Scottish North Eastern Railway

Last updated

The Scottish North Eastern Railway was a railway company in Scotland operating a main line from Perth to Aberdeen, with branches to Kirriemuir, Brechin and Montrose. It was created when the Aberdeen Railway amalgamated with the Scottish Midland Junction Railway on 29 July 1856. It did not remain independent for long, for it was itself absorbed by the Caledonian Railway on 10 August 1866.

Contents

Much of its network closed in 1967 when the former North British Railway route to Aberdeen via Dundee became the main route.

Constituents

Early authorisations

System map of the Scottish North Eastern Railway in 1866 Sner1866.gif
System map of the Scottish North Eastern Railway in 1866

There was a frenzy of railway promotions in Scotland in 1845; there had been widespread controversy over a route from central Scotland to England, where a railway network was forming, and the public discussion encouraged thought of Scottish routes too.

On 31 July 1845 the Caledonian Railway was authorised, with the then enormous capital of £1,500,000, to build from Glasgow and Edinburgh to Carlisle. On the same day the Scottish Central Railway, the Dundee and Perth Railway, the Aberdeen Railway and the Scottish Midland Junction Railway were authorised. The SCR was to build from Castlecary (forming a connection with the Caledonian and the already existing Edinburgh and Glasgow Railway) to Perth; the Aberdeen Railway was to build from Guthrie, near Arbroath, to Aberdeen, with branches to Montrose and Brechin; and it was to lease the Arbroath and Forfar Railway, a local stone block sleeper line. The SMJR was to link Perth and Forfar. Together the three railways would connect central Scotland to Perth, Forfar and Aberdeen, and with the Caledonian and its allies they would link to London as well.

Even before authorisation the Caledonian had strategic plans to control these and other, lines, forming a widespread Caledonian area of control in Scotland. As its capital would all be required to build its railway, it was unable to purchase the lines; instead it agreed leases of the other (as yet unauthorised) companies; this required no cash down payment, but a heavy commitment to periodical lease charges later. In due course, the Caledonian was to find that these payments were unaffordable, and it was able to escape them by demonstrating that they were ultra vires, that is, that their company had no powers to make such commitments. Moreover, Parliament was at times hostile to large combinations of lines, and declined to assent to some amalgamations.

Quite apart from this dubious outcome, relations between the companies were not always amicable, and in fact the Scottish Central Railway was robustly independent for some years. However the Aberdeen Railway and the SMJR remained in a "loose association" with the Caledonian. [1] [2]

The Aberdeen Railway

The Aberdeen Railway built its line from a triangular junction near Guthrie and Friockheim, not far from Arbroath, northwards to Aberdeen. It leased the Arbroath and Forfar Railway, on the basis that the A&FR would upgrade its track. It had been built as a stone block sleeper line on the local track gauge of 5 ft 6in (1,676 mm) and the Aberdeen Railway seems not to have fully understood the financial implications of converting this to a modern double track main line on the standard gauge. The A&FR had very little money to pay for the conversion itself. (The A&FR company continued to exist until 1923 as a financial shell only, receiving the lease payment from the lessees.) [3]

The Aberdeen company ran into financial difficulties of its own, running out of cash in 1848 after building from Guthrie to Dubton, with branches to Brechin and Montrose. After appealing for help from larger railways, it decided it did not care for the terms of any offer to help, and issued preference shares to its own shareholders (in modern parlance a rights issue). It managed to build to Ferryhill, a temporary terminus on the southern edge of Aberdeen, opening in 1850. Now the Burgh objected to plans the railway thought had been agreed, to take the line into the city, but after much negotiation the line was extended to a terminus called Guild Street in Aberdeen, opening in 1854. [1]

