Glasgow South Western Line

Last updated

Glasgow South Western Line
The Girvan Train - geograph.org.uk - 422632.jpg
A train from Girvan heading towards Maybole on the Glasgow South Western Line
Overview
StatusOperational
Owner Network Rail
Locale Scotland
North West England
Termini
Stations26
Service
Type Heavy rail, Rural Rail [1]
System National Rail
Operator(s) ScotRail
Rolling stock Class 156 "Super Sprinter"
Class 380 “Desiro” (Glasgow to Barrhead only)
Technical
Number of tracks Double track from Glasgow Central to Barrhead and Crosby, Lugton to Stewarton, Kilmarnock to Carlisle and Troon to Dalrymple Junction, Single line with Passing loops from Crosby to East Kilbride, Barrhead to Lugton, Stewarton to Kilmarnock, Kilmarnock to Troon and Dalrymple Junction to Stranraer.
Track gauge 4 ft 8+12 in (1,435 mm)
Operating speed80 mph (129 km/h) maximum [1]
Route map
Glasgow South Western Line.png
(Click to expand)

The Glasgow South Western Line is a mainline railway in Scotland that runs from Glasgow to Kilmarnock, and then either Carlisle via Dumfries, or Stranraer via Ayr, with a branch to East Kilbride.

Contents

History

The line was built by several railway companies during the 19th century: [2] [ page needed ]

The Glasgow, Dumfries and Carlisle Railway and the Glasgow, Paisley, Kilmarnock and Ayr Railway amalgamated to form the Glasgow and South Western Railway in 1850.

The Glasgow, Barrhead and Neilston Direct Railway and Glasgow and Kilmarnock Joint Railway were amalgamated to form the Glasgow, Barrhead and Kilmarnock Joint Railway jointly operated by the Glasgow and South Western Railway and Caledonian Railway.

The lines forming the East Kilbride branch were operated by the Caledonian Railway.

Until 1923 the line via Dumfries was in competition with the North British Railway and Caledonian Railway as one of the mainlines into Scotland. With the passing of the Railways Act 1921 (Grouping Act) the line became part of the London, Midland and Scottish Railway (LMS).

In 1948, with nationalisation the line became part of the Scottish Region of British Railways. During the Beeching Axe in the 1960s many of the railway's branch lines were closed, including the direct route between Dumfries and Stranraer, via Galloway on the Portpatrick and Wigtownshire Joint Railway and Castle Douglas and Dumfries Railway, leaving the present Y-shaped railway. The former G&SWR terminus at Glasgow St Enoch was also closed in this period (in 1966), with all services rerouted into Glasgow Central.

During the electrification of the West Coast Main Line in the early 1970s by British Rail, the line was used as a major diversionary route whilst the Caledonian Railway's Annandale/Clydesdale route was closed, particularly during the weekends. Following completion of this project, the sections of line between Barrhead and Kilmarnock (with a crossing loop at Lugton) and Annan and Gretna (controlled from Carlisle) were singled. Re-doubling of the Annan to Gretna section was completed in August 2008, controlled from Dumfries Station signal box.

In early 2009, work commenced to re-double the line between Lugton and Stewarton based on the 2008 plans published by Network Rail. Completed in September 2009, this allows ScotRail to run a half-hourly service between Glasgow and Kilmarnock.

In December 2023, electrification of the first section of the line between Glasgow Central and Barrhead was completed (services started on 11 December 2023 using Class 380 electric trains [3] ). Further work is currently underway to re-double and electrify the branch line from Thornliebank to East Kilbride. [4]

With the exception of the electrified section between Glasgow Central and Barrhead, all other services on the line are operated using the British Rail Class 156 diesel trains.

Accidents and incidents

Route

Kilmarnock KilmarnockRailWayTower.jpg
Kilmarnock
Girvan Girvan station exterior.JPG
Girvan
Dumfries Dumfries Railway Station 2008-01-18.jpg
Dumfries

Trains serve the following stations.

