Dundee and Perth Railway

Last updated

Dundee and Perth Railway
Overview
Locale Scotland
Dates of operation31 July 184531 July 1863
Successor Scottish Central Railway
Technical
Track gauge 4 ft 8+12 in (1,435 mm)
Dundee and Perth Railway
BSicon CONTg.svg
(NBR)
Dundee Tay Bridge
BSicon BHF.svg
Dundee West
BSicon exKBHFa.svg
BSicon STR.svg
Buckingham Junction
BSicon xKRWg+l.svg
BSicon STR2.svg
BSicon KRWr.svg
BSicon STRc3.svg
BSicon WASSER.svg
BSicon STR.svg
BSicon STRc1.svg
BSicon WKRZ2+4u.svg
BSicon STRc3.svg
BSicon STR.svg
BSicon STRc1.svg
BSicon WASSER.svg
BSicon CONT4.svg
Magdalen Green
BSicon eHST.svg
BSicon LWASSER.svg
Ninewells
BSicon eHST.svg
Ninewells Junction
BSicon exSTRc2.svg
BSicon eABZg3.svg
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon STR.svg
Invergowrie
BSicon HST.svg
Longforgan
BSicon eHST.svg
Inchture
BSicon eHST.svg
Inchture Village
BSicon exKHSTaq.svg
BSicon eABZgr.svg
Errol
BSicon eHST.svg
Glencarse
BSicon eHST.svg
Kinfauns
BSicon eHST.svg
Barnhill
BSicon eHST.svg
BSicon WSTRc2.svg
BSicon LWASSER3.svg
BSicon WASSERq.svg
BSicon hKRZWae.svg
BSicon WASSERr+1.svg
BSicon WSTRc4.svg
Perth Princes Street
BSicon eHST.svg
BSicon CONTg.svg
BSicon STR.svg
Perth
BSicon BHF-L.svg
BSicon BHF-R.svg
BSicon BS2l.svg
BSicon BS2r.svg
Moncrieffe Tunnel
BSicon TUNNEL1.svg
Hilton Junction
BSicon BS2+l.svg
BSicon BS2+r.svg
BSicon CONTf.svg
BSicon STR.svg
BSicon CONTf.svg

The Dundee and Perth Railway was a Scottish railway company. It opened its line in 1847 from Dundee to a temporary station at Barnhill and extended to Perth station in 1849. It hoped to link with other railways to reach Aberdeen and changed its name to the Dundee and Perth and Aberdeen Railway Junction Company, but this early attempt was frustrated, and for some years it failed to make a physical connection with other railways in Dundee.

Contents

It was taken over by the larger Scottish Central Railway in 1863.

Most of its main line is still in use today as the Perth to Dundee section of the railway network.

History

The first railways

By 1840 Dundee was already served by two railways: the Dundee and Newtyle Railway had opened in 1831, connecting the city and harbour with the fertile agricultural area of Strathmore. The line had three rope-worked inclines with the sections either side operated by horses, and it had primitive stone block sleeper track with fish-bellied rails, to the unusual gauge of 4 ft 6.5 in (1,384 mm). The other early Dundee railway was the Dundee and Arbroath Railway; this too had primitive permanent way, to its own unusual track gauge of 5 ft 6 in (1,680 mm). It had opened in 1838 - 1840 (in stages). There was a third railway in Angus, the Arbroath and Forfar Railway; like the D&AR it had the primitive track construction and the same track gauge. It too had opened in 1838 - 1839. None of these railways connected with one another, and none of them was commercially successful.

A railway between Dundee and Perth had been proposed in the 1830s, but there was hostility from influential local people and the idea had been dropped. [1] [2]

A Perth line proposed

System map of the Dundee & Perth Railway 1849 Dundee & Perth Rly.gif
System map of the Dundee & Perth Railway 1849

It was reported in 1835 that the population of Dundee had doubled in the previous twenty years; industry and trade through the harbour were growing considerably, and definite proposals were made for a line from Dundee to Perth. Insuperable opposition from powerful landowners made the scheme impossible to pursue, and it was dropped.

