The Switchback was a railway line in the East End of Glasgow, Scotland, constructed by the Caledonian Railway (CR). Connecting the lines at Rutherglen on the south side of the city with Robroyston on the north side, this route also served a number of industrial sidings and rail yards.
In 1858, the CR honed plans for the one-mile Rutherglen–Dalmarnock line, to be called the Dalmarnock branch. Primarily for the transport of coal, the terminus was the Dalmarnock Gas Works, Bridgeton, which had formerly been supplied via a canal from the river. No explicit commitment was made to introduce a passenger service. [1] [2]
The building of the seven-span Dalmarnock Railway Bridge during 1859–1861 across the River Clyde [3] was integral to the branch opening in 1861. [2] The terminus was initially known as Dalmarnock. [4] Illustrating 1867 traffic volumes, consecutive returning coal trains heading southeast towards Hamilton Junction, after leaving the branch, caused an accident that sandwiched a passenger train between them. [5] Catering for growing demand, a coal and goods depot existed at the terminus by 1869, which assumed the name of Bridgeton, the community to its northwest. [6]
During the following years, coal remained the chief commodity carried. [7] Although approved, [8] the CR was tardy in completing an extension to London Road. A road bridge replaced the level crossing at Strathclyde Street (Strathclyde Junction), from where the new line skirted the western edge of the rail yard, while ascending to the stone abutments and arches of Dalmarnock Road–Baltic Street. [7] Construction largely finished by the beginning of 1875, [9] the line did not open to goods until April 1877. [10]
The Rutherglen station was rebuilt further east to better facilitate the introduction of passenger traffic to the branch. [11] Although a coal depot had existed at London Road for months, the passenger station, and the corresponding one at Bridgeton, did not open until April 1879. The wisdom of locating the terminus in a rural area at the extreme eastern boundary of Bridgeton, instead of closer to Glasgow, was questioned. [12] [13] [14] The station stood to the west, and a goods yard, comprising four groups of sidings, opened to the east. The expanding Dalmarnock Iron Works (1873–1986) would be reached by reversing from the station onto sidings to the west. [15] The Bridgeton station was on the north side of Dalmarnock Road, and to its west, a siding connected the gas works until closure in 1956. [16] [17]
According to an 1887 timetable, passenger trains ran London Road–Bridgeton–Rutherglen about every hour from 5:18 am until 10:00 pm on the six-minute journey. [18] It is unclear if any ran as mixed trains. Some excursion trains, passing south of the Clyde, would include these two branch stations. [19]
In 1891, the Strathclyde Street bridge was lengthened by the addition of two 27-foot (8.2 m) spans in preparation for the new underground line branching at Strathclyde Junction. The existing parallel viaduct was underpinned during excavations for the new line's descent. [20] In 1895, when the low level Dalmarnock (Road) station opened on the new Rutherglen–Glasgow Green line that extended northwest of the station, the Rutherglen–London Road passenger service discontinued. [21] The high level Bridgeton station, [22] described for a few years in the early 1900s as a cleansing department station, [23] may have been a location for cleaning passenger trains during off-peak periods. The Parkhead (later Parkhead Stadium) station (1897–1964), immediately north of London Road and east of Celtic Park stadium, was on a new east–west line opened the previous year. Both these routes operated as CR's Glasgow Central Railway. London Road became solely a goods and minerals (coal) depot. [24]
The replacement Dalmarnock Railway Bridge was built during 1893–1897 to carry twin tracks, and was widened in 1923 to carry an additional track. The former bridge continued to provide additional capacity until no longer required. [3]
The Dalmarnock sewage works sidings (c.1902–1960s) facilitated the transportation of grit, sand and other heavy solids. [25] The Dalmarnock power station sidings (1920–1977) handled coal trains. [26] [27] When the plant converted to oil firing, two loaded trains of petrochemicals came each weekday. [28]
The Bridgeton depot closed in 1965, and the London Road rail yard in 1986. Since 1979, the Argyle Line has included the Rutherglen–Dalmarnock route. All other tracks north of Strathclyde Junction have been lifted.
In 1846, the CR leased the Garnkirk and Glasgow Railway's Coatbridge–Townhead line, with a formal merger in 1865. In 1849, the route was extended to a western terminus at Glasgow's Buchanan Street railway station. In 1881, approval was granted to connect this line with the London Road branch. The objectives were to access the Glasgow Cattle Market via the Coatbridge Branch (NBR), better serve the Parkhead area, and connect the CR's northern and southern systems in Glasgow. [29] [30] Although indicated to include passenger travel to Buchanan Street, [31] if such a service existed, it was short lived.
