Killin Railway

Last updated

Killin Railway
Bridge over the River Lochay at Killin.jpg
Former railway bridge over the River Lochay at Killin
Overview
Locale Scotland
Dates of operation188331 December 1922
Successor London, Midland and Scottish Railway
Technical
Track gauge 4 ft 8+12 in (1,435 mm)
Killin Railway
BSicon exKHSTa.svg
Loch Tay
BSicon exHST.svg
Killin
BSicon exSTRc2.svg
BSicon exSTR.svg
BSicon exCONT3.svg
BSicon exSTRc2.svg
BSicon exSTR3+1.svg
BSicon exlvHST@F-.svg
BSicon exSTR3.svg
BSicon exSTRc4.svg
Killin Junction
BSicon exCONT1.svg
BSicon exSTRc4.svg

The Killin Railway was a locally promoted railway line built to connect the town of Killin to the Callander and Oban Railway main line nearby. It opened in 1886, and carried tourist traffic for steamers on Loch Tay as well as local business. The directors and the majority of the shareholders were local people, and the little company retained its independence until 1923.

Contents

When the adjacent main line closed in 1965, the Killin line closed too.

History

Planning & local funding

System map of the Killin Railway Killin Rly.gif
System map of the Killin Railway

On 1 June 1870, the Callander and Oban Railway opened the first portion of its line. Shortage of cash meant that the original intention of linking Oban to the railway network was to be deferred for now. The line opened from the former Dunblane, Doune and Callander Railway at Callander to a station named Killin, but it was at Glenoglehead, high above the town and three miles (5 km) distant down a steep and rugged track. [1]

The difficult local terrain prevented any question of the line to Oban passing through Killin, and local people were for the time being happy enough that they had a railway connection of a sort; indeed tourist trade was brought in to the town. The Callander and Oban Railway had in fact been absorbed by the Caledonian Railway but continued to be managed semi-autonomously. The Caledonian was a far larger concern that had money problems, and priorities, elsewhere. Nevertheless, as time went on, extension of the first line to Oban was resumed in stages, and finally completed on 30 June 1880.

The people of Killin petitioned the Callander and Oban company for a branch line, but this was refused, and when the Caledonian Railway itself was persuaded to obtain Parliamentary authority to build the branch, the Bill failed in Parliament.

In frustration, local people decided to build the railway themselves. Gavin Campbell, 1st Marquess of Breadalbane was anxious to develop the area, and under his chairmanship the first meeting of the local railway took place on 19 August 1882, in Killin. Making a branch to join the Callander and Oban at its "Killin" station would involve an impossibly steep gradient, but a line was planned to meet the C&OR further west and at a lower altitude. Even so, the branch would be four miles (6.4 km) long with a gradient of 1 in 50. It could be built for about £18,000. At the Killin end, the line would be extended to a pier on Loch Tay, serving the steamer excursion traffic on the loch. [2] [3]

Construction

Share subscriptions locally were slow to be taken up at first, but with the help of Breadalbane and others, the money was raised, mostly from small traders locally. As no-one was objecting to the line, a Parliamentary hearing for incorporation was unnecessary, only a Board of Trade certificate being required; this was permitted under the Railway Constructional Facilities Act, 1864. The certificate was received on 8 August 1883, and tenders for the construction had already been invited, and received. Authorised capital was £20,785. [4]

One of the tenders, at £13,783, was £3,000 cheaper than the next lowest. The directors had misgivings about the competence of this contractor, MacDonald of Skye, but they accepted the tender.

There were some considerable bridges in the line, to be built as mass-concrete arch structures. MacDonald needed materials for them; his lack of credit at the bank made difficulties for him in obtaining bulk materials, and progress was very slow. By November 1884 MacDonald was in serious difficulties, unable to pay his men and unable to obtain even feed for the horses on the work. The contract was terminated, and re-allocated to John Best of Glasgow. Much time had been lost and the 1885 summer season was now lost.

