Ayr and Dalmellington Railway

Last updated

Contents

Ayr and Dalmellington Railway
BSicon CONTg.svg
BSicon HST.svg
Newton-on-Ayr
BSicon kABZg2.svg
Newton Junction
BSicon exkSTRc2.svg
BSicon STR+k1.svg
BSicon kABZl+4x3.svg
BSicon lCONTf@Fq.svg
BSicon ekABZg+1.svg
Hawkhill Junction
BSicon HST.svg
Ayr
BSicon exSTRc2.svg
BSicon eABZg3.svg
Alloway Junction
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon STR.svg
BSicon eABZgl.svg
BSicon exKBSTeq.svg
Ailsa Hospital
BSicon eHST.svg
Maybole Junction
BSicon STRc2.svg
BSicon ABZg3.svg
Maybole (Dalrymple) Junction
BSicon CONT1.svg
BSicon STR+c4.svg
BSicon BRK3.svg
BSicon eHST.svg
Hollybush
BSicon eSTR+c2.svg
BSicon exCONT3.svg
BSicon eABZg+1.svg
BSicon exSTRc4.svg
Holehouse Junction
BSicon eHST.svg
Holehouse Junction
BSicon eHST.svg
Patna
BSicon eHST.svg
Waterside
BSicon xABZgl.svg
BSicon KBSTeq.svg
Waste Tip
BSicon exKHSTe.svg
Dalmellington

The Ayr and Dalmellington Railway was a railway company in Scotland, which connected the growing ironworks community around Dalmellington with Ayr, in Ayrshire, Scotland. Its route was originally planned by the Ayrshire and Galloway Railway as part of a scheme to link Ayr with Castle Douglas, but lack of funds limited the construction to a very short section connecting the iron and coal pits of the Dalmellington Iron Company with its iron works, opening in 1849.

The remainder of the line opened in 1856. It was the first railway to cross the river at Ayr. At that time the main line from Glasgow terminated at a station north of the river. After opening of the line, the railway was extended eventually to Stranraer, diverging from the Dalmellington line at Dalrymple Junction, and in time this became the dominant section.

The branch line was heavily dependent on traffic from the Iron Company, and when that closed down, the branch line lost its passenger service, and now only carries mineral trains from open-cast workings.

The northern section of the line remains open as part of the Glasgow - Ayr - Stranraer route (2014).

History

A false start

The Burnton Viaduct near Dalrymple in 2008 Burnton Viaduct.jpg
The Burnton Viaduct near Dalrymple in 2008

The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) had reached Ayr in 1840, but its Ayr station was on the north bank of the River Ayr. (The GPK&AR was a predecessor company of the Glasgow and South Western Railway.) Although consideration was soon afterwards given to building a line southwards into Galloway, the daunting topography of any such route delayed any action on the matter.

In 1845 there was huge interest in railway investments, and a number of ambitious schemes were proposed, including a railway from Ayr to the shores of Loch Ryan, by way of Ballantrae, and sponsored by the GPKA&R, and titled the Glasgow and Belfast Union Railway. There was also an independent British and Irish Union Railway from Dumfries via Castle Douglas to Portpatrick. Both proposals sought a connection with the ferry service from Portpatrick to Donaghadee in the north of Ireland.

An Ayrshire and Galloway Railway (A&GR) proposed to build from a junction with the Glasgow and Belfast Union at Smithston, near Patna, by way of Dalmellington to Castle Douglas, there linking with the British and Irish Union Railway. The capital was to be £650,000; the company was courting the Caledonian Railway who had plans to reach Ayr across country. However the frenzied promotion of railway schemes, not all of them practicable, came to an end and in 1846. the British and Irish Union announced on 21 April 1846 that it was discontinuing its attempts to raise money for its line. The A&GR itself found raising money difficult, and this loss of connectivity at Castle Douglas (for Dumfries) was a blow. Consideration was given to abandoning their own scheme too, but the promoters decided to proceed, and a Bill was submitted to Parliament. The preamble to the Bill was found to be "not proved" [note 1] and the scheme was reduced by Parliament, to run between Smithston (near Patna) and Dalmellington only, a small fraction of its intended course. The Act[ which? ] gave the company running powers over the Glasgow and Belfast Union line (under consideration at the same time) between Ayr and Smithston.