The Scottish Midland Junction Railway

The SMJR built from Perth to Forfar, then an important medium-sized town, but the objective was to connect with other lines. Running through the fertile area of Strathmore, the SMJR adopted two local moribund lines, the Newtyle and Coupar Angus Railway and the Newtyle and Glammiss Railway. (Glammis is spelt Glamis nowadays.) Both of these were stone block sleeper single lines built to another local track gauge, this time 4 ft 6.5in (1,384 mm). These too needed to be modernised, the gauge altered, and the track made double. The SMJR started its line immediately north of Perth station, where the Scottish Central railway was building what became the joint station Perth General. It ran to Forfar, joining the Arbroath and Forfar line just after Forfar station. [3]

The line opened in 1848. The SMJR built a branch line to Blairgowrie, which opened in 1855. [1]

The Dundee and Arbroath Railway

The Dundee and Arbroath Railway had opened in 1838. Never intended to be part of a wider network, it adopted the track gauge of 5 ft 6in (1,676 mm)[ clarification needed ] and used stone block sleeper track, like the Arbroath and Forfar line. At first there was no physical link with the A&FR, or any other line.

In 1846 the D&AR had obtained powers to build an extension at Arbroath to link with the A&FR, and to convert its own track gauge to standard; this was in use from 1848. There were differences of priority between the SMJR and the D&AR which led to some traffic from Aberdeen to Dundee being routed via Newtyle; this involved a transshipment of goods there (and a change of train for passengers) as the Dundee and Newtyle line still had its unique track gauge, and three rope-worked inclines. [4] [5]

The SNER in action

From 29 July 1856 the SNER operated a railway from Perth to Aberdeen, with branches to Blairgowrie, Brechin and Montrose, as well as the stub to Newtyle, which connected with the Dundee and Newtyle Railway. The antipathy with the D&AR was done away with, and Dundee traffic was now regularly routed via Arbroath.

While the main line between Perth and Aberdeen was the highlight, there was much intermediate traffic at this date, chiefly agricultural.

At Perth the SNER used the General station build and managed by the Scottish Central Railway. The station was increasingly becoming a traffic hub, and by Act of Parliament it was transferred to the control of a Joint Committee, representing all the users. This took effect on 8 August 1859. The approach lines, both north and south of the station, belonged to the SCR, and the SNER was charged the equivalent of six miles running for the use of 320 yards of line on the northern approach. The SNER objected to this and when negotiation failed to produce a result, the SNER established a temporary platform just north of the SCR lines; the station was called Perth, Glasgow Road. SNER trains from the north terminated there and connecting passengers had to make their own way through the streets to the main stations. The dispute lasted a few weeks until an arbitrator allowed the SNER to use the tracks for an annual payment of £100. [2]

In 1862 the SNER purchased the Dundee and Arbroath line. [4]

Connecting to the Great North of Scotland Railway

The Scottish Northern Junction Railway proposed route Bervie rly & snjr.gif
The Scottish Northern Junction Railway proposed route

The Great North of Scotland Railway (GNoSR) had a terminal at Waterloo, in Aberdeen, since 1855 (goods) and 1856 (passengers). This was some distance from the Aberdeen Railway (now SNER) Guild Street station. GNoSR traffic to the south, principally live cattle, was mostly forwarded by coastal shipping and through passengers simply had to walk between the two stations. They were 700 yards (640 m) apart. Both railways had connections to the harbour quayside but locomotive operation was prohibited on the harbour sidings. Although the GNoSR authorising Act had stipulated the construction of a line through the Denburn Valley to link with then former Aberdeen Railway, the GNoSR made it plain that it was content with the status quo, although local people and northern farmers were not.

Scottish Northern Junction Railway Act 1862
Act of Parliament
Royal Coat of Arms of the United Kingdom (variant 1, 1952-2022).svg
Citation 25 & 26 Vict. c. lxxix
Dates
Royal assent 30 June 1862
Text of statute as originally enacted

In 1862 a new company was promoted, the Scottish Northern Junction Railway (SNJR), to by-pass Aberdeen by building a new railway from Limpet Mill, near Stonehaven, to Kintore, on the GNoSR system. The scheme was highly attractive to the SNER as it would bring it much traffic that was denied to it; equally the GNoSR was dismayed at the possibility of losing income diverted away from it. The SNJR was authorised by the Scottish Northern Junction Railway Act 1862 (25 & 26 Vict. c. lxxix), and it was heavily supported by the SNER. It was to cross the Deeside Railway at Peterculter and make two short branches connecting to it there, which would give the line access to Aberdeen in addition.

