Scottish Midland Junction Railway

Last updated

Scottish Midland Junction Railway
Overview
Locale Scotland
Dates of operationJuly 31, 1845 (1845-07-31)July 29, 1856 (1856-07-29)
Successor Scottish North Eastern Railway
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Scottish Midland
Junction Railway
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon exSTRc1.svg
BSicon exSTR+4.svg
BSicon exSTR2+4.svg
BSicon exSTRc3.svg
Forfar North Junction
BSicon exSTRc1.svg
BSicon exSTR.svg
BSicon exCONT4.svg
BSicon exHST.svg
Forfar
BSicon exSTRc2.svg
BSicon exABZg3.svg
Forfar West Junction
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon exSTR.svg
BSicon exHST.svg
Kirriemuir Junction
BSicon exSTRc2.svg
BSicon exABZg3.svg
Kirriemuir Junction
BSicon exlHST.svg
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon exSTR.svg
Kirriemuir
BSicon exHST.svg
Glamis
BSicon exHST.svg
Leason Hill
BSicon exHST.svg
Eassie
BSicon exHST.svg
Kirkinch
BSicon exHST.svg
Meigle Junction
BSicon exABZgl.svg
BSicon exCONTfq.svg
Arrow Blue Right 001.svg to Newtyle
BSicon exCONTgq.svg
BSicon exABZg+r.svg
BSicon exHST.svg
Alyth Junction
BSicon exBS2c2.svg
BSicon exSHI2gr.svg
BSicon exBS2c1.svg
BSicon lMKRZu.svg
BSicon exSTRl+4h.svg
BSicon exSTR+k2.svg
BSicon exkABZq+3.svg
BSicon exdCONTfq.svg
BSicon exkABZg+1.svg
BSicon exHST.svg
Washington (Tayside)
BSicon exHST.svg
Ardler
BSicon exHST.svg
Coupar Angus
BSicon exSTRc2.svg
BSicon exABZg3.svg
BSicon exHST+1.svg
BSicon exSTR+c4.svg
Stormont Loch Halt
BSicon exHST.svg
BSicon exSTR.svg
Rosemount Halt
BSicon exKHSTe.svg
BSicon exSTR.svg
Blairgowrie
BSicon exHST.svg
Woodside and Burrelton
BSicon exHST.svg
Cargill
BSicon exHST.svg
Ballathie
BSicon CONT2.svg
BSicon STRc3.svg
BSicon exSTR.svg
BSicon STRc1.svg
BSicon xABZg+4.svg
Stanley Junction
BSicon eHST.svg
Stanley Junction
BSicon eHST.svg
Stanley
BSicon exlHST.svg
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon STR.svg
Bankfoot
BSicon exSTRc1.svg
BSicon eABZg+4.svg
BSicon eHST.svg
Strathord
BSicon eHST.svg
Luncarty
BSicon eHST.svg
Muirton
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon STR.svg
BSicon exSTRc1.svg
BSicon eABZg+4.svg
Almond Valley Junction
BSicon STR~L.svg
BSicon STR+l.svg
BSicon STR~R.svg
BSicon dCONTfq.svg
BSicon vBHF.svg
Perth
BSicon SPLe.svg
BSicon CONTf.svg

The Scottish Midland Junction Railway was authorised in 1845 to build a line from Perth to Forfar. Other companies obtained authorisation in the same year, and together they formed a route from central Scotland to Aberdeen. The SMJR opened its main line on 4 August 1848. Proposals to merge with other railways were rejected by Parliament at first, but in 1856 the SMJR merged with the Aberdeen Railway to form the Scottish North Eastern Railway. The SNER was itself absorbed into the larger Caledonian Railway in 1866. The original SMJR main line was now a small section of a main line from Carlisle and central Scotland to Aberdeen.

Contents

The original route was well aligned for fast running, but it by-passed numerous towns and many branches were built to serve them. The rival North British Railway had its own route from the south to Aberdeen, and spectacular competition for the fastest journey from London to Aberdeen was generated in the final decades of the nineteenth century. In the 1960s there were some reflections of those days when powerful steam engines, displaced by diesel locomotives from other routes, operated a fast Glasgow - Aberdeen passenger service for some years.

In the mid-1960s the move to rationalise duplicate routes led to closure of the SMJR main line in 1967 except for a residual goods service to intermediate locations. Now the entire SMJR network has closed, except for the section from Perth to Stanley Junction, serving the main line to Inverness.

