Whifflet Line

Last updated

Whifflet Line
Whifflet railway station, Coatbridge, Scotland - platform looking west towards Kirkwood & Coatbridge.jpg
Overview
Owner Network Rail
Locale Glasgow
Scotland
Termini
Stations7
Service
System National Rail
Operator(s) ScotRail
Rolling stock Class 318, British Rail Class 320
Technical
Track gauge 4 ft 8+12 in (1,435 mm)
Route map
Whifflet Line.png
(Click to expand)
BSicon LCONTg.svg
BSicon STR+l.svg
BSicon KBHFeq.svg
BSicon LSTR.svg
Glasgow Central
Glasgow Subway.svg St Enoch
BSicon STR.svg
BSicon LSTR.svg
BSicon MASKc2.svg
BSicon ABZgl.svg
BSicon BHFABZgl+l.svg
BSicon STRr.svg
Rutherglen
BSicon dSTRc2.svg
BSicon BS2l.svg
BSicon STR3.svg
BSicon BS2c3.svg
BSicon dCONT1-.svg
BSicon dSTRc4.svg
BSicon STR.svg
BSicon HST.svg
Carmyle
BSicon HST.svg
Mount Vernon
BSicon HST.svg
Baillieston
BSicon HST.svg
Bargeddie
BSicon HST.svg
Kirkwood
BSicon dCONTgq.svg
BSicon dHSTq.svg
BSicon ABZqlr.svg
BSicon CONTfq.svg
Whifflet
for Argyle Line

The Whifflet Line is one of the lines within the Strathclyde suburban rail network in Scotland.

Contents

History

The line was built between 1863 and 1865 as the Rutherglen and Coatbridge Railway, part of the Caledonian Railway. It opened to goods traffic (mainly coal and iron) in September 1865 and to passengers in August 1866. It has been in continuous operation ever since. Stations in the first service on the line were at Carmyle, Broomhouse (now Mount Vernon), Baillieston, Langloan and Whifflet High Level (until 1964). Passenger services ceased in November 1966 following the Beeching Axe (latterly running to Coatbridge Central). Between 1972 and 1974 scheduled passenger trains between Glasgow Central and Perth used the route. For the following twenty years, the route was only used for freight and diverted passenger services. However the line was reopened by British Rail to scheduled passenger services with intermediate stations on 4 October 1993, running to the newly built station at Whifflet rather than Coatbridge Central as previously.

Line description

The modern line currently serves seven stations. It connects parts of south east Glasgow, Bargeddie and Coatbridge to Glasgow city centre. Between Glasgow Central and Rutherglen, the line shares the same track as the West Coast Main Line before branching off in a north easterly direction towards Coatbridge.

Services

The route is operated by ScotRail.

1993 to 2002

Following re-opening as a passenger line, service was provided by a mix of 1980s Class 156 and 1950s Class 101 DMUs. During their final years, the last of Class 101 DMUs were used, reduced from 3-car by having the centre trailer removed. In 2002, the remaining 101s were withdrawn from service on the Whifflet line, and more modern units took over the services.

2009 service pattern

Trains operated at a half-hour frequency. All services were scheduled to run as two-car trains only, although four carriage services were technically possible. Services were operated using Class 158 DMUs and the occasional Class 156 DMU. Three trains operated on this route during the day, usually remaining dedicated on this service throughout the day.

From December 2014

In late 2014, the Whifflet Line electrification was commissioned and from 14 December 2014 the service was incorporated into the Argyle Line, operated by EMUs. At the same time an all year round Sunday service commenced. Current Sunday Service is hourly from Balloch to Motherwell via Whifflet.

Anderston Tunnel Closure, 2022 [1]

In February 2022, ScotRail announced a £32million improvement works for the Anderston Tunnel to improve reliability for passengers. As part of the improvement works, engineers completed a series of projects to repair and replace infrastructure on the line through central Glasgow.

As part of the works, Anderston Tunnel closed for a period of eight weeks. The line between Rutherglen and Exhibition Centre was closed throughout the works, and no trains ran. The works started on 13 March 2022 and ended on 8 May 2022.

During the period of closure, services were rerouted via Glasgow Central High Level.

Line Developments

In 2006, Network Rail announced tentative proposals to electrify the Rutherglen - Whifflet section as part of a £1.4bn upgrade to Scotland's railways. The main benefits of this scheme were to provide an enhanced frequency for the Whifflet to central Glasgow routes and to provide an electric diversionary path for long distance WCML services. The new timetable came into operation on 14 December 2014, the Whifflet Line has been added to the Argyle Line system with services through Glasgow Central Low Level to the western suburbs.

References

  1. "£32m Argyle Line improvement works set to begin".

Sources