The SNJR, costing £150,000 would have difficult gradients and curves, and would by-pass Aberdeen, the most important settlement in the area, and it was obvious that a 22-mile (35 km) railway was not the most effective means of connecting the north of Scotland into the railway network, and the GNoSR was successful in inserting a clause into the SNJR Act stipulating that if it obtained authority for a link line in Aberdeen in the next parliamentary session, the SNJR authorisation would be suspended.

At this time Aberdeen was heavily built up, and the GNoSR quickly developed a scheme that would run in a wide loop round the western margin of the city, entering the SNER Guild Street station from the south. Nonetheless it would have required significant demolitions of residential buildings, and, costing £125,000 for less than three miles (5 km) of route, it attracted considerable hostility locally; its circuitous alignment brought it the mocking epithet "Circumbendibus". It was made a Parliamentary Bill, the Great North of Scotland Railway (Aberdeen Junction Railway) Bill in 1863.[ citation needed ]

The Circumbendibus line and the Denburn Valley route Circumbendibus.gif
The Circumbendibus line and the Denburn Valley route

In Parliamentary committee the objections were so significant that the promoters agreed that a previous proposal, the Denburn Valley Railway should be substituted, the capital of the GNoSR scheme and of the SNJR being combined for the purpose, amounting to £200,000. The Denburn Valley line would run directly from Kittybrewster on the GNoSR to a junction with the SNER near Guild Street; a new central Joint Station (to be managed by a Joint Committee) would be built, and the portion of line north and south of the station would be allocated respectively to the GNoSR and the SNER. The Denburn Valley Railway Act was passed in 1864 "to remove the inconvenience arising from the non-construction of the Portion of the Great North of Scotland Railway through the Denburn Valley in Aberdeen which was originally authorised as Part of that Railway". The SNJR powers, and those for the Circumbendibus line, were extinguished.

Although this was the rational solution, the Denburn Valley line was hugely expensive at £200,000, even though only 1.5 miles (2.5 km) long. Much expensive land acquisition, housing demolition, a tunnel, and the new station were all required. [6]

The new line and the Joint station came into use on 4 December 1867, by which time the SNER had been absorbed by the Caledonian Railway. [2]

Methven branch

In 1858 a local railway promoted by local people opened, connecting Methven to Perth; it joined the SMJR main line at Almond Valley Junction, some distance north of Perth, and was worked by the SMJR, and from 1856 by the SNER. The SNER purchased it in 1864. [1]

Alyth branch

Local interests elsewhere promoted a railway connection to Alyth, from Meigle on the former SMJR main line. It opened in 1861 and was worked by the SNER. The SNER absorbed it in 1863. [1]

Sold to the Caledonian Railway

The Scottish North Eastern Railway had been formed by the amalgamation of two smaller companies in 1856. It had long been in a "loose association" with the Caledonian Railway, and on 10 August 1866 it was itself absorbed into the Caledonian. [2]

The Caledonian now controlled lines from Carlisle to Aberdeen. While this appeared to be the outcome it had long desired, it came at a heavy price: Parliament was becoming uncomfortable with the monopoly power of large railway concerns, and granted the North British Railway running powers over much of the northern part of the Caledonian system. The NBR was building its own line from Arbroath to north of Montrose, where it made a junction, ( Kinnaber Junction ), with the Caledonian Railway. In 1878 the NBR bridged the Firth of Tay at Dundee, giving it direct access from Edinburgh and Fife to the north shore of the Firth, and Parliament ordered that the Dundee and Arbroath Railway be transferred to joint ownership: jointly between the Caledonian and the NBR. This took effect from 1 February 1880, and gave the NBR an independent route from Edinburgh to Kinnaber, and running powers from there to Aberdeen. [4]

From 1923

Under the terms of the Railways Act 1921, the main line railways of Great Britain were "grouped"; the Caledonian Railway was a constituent of the new London Midland and Scottish Railway (LMS) and the North British Railway was a constituent of the new London and North Eastern Railway (LNER). For the time being there continued to be two competing routes to Aberdeen from the south.