As the time for actual opening approached, the designation of the stations needed to be decided. A suggestion was Killin Junction, Killin, and Killin Pier. (The Callander and Oban already had a "Killin" on its line). It was then thought that the Loch ought to be referred to, and the pier station was called Loch Tay. [note 1] [5]

On 8 September 1885 Major Marindin, the Board of Trade inspector, was due to assess the line for passenger operation. However a severe snowstorm dislocated the trains and he was unable to be there. The cloud had a silver lining, for the Callander had a considerable amount of coal to deliver in the Killin area, by road cartage, which could not operate. The Killin Railway could at least get the coal to Killin, and could bring farmers' produce out. The contractor's engine was used. Marindin's re-arranged inspection was successful, and the line had an opening ceremony on 13 March 1886. [6] It opened for public passenger operation on 1 April 1886. [7] The Callander and Oban station named Killin was renamed Glenoglehead. [note 2] [1] [2] [3] [5]

Services

Timetable of the Killin Railway from the Oban Times and Argyllshire Advertiser Saturday 12 January 1889 Killin Railway timetable for 1889.png
Timetable of the Killin Railway from the Oban Times and Argyllshire Advertiser Saturday 12 January 1889

Killin Junction had three platform faces, with the Killin Railway on the northern face of an island platform. It was an exchange station only: passengers could not leave the station except by train. The Caledonian Railway worked the line for 55% of gross receipts. The line worked on the one engine in steam principle. There were eight trains each way daily between Killin Junction and Killin, half of them running to Loch Tay station.

Killin station had a single platform and no run-round loop; terminating trains propelled their train on to the gradient, and the engine moved to the goods yard. The coaches then ran back to the platform under the force of gravity, controlled by the guard using the brake, and the engine was coupled at the junction end. The Westinghouse brake was used in normal train operation.

Loch Tay station had a single platform also, but there was a small engine shed there and goods facilities. Loch Tay was intended solely for connections to steamers.

In 1921 the Caledonian Railway acquired the Loch Tay Steamboat Company which owned two steamers on the loch; the company was loss-making, and the Caledonian wished to continue the tourist trade over the Callander and Oban line; the Killin Railway obviously benefitted also. [1]

On 19 October 1922 the Marquis of Breadalbane died. As the local dignitary he had taken a benevolent interest in the success of the Killin Railway, often funding its shortages of money. It had never paid a dividend in twenty years. Breadalbane's trustees were not well disposed to continue the benevolence. [2]

Grouping

The Railways Act 1921 compulsorily organised nearly all the railways of Great Britain into four large groups: the process was called "the grouping" and it was supposed to take effect on 1 January 1923. The C&OR and the Killin Railway were to be "schemed" into the new London Midland and Scottish Railway. In fact the technicalities of finalising the accounts of numerous small concerns caused the detail of the process to overrun. Since Breadalbane's demise there were only two directors of the Killin Railway, both local men unacquainted with national railway politics and they were taken by surprise when the new LMS indicated the terms of the takeover. Fearing no evil, they rejected the terms, which were to pay £1 for every £100 Killin Railway. In addition they would shoulder all the company's considerable debts. Persistence paid off, and the LMS gradually raised its offer, eventually reaching £8, which the Killin Railway accepted. The Killin Railway was now a small branch line on the LMS railway.

The Loch Tay steamers were discontinued in 1939 and the passenger trains stopped running to Loch Tay station; however the goods siding and the engine shed were there, and they continued to be used. In the 1950s a hydro-electric power generating station was built on the Loch, and the railway and its pier were used for bringing in materials for the construction.

Closure

With the decline in the usage of local railways after World War II, the goods service on the branch was discontinued on 7 November 1964.

The C&OR line was to be closed completely on 1 November 1965, and the Killin branch with it. [8] In fact there was a serious rockfall on the C&OR line in Glen Ogle on 27 September 1965, and the line was impassable; clearing the line was unaffordable, [9] and the line never re-opened. The Killin branch closed prematurely on the next day.

Topography

The stations were:

The section between Killin and Loch Tay was closed to passengers on 9 September 1939, and the entire line closed on 28 September 1965.

The short line fell at a continuous gradient of 1 in 50 from Killin Junction to Killin; from there to Loch Tay the line was broadly level. [2]

Current uses

Killin station buildings were demolished shortly after closure, and the site is now occupied by a car park and council premises. Loch Tay station building is now a private house.

