Dundee railway station

Last updated

59+14 miles (95.4 km) northeast of Edinburgh. Dundee is the tenth busiest station in Scotland. [4] In January 2014, the former main station building was demolished to make way for a new building as part of the Dundee Waterfront Project which opened on 9 July 2018.

Contents

Dundee railway station is where the Edinburgh–Dundee line meets the Glasgow–Dundee line, via Perth, to form the Dundee to Aberdeen line.

History

The station is the rebuilt Dundee Tay Bridge railway station, which had been built by the North British Railway in 1878 as part of the Tay Rail Bridge project. It was originally one of three main stations in Dundee, along with Dundee West station, the Caledonian Railway station for Perth which was rebuilt in 1889-1890 and closed in the 1960s, and Dundee East station on the Dundee and Arbroath Joint Railway which closed in 1959. [5] It is located in cutting at the south end of Camperdown tunnel, which passes beneath the town's former docks (now filled in) and required permanent pumping to keep dry. The station is consequently sited below sea level.[ citation needed ]

The former station building which was demolished in 2013 Dundee Station.jpg
The former station building which was demolished in 2013

In the nineteenth century plans were put forward to concentrate all Dundee's railway facilities in a new central station, with the idea first being mooted by John Leng in 1864 in his role as editor of the Dundee Advertiser. The idea re-emerged in 1872 following the start of work on the Tay Rail Bridge and again in 1896. Various sites for the scheme were suggested including building it between the High Street and the harbour and between the Murraygate and the Meadows. However, none of these proposals were ever realised and the three distinct stations survived as independent entities. [6]

Today, the only other remaining station within Dundee City boundaries is Broughty Ferry. [7] Both Balmossie and Invergowrie stations are located very close to the city's boundaries, but lie in Angus and Perth and Kinross. [8]

As part of the redevelopment of Dundee city centre in the 1960s the original public entrance of Dundee Tay Bridge station was demolished to accommodate the new Tay Road Bridge offramps, with a new smaller structure replacing it. A footbridge connected the new station building to the city's Union Street to allow pedestrians to cross the busy inner ring road safely. In 2005, the footbridge was demolished in two phases as part of a regeneration project called the Dundee Central Waterfront Development Plan. This project, which has included removal of the 1970s public entrance to the station, will attempt to restructure the approach roads to the Tay Road Bridge and create a new civic space, as well as making way for the new railway station. [9]

New station

A new £38m railway station was built in 2018; it replaced the old station as part of the Dundee waterfront regeneration project. The designer of the station was Dundee-based architecture firm Nicoll Russell Studios in collaboration with Jacobs Engineering Group; construction work was carried out by Balfour Beatty. [10] Construction began in late 2015 and a temporary entrance was established on Riverside Drive. The new station was built over the site of the demolished old station. It includes a five-storey, curved building that houses the new station entrance, concourse and access points on the first and underground floors as well as a 120-room Sleeperz Hotel occupying the upper floors. [11]

Construction of the new railway station was completed in early June and it was opened alongside the new Sleeperz Hotel on 9 July 2018 by Dundee West MSP & then Minister for Public Health and Sport Joe FitzPatrick, Lord Provost Ian Borthwick and representatives from Dundee City Council. [12]

Facilities

There is a taxi stand immediately outside of the station building, and the main bus interchange is ½-mile walk from the station in the city centre. There is a "Travel Office" for information and ticket purchasing, as well as an automatic ticket machine outside the office. The office often closes well before the last trains have departed.

There is also a café adjacent to the automatic ticket gates on the concourse. The café, operated by WHSmith, mainly serves cold food such as sandwiches and hot and cold drinks. Like the ticket office, the café does not open in the late evening. [13] A Costa Coffee branch opened in 2020, located in the former Tay Bar.

A Tesco Express opened next to the entrance of the station in 2022.