Dundee and Perth Railway Act 1845
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Long title An Act for making a Railway from the Royal Burgh of Dundee in the County of Forfar to the Royal Burgh or City of Perth in the County of Perth, to be called "The Dundee and Perth Railway."
Citation 8 & 9 Vict. c. clvii
Dates
Royal assent 31 July 1845

In the 1840s there was a lengthy period of debate about the best route to connect central Scotland by rail to the emerging English network. For some time it was assumed that only a single route would be viable, and the argument was fierce. This stimulated consideration of other routes in Scotland, and it resulted in a frenzy of railway schemes being promoted. Building on the positive public mood towards railway projects, a public meeting in Dundee in January 1845 determined that a railway to Perth was now necessary, and a parliamentary bill was presented for that session. The Dundee and Perth Railway received its authorising act of Parliament, the Dundee and Perth Railway Act 1845 (8 & 9 Vict. c. clvii) on 31 July 1845.

The line was to be a little under 21 miles (34 km) in length. [3] The track gauge of 5 ft 6 in (1,680 mm) was considered, in accordance with the two existing Arbroath lines, but standard gauge was actually adopted. [4]

The 1845 session saw many other Scottish railways authorised: the Caledonian Railway (Glasgow and Edinburgh to Carlisle) was authorised on the same day as the Dundee and Perth Railway; its share capital was to be £1.5 million. The Scottish Central Railway was one of the others authorised that day; it was to build from Castlecary, on the Edinburgh and Glasgow Railway, to Perth. Other lines were to create a northward axis to Aberdeen.

The Caledonian Railway was naturally the most significant railway in this spate of authorisations, and even before its Act of Parliament it saw its destiny as controlling large tracts of Scotland; but with no cash to spend, it set about concluding agreements with the other (as yet unauthorised) lines to lease them. This would need no money at first, and would simply incur a lease charge periodically once the lines had been built.

Dundee and Perth Railway (Amendment) Act 1846
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Long title An Act to enable the Dundee and Perth Railway Company to alter their Line at Inchyra and Lairwell, and to extend the same towards the Penitentiary at Perth.
Citation 9 & 10 Vict. c. ccxxviii
Dates
Royal assent 27 July 1846

During construction the Dundee and Perth company arranged to lease the Dundee and Newtyle Railway for 999 years for a lease charge of £1,400 per annum; this was authorised by the Dundee and Perth Railway (Amendment) Act 1846 (9 & 10 Vict. c. ccxxviii) of 27 July 1846, and seems to have been done to prevent the Scottish Midland Junction Railway, then building from Perth to Forfar, from using the Newtyle line to gain access to Dundee. [2]

Construction and opening

Magdalen Green station, Dundee Magdalen green dundee.jpg
Magdalen Green station, Dundee

As well as renewed and serious opposition from landowners on the route, the new line experienced difficulty with the people of Perth. The proposed terminal was to be at South Inch, open parkland popular with the people of Perth once described as "the pride and ornament of Perth". [5] The D&PR was not active in gaining positive public opinion, and the idea was unwelcome to the Burgh, and a proposed bridge across the Tay was objected to. To secure the passage of the act of Parliament[ which? ] the company agreed, for the time being, to terminate at Barnhill, on the east side of the River Tay and some distance south of Perth (road) Bridge, a significantly inconvenient location.