East Kilbride branch
Stranraer line
Glasgow South Western Line

Services

Class 156s at Kilmarnock Kilmarnock railway station - geograph.org.uk - 651187.jpg
Class 156s at Kilmarnock

In the latter years of British Rail, operations were sectorised. All Scottish operations (excluding the WCML and ECML services), including this line, became part of the Regional Railways operation – being branded as ScotRail.

Following privatisation, passenger services upon the line were taken over by ScotRail, (part of National Express), and are now operated by ScotRail with the track and signalling being operated (nationally) by Network Rail. Although the Dumfries route is officially one of only three railway lines between England and the Scottish lowland areas, (The others being the East Coast Main Line and West Coast Main Line) the line joins the West Coast Main Line immediately north of the Anglo-Scottish border at Gretna Junction. Along with the Settle-Carlisle Railway, the line is much used as both a diversionary route, especially during the recent West Coast Main Line modernisation, and for freight, notably coal from the several open cast coalmines of the Ayrshire Coalfield that adjoin the line.

Between Glasgow Central, Gretna Green and Girvan the line is operated by ScotRail. Electric train services are also provided between Glasgow and Troon and Ayr via the Ayrshire Coast Line. There are also a number of through services between Glasgow & Stranraer that run direct via Paisley & Kilwinning (others run via Kilmarnock, as do certain trains to/from Girvan [6] ). From the December 2015 timetable change, new Scotrail franchisee Abellio changed the schedule on the Stranraer line—the service frequency to/from Ayr has increased from six trains each way to eight on weekdays (and from three to five on Sundays), but there are now no longer any direct trains to Glasgow via Paisley—all services now run via Kilmarnock.

In the 1970s, most of the intermediate stations between Kilmarnock and Carlisle were closed, leaving only Kirkconnel, Dumfries and Annan. Since then, the stations at New Cumnock, Auchinleck, Sanquhar and Gretna Green have been reopened. There have been several studies recently as to the possibility of reopening Thornhill station, roughly halfway between Dumfries and Sanquhar. [7]

As of 2020, the line has many different service patterns depending on its lines, From Glasgow, There is 2 trains per hour to Kilmarnock(12 of these extend south of Kilmarnock with 11 to Dumfries and 9 of which continue to Carlisle while 1 only goes as far as New Cumnock while 4 (3 on Saturdays) trains per day operate to Stranraer and 1 train per day terminates at Girvan), There is a regular hourly service between Dumfries and Carlisle on Monday to Saturdays, On Sundays, An hourly service operates to Kilmarnock however only 2 trains per day operate south to Dumfries and Carlisle, 5 trains per day also operate between Dumfries and Carlisle on Sundays on a roughly 2 hourly service for most of the day, There is 2 trains per hour between Glasgow and East Kilbride 7 days a week with extra trains during peak times. There is also a regular hourly service between Ayr and Girvan with 8 trains per day extending south to Stranraer with a 2 hourly service to/from Kilmarnock, On Sundays, 5 trains per day operate from Ayr to Stranraer however there is no service to/from Kilmarnock.

Before the May 2022 timetable change, there were some services that continued past Carlisle, continuing to Newcastle along the Tyne Valley Line. The service from Stranraer to Newcastle was withdrawn in 2009. Scotrail service to Newcastle was withdrawn as part of the May 2022 timetable change (therefore leaving Carlisle as the only station in England to be served by Scotrail.)

Rail & Sea Connections

The Glasgow South Western Line links into the ferries at Stranraer via the bus connecting with Cairnryan for the Stena Line ferries to the Port of Belfast and the P&O Ferries to Larne Harbour. The Stena Line ships (previously Sealink) ran from Stranraer Harbour until 2011. A bus connection to Cairnryan is also now provided from Ayr. Onward rail connections are provided by Northern Ireland Railways.

Former Ferries

The line also connected Troon to the P&O Ferries service to Larne Harbour.