When the railways were nationalised in 1948 this state of affairs continued and the pattern of passenger and goods trains remained relatively unaffected by the new common ownership. However the decline in usage of the railways, especially local railways in sparsely populated areas, forced consideration of rationalisation, and it was determined that the former NBR route should continue, with the former SNER route closing. This took effect in 1967.

The main route for trains from central Scotland to Aberdeen was therefore via Dundee, Arbroath and Montrose. Thus the Dundee and Arbroath line was still in use; the A&FR line was closed except for a short section at Arbroath from the station to the point of divergence of the NBR and Caledonian lines. The old Aberdeen Railway was retained from Kinnaber Junction to Aberdeen.

The former SMJR line from Perth to Forfar was closed except for the first section to Stanley Junction, where the Inverness line diverged. The entirety of the rest of the SNER system closed (although some local goods connections remained in use for a while).

The heritage section of the Brechin branch is now operated by the Caledonian Railway Brechin Ltd, which started operation in 1993.

The railway network is substantially unchanged from that time; domestic Scottish passenger services are operated by ScotRail. A limited through service from London to Aberdeen and from London to Inverness is operated by London North Eastern Railway. Trains to and from English destinations other than London are operated under the brand name CrossCountry, and night sleeping car trains to and from London are operated by Caledonian Sleeper.

