USS Jimmy Carter

Last updated

USS Jimmy Carter SSN 23.jpg
Jimmy Carter returns to NSB Kitsap, 2017
SSN23.svg
Jimmy Carter's profile
History
Flag of the United States.svgUnited States
NameUSS Jimmy Carter
Namesake Jimmy Carter
Ordered29 June 1996
Builder General Dynamics Electric Boat
Laid down5 December 1998
Launched13 May 2004
Christened5 June 2004
Commissioned19 February 2005
HomeportBangor Annex of Naval Base Kitsap, Washington
MottoSemper Optima ("Always the Best")
Statusin active service
Badge USS Jimmy Carter SSN-23 Crest.png
General characteristics
Class and typeModified Seawolf-class submarine
Displacement
  • 7,568 tons light
  • 12,139 tons  full
  • 1,569 tons dead
Length
  • 138 m (452.8 ft) overall
  • 128.5 m (421.6 ft) waterline length
Beam12.1 m (39.7 ft)
Draft10.9 m (35.8 ft)
Propulsion
  • 1 S6W PWR 220 MW (300,000 hp), HEU 93.5% [1] [2]
  • 1 secondary propulsion submerged motor
  • 2 steam turbines 57,000 shp (43 MW) [2] [3]
  • 1 shaft
  • 1 pump-jet propeller
Speedgreater than 25 knots (46 km/h) [4]
Complement15 officers, 126 enlisted
Armament8 × 26.5 inch torpedo tubes, sleeved for 21 inch weapons [5] (up to 50 Tomahawk land attack missile/Harpoon anti-ship missile/Mk 48 guided torpedo carried in torpedo room) [6]
Diagram of Jimmy Carter, showing added features Jimmy Carter Front.jpg
Diagram of Jimmy Carter, showing added features

USS Jimmy Carter (SSN-23) is the third and final Seawolf-class nuclear-powered fast-attack submarine in the United States Navy. Commissioned in 2005, she is named for the 39th president of the United States, Jimmy Carter, the only president to have qualified on submarines. [7] The only submarine to be named for a living president, Jimmy Carter is also one of the few vessels, and only the third submarine of the US Navy, to be named for a living person. Extensively modified from the original design of her class, she is sometimes described as a subclass unto herself.[ citation needed ]

Contents

History

Construction

The contract to build Jimmy Carter was to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 29 June 1996, and her keel was laid on 5 December 1998. Original schedules called for Jimmy Carter to be commissioned in late 2001 or early 2002. Electric Boat was awarded an $887 million extension to the Jimmy Carter contract on 10 December 1999 to modify the boat for testing new submarine systems and classified missions previously carried out by USS Parche. [8] During modification, her hull was extended 100 feet (30 m) to create a 2,500-ton supplementary middle section which forms a Multi-Mission Platform (MMP). This section is fitted with an ocean interface for divers, remotely operated vehicles (ROVs), and special operation equipment; ROV handling system, storage, and deployment space for mission systems, and a pressure-resistant passage between the fore and aft parts of the submarine to accommodate the boat's crew. [9] [10] [11]

Jimmy Carter was christened on 5 June 2004, and the ship sponsor was former First Lady Rosalynn Carter. One result of the changes was that Jimmy Carter was commissioned more than six years after USS Connecticut and almost four months after the commissioning of USS Virginia, the first of the Virginia-class subs.

Jimmy Carter has additional maneuvering devices fitted fore and aft that allow her to keep station over selected targets in odd currents. Intelligence experts speculate that the MMP may find use in missions as an underwater splicing chamber for optical fiber cables. [12] [13] [14] [15]

Deployments

On 19 November 2004 Jimmy Carter completed alpha sea trials, her first voyage in the open seas. On 22 December, Electric Boat delivered Jimmy Carter to the US Navy, and she was commissioned 19 February 2005 at NSB New London.

Jimmy Carter began a transit from NSB New London to her new homeport at the Bangor Annex of Naval Base Kitsap, Washington on 14 October 2005 but was forced to return when an unusually high wave caused damage while the submarine was running on the surface. The damage was repaired and Jimmy Carter left New London the following day, arriving at Bangor the afternoon of 9 November 2005.

In April and September 2017 Jimmy Carter returned twice to her homeport at Naval Base Kitsap-Bangor, flying a Jolly Roger flag, traditionally indicative of a successful mission. [16]

Awards

See also

Related Research Articles

<i>Los Angeles</i>-class submarine Class of nuclear-powered fast attack submarines of the United States Navy

The Los Angeles class of submarines are nuclear-powered fast attack submarines (SSN) in service with the United States Navy. Also known as the 688 class after the hull number of lead vessel USS Los Angeles (SSN-688), 62 were built from 1972 to 1996, the latter 23 to an improved 688i standard. As of 2022, 26 of the Los Angeles class remain in commission—more than any other class in the world—and they account for more than half of the U.S. Navy's 50 fast attack submarines.