Related Research Articles

<span class="mw-page-title-main">Glasgow and South Western Railway</span> British pre-grouping railway company

The Glasgow and South Western Railway (G&SWR) was a railway company in Scotland. It served a triangular area of south-west Scotland between Glasgow, Stranraer and Carlisle. It was formed on 28 October 1850 by the merger of two earlier railways, the Glasgow, Paisley, Kilmarnock and Ayr Railway and the Glasgow, Dumfries and Carlisle Railway. Already established in Ayrshire, it consolidated its position there and extended southwards, eventually reaching Stranraer. Its main business was mineral traffic, especially coal, and passengers, but its more southerly territory was very thinly populated and local traffic, passenger and goods, was limited, while operationally parts of its network were difficult.

The Glasgow, Dumfries and Carlisle Railway was a railway company in Scotland, which constructed the line from near Cumnock to Gretna Junction, forming the route from Glasgow to Carlisle via Dumfries, in association with other lines. Its promoters hoped it would form the only railway between central Scotland and England, but it lost out to rival companies.

<span class="mw-page-title-main">Stranraer railway station</span> Railway station in Dumfries and Galloway, Scotland

Stranraer railway station is a railway station that serves the town of Stranraer, Dumfries and Galloway, Scotland. The station is 94.5 miles (151 km) southwest of Glasgow and is the terminus of the Glasgow South Western Line. It has two platforms and is staffed on a part-time basis. Stranraer station remains owned by Stena Line and not Network Rail

<span class="mw-page-title-main">Gretna Green railway station</span> Railway station in Dumfries and Galloway, Scotland

Gretna Green is a railway station on the Glasgow South Western Line, which runs between Carlisle and Glasgow Central via Kilmarnock. The station, situated 9 miles 58 chains (16 km) north-west of Carlisle, serves the town of Gretna and village of Gretna Green in Dumfries and Galloway, Scotland. It is owned by Network Rail and managed by ScotRail.

<span class="mw-page-title-main">Dumfries railway station</span> Railway station in Dumfries and Galloway, Scotland

Dumfries railway station serves the town of Dumfries in Dumfries and Galloway, Scotland. It is located on the Glasgow South Western Line. The station is owned by Network Rail and managed by ScotRail who provide all passenger train services. It is staffed on a part-time basis throughout the week.

<span class="mw-page-title-main">Pollokshaws West railway station</span> Railway station in Glasgow, Scotland

Pollokshaws West railway station is a railway station in Glasgow, Scotland. The station is managed by ScotRail and is served by trains on the Glasgow South Western Line.

<span class="mw-page-title-main">Barrhead railway station</span> Railway station of Barrhead, Greater Glasgow, Scotland

Barrhead railway station is a railway station in the town of Barrhead, East Renfrewshire, Greater Glasgow, Scotland. The station is managed by ScotRail and is on the Glasgow South Western Line, 7+12 miles (12.1 km) southwest of Glasgow Central.

<span class="mw-page-title-main">Stewarton railway station</span> Railway station in East Ayrshire, Scotland

Stewarton railway station is a railway station in the town of Stewarton, East Ayrshire, Scotland. The station is managed by ScotRail and is on the Glasgow South Western Line.

<span class="mw-page-title-main">Kilmaurs railway station</span> Railway station in East Ayrshire, Scotland

Kilmaurs railway station is a railway station in the town of Kilmaurs, East Ayrshire, Scotland. The station is managed by ScotRail and is on the Glasgow South Western Line.

<span class="mw-page-title-main">Ayr railway station</span> Railway station in South Ayrshire, Scotland

Ayr railway station serves the town of Ayr in South Ayrshire, Scotland. It is situated in Smith Street, off Burns Statue Square. The station, which is managed by ScotRail, is on the Ayrshire Coast Line, 41+12 miles (66.8 km) south-west of Glasgow Central.

<span class="mw-page-title-main">Maybole railway station</span> Railway station in South Ayrshire, Scotland

Maybole railway station is a railway station serving the town of Maybole, South Ayrshire, Scotland. The station is owned by Network Rail and managed by ScotRail and is on the Glasgow South Western Line.