The Glasgow and Belfast Union Railway too was in financial difficulties, although partly funded by the profitable GPK&AR, and after consideration, it pressed forward with its Bill, now cutting back the scheme to reach Girvan only. It received its authorising Act of Parliament on 26 August 1846. [1] However the reality of the shortage of money for such a difficult proposition became unavoidable, and the powers were allowed to lapse without any actual construction. [2]

Dalmellington iron works

System map of the Ayr & Dalmellington Railway Ayr & dalmellington rly.gif
System map of the Ayr & Dalmellington Railway

The significance of Dalmellington was the substantial deposits of iron ore and of coal in the vicinity, as well as some limestone. The proximity of these minerals made the foundation of an ironworks feasible. Henry Houldsworth developed the mining and in 1846 founded an ironworks. He established tramways for local conveyance but wished to encourage the construction of the main line railway to facilitate internal transport, and more importantly transport to market. [3] [4]

A heavily reduced scheme

The 1846 authorisation was hardly practicable, and in the 1847 parliamentary session a further Bill was presented, after consideration with Houldsworth (as the dominant potential customer) as to the way forward. With the Glasgow and Belfast Union Railway scheme abandoned, the A&GR now needed to build from Ayr instead of Smithston. The GPKA&R undertook to purchase the shares for £100,500, and the A&GR undertook to construct the section between Drumgrange, near Waterside, and Sillyhole as a first priority, to give Houldsworth the connection between the iron workings and the works, that he required. The distance was about 2 miles (about 3 km), and the section was "to be given over to [his company] to be worked by horsepower".

The enabling Act for the Ayrshire and Galloway (Smithstown & Dalmellington) Railway received royal assent on 8 June 1847. [5] [6] The shareholders met on 22 November 1847 but too few attended to form a quorum, and the vote on sale to the GPK&AR could not be put to the meeting. The GPK&AR was in no hurry to finalise the matter, although it had purchased a large block of shares, and the delay in completion of the line led to heavy criticism by shareholders.

On 7 November 1849 the Drumgrange to Sillyhole section was completed and "handed over" (on a toll usage basis) to the Dalmellington Iron Company, ostensibly for horse operation, although the company did use small industrial locomotives.

The severe money shortage took its toll: in 1850 it was noted that the A&GR had made no effort toward constructing the remainder of its line, and that a lack of maintenance on the open section was showing itself. The company had failed to pay several creditors, and they obtained a warrant for "arrest" of the rental payments from the Iron Company. [2]

The G&SWR is formed

The GPK&AR became renamed the Glasgow and South Western Railway on 25 October 1850, absorbing the Glasgow, Dumfries and Carlisle Railway. At this time the Ayrshire and Galloway made a final call on subscribers to its shares. The G&SWR was now the largest shareholder, and after some prevarication paid up £16,651. It then took direct control of the A&GR, installing its own directors.

Extending the line

By 30 June 1851, the A&GR line had been completed from Sillyhole to Dalmellington, a distance of only a few hundred yards. However it was not opened at this stage, as only the mineral working north of Sillyhole was in effect. The G&SWR evidently saw no benefit in completing the line to Ayr, until negotiations with the Dalmellington Iron Company resulted in a commitment from them to guarantee a 4% return on capital (of £150,000) for ten years. Thirteen miles (20 km) of new railway needed to be built. The original compulsory purchase powers had expired, so a new Act needed to be obtained; this was passed on 4 August 1853. [7] The line would be from Falkland Junction, immediately north of the G&SWR "Ayr" terminus, to Drumgrange. A line to Girvan was being planned now, and it would diverge from the Ayr and Dalmellington line and have running powers from Ayr, in contrast to the 1845 proposal where the A&GR line was to have diverged from the G&BUR and have running powers over that line.