Platform layout

The station is based on an island platform, with two through platforms on the outer sides, and two west-facing bay platforms:

Passenger volume

Dundee

Scottish Gaelic: Dùn Dè [1]
National Rail logo.svg
Dundee Railway Station and Sleeperz Hotel.jpg
General information
Location Dundee, Dundee City
Scotland
Coordinates 56°27′24″N2°58′16″W / 56.4566°N 2.9710°W / 56.4566; -2.9710
Grid reference NO402298
Managed by ScotRail
Platforms4
Other information
Station codeDEE [2]
History
Original company North British Railway
Post-grouping LNER
Key dates
1 June 1878Opened as Dundee Tay Bridge [3]
1965Renamed as Dundee [3]
Passengers
2019/20Decrease2.svg 1.945 million
 Interchange Decrease2.svg 73,721
Passenger Volume at Dundee [14]
2002–032004–052005–062006–072007–082008–092009–102010–112011–122012–132013–142014–152015–162016–172017–182018–192019–202020–212021–222022–23
Entries and exits1,204,3061,437,5191,514,7251,490,2541,600,0601,636,8621,664,2101,719,8441,723,0181,690,4861,737,4441,835,9781,890,1341,815,3421,865,7282,015,7821,945,950317,5821,167,7301,453,560
Interchanges [nb 1] 32,09531,81837,63649,06851,95758,92152,46859,22961,21867,74668,51269,56863,18365,55791,26773,7218,53942,72668,073

The statistics cover twelve month periods that start in April.

Services

A East Coast service to London King's Cross Dundee 43208.jpg
A East Coast service to London King's Cross

There are 3 direct services to London King's Cross per day, plus 1 CrossCountry service per day along the Cross Country Route between Aberdeen and Penzance via Leeds, Sheffield, Derby, Birmingham New Street, Bristol Temple Meads, Exeter St Davids and Plymouth. Additionally, one LNER service per day will operate between Aberdeen and Leeds. More frequent services run to Glasgow Queen Street, Edinburgh and Aberdeen. Caledonian Sleeper provides overnight services to London Euston.

Off-peak services that operate from the station are: [15]

OperatorServices
London North Eastern Railway
  • 3 trains per day to London Kings Cross via Edinburgh, Newcastle and York.
  • 4 trains per day to Aberdeen.
  • 1 train per day to Leeds.
Caledonian Sleeper
  • 1 train per day to London Euston from Aberdeen via Edinburgh, [nb 2] Preston and Crewe.
  • 1 train per day to Aberdeen from London Euston via Crewe, Preston and Edinburgh. [nb 3]
CrossCountry
  • 2 trains per day to Aberdeen.
  • 1 train per day to Penzance (To Plymouth on Sunday.)
  • 1 train per day to Edinburgh.
ScotRail [nb 4]
  • 1 train per hour to Edinburgh running via Leuchars, generally running fast, stopping only at Leuchars and Haymarket.
  • 1 train per hour to Edinburgh via Leuchars, Kirkcaldy, Inverkeithing and Haymarket.
  • 1 train per hour to Glasgow Queen Street via Perth and Stirling.
  • 1 train per hour (with some gaps) to Aberdeen via Arbroath, Montrose and Stonehaven.
  • 1 train every 2 hours to Arbroath, calling at Broughty Ferry, Monifieth (every 2 hours) and Carnoustie.
Preceding station National Rail logo.svg National Rail Following station
Leuchars   London North Eastern Railway
East Coast Main Line
  Arbroath
Leuchars  CrossCountry
Cross Country Route
  Arbroath or
Aberdeen
Leuchars   ScotRail
Edinburgh–Dundee line
 Terminus
Invergowrie
or Perth
 ScotRail
Glasgow–Dundee line
 Terminus
Terminus ScotRail
Dundee–Aberdeen line
  Broughty Ferry
Leuchars  Caledonian Sleeper
Highland Caledonian Sleeper
  Carnoustie

Notes

  1. No data available.
  2. Passengers can board or alight at Edinburgh Waverley. This is where the Sleepers to/from Fort William, Inverness and Aberdeen join/separate.
  3. Passengers can board or alight at Edinburgh Waverley. This is where the Sleepers to/from Fort William, Inverness and Aberdeen join/separate.
  4. These services give an indication of off-peak services. In peak hours, services on these routes may increase, but these have not been shown here.

Related Research Articles

<span class="mw-page-title-main">Glasgow Queen Street railway station</span> Terminus railway station in Glasgow, Scotland

Glasgow Queen Street is a passenger railway terminus serving the city centre of Glasgow, Scotland. It is the smaller of the city's two mainline railway terminals and is the third-busiest station in Scotland behind Central and Edinburgh Waverley.

<span class="mw-page-title-main">Edinburgh Waverley railway station</span> Railway station in Edinburgh, Scotland

Edinburgh Waverley is the principal railway station serving Edinburgh, Scotland. It is the second busiest station in Scotland, after Glasgow Central. The station serves as the northern terminus of the East Coast Main Line, 393 miles 13 chains from London King's Cross, although some trains operated by London North Eastern Railway continue to other Scottish destinations beyond Edinburgh.