History

The Caledonian Railway

From the second decade of the nineteenth century, a number of short railway lines had been operating in Scotland; in most cases these were connected with mineral extraction, and there was little thought to connecting between them to form a network. The Stockton and Darlington Railway and the Liverpool and Manchester Railway in England showed that longer railway routes could be worthwhile, and thoughts turned to trunk railways in Scotland, and to connection to the emerging English network.

In the 1840s business people in Scotland made definite moves which resulted in proposals for trunk lines to connect the central belt of Scotland with England, and in 1845 there was a frenzy of Parliamentary Bills for Scottish railways. The Caledonian Railway was authorised on 12 April 1845 with capital of £1,500,000. Its main line was to run between Edinburgh, Glasgow and Carlisle.

The Caledonian policy was to capture as much territory in Scotland as possible: they foresaw a "Caledonian system" controlled by themselves. At this period it was expected that a district could only support one railway line, so that the first to serve an area would secure a near-monopoly. Even before authorisation the Caledonian made provisional agreements with the promoters of other lines to lease their railways. This was done by agreeing a guaranteed periodical lease payment; it did not require money at the time of making the agreement, but it incurred a financial obligation later. [1] [ page needed ]

Authorisation

System map of the SMJR in 1855 Smjr 1855.gif
System map of the SMJR in 1855

In the 1845 session of Parliament, a large number of Scottish trunk lines were proposed. In the period prior to the hearings, discussions about alliances and leases accelerated. The Scottish Central Railway was to build from Perth to Castlecary where it would join the Edinburgh and Glasgow Railway and the Caledonian Railway, and it had discussed merging with the Scottish Midland Junction but at the same time it discussed leasing its line to the E&GR or the Caledonian.

The Scottish Midland Junction Railway was authorised on 31 July 1845, with capital of £300,000, for a line just over 30 miles (48 km) in length from Perth to Forfar. At Perth it was to connect with the SCR and at Forfar with the Arbroath and Forfar Railway which gave rail access on to Aberdeen over the Aberdeen Railway. The Scottish Central Railway and the Caledonian Railway were also authorised on 31 July 1845. [2] [ page needed ] [3] [ page needed ]

The Dundee and Newtyle Railway had been built in 1831 to connect the growing Burgh of Dundee with the fertile broad valley of Strathmore; it terminated at Newtyle which was then no more than a farm, intended as a railhead. This proved unpopular and two nominally independent extension railways were built, the Newtyle and Coupar Angus Railway and the Newtyle and Glammiss Railway. (Glammiss is spelt Glamis nowadays.) These railways opened in 1837, but they hardly added to the traffic of the Dundee line.

Leaving Newtyle the two lines turned away from one another and together formed a nearly straight axis that suited the intended route of the SMJR; the authorising Act empowered the SMJR to acquire them and incorporate their lines into the SMJR main line. [1] [ page needed ] [4] [5] [6] [ page needed ]

A possible lease

After lengthy discussions, the SMJR agreed to lease its line to the Scottish Central Railway by decision of 18 February 1847; the lease charge was to be 6% on the SMJR capital of £600,000. [note 1]

The Caledonian had assumed that it was going to lease the Scottish Central Railway, but this was not confirmed. The SCR lease of the SMJR seems not to have proceeded, for in 1848 the Caledonian was negotiating to lease the SMJR direct, and on 5 May 1848 agreement was finalised; the Caledonian would pay 6% on the SMJR capital, now quoted as £500,000. [7] The lease arrangement was modified to be joint with the Edinburgh and Glasgow Railway on an agreed traffic sharing system; but it needed to be ratified by Parliament. [8]

Opening

The two Newtyle lines had been constructed to the track gauge of 4 ft 6+12 in (1,384 mm) as a single line using stone block sleepers. This had to be converted to a more robust track construction as a double line; they were closed in 1847 for the purpose. The SMJR main line, including the converted sections, was opened on 20 August 1848. Through trains started to run from Glasgow and Edinburgh to Forfar over the line and the SCR. [1] [ page needed ] [9] [ page needed ] However, in 1849 it was reported that "many of the stations were unfinished and there was virtually no goods traffic". [1] [ page needed ]

The lease rejected by Parliament

The Caledonian Railway relations with the Edinburgh and Glasgow were somewhat stormy, and lurched from friendly to hostile. The lease of the SMJR required Parliamentary authorisation, and a joint Bill was prepared for the 1849 session. However, in February 1849 it became clear that any alliance between the Caledonian and the E&GR was impossible and the Caledonian declined to proceed with the Bill, and the lease. [1] [ page needed ]

In 1854 the SCR was still independent, and was negotiating with the SMJR for an amalgamation of the two companies. At this time the attitude of Parliament was hostile to mergers of railways, and the proposal was rejected.