The trackbed now forms part of the Rob Roy Way, a cycle path/walk that connects Drymen with Pitlochry. The path incorporates much of the trackbed of the old Callander and Oban Railway.

Notes

  1. Thomas consistently uses the spelling Lochtay, as does Ross. Quick states that the station was opened as Loch Tay Killin Pier, being renamed Loch Tay in 1895. The 1895 Bradshaw's timetable uses Loch Tay.
  2. Quick says Glenoglehead Crossing.

Related Research Articles

<span class="mw-page-title-main">Caledonian Railway</span> British pre-grouping railway company

The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.

The Callander and Oban Railway company was established with the intention of linking the sea port of Oban to the railway network. This involved a long line from Callander through wild and thinly populated terrain, and shortage of money meant that the line was opened in stages from 1866 to 1880.

<span class="mw-page-title-main">Oban railway station</span> Railway station in Argyll and Bute, Scotland

Oban railway station is a railway station serving Oban in Scotland. It is the terminus of one branch of the highly scenic West Highland Line, sited 71 miles 44 chains (115.1 km) from Callander, via Glen Ogle. It was originally the terminus of the Callander and Oban Railway. All services are operated by ScotRail, who also manage the station.

<span class="mw-page-title-main">Falls of Cruachan railway station</span> Scottish railway station

Falls of Cruachan railway station is a railway station located at the foot of Ben Cruachan in Scotland. This station is on the Oban branch of the West Highland Line, originally part of the Callander and Oban Railway. It is sited between Taynuilt and Loch Awe, sited 52 miles 69 chains (85.1 km) from Callander via Glen Ogle. ScotRail manage the station and operate all services.

<span class="mw-page-title-main">Crianlarich railway station</span> Railway station in Stirling, Scotland

Crianlarich railway station is a railway station serving the village of Crianlarich in Scotland. It is located on the West Highland Line, sited 41 miles 25 chains (66.5 km) from Craigendoran Junction, near Helensburgh, with Ardlui to the south, and Tyndrum Lower and Upper Tyndrum to the north west, on the routes to Oban and Mallaig respectively, which diverge immediately north of the station. ScotRail, who manage the station, operate most services.

<span class="mw-page-title-main">Dalmally railway station</span> Railway station in Argyll and Bute, Scotland

Dalmally railway station is a railway station serving the village of Dalmally, near Loch Awe in Scotland. This station is on the Oban branch of the West Highland Line, originally part of the Callander and Oban Railway. It is sited 46 miles 76 chains (75.6 km) from Callander via Glen Ogle, between Tyndrum Lower and Loch Awe. ScotRail manage the station and operate all services.

<span class="mw-page-title-main">Loch Awe railway station</span> Railway station in Argyll and Bute, Scotland

Loch Awe railway station is a railway station serving the village of Lochawe, on the northern bank of Loch Awe, in western Scotland. This station is on the Oban branch of the West Highland Line, originally part of the Callander and Oban Railway. It is sited 49 miles 48 chains (79.8 km) from Callander via Glen Ogle, between Dalmally and Falls of Cruachan. ScotRail manage the station and operate all services.

<span class="mw-page-title-main">West Highland Railway</span> Former railway company in Scotland

The West Highland Railway was a railway company that constructed a railway line from Craigendoran to Fort William and Mallaig. The line was built through remote and difficult terrain in two stages: the section from Craigendoran to Fort William opened in 1894, with a short extension to Banavie on the Caledonian Canal opening in 1895.

<span class="mw-page-title-main">Ballachulish railway station</span> Railway station in Scotland, UK

Ballachulish was a railway station at Ballachulish on the southern shore of Loch Leven at East Laroch in Highland. It was the terminus of the Ballachulish branch line that linked to the main line of the Callander and Oban Railway at Connel Ferry.

<span class="mw-page-title-main">Callander railway station</span> Disused railway station in Scotland

Callander was a railway station located in Callander, in the council area of Stirling, Scotland.