<span class="mw-page-title-main">Perth railway station (Scotland)</span> Railway station in Perth, Scotland

Perth railway station is a railway station located in the city of Perth, Scotland, on both the Glasgow to Dundee line and the Highland Main Line. It is managed by ScotRail, who provide almost all of the services.

<span class="mw-page-title-main">Helensburgh Central railway station</span> Railway station in Argyll and Bute, Scotland

Helensburgh Central railway station serves the town of Helensburgh on the north shore of the Firth of Clyde, near Glasgow, Scotland. The station is a terminus on the North Clyde Line, sited 24 miles 31 chains (39.2 km) from Glasgow Queen Street, measured via Singer and Maryhill. Passenger services are operated by ScotRail on behalf of Strathclyde Partnership for Transport.

<span class="mw-page-title-main">Singer railway station</span> Railway station in West Dunbartonshire, Scotland

Singer railway station is a two-platformed staffed station serving Clydebank town centre, West Dunbartonshire, Scotland. It is located on the Argyle Line and North Clyde Line between Drumry and Dalmuir, 9 miles 5 chains (14.6 km) from Glasgow Queen Street, measured via Maryhill. All passenger services are provided by ScotRail.

<span class="mw-page-title-main">Branchton railway station</span> Railway station in Inverclyde, Scotland, UK

Branchton railway station is a railway station in Scotland opened in 1967 under British Rail located in the south-west of the town of Greenock, beside the area called Branchton. The station is on the Inverclyde Line, 24+34 mi (40 km) west of Glasgow Central. The station is managed by ScotRail.

<span class="mw-page-title-main">Cambuslang railway station</span> Railway station in South Lanarkshire, Scotland

Cambuslang railway station is a railway station which serves the town of Cambuslang, South Lanarkshire, Scotland. The station is 5 miles (8 km) south east of Glasgow Central, and is regularly served by trains on the Argyle Line to and from Glasgow Central. Passenger services are provided by ScotRail on behalf of Strathclyde Partnership for Transport (SPT).

<span class="mw-page-title-main">Breich railway station</span> Railway station in West Lothian, Scotland

Breich railway station is a rural railway station serving the village of Breich in West Lothian, Scotland. It is located on the Shotts Line, 21 miles (34 km) west of Edinburgh Waverley towards Glasgow Central. It was the sixth-least-used station in the UK until 2018-19 and was the second-least-used in Scotland, after Barry Links as well as being the least used station in West Lothian.

<span class="mw-page-title-main">Aberdeen railway station</span> Railway station in Aberdeen City, Scotland, UK

Aberdeen railway station is the main railway station in Aberdeen, Scotland. It is the busiest railway station in Scotland north of the major cities of Glasgow and Edinburgh. It is located on Guild Street in the city centre, next to Union Square.

<span class="mw-page-title-main">Edinburgh–Dunblane line</span> Railway line in Scotland

The Edinburgh–Dunblane line is a railway line in East Central Scotland. It links the city of Edinburgh via Falkirk to the city of Stirling and the town of Dunblane.

<span class="mw-page-title-main">Hartwood railway station</span> Railway station in North Lanarkshire, Scotland

Hartwood railway station is a railway station serving Hartwood in North Lanarkshire, Scotland. It is on the Shotts Line, 19 miles (31 km) east of Glasgow Central towards Edinburgh Waverley. The station has two platforms, connected by a stairway footbridge. It is managed by ScotRail.

<span class="mw-page-title-main">Glasgow South Western Line</span> Railway line in the UK

The Glasgow South Western Line is a mainline railway in Scotland that runs from Glasgow to Kilmarnock, and then either Carlisle via Dumfries, or Stranraer via Ayr, with a branch to East Kilbride.

<span class="mw-page-title-main">Invergowrie railway station</span> Railway station in Perth and Kinross, Scotland

Invergowrie railway station is a railway station which serves the village of Invergowrie, west of the city of Dundee, Scotland on the north bank of the Firth of Tay. It is the only intermediate station between Dundee and Perth, on the Glasgow to Dundee line, approximately 4 miles from Dundee station – and only around 500 yards from the city's western boundary – and just over 17 miles from Perth. ScotRail, who manage the station, provide all the services.