From this time there was a "loose amalgamation" between the SCR, the SMJR and the Aberdeen Railway: they worked collaboratively but remained separate companies. This ended on 29 July 1856 when they formally amalgamated, to form the Scottish North Eastern Railway. [1] [ page needed ]

Branches

On 26 June 1846 the SMJR obtained authorisation to build three branches: to Dunkeld, to Kirriemuir and to Blairgowrie. [2] [ page needed ] In fact only the Blairgowrie branch was constructed during the lifetime of the SMJR. The Dunkeld branch was actually built by an independent company, the Perth and Dunkeld Railway. It left the SMJR main line at Stanley Junction, and was opened on 7 April 1856. It was worked by the SMJR. The Perth and Dunkeld Railway was taken over in 1864 as part of a scheme to connect Perth and Inverness, by what became the Highland Railway.

The Kirriemuir branch was opened in November 1854. [note 2] [10] [11] [ page needed ] [12] [ page needed ] [13] [ page needed ]

Most trains continued to Forfar, and when the Dundee and Forfar direct line opened, to Dundee. [13] [ page needed ]

The Blairgowrie branch left the main line at Coupar Angus; it opened for passengers on 1 August 1855, and for goods on 21 August 1855. Blairgowrie was an industrial centre for jute manufacture, and for soft fruit. The line descended sharply from Coupar Angus to the crossing of the River Isla, and then climbed again to the terminus. The Isla bridge was at first a twelve-span timber viaduct. On 3 February 1881 the river was in spate with large blocks of ice striking the piers of the bridge. The structure survived, but it was replaced by a stone and wrought iron bridge soon afterwards. [14] [ page needed ] In later years there were typically five passenger trains daily. [15] [ page needed ]

The SMJR had inherited the short branch to Newtyle by its acquisition of the Coupar Angus and Glammiss lines.

Other branches were constructed off the SMJR main line after the company was amalgamated.

Absorption

On 29 July 1856 the Scottish North Eastern Railway was formed by the amalgamation of the SMJR, the Scottish Central Railway and the Aberdeen Railway, forming a continuous line between Perth and Aberdeen. The SNER itself was absorbed by the Caledonian Railway by Act of Parliament on 10 August 1866. [16] [ page needed ] [1] [ page needed ]

Subsequent history

Firmly aligned to the Caledonian Railway, the route formed an important artery feeding Aberdeen traffic to central Scotland and the south. While express passenger trains caught the public eye, there was a substantial goods traffic; cattle were particularly dominant. Large structures on the line were constructed in laminated timber, but in the 1880s these were in poor condition and inadequate for the heavier and faster traffic of those days, and widespread reconstruction in stone and wrought iron was undertaken.

As part of a route between London and Aberdeen, the line was rivalled by the North British Railway route on the east coast via Dundee. As publicity became important, the two routes competed for the title of the fastest transit, and in 1888 and again in 1895 spectacularly fast journeys were made; the rivalry was known as the Railway race to the north. [17] [ page needed ]

Model of Caledonian Railway Class "769" or "Dunalastair II". At the Museum of Transport, Glasgow, 03/07. Hugh llewelyn 769 (6324836085).jpg
Model of Caledonian Railway Class "769" or "Dunalastair II". At the Museum of Transport, Glasgow, 03/07.

The early passenger engines used on the line were 2-4-0s. At the end of the 19th century and, after the line had been upgraded, the Caledonian Railway introduced the very successful 4-4-0 Dunalastair class of locomotives.