<i>Sturgeon</i>-class submarine Class of fast attack nuclear submarine by US Navy

The Sturgeon class was a class of nuclear-powered fast attack submarines (SSN) in service with the United States Navy from the 1960s until 2004. They were the "workhorses" of the Navy's attack submarine fleet throughout much of the Cold War. The boats were phased out in the 1990s and early 21st century, as their successors, the Los Angeles, followed by the Seawolf and Virginia-class boats, entered service.

<i>Seawolf</i>-class submarine Class of US nuclear attack submarines

The Seawolf class is a class of nuclear-powered, fast attack submarines (SSN) in service with the United States Navy. The class was the intended successor to the Los Angeles class, and design work began in 1983. A fleet of 29 submarines was to be built over a ten-year period, but that was reduced to 12 submarines. The end of the Cold War and budget constraints led to the cancellation of any further additions to the fleet in 1995, leaving the Seawolf class limited to just three boats. This, in turn, led to the design of the smaller Virginia class. The Seawolf class cost about $3 billion per unit, making it the most expensive United States Navy fast attack submarine and second most expensive submarine ever, after the French Triomphant-class nuclear-powered ballistic missile submarines.

The Ship-Submarine Recycling Program (SRP) is the process that the United States Navy uses to dispose of decommissioned nuclear vessels. SRP takes place only at the Puget Sound Naval Shipyard (PSNS) in Bremerton, Washington, but the preparations can begin elsewhere.

USS <i>Thresher</i> (SSN-593) United States Navy submarine (1961–63)

USS Thresher (SSN-593) was the lead boat of her class of nuclear-powered attack submarines in the United States Navy. She was the U.S. Navy's second submarine to be named after the thresher shark.

USS <i>Ohio</i> (SSGN-726) Submarine of the United States

USS Ohio (SSBN-726/SSGN-726), the lead boat of her class of nuclear-powered fleet ballistic missile submarines (SSBN), is the fourth vessel of the United States Navy to be named for the U.S. state of Ohio. She was commissioned with the hull designation of SSBN-726, and with her conversion to a guided missile submarine she was re-designated SSGN-726.

USS <i>Seawolf</i> (SSN-575) US Navy nuclear attack submarine

USS Seawolf (SSN-575) was the third ship of the United States Navy to be named for the seawolf, the second nuclear submarine, and the only US submarine built with a liquid metal cooled (sodium), beryllium-moderated nuclear reactor, the S2G. Her overall design was a variant of Nautilus, but with numerous detail changes, such as a conning tower, stepped sail, and the BQR-4 passive sonar mounted in the top portion of the bow instead of further below. This sonar arrangement resulted in an unusual bow shape above the water for a U.S. submarine. Originally laid down in 1953, her distinctive reactor was later replaced with a standard pressurized water reactor, the replacement process lasting from 12 December 1958 to 30 September 1960.

USS <i>Seawolf</i> (SSN-21) Submarine of the United States

USS Seawolf (SSN-21), is a nuclear-powered fast attack submarine and the lead ship of her class. She is the fourth submarine of the United States Navy named for the seawolf, a solitary fish with strong, prominent teeth that give it a savage look.

USS <i>Michigan</i> (SSGN-727) Submarine of the United States

USS Michigan (SSBN-727/SSGN-727) is an Ohio-class nuclear-powered guided missile submarine (SSGN), converted from a ballistic missile submarine (SSBN), that is part of the United States Navy. She is the third vessel to bear the name of the U.S. state of Michigan.

USS <i>Halibut</i> (SSGN-587) US Navy submarine

USS Halibut (SSGN-587), a unique nuclear-powered guided missile submarine-turned-special operations platform, later redesignated as an attack submarine SSN-587, was the second ship of the United States Navy to be named after the halibut.

USS <i>Parche</i> (SSN-683) Submarine of the United States

USS Parche (SSN-683), a Sturgeon-class submarine, was the second ship of the United States Navy to be named for the parche, a small, coral reef butterfly fish. Parche was launched on 13 January 1973, sponsored by Natalie Beshany, the wife of Vice Admiral Philip A. Beshany, and commissioned on 17 August 1974.

USS <i>Hawaii</i> (SSN-776) US Navy Virginia-class submarine

USS Hawaii (SSN-776), a Virginia-class submarine, is the first commissioned warship of the United States Navy to be named for the 50th state. The building contract was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 30 September 1998 and her keel was laid down on 27 August 2004. She was christened on 17 June 2006 by her sponsor, Governor Linda Lingle of Hawaii. Electric Boat delivered Hawaii to the US Navy on 22 December 2006, ahead of schedule. She was commissioned on 5 May 2007. In July 2009, she changed home port from Groton, CT to Pearl Harbor, HI.

USS <i>Alabama</i> (SSBN-731) Ohio-class submarine

USS Alabama (SSBN-731) is the sixth Ohio-class nuclear-powered ballistic missile submarine, and the seventh United States vessel to be named for the state of Alabama. The boat's motto duplicates the state's motto, Audemus Jura Nostra Defendere.