<span class="mw-page-title-main">Craigendoran railway station</span> Railway station in Argyll and Bute, Scotland

Craigendoran railway station is a railway station serving Craigendoran, east of Helensburgh, Scotland. The station is managed by ScotRail, which operates all services at the station. It is located on the North Clyde Line between Helensburgh Central and Cardross, 23 miles 18 chains (37.4 km) west of Glasgow Queen Street, measured via Singer and Maryhill. West Highland Line trains used to call here but no longer do following the closure of the upper platforms.

<span class="mw-page-title-main">Drumgelloch railway station (1989)</span> Closed railway station in Scotland

Drumgelloch railway station was a railway station serving Drumgelloch, an eastern suburb of Airdrie, North Lanarkshire, Scotland. The station was managed by First ScotRail and was the eastern terminus of the North Clyde Line, 20 km east of Glasgow Queen Street from May 1989 to May 2010.

<span class="mw-page-title-main">Kirkcaldy railway station</span> Railway station in Fife, Scotland

Kirkcaldy railway station is a railway station in the town of Kirkcaldy, Fife, Scotland. The station is managed by ScotRail and is on the Fife Circle Line and principal East Coast Main Line, 26 miles (42 km) north east of Edinburgh Waverley. British Transport Police maintain a small office on Platform 1.

<span class="mw-page-title-main">Carnoustie railway station</span> Railway station in Angus, Scotland

Carnoustie railway station is a railway station which serves the town of Carnoustie, Angus, Scotland. It is sited 10 miles 33 chains (16.8 km) east of the former Dundee East station, on the Dundee to Aberdeen line, between Golf Street and Arbroath. There is a crossover at the south end of the station, which can be used to facilitate trains turning back if the line north to Arbroath is blocked. ScotRail manage the station and provide almost all services.

<span class="mw-page-title-main">Montrose railway station</span> Railway station in Angus, Scotland

Montrose railway station serves the town of Montrose in Angus, Scotland. The station overlooks the Montrose Basin and is situated on the Dundee–Aberdeen line, 90 miles (144 km) north of Edinburgh Waverley, between Arbroath and Laurencekirk. There is a crossover at the north end of the station, which can be used to facilitate trains turning back if the line south to Arbroath is blocked.

The Dundee and Perth Railway was a Scottish railway company. It opened its line in 1847 from Dundee to a temporary station at Barnhill and extended to Perth station in 1849. It hoped to link with other railways to reach Aberdeen and changed its name to the Dundee and Perth and Aberdeen Railway Junction Company, but this early attempt was frustrated, and for some years it failed to make a physical connection with other railways in Dundee.

Manuel Junction is a railway junction near the village of Whitecross, Falkirk, Scotland. It is the terminus of the Bo'ness and Kinneil Railway and forms a connection between it and the Glasgow–Edinburgh via Falkirk line.

References

  1. Brailsford 2017, Gaelic/English Station Index.
  2. Deaves, Phil. "Railway Codes". railwaycodes.org.uk. Retrieved 27 September 2022.
  3. 1 2 Butt (1995), page 85
  4. "Estimates of station usage | Office of Rail and Road". orr.gov.uk. Retrieved 7 March 2019.
  5. McKean, Charles; Whatley, Patricia; with Baxter, Kenneth (2013). Lost Dundee. Dundee's Lost Architectural Heritage (2nd ed.). Edinburgh: Birlinn. pp. 228 & 242.
  6. McKean, Charles; Whatley, Patricia; with Baxter, Kenneth (2013). Lost Dundee. Dundee's Lost Architectural Heritage (2nd ed.). Edinburgh: Birlinn. pp. 233–235.
  7. "Broughty Ferry | ScotRail". www.scotrail.co.uk. Retrieved 7 March 2019.
  8. "Invergowrie | ScotRail". www.scotrail.co.uk. Retrieved 7 March 2019.
  9. "Welcoming the world – Dundee's grand new railway station | netMAGmedia Ltd". www.architectsdatafile.co.uk. 3 August 2016. Retrieved 7 March 2019.
  10. "Dundee Station Redevelopment, Scotland". Railway Technology. Retrieved 7 March 2019.
  11. "New £38m Dundee railway station opens". 9 July 2018. Retrieved 7 March 2019.
  12. "Dundee's New £38m railway station opened". Archived from the original on 11 October 2022. Retrieved 7 August 2018.
  13. "State-of-the-art Dundee station opened after 20 years of planning". www.railtechnologymagazine.com. Retrieved 7 March 2019.
  14. "Estimates of station usage | ORR Data Portal". dataportal.orr.gov.uk. Retrieved 25 December 2023.
  15. eNRT May 2022 Edition, Tables 20, 50, 214, 215, 220

Bibliography