The line opened to goods and mineral trains on 15 May 1856. the opening to passengers was delayed due to washouts of earthworks, but it took place on 7 August 1856. [2] [5] [8]

The line was difficult to work, with gradients of 1 in 70 and 1 in 90 climbing to Dalmellington, and numerous mineral tramway connections. At Ayr it diverged (considered in the southward direction) from the G&SWR Ayr line at Falkland Junction, crossing the River Ayr. A new through station at Townhead was provided, a temporary structure until 1 July 1857. The line was worked by the G&SWR, but ordinary G&SWR trains continued to use the old terminus on the north side of the River Ayr until January 1860 when it was downgraded to goods depot status, all passenger trains using the new through station.

Later history

The G&SWR was working the line and had paid most of the cost of construction; it was only a matter of time until they took over the company, and they did so on 1 August 1858 (by Act of 28 June 1858). [2] [5]

The Ayr and Maybole Junction Railway had been authorised in 1854, and opened to goods traffic on 15 September 1856, and to passengers on 13 October 1856. That line too was worked by the G&SWR. It diverged from the Dalmellington line at Dalrymple Junction. The G&SWR saw it as another stage of an extension to Stranraer, and that objective was achieved in 1877. The Dalmellington line continued operating a heavy mineral service, and the long Stranraer line had a chequered existence. However, in time it came to be thought of as the main line, and the Dalmellington line was a branch.

In 1872 a mineral line was opened from Cronberry to Newton-on-Ayr with a branch from Annbank to Holehouse Junction, on the Dalmellington line. The entry at Holehouse faced Dalmellington. Passenger trains from Dalmellington ran as far as Rankinston from 1892.

The ironworks closed in 1921, since which time the mineral traffic on the branch had been devoted to extractive industries alone. [9] The Dalmellington line had long been subordinate to the Stranraer route; the point of divergence via Dalrymple Junction. The branch passenger service closed on 6 April 1964. [10] The line between Falkland Junction and Dalrymple Junction continues in use for Stranraer line passenger services, and mineral trains use the Dalmellington branch to access open cast mining sites near Dalmellington. The trains use the original line as far as Waterside, near Drumgrange, from where a private mineral line climbs into the hills above, and to the north of, Dalmellington. The branch is known now as the Waterside branch.

Topography

Falkland Junction to Drumgrange opened to goods trains 15 May 1856, and passenger trains on 7 August

Drumgrange to Sillyhole opened 7 November 1849; [note 2]

Sillyhole to Dalmellington opened to goods train 15 May 1856, and passenger trains on 7 August;

Connections to other lines

Related Research Articles

<span class="mw-page-title-main">Glasgow and South Western Railway</span> British pre-grouping railway company

The Glasgow and South Western Railway (G&SWR) was a railway company in Scotland. It served a triangular area of south-west Scotland between Glasgow, Stranraer and Carlisle. It was formed on 28 October 1850 by the merger of two earlier railways, the Glasgow, Paisley, Kilmarnock and Ayr Railway and the Glasgow, Dumfries and Carlisle Railway. Already established in Ayrshire, it consolidated its position there and extended southwards, eventually reaching Stranraer. Its main business was mineral traffic, especially coal, and passengers, but its more southerly territory was very thinly populated and local traffic, passenger and goods, was limited, while operationally parts of its network were difficult.

<span class="mw-page-title-main">Paisley Gilmour Street railway station</span> Railway station in Renfrewshire, Scotland

Paisley Gilmour Street railway station is the largest of the four stations serving the town of Paisley, Renfrewshire, Scotland, and acts as the town's principal railway station. The station is managed by ScotRail and serves the Ayrshire Coast Line and Inverclyde Line, 7+14 miles (11.7 km) west of Glasgow Central. The station is protected as a category B listed building.

