The Glasgow, Yoker and Clydebank Railway was a railway company that opened in 1882, giving a rail connection to shipyards and other industry that developed in what became Clydebank. At first it was a purely local line, connecting only at Stobcross with the North British Railway, but as industry developed in the area it served it became increasingly important.
It was built from a junction near the present-day Jordanhill railway station to a terminus at Clydebank, and in 1897 it was extended to Dalmuir.
Most of the route is still in use as the Yoker section of the North Clyde suburban network.
In 1858 the Glasgow, Dumbarton and Helensburgh Railway opened, forming the first railway connection from the city to the north bank of the Clyde. However the line ran a considerable distance from the river until it reached Bowling, and the intervening area was for the time being undeveloped.
At the time, industry was concentrated in the city and the berthing of ships took place at the Broomielaw. Larger berthing facilities were needed, and the Clyde Commissioners constructed a new dock at Stobcross; it opened in 1877, and was called The Queen's Dock. By this time the North British Railway (NBR) had taken over the Glasgow, Dumbarton and Helensburgh Railway, and the NBR built a line to the dock. The Stobcross Railway opened in 1874, for goods and mineral traffic only. The Stobcross line ran in a wide sweep round the north of Glasgow through Maryhill, then a remote rural town, and then south and south-east through Partick, where there was a goods station.
Also in 1874 the Whiteinch Railway opened; this was also a goods-only railway, running from the Stobcross line south to a Whiteinch goods station on the Dumbarton Road. This was built to support a small enclave of industry that had built up in the area, which was otherwise remote. [1]
In July 1872 the Clyde Trustees evicted the Govan shipyard of J & G Thomson, and the company established a new yard downstream on the other bank at what became Clydebank. The shipyard workers of course all lived locally to Govan, and the company conveyed them to and from their place of work in an old steamer, the Vulcan. Heavy materials too were brought in by steamer. Over the succeeding years other industrial premises opened nearby, also using the river as their transport medium. [1] J & G Thomson promoted the idea of a railway, at first to be called the Glasgow, Yoker and Dalmuir Railway, but the Forth and Cart Canal, a branch of the Forth and Clyde Canal proved awkward, and the idea was cut back to reach Clydebank only. [2] [3] [4]
On 4 July 1878 the Glasgow, Yoker and Clydebank Railway obtained its authorising Act of Parliament, [note 1] to build a line connecting the Clydebank site with the Stobcross Railway. Local industrialists who would benefit from the line subscribed £65,000, and the remaining £17,500 was put forward by the North British Railway. [2]
The railway opened as a single line on 1 December 1882, with stations at Partick (on the Stobcross line) and Yoker. Partick could be reached by the Govan Ferry, and the Yoker station was not far from the Renfrew ferry. Goods traffic was of course significant, and the passenger service was not connected to the rest of the railway network for the time being; there was no passenger station at Stobcross. The passenger trains were not run at suitable times for the workers at first, and they continued to use the steamer. [3] The line was worked by the North British Railway. [1] [2] [4] [5]
The construction appears to have exceeded its estimated cost, for in 1888 debentures were redeemed by a preference share issue at a face value of £28,241. [2]
A year after the opening of the Clydebank line, the Singer Manufacturing Company opened the plant that became their sewing machine factory adjacent to Kilbowie, on the GD&HR line nearby. This plant grew immensely, and encouraged other industries to set up in the area, so that Clydebank in general, served by both lines, became an important industrial complex.
The North British Railway network had suffered from the circuitous connection from Queen Street passenger terminal and College goods station to get access to the north Clyde lines, and in 1886 a great improvement was made when the Glasgow City and District Railway opened. This ran east to west through the city as a sub-surface line, connecting with the original Stobcross Railway end on; a new passenger station named Finnieston was provided there. This transformed the access for suburban passenger trains but also for goods and mineral traffic which could now run direct from Sighthill.
The Caledonian Railway had long felt that it was losing out in its poor access to the north bank of the Clyde, and it encouraged the construction of the Lanarkshire and Dumbartonshire Railway (the company used the variant spelling of Dumbartonshire). This opened in 1896, running generally closer to the Clyde than the North British lines, and giving more convenient access for goods and passenger purposes to many of the industrial sites. The North British managed to get a clause inserted into the L&DR Act restraining that company from opposing a westward extension of the GY&CR. [2]
The limited potential of the GY&C line proved to be a problem, and encouraged by the NBR, the GY&CR tried to get approval for a line onwards to Dalmuir, but in 1892 this was turned down by Parliament.