The Scottish Central Railway had planned a terminal there, but now altered its plan and proposed a station in a more westerly location. As it became clear that several railways all wished to have a terminal in Perth, the idea of a "General" or joint station arose. When the SCR obtained an enabling act of Parliament[ which? ] for the station, there was a period during which other railways could serve notice that they wished to use it; the Scottish Midland Junction Railway and the Edinburgh and Northern Railway gave the necessary notice but the D&PR failed to do so. The SCR accordingly settled on a location somewhat further north than had been contemplated earlier, as it was apparently not necessary to allow for the D&PR alignment. The D&PR now settled on a second temporary terminus at Princes Street while it decided on its approach to the joint station. At least this was on the west side of the Tay, but it was not at all central. [5]

The line just west of the bridge spanning the Tay at Perth Tay Railway Bridge at Perth - geograph.org.uk - 2671123.jpg
The line just west of the bridge spanning the Tay at Perth

At the end of October 1846 the D&PR finally decided that it wished to use the joint station; its discussions with the SCR, although received as rather arrogant, were just in time to influence the design of the station. This was announced at a shareholders' meeting in October 1846: "a station in Perth west of the town was being arranged, enabling connection with the Scottish Central Railway and the Edinburgh and Northern Railway. There were also to be three short branches added to the system, although in fact only one of them, at Inchture, was completed.

A ceremonial opening of the line was arranged for 22 May 1847. A horse omnibus connection plied from Barnhill to the centre of Perth, and a booking office was opened in the centre. [2]

The public opening took place on 24 May 1847; it was the first railway in Perth. [1] [4]

Dreams of going on to Aberdeen

Dundee and Perth Railway (Dundee Junction) Act 1848
Act of Parliament
Coat of Arms of the United Kingdom (1837).svg
Citation 11 & 12 Vict. c. lii

In 1847 the Directors announced that they had concluded a lease of the Dundee and Arbroath Railway; a new connecting line at Dundee was to be built between the two lines. The D&P would guarantee an 8% return on the £66,666 cost of building a linking line across the north side of Dundee and the construction of a central station. The lease was authorised by the Dundee and Arbroath Railway Lease Act 1848 (11 & 12 Vict. c. cliv) of 14 August 1848 and the link line was authorised by the Dundee and Perth Railway (Dundee Junction) Act 1848 (11 & 12 Vict. c. lii) on 31 August; the latter act also renamed the company the Dundee and Perth and Aberdeen Railway Junction (DPARJ). The cumbersome title was explained by the fact that the Dundee and Arbroath line had powers to connect to the Arbroath and Forfar line which was being taken over by the Aberdeen Railway: the lease would connect Perth and Dundee with the Aberdeen Railway. [6]

At the end of December 1848 work had begun on the temporary station at Princes Street; there was pressure now from the SCR to connect to their joint station, but the D&PR said that "the Perth branch" had already cost much more than they had expected, and they could not afford to proceed immediately with the extension from Princes Street to the joint station.

On 16 February 1849 Captain Simmons of the Board of Trade inspected the Tay bridge; it was constructed of laminated timber arches with an opening swing bridge section. Although he remarked that the bridge deflected excessively under load, the section of line opened on 1 March 1849.

There continued to be wrangling over the connecting line, and part of the problem was the levels of the approaching line compared with the SCR line. However, this was eventually resolved and the D&PR finally reached the SCR; the trains passed the joint station southwards past the point of junction, and then reversed into the station. [5]

An attempted lease by the Caledonian

Now the Caledonian Railway announced that it had concluded an agreement to lease the DPARJ at 8% of its capital cost. At this time the Caledonian was undergoing a crisis, as it had been making lease agreements with many different line; the lease agreements required no cash down, but represented a heavy ongoing drain on profits later, and shareholders were angered by the DPARJ and other leases. In February 1849 the Caledonian announced that it was not proceeding with the lease. The DPARJ demanded the lease payment for the period until then, but the Caledonian simply refused, saying it had never been acted upon, and in any case it had had no power to make the lease agreement: it was ultra vires.

This meant that the proposed line linking the D&AR and the Perth line was not built, and the only link was the horse tramway running through the streets, belonging to the Harbour Commissioners. [6]

The Inchture tramway

A one and a half miles (2.4 km) branch was built from Inchture station to the Turnpike crossroads (referred to as Crossgates Tramroad station) at Inchture. It was constructed with light T-section rails and was mainly horse operated. It opened on 1 February 1848. It was extended later to a brick works and clay pit, and occasional locomotive use took place for goods traffic and possibly for harvest workers' special trains, although locomotives were prohibited from the time the Caledonian Railway took over the line.