Route maps

Aberdeen Railway
BSicon CONTg.svg
BSicon BHF.svg
Aberdeen
(DVL)
BSicon STR2.svg
BSicon STRc3.svg
BSicon exKBHFa.svg
Aberdeen Guild Street
BSicon STRc1.svg
BSicon xABZg+4.svg
Clayhills Yard
BSicon eHST.svg
Aberdeen Ferryhill
(DVL)
BSicon exSTRc2.svg
BSicon eABZg3.svg
Ferryhill Junction
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon STR.svg
BSicon eHST.svg
Cove Bay
BSicon HST.svg
Portlethen
BSicon eHST.svg
Newtonhill
BSicon eHST.svg
Muchalls
BSicon eHST.svg
Limpet Mill
BSicon HST.svg
Stonehaven
BSicon eHST.svg
Carmont
BSicon eHST.svg
Drumlithie
BSicon eHST.svg
Fordoun
BSicon HST.svg
Laurencekirk
BSicon eHST.svg
Marykirk
BSicon eHST.svg
Craigo
BSicon exSTRc2.svg
BSicon STR2.svg
BSicon exSTR3.svg
BSicon STRc3.svg
Kinnaber Junction
BSicon exSTR+1.svg
BSicon STRc1.svg
BSicon exSTRc4.svg
BSicon CONT4.svg
BSicon exSTR.svg
BSicon exKHSTa.svg
Montrose
(CR)
BSicon exSTR.svg
BSicon exSTRc2.svg
BSicon exSTR.svg
BSicon exCONT3.svg
BSicon exSTR.svg
BSicon exABZg+1.svg
BSicon exSTRc4.svg
Broomfield Junction
BSicon exSTR.svg
BSicon exHST.svg
Broomfield Junction Halt
BSicon exSTR.svg
BSicon exABZg2.svg
BSicon exSTRc3.svg
BSicon exBS2l.svg
BSicon exSTRc1.svg
BSicon exBS2r.svg
BSicon exCONT4.svg
BSicon exHST.svg
Dubton
BSicon KHSTxa.svg
Bridge of Dun
BSicon BS2+l.svg
BSicon eBS2+r.svg
BSicon STR.svg
BSicon exHST.svg
Farnell Road
BSicon STR.svg
BSicon exHST.svg
Glasterlaw
BSicon STR.svg
BSicon exSTR.svg
BSicon exCONTg.svg
BSicon STR.svg
BSicon exABZgl.svg
BSicon exABZgr.svg
Glasterlaw Jn | Friockheim Jn
BSicon STR.svg
BSicon exSTR2.svg
BSicon exSTRc3.svg
BSicon exHST.svg
Friockheim
(A&F)
BSicon STR.svg
BSicon exSTRc1.svg
BSicon exABZg+4.svg
Guthrie Junction
BSicon STR.svg
BSicon exHST.svg
Guthrie
(A&F)
BSicon kSTR2.svg
BSicon exCONTf.svg
BSicon kSTRc1.svg
BSicon exSTR+l.svg
BSicon kSTRl+4.svg
BSicon exkkSTR+4.svg
BSicon KHSTeq.svg
Brechin
BSicon exCONTf.svg
Alyth Railway
Alyth
BSicon exKHSTa.svg
Golf Club Halt
BSicon exHST.svg
Jordanstone
BSicon exHST.svg
Meigle
BSicon exHST.svg
BSicon exSTR2.svg
BSicon exdCONTg@G.svg
BSicon exdSTRc3.svg
Alyth Junction
BSicon exSTRc1.svg
BSicon exlvHST@F-.svg
BSicon exdABZg+4.svg
BSicon exdBS2c2.svg
BSicon exSHI2gr.svg
BSicon exdBS2c1.svg
BSicon lMKRZu.svg
BSicon exSTRl+4h.svg
BSicon exSTR+k2.svg
BSicon exkABZq+3.svg
BSicon exlCONTf@Gq.svg
BSicon exkABZg+1.svg
BSicon exlCONTf@G.svg
Arbroath and Forfar Railway
BSicon CONTg.svg
BSicon HST.svg
Arbroath (new)
BSicon STRc2.svg
BSicon exKHSTa.svg
BSicon STR3.svg
Arbroath Catherine Street
BSicon STR+1.svg
BSicon exABZg+1.svg
BSicon STRc4.svg
St Vigean's Junction
BSicon CONTgq.svg
BSicon xABZgr.svg
BSicon exHST.svg
Colliston
BSicon exHST.svg
Leysmill
BSicon exCONTg.svg
BSicon exSTR.svg
BSicon exHST.svg
BSicon exSTR.svg
Glasterlaw
(AR)
BSicon exABZgl.svg
BSicon exABZgr.svg
Glasterlaw Junction│Friockheim Junction
BSicon exSTR2.svg
BSicon exSTRc3.svg
BSicon exHST.svg
Friockheim
BSicon exSTRc1.svg
BSicon exABZg+4.svg
Guthrie Junction
BSicon exHST.svg
Guthrie
BSicon exHST.svg
Auldbar Road
BSicon exHST.svg
Clocksbriggs
BSicon exSTRc2.svg
BSicon exSTR.svg
BSicon exCONT3.svg
BSicon exABZg+1.svg
BSicon exSTRc4.svg
Forfar East Junction
BSicon exSTRc2.svg
BSicon exABZg3.svg
Forfar North Junction
BSicon exSTR+1.svg
BSicon exSTRc4.svg
BSicon exKHSTe.svg
Forfar Playfield
BSicon exHST.svg
Forfar (new)
BSicon exCONTf.svg
BSicon CONTg.svg
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon STR.svg
BSicon exSTRc1.svg
BSicon eABZg+4.svg
St Vigean's Junction
BSicon eABZgl.svg
BSicon exKBHFeq.svg
Arbroath Catherine Street
BSicon BHF.svg
Arbroath (new)
BSicon eABZg+l.svg
BSicon exKBHFeq.svg
Arbroath Lady Loan
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon eHST.svg
Elliot Junction
BSicon eHST.svg
Easthaven
BSicon HST.svg
Carnoustie
BSicon HST.svg
Golf Street Halt
BSicon HST.svg
Barry Links
BSicon eHST.svg
Buddon
BSicon HST.svg
Monifieth
BSicon HST.svg
Balmossie
BSicon exCONTg@Gq.svg
BSicon xvSTR-STR+ro.svg
BSicon evSHI2g+l-.svg
Barnhill Junction
BSicon eABZgl+l.svg
BSicon exKHSTeq.svg
Broughty Ferry Pier
BSicon HST.svg
Broughty Ferry
BSicon eHST.svg
West Ferry
BSicon eHST.svg
Craigie
BSicon eHST.svg
Stannergate
BSicon eHST.svg
Roodyards
BSicon xABZg2.svg
BSicon STRc3.svg
Camperdown Junction
BSicon STRc1.svg
BSicon exKBHFe.svg
BSicon STR+4.svg
Dundee East
BSicon BHF.svg
Dundee Tay Bridge
BSicon CONTf.svg
to Tay Bridge and associated lines
 