In the late 1950s the line became a speeding ground for the three-hour Glasgow-to-Aberdeen expresses using Gresley A4 Pacifics displaced by dieselisation of long distance main line expresses. The route carried the last regular steam hauled passenger trains timed at over 60 mph (97 km/h). [18] [ page needed ]

The Blairgowrie branch closed to passengers on 10 January 1955, and completely on 6 December 1965. The section from Alyth West Junction to Newtyle, the west curve built by the Newtyle and Coupar angus Railway, was used by Blairgowrie passenger trains and when the Blairgowrie passenger service was discontinued, the curve closed too. [15] [ page needed ]

The Kirriemuir branch closed to passengers on 4 August 1952 and completely in 1965. [13] [ page needed ]

There were two routes from central Scotland to Aberdeen, and during the process of rationalisation of the railways in the 1960s, the Dundee route was selected. Closure of the SMJR main line was inevitable and took place for passengers on 4 September 1967. The line was retained from Stanley Junction to Forfar for goods trains until 1982. [19] [ page needed ]

The Perth to Inverness line used the SMJR route as far as Stanley Junction, north of Perth. That line remains in use and the section from Perth to Stanley Junction is the only part of the SMJR that is still open to traffic. [9] [ page needed ]

Route

The line ran from Perth to Forfar, with branches to Kirriemuir, Newtyle and Blairgowrie.

LocationOpenedClosedNotes
Main line
PerthScottish Central Railway station; connects with Dundee and Perth Railway and Scottish Central Railway
Almond Valley Junctionconnects with Perth, Almond Valley & Methven Railway
Muirton Halt193921 November 1959unadvertised halt with limited service
Luncarty2 August 184818 June 1951
Dunkeld RoadJune 184913 April 1931very limited service, sometimes as "Strathord Siding", February 1857 to January 1867; then fully open as Strathord; connects with Bankfoot Railway
Stanley2 August 184811 June 1956sometimes shown as Stanley Junction; relocated northwards probably in 1857
Stanley Junctionfacing junction; connects with Perth and Dunkeld Railway
Ballathie2 August 1848July 1868
Cargill2 August 184811 June 1956
Woodside1 January 185811 June 1956renamed Woodside and Burrelton 1905; renamed Burrelton 1927
Coupar Angus24 April 1837 (N&CAR)
2 August 1848
6 September 1847
4 September 1967
despite the name the station is in Perthshire [19] [ page needed ]; line from Blairgowrie trailed in
Ardler24 February 1837 (N&CAR)
2 August 1848
6 September 1847
11 June 1956
Alyth Junctionconnects with Alyth Railway
Washington24 February 18376 September 1847
Ardler West Junctionfacing junction to Newtyle
Meigle18614 September 1967trailing junction from flyover line from Newtyle; renamed Alyth Junction 1876
Meigle Junctiontrailing junction from Newtyle; original Newtyle and Glammiss Railway (N&GR)
Meigle Junction4 June 18381861replaced by Meigle
Kirkinch4 June 18381847
Eassie4 June 1838 (N&GR)
2 August 1848
October 1847
11 June 1956
Leason Hill4 June 18381847
Glammiss4 June 1838 (N&GR)11 June 1956soon renamed Glamis
Kirriemuir JunctionDecember 1854June 1864?Kirriemuir branch trailed in; may have been retained as an exchange station
Forfar South Junction1895connects with Forfar and Brechin Railway
Forfar2 August 18484 September 1967known at first as Forfar Joint
Forfar East Junctionconnects with existing Arbroath and Forfar Railway
Blairgowrie branch
Blairgowrie1 August 185510 January 1955
RosemountSeptember 185710 January 1955later Rosemount Halt
Coupar Angussee Main line
Kirriemuir branchDecember 18544 August 1952remained open for goods
Kirriemuir
Kirriemuir Junctionsee Main line [20] [ page needed ] [12] [ page needed ] [15] [ page needed ]

Notes

  1. From Ross, page 39; the capital quoted is at considerable variance from Carter. On page 45 Ross quotes the SMJR capital as £500,000.
  2. According to Bradshaw; Quick says December 1854; Ferguson says (on page 80) that in November 1854 the SMJR informed Captain Tyler that improvements he had required during a previous inspection had been carried out, and Tyler advised the Board of Trade that the line could open without a re-inspection; Awdry says November 1855 (on page 102); Cobb says 1855; Thomas and Turnock say 12 August 1861 (page 314); Butt says 12 August 1861 (for passengers); Stansfield says August 1861; Ferguson is silent on the matter.