The Inchture tramway closed on 1 April 1916, [2] or 1 January 1917. [4] `

Perth station

The Perth General station was aligned north–south and the Dundee line approached from the east; the passenger trains passed the station southwards and then reversed into the station. In 1861 separate platforms outside the main station and at right angles to it, were opened for them; they were referred to as the Dundee Dock. Through passenger trains running beyond Perth entered the Dundee Dock and then reversed out of it, continuing their journey southward. The Dundee Dock was in use until 1887. [2] [6]

Absorbed by the Scottish Central

The 1845 spate of railway authorisations had created many small companies, and the mood now was for consolidation. The Scottish Midland Junction Railway and the Aberdeen Railway linked up to form the Scottish North Eastern Railway, itself to exist for only ten years.

The dominant Scottish Central Railway offered terms to the Dundee and Perth Railway, which were accepted, and the SCR absorbed the D&PR by an act of Parliament[ which? ] of 26 July 1863. The leased Dundee and Newtyle line went with the D&PR to the SCR. The SCR too had not long to remain independent. In 1865 the Caledonian Railway absorbed both the SMJR and the SCR. [4]

The SCR was dismayed by the poor quality of the infrastructure and rolling stock it had taken over. The wooden Tay bridge at Perth was obviously in poor condition and was replaced by 1864

The SCR considered the terminus at Dundee West to be a modest and inadequate structure, but worse than that, it was in a dangerous condition, and from 1863 it was extended and reconstructed, opening fully in October 1866. [2] [5] [6]

The North British Railway

The North British Railway had become dominant in Fife and had long run through trains to Dundee; however these involved crossing the Tay from Tayport to Broughty Ferry by ferryboat, operated as a train ferry, and then being dependent on the Dundee and Arbroath line to reach Dundee. In 1870 the NBR obtained Parliamentary authorisation to build a bridge across the Tay: the North British Railway (Tay Bridge and Railways) Act. Construction proved difficult, and it was not until 31 May 1878 that the bridge was opened.

The Dundee and Perth line approached Dundee at the water's edge, and the entry from the Tay Bridge into Dundee was on reclaimed land on the south side of the D&PR line. The NBR opened a new station near Craig Pier; this was the present day station, located immediately to the south of the D&PR terminus. The NBR line continued eastwards in a cut-and-cover tunnel to connect to the Arbroath line.

On 28 December 1879 the bridge fell during an extremely strong storm, taking a train down with it. 74 or 75 persons lost their lives. The NBR set about constructing a new bridge as soon as possible, despite the obvious difficulties, and it opened the new bridge on 20 June 1887. [7]

When the first bridge opened, the NBR provided a better route to Edinburgh and London than the existing Caledonian route via Perth, and the Caledonian set about improvements to the goods and passenger accommodation at Dundee. Both were considerably expanded, and the new goods accommodation was ready by 1885. A new locomotive depot was provided at the same time. The new passenger station was opened in 1889: [2] "one of the most beautifully proportioned late Victorian buildings in Britain and a celebration of Scottish Baronial architecture. [4]

Grouping and nationalisation

Following World War I the government determined that the main line railways of Great Britain should be "grouped" into one of four large companies, and it enacted the Railways Act 1921; the Caledonian Railway was a constituent of the new London Midland and Scottish Railway (LMS), which was formed on 1 January 1923 (although formalities were not legally finalised until July in the case of the Caledonian).

The train service pattern did not change fundamentally; the LMS continued to run the familiar train service.

After World War II, the Government nationalised the railways, so on 1 January 1948 the LMS and the other main line railways passed into state ownership: the Scottish section of the LMS and of the rival LNER became part of British Railways Scottish Region. Still the train service pattern was not radically changed, although diesel multiple units were introduced on local services. A regular service from Dundee West to Edinburgh Princes Street via Perth continued, a remnant of the Caledonian Railway.