Scottish Midland
Junction Railway
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon exSTRc1.svg
BSicon exSTR+4.svg
BSicon exSTR2+4.svg
BSicon exSTRc3.svg
Forfar North Junction
BSicon exSTRc1.svg
BSicon exSTR.svg
BSicon exCONT4.svg
BSicon exHST.svg
Forfar
BSicon exSTRc2.svg
BSicon exABZg3.svg
Forfar West Junction
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon exSTR.svg
BSicon exHST.svg
Kirriemuir Junction
BSicon exSTRc2.svg
BSicon exABZg3.svg
Kirriemuir Junction
BSicon exlHST.svg
BSicon exCONT1.svg
BSicon exSTRc4.svg
BSicon exSTR.svg
Kirriemuir
BSicon exHST.svg
Glamis
BSicon exHST.svg
Leason Hill
BSicon exHST.svg
Eassie
BSicon exHST.svg
Kirkinch
BSicon exHST.svg
Meigle Junction
BSicon exABZgl.svg
BSicon exCONTfq.svg
Arrow Blue Right 001.svg to Newtyle
BSicon exCONTgq.svg
BSicon exABZg+r.svg
BSicon exHST.svg
Alyth Junction
BSicon exBS2c2.svg
BSicon exSHI2gr.svg
BSicon exBS2c1.svg
BSicon lMKRZu.svg
BSicon exSTRl+4h.svg
BSicon exSTR+k2.svg
BSicon exkABZq+3.svg
BSicon exdCONTfq.svg
BSicon exkABZg+1.svg
BSicon exHST.svg
Washington (Tayside)
BSicon exHST.svg
Ardler
BSicon exHST.svg
Coupar Angus
BSicon exSTRc2.svg
BSicon exABZg3.svg
BSicon exHST+1.svg
BSicon exSTR+c4.svg
Stormont Loch Halt
BSicon exHST.svg
BSicon exSTR.svg
Rosemount Halt
BSicon exKHSTe.svg
BSicon exSTR.svg
Blairgowrie
BSicon exHST.svg
Woodside and Burrelton
BSicon exHST.svg
Cargill
BSicon exHST.svg
Ballathie
BSicon CONT2.svg
BSicon STRc3.svg
BSicon exSTR.svg
BSicon STRc1.svg
BSicon xABZg+4.svg
Stanley Junction
BSicon eHST.svg
Stanley Junction
BSicon eHST.svg
Stanley
BSicon exlHST.svg
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon STR.svg
Bankfoot
BSicon exSTRc1.svg
BSicon eABZg+4.svg
BSicon eHST.svg
Strathord
BSicon eHST.svg
Luncarty
BSicon eHST.svg
Muirton
BSicon exCONT2.svg
BSicon exSTRc3.svg
BSicon STR.svg
BSicon exSTRc1.svg
BSicon eABZg+4.svg
Almond Valley Junction
BSicon STR~L.svg
BSicon STR+l.svg
BSicon STR~R.svg
BSicon dCONTfq.svg
BSicon vBHF.svg
Perth
BSicon SPLe.svg
BSicon CONTf.svg
Perth, Almond Valley
and Methven Railway
BSicon CONTg.svg
BSicon dSTRc2.svg
BSicon ABZg3.svg
BSicon dSTRc2.svg
BSicon lBHF-L.svg
BSicon BHF3+1.svg
BSicon STRc4.svg
BSicon BHF-R.svg
Perth
BSicon dCONT1-.svg
BSicon STRc4.svg
BSicon STR.svg
BSicon dSTRc2.svg
BSicon xABZg3.svg
Almond Valley Junction
BSicon CONT1.svg
BSicon xSTR+c4.svg
BSicon exHST.svg
Ruthven Road
BSicon exHST.svg
Almondbank
BSicon exHST.svg
Tibbermuir
BSicon exHST.svg
Methven Junction
BSicon exKHSTaq.svg
BSicon exABZgr.svg
Methven
BSicon exCONTf.svg