Related Research Articles

<span class="mw-page-title-main">Caledonian Railway</span> British pre-grouping railway company

The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.

<span class="mw-page-title-main">Perth railway station (Scotland)</span> Railway station in Perth, Scotland

Perth railway station is a railway station located in the city of Perth, Scotland, on the Glasgow to Dundee line, and the Highland Main Line. It is managed by ScotRail, who provide almost all of the services.

<span class="mw-page-title-main">Stirling railway station (Scotland)</span> Railway station in Stirling, Scotland

Stirling railway station is a railway station located in Stirling, Scotland. It is located on the former Caledonian Railway main line between Glasgow and Perth. It is the junction for the branch line to Alloa and Dunfermline via Kincardine and is also served by trains on the Edinburgh to Dunblane Line and long-distance services to Dundee and Aberdeen and to Inverness via the Highland Main Line.

<span class="mw-page-title-main">Dundee and Newtyle Railway</span>

The Dundee and Newtyle Railway opened in 1831 and was the first railway in the north of Scotland. It was built to carry goods between Dundee and the fertile area known as Strathmore; this involved crossing the Sidlaw Hills, and was accomplished with three rope-worked inclined planes. Newtyle was simply a remote railhead, and the anticipated traffic volumes were not achieved, the inclines incurred heavy operating costs, and the railway never made money.

The Perth, Almond Valley and Methven Railway was a Scottish railway line that connected Methven with Perth. It opened in 1858.

The Scottish Central Railway was formed in 1845 to link Perth and Stirling to Central Scotland, by building a railway line to join the Edinburgh and Glasgow Railway near Castlecary.

<span class="mw-page-title-main">Stirling and Dunfermline Railway</span> Former railway in Scotland

The Stirling and Dunfermline Railway was a railway in Scotland connecting Stirling and Dunfermline. It was planned by the Edinburgh and Glasgow Railway to get access to the mineral deposits on the line of route, but also as a tactical measure to keep the rival Caledonian Railway out of Fife.

<span class="mw-page-title-main">Aberdeen Railway</span> Historical railway line in Scotland linking Aberdeen and Guthrie

The Aberdeen Railway was a Scottish railway company which built a line from Aberdeen to Forfar and Arbroath, partly by leasing and upgrading an existing railway.

<span class="mw-page-title-main">Arbroath and Forfar Railway</span> Early railway in Scotland

The Arbroath and Forfar Railway (A&FR) was a railway that connected Forfar with the port town of Arbroath, in Scotland.

<span class="mw-page-title-main">Newtyle</span> Human settlement in Scotland

Newtyle is a village in the west of Angus, Scotland. It lies eleven miles north of Dundee in the southwest of Strathmore, between Hatton Hill and Newtyle in the Sidlaws. The village sits on gently sloping ground with a northwest aspect. The main communication link is the B954 road. The population was about 800 as of 2004.

The Dundee and Arbroath Railway was an early railway in Scotland. It opened in 1838, and used the unusual track gauge of 5 ft 6 in (1,676 mm). In 1848 it changed to standard gauge and connected to the emerging Scottish railway network.

The Scottish North Eastern Railway was a railway company in Scotland operating a main line from Perth to Aberdeen, with branches to Kirriemuir, Brechin and Montrose. It was created when the Aberdeen Railway amalgamated with the Scottish Midland Junction Railway on 29 July 1856. It did not remain independent for long, for it was itself absorbed by the Caledonian Railway on 10 August 1866.

The Dundee and Perth Railway was a Scottish railway company. It opened its line in 1847 from Dundee to a temporary station at Barnhill and extended to Perth station in 1849. It hoped to link with other railways to reach Aberdeen and changed its name to the Dundee and Perth and Aberdeen Railway Junction Company, but this early attempt was frustrated, and for some years it failed to make a physical connection with other railways in Dundee.

The Alyth Railway was a short branch railway line built in Strathmore in Scotland, connecting the town of Alyth to the main line network. It opened in 1861. Its junction was remote from any large population centre except Dundee, which was only reached by a primitive line with three rope worked inclines. This was modernised in 1868 and the Alyth branch, now with a good connection to Dundee, became busy. Nonetheless, the population of Alyth declined, and so did usage of the line, and it closed in 1951.