However, in 1893 an Act was obtained authorising doubling of the single line and extension from Clydebank to Dalmuir. The GY&CR was still independent but this work was carried out collaboratively with the NBR, which guaranteed the GY&CR 6% on capital. [note 2] [2] The extension started a little to the east of the Clydebank terminus, which was therefore left on a dead end section. A new Clydebank station was opened on Kilbowie Road, and this station was known as Clydebank Central. The old terminus was renamed Clydebank East and continued to be the terminus for some suburban passenger trains. At Dalmuir the extension converged with the GD&HR line, now owned by the NBR. The point of convergence was to the west of the existing Dalmuir station, which was near Park Road. The GY&CR line passed under the GD&HTR line and a new Dalmuir station with platforms on both lines was opened at Duntocher Road. [6]
The doubling of the original GY&CR was completed on 13 December 1896, and the extension opened on 8 May 1897 for goods and mineral trains and on 17 May 1897. the through line was an instant success with passengers. the old terminus continued to be used as an end point for some suburban trains, and also as a starting and finishing point for excursions, until 1959. [4]
The GY&CR was absorbed by the North British Railway on 15 July 1897. [2] [4]
The pressure to provide expanded quay facilities for larger vessels continued, and the Clyde Commissioners opened the new Rothesay Dock [note 3] near Clydebank on 25 April 1907. [3] Just as with the Queen's Dock, it was essential to provide rail access to it, and it lay alongside the GY&CR line, from which the connection was provided. A considerable volume of freight traffic was foreseen, and a connection at Jordanhill was provided to give direct access from Clydebank towards Maryhill.
At the area close to the present-day Jordanhill station, the Stobcross Railway had run from north to east on a tight curve, passing the hospital grounds. When the GY&CR line opened, that ran directly west from the Stobcross line, at Yoker Junction. A north to west curve, the Jordanhill Loop, forming a triangle, was constructed, giving the required direct access from the Yoker line towards the Maryhill direction.
In 1923 the main line railways of Great Britain were "grouped" by Act of Parliament, the Railways Act 1921 into four large units; the North British Railway was a "constituent" of the new London and North Eastern Railway (LNER). By now the GY&CR line was fully integrated into the passenger and goods network on the north bank of the Clyde.
The railways were then nationalised in 1948, the Scottish lines forming part of British Railways Scottish Region.
The L&DR line was now in the same management unit, and as social patterns changed and some heavy industry declined, the need for two competing networks along the Clyde was called into question. In fact the NBR network was designated for modernisation under a plan of 1955; the modernisation in fact became a scheme to electrify the passenger train operation, and this became effective in 1960. Most of the L&DR section closed, although a number of short sections were retained to give continued access to industrial sites.
The Rothesay Dock line was closed in the 1960s, but it was reopened when imported coal was brought to the dock in the early 1980s. Traffic ceased again in 1988 and the line has since been removed.
Clydebank East, the original Clydebank terminus, closed in 1959, but in the final decade the terminus was the originating point of "Starlight Specials" which were overnight services to London at cheap fares. [6]
The remainder of the GY&CR line continues in heavy use today as part of the Glasgow suburban network.
In 1987 a passenger train maintenance depot was constructed at Yoker, together with a signalling centre, in a site formerly occupied by goods sidings, south of the line.
The locations on the line were:
The North Clyde Line is a suburban railway in West Central Scotland. The route is operated by ScotRail. As a result of the incorporation of the Airdrie–Bathgate rail link and the Edinburgh–Bathgate line, this route has become the fourth rail link between Glasgow and Edinburgh.
The Argyle Line is a suburban railway located in West Central Scotland. The line serves the commercial and shopping districts of Glasgow's central area, and connects towns from West Dunbartonshire to South Lanarkshire. Named for Glasgow's Argyle Street, the line uses the earlier cut-and-cover tunnel running beneath that thoroughfare.
The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followed a policy of expanding its geographical area, and competing with the Caledonian Railway in particular. In doing so it committed huge sums of money, and incurred shareholder disapproval that resulted in two chairmen leaving the company.
Dalmuir railway station is a railway station serving the Dalmuir area of Clydebank, West Dunbartonshire, Scotland. It is a large, five-platform interchange between the Argyle Line, North Clyde Line and West Highland Line, between Singer and Clydebank and Kilpatrick. It is situated 9 miles 71 chains (15.9 km) from Glasgow Queen Street, measured via Westerton and Maryhill.