The Glasgow, Dumfries and Carlisle Railway was a railway company in Scotland, which constructed the line from near Cumnock to Gretna Junction, forming the route from Glasgow to Carlisle via Dumfries, in association with other lines. Its promoters hoped it would form the only railway between central Scotland and England, but it lost out to rival companies.

<span class="mw-page-title-main">Glasgow South Western Line</span> Railway line in the UK

The Glasgow South Western Line is a mainline railway in Scotland that runs from Glasgow to Kilmarnock, and then either Carlisle via Dumfries, or Stranraer via Ayr, with a branch to East Kilbride.

<span class="mw-page-title-main">Maybole railway station</span> Railway station in South Ayrshire, Scotland

Maybole railway station is a railway station serving the town of Maybole, South Ayrshire, Scotland. The station is owned by Network Rail and managed by ScotRail and is on the Glasgow South Western Line.

<span class="mw-page-title-main">Girvan railway station</span> Railway station in South Ayrshire, Scotland

Girvan railway station is a railway station serving the town of Girvan, South Ayrshire, Scotland. The station is managed by ScotRail, who operate all passenger services from there. It is on the Ayr to Stranraer section of the Glasgow South Western Line and is situated 62 miles south of Glasgow Central. It has two platforms and is the location of one of the five passing loops on the single track line between Dalrymple Junction and Stranraer. Immediately south of the station, the line climbs steeply towards Pinmore tunnel – the climb is known as the Glendoune Bank and has a ruling gradient of 1 in 54.

The City of Glasgow Union Railway - City Union Line, also known as the Tron Line, was a railway company founded in Glasgow, Scotland, in 1864 to build a line connecting the railway systems north and south of the River Clyde, and to build a central passenger terminus and a general goods depot for the city. The through line, running from south-west to north-east across the city, opened in 1870–1, and the passenger terminal was St Enoch railway station, opened in 1876. The railway bridge across the Clyde was the first in the city.

The Glasgow and Paisley Joint Railway was the section of railway line between Glasgow Bridge Street railway station and Paisley, in the west of Scotland. It was constructed and operated jointly by two competing railway companies as the stem of their lines to Greenock and Ayr respectively, and it opened in 1840. The Joint Committee, which controlled the line, built a branch to Govan and later to Cessnock Dock, and then Prince's Dock.

The Lanarkshire and Ayrshire Railway (L&AR) was an independent railway company built to provide the Caledonian Railway with a shorter route for mineral traffic from the coalfields of Lanarkshire to Ardrossan Harbour, in Scotland.

The Dalry and North Johnstone Line was a branch of the Glasgow and South Western Railway (G&SWR) in Renfrewshire and Ayrshire, Scotland, connecting the stations in Elderslie and Dalry via a route running parallel to the existing line built by the Glasgow, Paisley, Kilmarnock and Ayr Railway. This provided additional line capacity for Ayrshire Coast and Kilmarnock services. The loop line was used for passenger services until the mid-1960s, when it was closed by the Beeching Axe. The majority of the line's trackbed has since been absorbed into the Sustrans National Cycle Network.

<span class="mw-page-title-main">Glasgow, Paisley, Kilmarnock and Ayr Railway</span> Railway in Scotland

The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) was a railway in Scotland that provided train services between Glasgow, Kilmarnock and Ayr. It opened its first line, between Glasgow and Ayr, in stages from 1839 to 1840. The section between Glasgow and Paisley was made jointly with the Glasgow, Paisley and Greenock Railway. Later it built a line from Dalry via Kilmarnock to Cumnock, linking there with the Glasgow, Dumfries and Carlisle Railway, and together forming a through route from Glasgow to Carlisle. The two companies merged to form the Glasgow and South Western Railway.

