General information | |
---|---|
Location | Gogar, Edinburgh Scotland |
Coordinates | 55°56′28″N3°19′12″W / 55.941°N 3.320°W |
Grid reference | NT176727 |
Owned by | Network Rail Edinburgh Trams |
Managed by | ScotRail |
Platforms | 4 (2 National Rail & 2 Edinburgh Trams) |
Other information | |
Station code | EGY |
Key dates | |
11 December 2016 | Opened |
Passengers | |
2017/18 | 0.284 million |
2018/19 | 0.324 million |
Interchange | 2,397 |
2019/20 | 0.293 million |
Interchange | 1,739 |
2020/21 | 44,450 |
Interchange | 304 |
2021/22 | 0.117 million |
Interchange | 1,212 |
Notes | |
Passenger statistics from the Office of Rail and Road |
Edinburgh Gateway station is a railway station and interchange at Gogar in Edinburgh,Scotland,which opened on 11 December 2016. [2] It is served by ScotRail and Edinburgh Trams,and serves both Gogar and Edinburgh Airport,to which it is connected by the tram line.
As part of the Strategic Transports Project Review,which plans what is going to happen with Scotland's transport over the next 20 years,29 investment priorities were identified in support of the future growth of Scotland's businesses and communities. One of these was the construction of Gogar station for better access to Edinburgh Airport through onward travel on the Edinburgh tram network as well as the rest of the area through the integration with the tram system. [3] This may be to compensate for the scrapping of the Edinburgh Airport Rail Link [4] and the station was part of the original proposal. The station would also thought to be delivered sooner. [5] [6]
The railway station is part of the Edinburgh to Glasgow Improvement Programme (EGIP),a major Scottish transport project involving infrastructure improvements and electrification of most railway lines between Glasgow and Edinburgh. It was intended that services between the two cities will increase to 13 trains per hour with fastest time being 35 minutes but after the Scottish Department For Transport reviewed the project,it was down scaled and services will continue to be every 15 minutes but with new,longer electric trains,which will at least meet the journey time targets originally set out. The project also includes the electrification of eight routes and 350 km of existing lines. [4] [7] The Shotts Line will have an increase in services with the provision of a limited express service. [4]
The railway station is located at the A8 to the east of Gogar. [4] The station has two platforms. The platforms have been constructed to accommodate the longest trains currently operating in Scotland (London North Eastern Railway). A chord is proposed a few miles to the north of the station,near the River Almond crossing,to provide another link between Glasgow and Edinburgh with potential for increasing services through. [4] [5] [8]
The original design for the station included a 1st floor and high level bridge but following consultation these were removed with an at-grade bridge providing easier access. The design of the station is to provide a secure covered area for parking of 100 cycles as well as five cycle lockers. This is located next to the station building and is monitored by CCTV. Lifts inside the station building are large enough to accommodate bicycles. The station provides an interchange with Edinburgh Trams to Edinburgh and the airport as well as providing pedestrian access to The Gyle Shopping Centre through an underpass under the A8. [4] [7]
Network Rail submitted its plans for the interchange on 9 October 2009 following completion of the pre-planning submission consultation. Gogar was the first infrastructure project to go the through the National Planning Framework. The consultation involved four public exhibitions with clear public support for the investments and the proposal. [7]
When the tram line was built in 2013,provision was made for Edinburgh Gateway but it would not open until the same time as the railway station. In February 2015,a contract to build the station was awarded to Balfour Beatty with work commencing in April 2015. [9] [10] The new station building was designed by IDP Architects. [11]
In June 2016 the station was badly vandalised while still under construction. Vehicles and windows were damaged. [12]
Edinburgh Gateway station was officially opened by the Scottish Government Minister for Transport and the Islands Humza Yousaf on 9 November 2016. [13] The station opened to the public on 11 December 2016. [2]
Edinburgh Gateway station is served half-hourly by trains operating on the Fife Circle Line,and hourly by services operating to Perth,Dundee and Inverness.
Fife Circle trains scheduled to stop at Edinburgh Gateway will normally skip the nearby South Gyle station.
All Edinburgh Trams services are currently scheduled to call at Edinburgh Gateway.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
South Gyle or Haymarket | ScotRail Fife Circle Line | Dalmeny | ||
Preceding station | Edinburgh Trams | Following station | ||
Gyle Centre towards Newhaven | Newhaven –Edinburgh Airport | Gogarburn towards Edinburgh Airport |
First ScotRail was a train operating company in Scotland owned by FirstGroup which operated the ScotRail franchise from October 2004 until March 2015. Prior to October 2004,trains were run by ScotRail. First ScotRail was succeeded by Abellio ScotRail on 1 April 2015.
Manchester Piccadilly is the principal railway station in Manchester,England. Opened as Store Street in 1842,it was renamed Manchester London Road in 1847 and became Manchester Piccadilly in 1960. Located to the south-east of Manchester city centre,it hosts long-distance intercity and cross-country services to national destinations including London,Birmingham,Nottingham,Glasgow,Edinburgh,Cardiff,Bristol,Exeter,Plymouth,Reading,Southampton and Bournemouth;regional services to destinations in Northern England including Liverpool,Leeds,Sheffield,Newcastle and York;and local commuter services around Greater Manchester. It is one of 19 major stations managed by Network Rail. The station has 14 platforms:12 terminal and two through platforms. Piccadilly is also a major interchange with the Metrolink light rail system with two tram platforms in its undercroft.
