway electrified suburban services on Tyneside with a third rail at 600 V DC and built saloon cars that ran in 3-car to 8-car formations. More cars were built between 1908 and 1915 to cope with increased traffic. In 1918, a fire at Walkergate car shed destroyed 34 cars and replacement cars were built in 1920.

<span class="mw-page-title-main">South Gosforth TMD</span> Tyne and Wear Metro depot

South Gosforth Traction Maintenance Depot is a vehicle cleaning, maintenance and stabling facility used by the Tyne and Wear Metro. It was originally constructed for the London and North Eastern Railway, opening in October 1923.

<span class="mw-page-title-main">Newcastle New Bridge Street railway station</span> Closed railway station in Newcastle-upon-Tyne, UK

Newcastle New Bridge Street was a railway station on the edge of the city-centre of Newcastle-upon-Tyne, England. The station was the original Newcastle terminus of the Blyth and Tyne Railway, and was opened on 27 June 1864. In 1874 the Blyth & Tyne was taken over by the North Eastern Railway. For most of its life it served trains to Tynemouth and Morpeth. Picton House, a villa designed by John Dobson, was used for company offices and passenger facilities.

References

  1. Cooke, B.W.C., ed. (March 1963). "Tyneside Electrics". The Railway Magazine . Vol. 109, no. 743. Westminster: Tothill Press. p. 182.
  2. 1 2 3 4 5 6 7 Hoole, Ken (1987). The North Eastern Electrics. The Oakwood Press. ISBN   0 85361 358 3.
  3. 1 2 3 4 Marsden, Colin (2008). The DC Electrics. Ian Allan. p. 62. ISBN   978-0-86093-615-2.
  4. "The NER Tyneside Electric Multiple Units". lner.info. Retrieved 10 July 2012.
  5. "Walkergate Fire". Newcastle Journal. Newcastle upon Tyne, England. 13 August 1918. p. 5. Retrieved 16 November 2018.
  6. "NER parcels van". National Railway Museum . Retrieved 10 July 2012.

Sources

Further reading