Related Research Articles

<span class="mw-page-title-main">Angus, Scotland</span> Council area of Scotland

Angus is one of the 32 local government council areas of Scotland, a registration county and a lieutenancy area. The council area borders Aberdeenshire, Dundee City and Perth and Kinross. Main industries include agriculture and fishing. Global pharmaceuticals company GSK has a significant presence in Montrose in the east of the county.

<span class="mw-page-title-main">Caledonian Railway</span> British pre-grouping railway company

The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.

<span class="mw-page-title-main">Perth railway station (Scotland)</span> Railway station in Perth, Scotland

Perth railway station is a railway station located in the city of Perth, Scotland, on both the Glasgow to Dundee line and the Highland Main Line. It is managed by ScotRail, who provide almost all of the services.

<span class="mw-page-title-main">Arbroath railway station</span> Railway station in Angus, Scotland

Arbroath railway station serves the town of Arbroath in Angus, Scotland. The station is 17 miles (27 km) east of Dundee on the line between Dundee and Aberdeen, between Carnoustie and Montrose. There are two crossovers at the north end of the station, which can be used to facilitate trains turning back if the line south to Carnoustie is blocked. ScotRail, who manage the station, provide most of the services, along with CrossCountry, London North Eastern Railway and Caledonian Sleeper.

<span class="mw-page-title-main">Montrose railway station</span> Railway station in Angus, Scotland

Montrose railway station serves the town of Montrose in Angus, Scotland. The station overlooks the Montrose Basin and is situated on the Dundee–Aberdeen line, 90 miles (144 km) north of Edinburgh Waverley, between Arbroath and Laurencekirk. There is a crossover at the north end of the station, which can be used to facilitate trains turning back if the line south to Arbroath is blocked.

<span class="mw-page-title-main">Dundee and Newtyle Railway</span>

The Dundee and Newtyle Railway opened in 1831 and was the first railway in the north of Scotland. It was built to carry goods between Dundee and the fertile area known as Strathmore; this involved crossing the Sidlaw Hills, and was accomplished with three rope-worked inclined planes. Newtyle was simply a remote railhead, and the anticipated traffic volumes were not achieved, the inclines incurred heavy operating costs, and the railway never made money.

The Perth, Almond Valley and Methven Railway was a Scottish railway line that connected Methven with Perth. It opened in 1858.

The Scottish Central Railway was formed in 1845 to link Perth and Stirling to Central Scotland, by building a railway line to join the Edinburgh and Glasgow Railway near Castlecary.

<span class="mw-page-title-main">Aberdeen Railway</span> Historical railway line in Scotland linking Aberdeen and Guthrie

The Aberdeen Railway was a Scottish railway company which built a line from Aberdeen to Forfar and Arbroath, partly by leasing and upgrading an existing railway.

The Scottish Midland Junction Railway was authorised in 1845 to build a line from Perth to Forfar. Other companies obtained authorisation in the same year, and together they formed a route from central Scotland to Aberdeen. The SMJR opened its main line on 4 August 1848. Proposals to merge with other railways were rejected by Parliament at first, but in 1856 the SMJR merged with the Aberdeen Railway to form the Scottish North Eastern Railway. The SNER was itself absorbed into the larger Caledonian Railway in 1866. The original SMJR main line was now a small section of a main line from Carlisle and central Scotland to Aberdeen.

<span class="mw-page-title-main">Arbroath and Forfar Railway</span> Early railway in Scotland

The Arbroath and Forfar Railway (A&FR) was a railway that connected Forfar with the port town of Arbroath, in Scotland.