<span class="mw-page-title-main">Girvan railway station</span> Railway station in South Ayrshire, Scotland

Girvan railway station is a railway station serving the town of Girvan, South Ayrshire, Scotland. The station is managed by ScotRail, who operate all passenger services from there. It is on the Ayr to Stranraer section of the Glasgow South Western Line and is situated 62 miles south of Glasgow Central. It has two platforms and is the location of one of the five passing loops on the single track line between Dalrymple Junction and Stranraer. Immediately south of the station, the line climbs steeply towards Pinmore tunnel – the climb is known as the Glendoune Bank and has a ruling gradient of 1 in 54.

<span class="mw-page-title-main">Kilmarnock railway station</span> Railway station in East Ayrshire, Scotland

Kilmarnock railway station is a railway station in Kilmarnock, East Ayrshire, Scotland. The station is managed by ScotRail and is served by trains on the Glasgow South Western Line. One of the earliest railway stations in Scotland, the Kilmarnock and Troon Railway opened on 6 July 1812, until it was replaced by the Glasgow, Paisley, Kilmarnock and Ayr Railway on 4 April 1843.

<span class="mw-page-title-main">Glasgow, Paisley, Kilmarnock and Ayr Railway</span> Railway in Scotland

The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) was a railway in Scotland that provided train services between Glasgow, Kilmarnock and Ayr. It opened its first line, between Glasgow and Ayr, in stages from 1839 to 1840. The section between Glasgow and Paisley was made jointly with the Glasgow, Paisley and Greenock Railway. Later it built a line from Dalry via Kilmarnock to Cumnock, linking there with the Glasgow, Dumfries and Carlisle Railway, and together forming a through route from Glasgow to Carlisle. The two companies merged to form the Glasgow and South Western Railway.

The Glasgow, Barrhead and Kilmarnock Joint Railway was a railway jointly owned by the Caledonian Railway and the Glasgow and South Western Railway, completed in 1873, and giving the latter a shorter access to its Carlisle main line. A branch to Beith was also built.

The Largs Branch is a railway line in Scotland, serving communities on the north Ayrshire Coast, as well as the deep water ocean terminal at Hunterston. It branches from the Glasgow to Ayr line at Kilwinning.

The Ayr and Maybole Junction Railway (A&MJR) was a railway in Ayrshire, Scotland that provided services between Ayr and Maybole. It opened in 1856 and was seen as a link in providing a through line between Glasgow and Portpatrick, then the ferry port for the north of Ireland.

The Maybole and Girvan Junction Railway was a railway company that constructed a line between Maybole and Girvan. Although promoted independently, it was supported by the Glasgow and South Western Railway, and was seen as part of a trunk line connecting Glasgow with a ferry port for the north of Ireland.

Girvan and Portpatrick Junction Railway (G&PJR) was a railway company in Scotland. It opened in 1877 between Girvan and Challoch Junction, where it joined the Portpatrick Railway, which had already reached Stranraer from Castle Douglas. Portpatrick had been an important ferry terminal for traffic to and from the north of Ireland, but its significance was waning and Stranraer assumed greater importance. The new line formed part of a route between Glasgow, Ayr and Stranraer.

<span class="mw-page-title-main">Busby Railway</span> Railway in South Lanarkshire, Scotland, UK

The Busby Railway is a short railway line built to the south of Glasgow, connecting the small villages of Thornliebank, Giffnock, Clarkston and Busby and later Thorntonhall and East Kilbride with the city. It opened in two stages, in 1866 and 1868, and served industry and encouraged residential development.

References

Notes

  1. 1 2 "Business Plan 2007" (PDF). Network Rail . Archived from the original (PDF) on 1 October 2012. Retrieved 9 July 2011.
  2. Awdry 1990.
  3. "Barrhead to Glasgow Electrification". December 2023.
  4. "East Kilbride Enhancements". January 2024.
  5. Dalton, Alastair (1 August 2015). "Trains crash near Cumnock in Ayrshire". The Scotsman. Retrieved 2 August 2015.
  6. GB Rail Timetables 216 & 218, May 2013
  7. "New Dumfries and Galloway railway station funds pursued". BBC News. 9 January 2014. Retrieved 30 June 2024.

Sources

Further reading