From Germiston Junction High on this line, the route proceeded 0.4 miles (0.6 km) south to Blochairn Junction. Here at the Blackhill locks, a one-half mile (0.8 km) branch southwest opened in 1884 along the north bank of the Monkland Canal to the Blochairn Iron Works. Constructed by the Steel Company of Scotland about this time, the plant closed in 1958 [32] or 1962. Proceeding 1.9 miles (3 km) south of Blochairn Junction, the project would involve excavating 300,000 cubic yards (230,000 m3) of earth, and a long viaduct stretching over the City Union Line (NBR) at Carntyne Road, Duke Street, the Coatsbridge line, and Great Eastern Road. Bridging London Road, the line passed around the east of the goods yard, to connect at London Road Junction. Opened in 1886, the whole route was double track. [31] [33] [34] [35]
At 350 yards (320 m) north of London Road, the Parkhead Forge, a.k.a. the Parkhead Iron Works, and the largest steelworks in Scotland, operated extensive sidings. Served initially only by the NBR Coatbridge line, [16] the new CR line, designated part of the London Road branch, [36] later included a connection. [24] [37]
Germiston Junction Low (west of High) (1886–1962) was connected to the line at Blackhill Junction to its southeast. [38] The Kennyhill goods yard (1887–1964), that existed 1.2 miles (2 km) south of Germiston Junction, had a depot from 1895. Germiston Junction–Balornock Junction extended north in 1894 to connect with the Hamiltonhill Branch being opened the same year. [38]
Balornock Junction–London Road Junction closed in 1964, as a result of the Beeching cuts. It is unclear when The Switchback name first appeared and whether it applied to the whole route that connected the CR's northern and southern systems in Glasgow.
1895: A shunter brakeman, who stepped onto the main line near Strathclyde Street, was cut in two by a passing train. [39]
1901: A steam engine stopped shunting at the Parkhead Ironworks to refill with water at London Road. On returning at high speed, it crashed into the stationary wagons, derailing and wrecking the first three. Although the fireman was initially rendered unconscious, both he and the engineer suffered only minor injuries. [36]
1902: When a brakeman stumbled beneath a shunting engine at the Dalmarnock Gas Works, he did not survive the amputation of both legs. [40]
1903: When a passenger leaned on a compartment door, while crossing the Clyde, the door swung open, and she fell out. A search party found her on the Rutherglen side, but she died of her injuries that evening. [41] [42] A few months later, when attempting to board a moving engine at the Dalmarnock Gas Works, an employee slipped and was fatally crushed between a railway wagon and wall. [43]
1914: When shunter fell on the line at the Blochairn Steelworks, a wagon wheel fatally crushed his head. [44]
1938: A rolling wagon at the Blochairn Steelworks fatally knocked down a shunter. [45]
The M80 motorway obliterated the Germiston Junction–Blochairn Junction track bed. The Glasgow Wholesale Market and other commercial premises occupy the former Blochairn Iron Works site. The Monkland Canal was infilled prior to constructing the M8 around 1980. [32]
Road bridges over the railway cutting exist at Gadie Street (c.1902), [25] [46] Cumbernauld Road (c.1895), [38] and Edinburgh Road (c.1928). [47] [48]
At the Carntyne Road/Todd Street intersection, [49] only the western part of the substantial NBR stone abutments stands after 2016 demolition work. [50] Only sections of low wall remain of the CR bridges immediately to the east on Carntyne and south at Duke Street.
The Forge Shopping Centre occupies the former Parkhead Forge site.
Nothing remains of the railway viaduct at Gallowgate (Great Eastern Road) and today's A728 intersection, [51] nor London Road at Davaar Street. [15] The brownfield London Road station and rail yards became the Commonwealth Arena and Sir Chris Hoy Velodrome, and the corresponding section of the Glasgow East End Regeneration Route (EERR).
The arch and bridge viaduct near the now A728/A749 intersection [52] [53] was demolished in 2009. [54] The former rail yards and properties immediately to the northwest and northeast are brownfields. As of 2019, a mixture of one and two-bedroom flats and two and three-bedroom terraced housing were planned for the northwest location, [55] and the northeast one was for sale. [56]
Glasgow Corporation gasworks Dalmarnock....death....of brakesman named William Weir....engaged shunting waggons into the works when stumbled and fell underneath....injuring his legs....that they were amputated.