Edinburgh Airport is an airport located in the Ingliston area of Edinburgh,Scotland. It was the busiest airport in Scotland in 2019,handling over 14.7 million passengers. It was also the sixth-busiest airport in the United Kingdom by total passengers in 2019. It is located 5 NM west of the city centre,just off the M8 and M9 motorways. It is owned and operated by Global Infrastructure Partners,who are also a minority shareholder of Gatwick Airport. The airport has one runway and one passenger terminal and employs about 2,500 people.
Edinburgh Trams is a tramway in Edinburgh,Scotland,operated by Edinburgh Trams Ltd. It is a 18.5-kilometre (11.5 mi) line between Newhaven in Leith and Edinburgh Airport,with 23 stops.
The Edinburgh City Bypass,designated as A720,is one of the most important trunk roads in Scotland. Circling around the south of Edinburgh,as the equivalent of a ring road for the coastal city,it links together the A1 towards north-east England,the A702 towards north-west England,the M8 through the Central Belt towards Glasgow,the A7 through south-east Scotland and north-west England as well as the A8 leading to the M9 for Stirling and the Queensferry Crossing.
The city of Glasgow,Scotland,has a transport system encompassing air,rail,road and an underground light metro line. Prior to 1962,the city was also served by trams. Commuters travelling into Glasgow from the neighbouring local authorities of North and South Lanarkshire,Renfrewshire,East Renfrewshire,and East and West Dunbartonshire have a major influence on travel patterns,with tens of thousands of residents commuting into the city each day. The most popular mode of transport in the city is the car,used by two-thirds of people for journeys around the city.
Haymarket railway station is the second largest railway station in Edinburgh,Scotland,after Waverley railway station.
Edinburgh Park is an out-of-town business park in South Gyle,Edinburgh,Scotland. It is west of the city,near Edinburgh Airport and adjacent to the Edinburgh City Bypass. It was opened in 1995. The layout of the park was masterplanned by American architect Richard Meier. The park has a bar/grill,nursery,and several sculptures,including busts of famous Scottish poets,many of them socialists.
The Fife Circle Line is the local rail service north from Edinburgh. It links towns of south Fife and the coastal towns along the Firth of Forth before heading to Edinburgh. Operationally,the service is not strictly a circle route,but,rather,a point to point service that reverses at the Edinburgh end,and has a large bi-directional balloon loop at the Fife end.
Manchester Airport station is a railway,tram,bus and coach station at Manchester Airport,England which opened at the same time as the second air terminal in 1993. The station is 9+3⁄4 miles (15.7 km) south of Manchester Piccadilly,at the end of a short branch from the Styal line via a triangular junction between Heald Green and Styal stations. Manchester Metrolink tram services were extended to the airport in 2014 and operate to Manchester Victoria.
South Gyle is an area of Edinburgh,Scotland,lying on the western edge of the city and to the south and west of an area of former marshland once known as the Gogarloch,on the edge of Corstorphine. Most of the buildings in the area are of recent origin,dating from the later 1980s,1990s,and early 21st century,with the exception of some farm workers' cottages and an early 1970s council estate abutting South Gyle railway station.
Edinburgh Park railway station is a railway station in the west of Edinburgh,Scotland,serving the Edinburgh Park business park and the Hermiston Gait shopping centre. The new station building was designed by IDP Architects,and it opened on 4 December 2003. It is the first intermediate station between Haymarket and Linlithgow since 1951. Ticket barriers came into use on 25 March 2015.
Edinburgh is a major transport hub in east central Scotland and is at the centre of a multi-modal transport network with road,rail and air communications connecting the city with the rest of Scotland and internationally.
Gogar is a predominantly rural area of Edinburgh,Scotland,located to the west of the city. It is not far from Gogarloch,Edinburgh Park and Maybury. The Fife Circle Line is to the north.
Crossrail Glasgow is a proposed railway development in Central Scotland to connect the stations Glasgow Central and Queen Street. It has been estimated at a cost of £200 million.
The Edinburgh Airport Rail Link (EARL) was a proposed rail link to Edinburgh Airport,Scotland. The project was passed by the Scottish Parliament in 2007,but following a change of government,was cancelled in September 2007 on the grounds of cost.
The Glasgow Airport Rail Link (GARL) is a proposed link between Glasgow City Centre and Glasgow Airport. The original plans for an airport rail link were proposed during the 2000s to directly link Glasgow Central station with Glasgow Airport in Scotland. The link was intended for completion by 2013 and would have had a service of four trains per hour via Paisley Gilmour Street railway station.
Urban andsuburban rail plays a key role in public transport in many of the major cities of the United Kingdom. Urban rail refers to the train service between city centres and suburbs or nearby towns that acts as a main mode of transport for travellers on a daily basis. They consist of several railway lines connecting city centre stations of major cities to suburbs and surrounding towns.
The Edinburgh Glasgow Improvement Programme or EGIP was an initiative funded by Transport Scotland on behalf of the Scottish Government to increase capacity on the main railway line between Edinburgh and Glasgow,with new,longer electric trains running by 2017 and scheduled for full completion in 2019. It was expected to cost £742 million and delivered by Network Rail.
Various studies,from 1989 onwards,considered the reintroduction of trams to Edinburgh. In 2001,a proposal for a new Edinburgh Trams network envisaged three routes across the city,Lines 1,2 and 3. Line 1 was a circular route running around the northern suburbs,with the other two forming radial lines running out to Newbridge in the west and to Newcraighall in the south respectively. All lines would run through the city centre.