The Glasgow, Barrhead and Kilmarnock Joint Railway was a railway jointly owned by the Caledonian Railway and the Glasgow and South Western Railway, completed in 1873, and giving the latter a shorter access to its Carlisle main line. A branch to Beith was also built.

The Maidens and Dunure Light Railway was a railway in Ayrshire, Scotland built to open up coastal communities by connecting them to the main line railway network.

The Largs Branch is a railway line in Scotland, serving communities on the north Ayrshire Coast, as well as the deep water ocean terminal at Hunterston. It branches from the Glasgow to Ayr line at Kilwinning.

The Ayr and Maybole Junction Railway (A&MJR) was a railway in Ayrshire, Scotland that provided services between Ayr and Maybole. It opened in 1856 and was seen as a link in providing a through line between Glasgow and Portpatrick, then the ferry port for the north of Ireland.

The Maybole and Girvan Junction Railway was a railway company that constructed a line between Maybole and Girvan. Although promoted independently, it was supported by the Glasgow and South Western Railway, and was seen as part of a trunk line connecting Glasgow with a ferry port for the north of Ireland.

Girvan and Portpatrick Junction Railway (G&PJR) was a railway company in Scotland. It opened in 1877 between Girvan and Challoch Junction, where it joined the Portpatrick Railway, which had already reached Stranraer from Castle Douglas. Portpatrick had been an important ferry terminal for traffic to and from the north of Ireland, but its significance was waning and Stranraer assumed greater importance. The new line formed part of a route between Glasgow, Ayr and Stranraer.

Maybole Junction railway station was a railway station located between Alloway and Dalrymple in South Ayrshire, Scotland. The station was originally part of the Ayr and Dalmellington Railway.

<span class="mw-page-title-main">Hollybush railway station</span> Former railway station in Scotland

Hollybush railway station was a railway station in East Ayrshire, Scotland that served the nearby Hollybush Hotel and the rural district. The line on which the old station stands was originally part of the Ayr and Dalmellington Railway, worked and later owned by the Glasgow and South Western Railway. The station, opened as Hollybush later became part of the London, Midland and Scottish Railway and was closed by the British Railways Board (BRB).

The Glasgow and South Western Railway operated a number of cross-country lines in Ayrshire.

References

  1. Glasgow and Belfast Union Railway Act 1846 (9 & 10 Vict. c. cccxcii)
  2. 1 2 3 4 Ross, David (2014). The Glasgow and South Western Railway: A History. Catrine: Stenlake Publishing Limited. ISBN   978-1-84033-648-1.
  3. Smith, David L. (1967). The Dalmellington Iron Company: Its Engines and Men. Newton Abbot: David & Charles.
  4. Marwick, William H. (2002) [1964]. Scotland in Modern Times. Abingdon: Routledge. ISBN   978-0-714-61342-0.
  5. 1 2 3 Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. Wellingborough: Patrick Stephens Limited. p. 59. ISBN   1-85260-049-7.
  6. Ayrshire and Galloway (Smithstown and Dalmellington) Railway Act 1847 (10 & 11 Vict. c. x)
  7. Ayr and Dalmellington Railway Act 1853 (16 & 17 Vict. c. cxlviii)
  8. Highet, Campbell (1965). The Glasgow & South-Western Railway. Lingfield: Oakwood Press.
  9. Smith, David L. (1980). Legends of the Glasgow and South Western Railway in LMS Days. Newton Abbot: David and Charles (Publishers) Limited. p. 9. ISBN   0-7153-7981-X.
  10. Stansfield 1999, p. 14.

Notes

  1. That is, the claimed benefits to the public did not justify the interference with existing rights, or that the practicability of the scheme was in doubt; or that the required 10% of projected capital had not been deposited. Beyond Dalmellington the line would have run through very sparsely populated country, with only Castle Douglas itself at its termination.
  2. Cobb says 1852, transferred to A&GR 1853

Sources