....James MCormack (25), a shunter....in the yard of the Steel Company of Scotland at Blochairn Road....fell....and one of the wheels of a waggon passed over his head. Death was instantaneous.
Lanarkshire, also called the County of Lanark, is a historic county, lieutenancy area and registration county in the central Lowlands of Scotland.
The Argyle Line is a suburban railway located in West Central Scotland. The line serves the commercial and shopping districts of Glasgow's central area, and connects towns from West Dunbartonshire to South Lanarkshire. Named for Glasgow's Argyle Street, the line uses the earlier cut-and-cover tunnel running beneath that thoroughfare.
Parkhead is a district in the East End of Glasgow. Its name comes from a small weaving hamlet at the meeting place of the Great Eastern Road and Westmuir Street. Glasgow's Eastern Necropolis cemetery was laid out in the area in 1847 beside the Gallowgate.
Bridgeton is a district to the east of Glasgow city centre. Historically part of Lanarkshire, it is bounded by Glasgow Green to the west, Dalmarnock to the east and south, Calton to the north-west at Abercromby Street/London Road and Broad street to the north-east.
Glasgow Shettleston was a burgh constituency represented in the House of Commons of the Parliament of the United Kingdom from 1918 until 2005. The Shettleston area's representation is now covered by Glasgow Central and Glasgow East.
Dalmarnock is a district in the Scottish city of Glasgow. It is situated east of the city centre, directly north of the River Clyde opposite the town of Rutherglen. It is also bounded by the Glasgow neighbourhoods of Parkhead to the north-east and Bridgeton to the north-west.
The Glasgow East End Regeneration Route (GEERR) is a new road in the East End of Glasgow, Scotland. The first phase was opened in 2011 with the second phase opened in mid-2012; these two phases are officially known as the A728 Clyde Gateway. A third phase from the Parkhead Bypass to Provan (M8/M80) was scheduled for construction in 2018, but may not now be built. Another nearby road in the city also has the A728 designation.
Uddingston railway station serves the town of Uddingston, South Lanarkshire, Scotland. ScotRail provides passenger services to this station on the Argyle Line and Shotts Line.
Rutherglen railway station is in the town centre of Rutherglen, South Lanarkshire, Scotland, and lies on the Argyle Line. The station is served by a single island platform, connected to the street by a footbridge.
Carmyle railway station is located in the Carmyle area of Glasgow. It is on the Whifflet Line, 5.5 miles (8.9 km) east of Glasgow Central railway station. Train services are provided by ScotRail Trains.
Dalmarnock railway station, serving the Dalmarnock area of Glasgow, Scotland, lies on the Argyle Line, two and a quarter miles (3.6 km) southeast of Glasgow Central. The northern ends of the side platforms are within a tunnel. Revamped for the 2014 Commonwealth Games, the station is a 15-minute walk from the Commonwealth Arena and Sir Chris Hoy Velodrome, and Celtic football club's Celtic Park stadium at Parkhead.
Bridgeton railway station serves the Bridgeton district of Glasgow, Scotland and is a station on the Argyle Line, 1+3⁄4 miles (2.8 km) south east of Glasgow Central. The station is operated by ScotRail who also provide all train services.
The Glasgow Central Railway was a railway line built in Glasgow, Scotland by the Caledonian Railway, running in tunnel east to west through the city centre. It was opened in stages from 1894 and opened up new journey opportunities for passengers and enabled the Caledonian Railway to access docks and industrial locations on the north bank of the River Clyde. An intensive and popular train service was operated, but the long tunnel sections with frequent steam trains were smoky and heartily disliked.
Glasgow Corporation Tramways were formerly one of the largest urban tramway systems in Europe. Over 1000 municipally-owned trams served the city of Glasgow, Scotland, with over 100 route miles by 1922. The system closed in 1962 and was the last city tramway in Great Britain.
The A749 road in Scotland connects East Kilbride with Glasgow city centre via Rutherglen and Bridgeton.
The Rutherglen Bridge or the Shawfield Bridge is a bridge which was built 1893–96, which crosses the River Clyde, in Scotland.
Dalserf railway station served the village of Dalserf in South Lanarkshire, Scotland, on the Coalburn branch of the Caledonian Railway line.
The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.
Bridgeton Waverley Football Club was a Scottish football club based in Glasgow. Originally founded in 1904, they competed in the Junior grade from 1923 until folding in 1962.