The three terminal stations at Dundee were retained for the time being, the cramped accommodation at the former NBR Tay Bridge station deterring the obvious rationalisation. The decline in local passenger use was a greater factor, and Dundee West station was closed on 3 May 1965. [2]

Current operations

Except for the spur into Dundee West station, the line is still open with passenger services provided by ScotRail. The only remaining intermediate station is at Invergowrie.

Topography

The main line opened on 24 May 1847 between Barnhill and the D&PR station at Dundee.

Archives

The archives of the Dundee and Perth and Aberdeen Railway Junction Company, which include those of the Dundee and Perth Railway Company are held at the University of Dundee as part of the Shiell and Small, Solicitors Collection. [8] The same collection also includes the records of the Dundee and Newtyle Railway Company. [9]

Related Research Articles

<span class="mw-page-title-main">Caledonian Railway</span> British pre-grouping railway company

The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.

<span class="mw-page-title-main">North British Railway</span> British pre-grouping railway company (1844–1922)

The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followed a policy of expanding its geographical area, and competing with the Caledonian Railway in particular. In doing so it committed huge sums of money, and incurred shareholder disapproval that resulted in two chairmen leaving the company.

<span class="mw-page-title-main">Perth railway station (Scotland)</span> Railway station in Perth, Scotland

Perth railway station is a railway station located in the city of Perth, Scotland, on both the Glasgow to Dundee line and the Highland Main Line. It is managed by ScotRail, who provide almost all of the services.

<span class="mw-page-title-main">Dundee and Newtyle Railway</span> Railway in the north of Scotland

The Dundee and Newtyle Railway opened in 1831 and was the first railway in the north of Scotland. It was built to carry goods between Dundee and the fertile area known as Strathmore; this involved crossing the Sidlaw Hills, and was accomplished with three rope-worked inclined planes. Newtyle was simply a remote railhead, and the anticipated traffic volumes were not achieved, the inclines incurred heavy operating costs, and the railway never made money.

The Scottish Central Railway was formed in 1845 to link Perth and Stirling to Central Scotland, by building a railway line to join the Edinburgh and Glasgow Railway near Castlecary.

<span class="mw-page-title-main">Aberdeen Railway</span> Historical railway line in Scotland linking Aberdeen and Guthrie

The Aberdeen Railway was a Scottish railway company which built a line from Aberdeen to Forfar and Arbroath, partly by leasing and upgrading an existing railway.

The Alloa Railway was intended to bridge the River Forth linking Alloa with the south without using a ferry.

The Scottish Midland Junction Railway was authorised in 1845 to build a line from Perth to Forfar. Other companies obtained authorisation in the same year, and together they formed a route from central Scotland to Aberdeen. The SMJR opened its main line on 4 August 1848. Proposals to merge with other railways were rejected by Parliament at first, but in 1856 the SMJR merged with the Aberdeen Railway to form the Scottish North Eastern Railway. The SNER was itself absorbed into the larger Caledonian Railway in 1866. The original SMJR main line was now a small section of a main line from Carlisle and central Scotland to Aberdeen.

<span class="mw-page-title-main">Arbroath and Forfar Railway</span> Early railway in Scotland

The Arbroath and Forfar Railway (A&FR) was a railway that connected Forfar with the port town of Arbroath, in Scotland.

The Dundee and Arbroath Railway was an early railway in Scotland. It opened in 1838, and used the unusual track gauge of 5 ft 6 in (1,676 mm). In 1848 it changed to standard gauge and connected to the emerging Scottish railway network.

The Scottish North Eastern Railway was a railway company in Scotland operating a main line from Perth to Aberdeen, with branches to Kirriemuir, Brechin and Montrose. It was created when the Aberdeen Railway amalgamated with the Scottish Midland Junction Railway on 29 July 1856. It did not remain independent for long, for it was itself absorbed by the Caledonian Railway on 10 August 1866.