The Lochearnhead, St Fillans and Comrie Railway company was formed to build a line along the valley of Strathearn, closing the gap between the Callander and Oban line of the Caledonian Railway and Crieff. Tourism was on the increase in the area, and there were ambitious ideas that imported goods traffic at Oban would be routed to the eastern Scotland towns and cities over the line.

The Dunblane, Doune and Callander Railway was opened in 1858 to connect Callander and Doune with the Scottish railway network. When promoters wished to make a connection to Oban, Callander was an obvious place to start, and from 1880 Callander was on the main line to Oban. The railway network was reduced in the 1960s and the line closed in 1965. Oban is now served by a different route.

<span class="mw-page-title-main">Invergarry and Fort Augustus Railway</span> Branch-line railway in Scotland

The Invergarry and Fort Augustus Railway was a branch-line railway built in Scotland, connecting the named places with the main line at Spean Bridge. It opened in 1903.

Barcaldine was a railway station located in Barcaldine, Argyll and Bute, near the southern shore of Loch Creran. It was on the Ballachulish branch line that linked Connel Ferry, on the main line of the Callander and Oban Railway, with Ballachulish.

The Caledonian and Dumbartonshire Junction Railway (C&DJR) was a Scottish railway opened in 1850 between Bowling and Balloch via Dumbarton. The company had intended to build to Glasgow but it could not raise the money.

The Glasgow, Dumbarton and Helensburgh Railway was independently sponsored to build along the north of the River Clyde. It opened in 1858, joining with an earlier local line serving Balloch. Both were taken over by the powerful North British Railway in 1865, and for some time the line was the main route in the area. As industry developed other lines were opened to serve it, and the line formed the core of a network in the area.

The Crieff and Comrie Railway was a Scottish railway, opened in 1893, connecting Comrie to the railway network at Crieff. The tourism potential of Loch Earn was an important factor, and the route was later extended westward to Lochearnhead. However the line was never successful, and declined in the twentieth century, particularly due to cheap and frequent bus competition. Four-wheel railbuses were introduced in 1958 to reduce operating costs, but the decline continued and the line closed on 6 July 1964.

The Inverarnan Canal was a short length of canal terminating at Garbal, close to the hamlet of Inverarnan, Scotland. This waterway once linked the old coaching inn, now the Drovers Inn, at Inverarnan, on the Allt Arnan Burn to the River Falloch and passengers could continue southward to Loch Lomond and finally to Balloch. From Inverarnan stagecoaches ran to various destinations in the north of Scotland.

<span class="mw-page-title-main">Banavie Pier railway station</span> Disused railway station in Banavie, Highland

Banavie Pier railway station was the terminus of a short branch and was at first known as Banvie, opened by the North British Railway in 1895. The station's location was just above the impressive flight of locks on the Caledonian Canal known as "Neptune's Staircase", Banavie, Highland council area, Scotland.

<span class="mw-page-title-main">Loch Tay Steamboat Company</span>

The Loch Tay Steamboat Company operated steamer services on Loch Tay Scotland from 1882 to 1921.

References

  1. 1 2 3 David Ross, The Caledonian: Scotland's Imperial Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1840 335842
  2. 1 2 3 4 John Thomas, The Callander and Oban Railway, David & Charles, Newton Abbot, 1966
  3. 1 2 John Thomas and David Turnock, A Regional History of the Railways of Great Britain: Volume 15: North of Scotland, David & Charles (Publishers), Newton Abbot, 1989, ISBN   0 946537 03 8
  4. E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  5. 1 2 3 M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002
  6. "Opening of the Killin Railway" . Glasgow Herald. England. 15 March 1886. Retrieved 24 November 2024 via British Newspaper Archive.
  7. "The Killin Railway" . Bridge of Allan Gazette. England. 3 April 1886. Retrieved 24 November 2024 via British Newspaper Archive.
  8. "British Railways Board. Public Notice. Withdrawal of Railway Passenger Services" . Cumbernauld News. Scotland. 13 August 1965. Retrieved 24 November 2024 via British Newspaper Archive.
  9. "Line will not be repaired" . The Scotsman. Scotland. 20 September 1965. Retrieved 24 November 2024 via British Newspaper Archive.

Sources