The Dundee and Arbroath Railway was an early railway in Scotland. It opened in 1838, and used the unusual track gauge of 5 ft 6 in (1,676 mm). In 1848 it changed to standard gauge and connected to the emerging Scottish railway network.

The Dundee and Perth Railway was a Scottish railway company. It opened its line in 1847 from Dundee to a temporary station at Barnhill and extended to Perth station in 1849. It hoped to link with other railways to reach Aberdeen and changed its name to the Dundee and Perth and Aberdeen Railway Junction Company, but this early attempt was frustrated, and for some years it failed to make a physical connection with other railways in Dundee.

The Alyth Railway was a short branch railway line built in Strathmore in Scotland, connecting the town of Alyth to the main line network. It opened in 1861. Its junction was remote from any large population centre except Dundee, which was only reached by a primitive line with three rope worked inclines. This was modernised in 1868 and the Alyth branch, now with a good connection to Dundee, became busy. Nonetheless, the population of Alyth declined, and so did usage of the line, and it closed in 1951.

<span class="mw-page-title-main">Montrose and Bervie Railway</span> Former railway line in Scotland

The Montrose and Bervie Railway was a Scottish railway. When the Aberdeen Railway opened in 1850, the coastal settlements north of Montrose were not linked in, and local interests promoted a branch line from Montrose to Bervie. They found it impossible to raise capital at first, but from 1861 the larger railways were promoting new connections around Aberdeen, and the Great North of Scotland Railway (GNoSR) decided that the Bervie line would give it a route to the south.

<span class="mw-page-title-main">North British, Arbroath and Montrose Railway</span> Railway line in Scotland

The North British, Arbroath and Montrose Railway was a company established by Act of Parliament in 1871 to construct and operate a railway line from north of Arbroath via Montrose to Kinnaber Junction, 38 miles (61 km) south of Aberdeen. The company was originally a subsidiary of the North British Railway but was absorbed into its parent in 1880.

The Brechin and Edzell District Railway was a local line in Scotland connecting Edzell, then a developing tourist centre, to the nearby main population centre of Brechin, where there was a branch of the Caledonian Railway. The short line opened in 1896, and it was worked by the Caledonian Railway.

The Forfar and Brechin Railway was promoted as a possible alternative main line to part of the Caledonian Railway route between Perth and Aberdeen. It was opened in 1895, having been sold while incomplete to the Caledonian Railway.

The Dundee and Forfar direct line was a railway line opened by the Caledonian Railway in 1870, connecting the important county town of Forfar with the harbour and manufacturing town of Dundee.

<span class="mw-page-title-main">Montrose railway station (Caledonian Railway)</span> Former railway station in Scotland

Montrose railway station was opened on 1 February 1848 by the Aberdeen Railway as a terminus of a short branch from Dubton Junction. Services initially comprised trains to the junction at Dubton, with some continuing through to Brechin.

References

  1. 1 2 3 4 5 John Thomas and David Turnock, A Regional History of the Railways of Great Britain: Volume 15, North of Scotland, David and Charles, Newton Abbot, 1989, ISBN   0 946537 03 8
  2. 1 2 3 4 David Ross, The Caledonian: Scotland's Imperial Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1840 335842
  3. 1 2 Niall Ferguson, The Arbroath & Forfar Railway, the Dundee Direct Line and the Kirriemuir Branch, Oakwood Press, Usk, 2000, ISBN   978-0-85361-545-3
  4. 1 2 3 Peter Marshall, The Railways of Dundee, Oakwood Press, Headington, 1996, ISBN   0 85361 482 2
  5. W A C Smith and Paul Anderson, An Illustrated History of Tayside's Railway, Dundee and Perth, Irwell Press, Clophill, 1997, ISBN   1 871 608 73 2
  6. R E H Mellor (editor), The Railways of Scotland: Papers of Andrew C O'Dell, University of Aberdeen, 1962, ISBN   0 906265 02 9

Sources