The Edinburgh and Northern Railway was a railway company authorised in 1845 to connect Edinburgh to both Perth and Dundee. It relied on ferry crossings of the Firth of Forth and the Firth of Tay, but despite those disadvantages it proved extremely successful. It took over a short railway on the southern shore of the Forth giving a direct connection to Edinburgh, and it changed its name to the Edinburgh, Perth and Dundee Railway.

The Alyth Railway was a short branch railway line built in Strathmore in Scotland, connecting the town of Alyth to the main line network. It opened in 1861. Its junction was remote from any large population centre except Dundee, which was only reached by a primitive line with three rope worked inclines. This was modernised in 1868 and the Alyth branch, now with a good connection to Dundee, became busy. Nonetheless, the population of Alyth declined, and so did usage of the line, and it closed in 1951.

<span class="mw-page-title-main">Montrose and Bervie Railway</span> Former railway line in Scotland

The Montrose and Bervie Railway was a Scottish railway. When the Aberdeen Railway opened in 1850, the coastal settlements north of Montrose were not linked in, and local interests promoted a branch line from Montrose to Bervie. They found it impossible to raise capital at first, but from 1861 the larger railways were promoting new connections around Aberdeen, and the Great North of Scotland Railway (GNoSR) decided that the Bervie line would give it a route to the south.

<span class="mw-page-title-main">North British, Arbroath and Montrose Railway</span> Railway line in Scotland

The North British, Arbroath and Montrose Railway was a company established by Act of Parliament in 1871 to construct and operate a railway line from north of Arbroath via Montrose to Kinnaber Junction, 38 miles (61 km) south of Aberdeen. The company was originally a subsidiary of the North British Railway but was absorbed into its parent in 1880.

The Carmyllie Railway was built in 1855 to enable transport of stone products from the Carmyllie area of Scotland to markets. At the time the stone was highly sought after for the urban development in progress.

The Brechin and Edzell District Railway was a local line in Scotland connecting Edzell, then a developing tourist centre, to the nearby main population centre of Brechin, where there was a branch of the Caledonian Railway. The short line opened in 1896, and it was worked by the Caledonian Railway.

The Forfar and Brechin Railway was promoted as a possible alternative main line to part of the Caledonian Railway route between Perth and Aberdeen. It was opened in 1895, having been sold while incomplete to the Caledonian Railway.

The Dundee and Forfar direct line was a railway line opened by the Caledonian Railway in 1870, connecting the important county town of Forfar with the harbour and manufacturing town of Dundee.

The Railways of Kinross were a local network of three rural railways which made the town of Kinross in Scotland their objective in the 1850s.

References

  1. 1 2 John Thomas and David Turnock, A Regional History of the Railways of Great Britain: Volume 15, North of Scotland, David and Charles, Newton Abbot, 1989, ISBN   0 946537 03 8
  2. 1 2 3 4 5 6 7 8 Peter Marshall, The Railways of Dundee, The Oakwood Press, Headington, 1996, ISBN   0 85361 482 2
  3. E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  4. 1 2 3 4 5 W A C Smith and Paul Anderson, An Illustrated History of Tayside's Railways, Dundee and Perth, Irwell Press, Clophill, 1997, ISBN   1 871608 73 2
  5. 1 2 3 4 Peter Marshall, The Scottish Central Railway: Perth to Stirling, Oakwood Press, Usk, 1998, ISBN   0-8536-1522-5
  6. 1 2 3 4 David Ross, The Caledonian: Scotland's Imperial Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1840 335842
  7. David Ross, The North British Railway: A History, Stenlake Publishing, Catrine, 2104, ISBN   978 1 84033 647 4
  8. "MS 105/3 Dundee and Perth and Aberdeen Railway Junction Company". Archive Services Online Catalogue. University of Dundee. Retrieved 29 January 2016.
  9. "MS 105/2 Dundee and Newtyle Railway Junction Company". Archive Services Online Catalogue. University of Dundee. Retrieved 29 January 2016.

Notes

    Sources