<span class="mw-page-title-main">Nuclear submarine</span> Submarine powered by a nuclear reactor

A nuclear submarine is a submarine powered by a nuclear reactor, but not necessarily nuclear-armed. Nuclear submarines have considerable performance advantages over "conventional" submarines. Nuclear propulsion, being completely independent of air, frees the submarine from the need to surface frequently, as is necessary for conventional submarines. The large amount of power generated by a nuclear reactor allows nuclear submarines to operate at high speed for long periods, and the long interval between refuelings grants a range virtually unlimited, making the only limits on voyage times being imposed by such factors as the need to restock food or other consumables.

USS <i>New Hampshire</i> (SSN-778) US Navy Virginia-class submarine

USS New Hampshire (SSN-778), a Virginia-class nuclear-powered attack submarine, is the fourth vessel of the United States Navy to be named for the state of New Hampshire. She is the first of the Virginia-class Block-II submarines to enter service. Her name was awarded to the submarine after a letter-writing campaign by the third-graders from Garrison Elementary School and sixth graders from Dover Middle School in Dover to their members of Congress, the state governor, and the Secretary of the Navy.

USS <i>Connecticut</i> (SSN-22) Submarine of the United States

USS Connecticut (SSN-22) is a Seawolf-class nuclear powered fast attack submarine operated by the United States Navy. Connecticut is the fifth active United States Ship to be named for the U.S. state of Connecticut, going back to 1776. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 3 May 1991 and her keel was laid down on 14 September 1992. She was launched on 1 September 1997, sponsored by Patricia L. Rowland, wife of the Governor of Connecticut, John G. Rowland, and commissioned on 11 December 1998.

<span class="mw-page-title-main">S2G reactor</span>

The S2G reactor was a naval reactor used by the United States Navy to provide electricity generation and propulsion on warships, and the only liquid metal cooled reactor yet deployed by the US Navy. The S2G designation stands for:

<span class="mw-page-title-main">S6W reactor</span> US Navy nuclear reactor

The S6W reactor is a naval reactor used by the United States Navy to provide electricity generation and propulsion on warships. The S6W designation stands for:

References

  1. Alan Kuperman; Frank von Hippel (10 April 2020). "US study of reactor and fuel types to enable naval reactors to shift from HEU fuel". IPFM Blog.
  2. 1 2 "Validation of the Use of Low Enriched Uranium as a Replacement for Highly Enriched Uranium in US Submarine Reactors" (PDF). dspace.mit.edu. June 2015. p. 32. Retrieved 20 November 2021.
  3. "S6W Advanced Fleet Reactor". www.globalsecurity.org. Retrieved 23 January 2023.
  4. "The US Navy -- Fact File". Archived from the original on 3 July 2007. Retrieved 5 July 2007.
  5. Schank, John F.; Cesse, Cameron; Ip, Frank W.; Lacroix, Robert; Murphy, Mark V.; Arena, Kristy N.; Kamarck; Lee, Gordon T. (2011). "Learning from Experience: Volume II: Lessons from the U.S. Navy's Ohio, Seawolf, and Virginia Submarine Programs". rand.org.
  6. "Attack Submarines - SSN". United States Navy Fact Files. United States Navy. Retrieved 13 November 2021.
  7. "Lieutenant James Earle Carter, Jr., USN". Naval History & Heritage Command. United States Navy. Retrieved 22 March 2021.
  8. Zimmerman, W. Frederick (2008). SSN-23 Jimmy Carter: U.S. Navy Submarine (Seawolf Class). Nimble Books. p. 1. ISBN   978-1-934840-30-6.
  9. RADM Davis, J. P. USS JIMMY CARTER (SSN23): Expanding Future SSN Missions, Undersea Warfare, Fall 1999, pp. 16-18.
  10. PCU Jimmy Carter Christened at Electric Boat Archived 17 November 2015 at the Wayback Machine , U.S. Navy, Story Number: NNS040609-07, Release Date: 6/9/2004
  11. The Navy's underwater eavesdropper, Reuters, 19 July 2013
  12. "New Nuclear Sub Is Said to Have Special Eavesdropping Ability". The New York Times. Associated Press. 20 February 2005. Retrieved 30 June 2009.
  13. Zorpette, Glenn (January 2002). "Making Intelligence Smarter". IEEE Spectrum. IEEE. 39 (1): 38–43. doi:10.1109/6.975021. ISSN   0018-9235.
  14. Neil Jr. (23 May 2001). "Spy agency taps into undersea cable". ZDNet News . CBS Interactive . Retrieved 30 June 2009.
  15. "Jimmy Carter: Super Spy?". Defensetech.org. 21 February 2005. Archived from the original on 3 February 2007. Retrieved 30 June 2009.
  16. Wetzel, Gary (17 September 2017). "America's Most Secret Spy Sub Returned To Base Flying A Pirate Flag". Gizmodo.
  17. Rowley, Eric (22 January 2008). "Pacific Northwest Sub Crews Win Battle "E"". Navy.mil. Retrieved 30 June 2009.
  18. "This secretive U.S. Navy submarine went on a dangerous mission". theweek.com. 4 March 2016. Retrieved 23 November 2019.
  19. "The mystery of the USS Jimmy Carter and Mission 7". tnationalintrest.org. 11 March 2021. Retrieved 25 March 2023.