<span class="mw-page-title-main">Montrose and Bervie Railway</span> Former railway line in Scotland

The Montrose and Bervie Railway was a Scottish railway. When the Aberdeen Railway opened in 1850, the coastal settlements north of Montrose were not linked in, and local interests promoted a branch line from Montrose to Bervie. They found it impossible to raise capital at first, but from 1861 the larger railways were promoting new connections around Aberdeen, and the Great North of Scotland Railway (GNoSR) decided that the Bervie line would give it a route to the south.

This article describes the Caledonian Railway from its conception down to the year 1850.

The Brechin and Edzell District Railway was a local line in Scotland connecting Edzell, then a developing tourist centre, to the nearby main population centre of Brechin, where there was a branch of the Caledonian Railway. The short line opened in 1896, and it was worked by the Caledonian Railway.

The Forfar and Brechin Railway was promoted as a possible alternative main line to part of the Caledonian Railway route between Perth and Aberdeen. It was opened in 1895, having been sold while incomplete to the Caledonian Railway.

The Dundee and Forfar direct line was a railway line opened by the Caledonian Railway in 1870, connecting the important county town of Forfar with the harbour and manufacturing town of Dundee.

<span class="mw-page-title-main">Public transport in Perth and Kinross</span>

Public transport in Perth and Kinross is available for two main modes of transport—bus and rail—assisting residents of and visitors to Perth and Kinross, without their own vehicle, to travel around much of the council area's 2,041 square miles (5,290 km2).

References

  1. 1 2 3 4 5 6 7 Ross, David (2014). The Caledonian: Scotland's Imperial Railway: A History. Catrine: Stenlake Publishing Limited. ISBN   978-1840-335842.
  2. 1 2 Carter, E.F. (1959). An Historical Geography of the Railways of the British Isles. London: Cassell.
  3. Marshall, Peter (1998). The Scottish Central Railway: Perth to Stirling. Usk: Oakwood Press. ISBN   0-8536-1522-5.
  4. Lythe, S.G.E. (August 1951). "The Dundee and Newtyle Railway: 1 - Promotion and Management, 1825 - 1846". Railway Magazine.
  5. Lee, Charles E. (October 1951). "The Dundee and Newtyle Railway: 2 - Engineering and Operation". Railway Magazine.
  6. Marshall, Peter (1996). The Railways of Dundee. Headington: The Oakwood Press. ISBN   0-85361-482-2.
  7. Ross, page 46
  8. Ross, page 47
  9. 1 2 Thomas, John; Turnock, David (1989). A Regional History of the Railways of Great Britain. Vol. 15: North of Scotland. Newton Abbot: David & Charles. ISBN   0-946537-03-8.
  10. Bradshaw's Railway Manual, Shareholders' Guide, and Official Directory for 1862. London: W.J. Adams. 1862. p. 254.
  11. Ferguson, Niall (2000). The Arbroath and Forfar Railway: The Dundee Direct Line and the Kirriemuir Branch. Usk: Oakwood Press. ISBN   0-85361-545-4.
  12. 1 2 Cobb, Col. M.H. (2003). The Railways of Great Britain – A Historical Atlas. Shepperton: Ian Allan Publishing Limited. ISBN   07110-3003-0.
  13. 1 2 3 Stansfield, Gordon (2000). Angus and Kincardineshire's Lost Railways. Ochiltree: Stenlake Publishing. ISBN   1-84033-111-9.
  14. Smith, W.A.C.; Anderson, Paul (1997). Tayside's Railways - Dundee and Perth. Clophill: Irwell Press. ISBN   1-871608-73-2.
  15. 1 2 3 Stansfield, Gordon (2001). Perthsire and Kinross-shire's Lost Railways. Catrine: Stenlake Publishing. ISBN   1-84033-153-4.
  16. Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. Sparkford: Patrick & Stephens Ltd. ISBN   1-8526-0049-7.
  17. Nock, O.S. (1958). The Railway Race to the North. Shepperton: Ian Allan.
  18. Thomas, John (1976). Forgotten Railways: Scotland. Newton Abbot: David & Charles. ISBN   0-7153-7185-1.
  19. 1 2 Goode, C.T. (1988). Railways of Strathmore. Hull: C.T. Goode. ISBN   1-870-313-05-4.
  20. Quick, M.E. (2002). Railway Passenger Stations in England Scotland and Wales—A Chronology. The Railway and Canal Historical Society.

Further reading