Clydebank railway station is a railway station serving the town of Clydebank in West Dunbartonshire, Scotland. It is located on the Argyle Line and the North Clyde Line. Passenger services are operated by ScotRail.
Anniesland railway station is a railway station that serves the Anniesland suburb of Glasgow, Scotland.
Kelvindale railway station is a railway station that serves the Kelvindale suburb of Glasgow, Scotland. It was opened on 26 September 2005 by Bill Butler, the then Member of Parliament in the Scottish Parliament and Councillor Alistair Watson. A bronze plaque records the event. The station is 5+1⁄2 miles (8.9 km) north of Glasgow Queen Street on the Maryhill Line.
Jordanhill railway station is a side-platformed suburban railway station in the Jordanhill area in the West End of Glasgow, Scotland. The station, which is governed by Transport Scotland and managed by ScotRail, lies on the Argyle Line and the North Clyde Line. In operation since 1887, the station stemmed losses for an area that was in decline.
Springburn railway station serves the Springburn district of Glasgow, Scotland. The station is 1+1⁄4 miles (2.0 km) north of Glasgow Queen Street station on the Cumbernauld Line and is a terminus of the Springburn branch, a spur from Bellgrove station, on the North Clyde Line.
The Stobcross Railway was a railway line in Glasgow, Scotland, built by the North British Railway to connect from Maryhill to the new dock being built at Stobcross; the dock became the Queen's Dock, opened in 1877. The line was opened first, in 1874, and gave the North British company access to the north bank of the River Clyde; there was a goods depot at Partick.
The Whiteinch Railway was a railway line opened in 1874 in Scotland to connect industrial premises that had developed in the area with the Stobcross Railway, giving access to the main line network. It was opened for goods and mineral traffic, and was extended by the Whiteinch Tramway which fed directly into the factories and works.
The City of Glasgow Union Railway - City Union Line, also known as the Tron Line, was a railway company founded in Glasgow, Scotland, in 1864 to build a line connecting the railway systems north and south of the River Clyde, and to build a central passenger terminus and a general goods depot for the city. The through line, running from south-west to north-east across the city, opened in 1870–71, and the passenger terminal was St Enoch railway station, opened in 1876. The railway bridge across the Clyde was the first in the city.
The Glasgow Central Railway was a railway line built in Glasgow, Scotland by the Caledonian Railway, running in tunnel east to west through the city centre. It was opened in stages from 1894 and opened up new journey opportunities for passengers and enabled the Caledonian Railway to access docks and industrial locations on the north bank of the River Clyde. An intensive and popular train service was operated, but the long tunnel sections with frequent steam trains were smoky and heartily disliked.
The Lanarkshire and Dumbartonshire Railway was a railway company in Scotland. It was promoted independently but supported by the Caledonian Railway, and it was designed to connect Balloch and Dumbarton with central Glasgow, linking in heavy industry on the north bank of the River Clyde. From Dumbarton to Balloch the line would have closely duplicated an existing railway, and negotiation led to the latter being made jointly operated, and the L&DR terminated immediately east of Dumbarton, trains continuing on the joint section.
The Glasgow City and District Railway was a sub-surface railway line in Glasgow, Scotland, built to connect suburban routes east and west of the city, and to relieve congestion at the Queen Street terminus.
The Caledonian and Dumbartonshire Junction Railway (C&DJR) was a Scottish railway opened in 1850 between Bowling and Balloch via Dumbarton. The company had intended to build to Glasgow but it could not raise the money.
The Glasgow, Dumbarton and Helensburgh Railway was independently sponsored to build along the north of the River Clyde. It opened in 1858, joining with an earlier local line serving Balloch. Both were taken over by the powerful North British Railway in 1865, and for some time the line was the main route in the area. As industry developed other lines were opened to serve it, and the line formed the core of a network in the area.
The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.
The Kelvin Valley Railway was an independent railway designed to connect Kilsyth, an important mining town in central Scotland, with the railway network. It connected Kilsyth to Kirkintilloch and thence over other railways to the ironworks of Coatbridge, and to Maryhill, connecting onwards to the Queen's Dock at Stobcross.
The Kilsyth and Bonnybridge Railway was a railway line in central Scotland, built to exploit the mineral extractive industries in the area; it opened in 1888. A passenger service was run, but bus competition overwhelmed it after 1920 and the passenger service closed in 1935. The goods and mineral traffic continued, but it was dependent on the industries it served, and when they declined so did the business on the railway; it closed in 1964 and none of it is now in railway use.