Largs Branch

Last updated

Contents

Largs Branch
BSicon CONTg.svg
BSicon HST.svg
Ardrossan South Beach
BSicon STRc2.svg
BSicon ABZg3.svg
Holm Junction
BSicon STR+1.svg
BSicon exSTR+l.svg
BSicon STRc4.svg
BSicon eABZg+r.svg
Parkhouse
Junction
Castlehill
Junction
BSicon STR.svg
BSicon CONTf.svg
BSicon HST.svg
West Kilbride
BSicon dSHI2+l.svg
BSicon dSHI2glr.svg
BSicon dSHI2+r.svg
BSicon dKDSTe.svg
BSicon dSTR.svg
BSicon dKDSTe.svg
Hunterston
High │ Low
(
British
Rail
)
BSicon HST.svg
Fairlie
BSicon TUNNEL1.svg
Fairlie Tunnel
BSicon eABZg2.svg
BSicon exSTRc3.svg
Fairlie Pier Junction
BSicon eSTR+c1.svg
BSicon exKHST4.svg
Fairlie Pier
BSicon KHSTe.svg
Largs

The Largs Branch is a railway line in Scotland, serving communities on the north Ayrshire Coast, as well as the deep water ocean terminal at Hunterston. It branches from the Glasgow to Ayr line at Kilwinning.

The first part was formed when the Ardrossan Railway was built, with the principal objective of facilitating coastwise export of minerals and import of goods to Glasgow, but it was only partly successful. The later Glasgow and South Western Railway extended the line to serve Largs, opening the line throughout in 1885.

There is a half-hourly electric passenger train service a far as Ardrossan, and generally hourly from there to Largs. Heavy mineral trains use the route from Hunterston deep water terminal.

History

Horse drawn trains

System diagram of the Largs branch Largs branch.gif
System diagram of the Largs branch

The twelfth Earl of Eglinton developed Ardrossan Harbour in the early years of the nineteenth century, intending it to be useful for the transport of minerals from Ayrshire by coastal shipping, and as an inwards port to serve Glasgow. He tried to build the Glasgow, Paisley and Ardrossan Canal, but the scheme ran out of money and only reached Johnstone, becoming the Glasgow, Paisley and Johnstone Canal.

He next obtained authorisation in 1827 for the Ardrossan and Johnstone Railway, intending to link his truncated canal by a railway. This too failed to reach its full extent, and was only constructed between Ardrossan and Kilwinning, with an eastward mineral branch to Perceton and Doura collieries, which he controlled. The line was horse-operated and the track consisted of cast iron fishbelly rails on stone blocks; the track gauge was 4 ft 6 in (1,372 mm). It opened in 1831, and passengers as well as minerals were carried, at least between Ardrossan and Kilwinning, and it was called the Ardrossan Railway.

Within a short time, promoters began raising support for a railway between Glasgow and Ayr, and Glasgow and Kilmarnock. This scheme became the Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR); it was authorised in 1837, and opened in stages between 1839 and 1840. It was a locomotive railway on the standard gauge, and it intersected the Ardrossan Railway at Kilwinning.

By now the antiquated technology of the Ardrossan Railway was obviously a problem, and in 1840 the line was altered to standard gauge and the track modernised for locomotive operation. The railway had not so far been separated financially from the canal company, and the opportunity was now taken to do this; additional capital was raised for the upgrading works. [note 1] [1]

The GPK&AR had clear intentions at this stage of forming part of a through route between Glasgow and London, although achieving that was still far off. A rival railway, the Caledonian Railway (CR) now came on the scene with its own plans to reach Carlisle and forming part of the route to London. The CR also considered competing with the GPK&AR in Ayrshire, and the two companies became deadly rivals; the Ardrossan Railway was physically connected to the GPK&AR, but if the CR could build a line to reach it, it would have a secure foothold deep in GPK&AR territory. The Ardrossan company bought shares in the Glasgow, Barrhead and Neilston Direct Railway, and the Caledonian Railway bought shares in the Ardrossan Railway, and in 1846 parliamentary authority was obtained for a line [note 2] connecting the two. But by now the financial bubble, in which all manner of railway schemes were being proposed, had burst, and there was no money for building railways. Moreover, a proposed merger of the Ardrossan with the Caledonian was rejected by the former's shareholders in 1847. [2] [3]

The Glasgow and South Western Railway

The GPK&AR too found its financial resources strained, and an independent ally, the Glasgow, Dumfries and Carlisle Railway took a share of building the line to Carlisle. The two companies completed the task on 28 October 1850 and on that day they merged, forming the Glasgow and South Western Railway (G&SWR). At this time the Ardrossan Railway was operating as a locomotive line; there were four passenger trains each way between Kilwinning and Ardrossan, with stops at Stevenston and Saltcoats stations. [4]

Finding that the Ardrossan Railway, deep in G&SWR territory, was now friendless and penniless, the G&SWR made arrangements to purchase it. This proved a lengthy process, but it was effected on 1 August 1854. [2]

Extending to Largs

The people of Largs had been hoping for a railway connection since the mid-1850s. In 1864 the G&SWR started to plan a line from Dalry to Largs; the Caledonian Railway too was planning a connection, from Wemyss Bay. Opposition was immediately experienced from wealthy residents of Fairlie and elsewhere, who saw the incursion of a railway as detrimental. Another attempt was made by the G&SWR in 1871, also with a frustrating outcome. However, in 1873 a line from Ardrossan (instead of Dalry) to West Kilbride was approved. That section opened to goods trains in March 1878, and passenger trains started operating on 1 May 1878. It made a triangular junction with the existing line at Ardrossan.

The hostility to a railway further north had waned, and the G&SWR was able to open an extension from West Kilbride to Fairlie on 1 June 1880. Onward construction was blocked for the time being by hilly terrain. However, there was a pier used by Clyde steamers, and extension to Fairlie Pier, involving a tunnel section, was opened on 1 July 1882. The station roof was built using materials recovered from the temporary Dunlop Street station in Glasgow. Six passenger trains ran each way daily from St Enoch station in Glasgow to Fairlie Pier.

The extension from Fairlie Pier Junction to Largs was over flatter terrain, but there was a long section at the shore line requiring a sea wall. It opened on 1 June 1885. Ten trains ran to and from Glasgow daily. [2] [5]

Competition on the Firth of Clyde

Ardrossan lines in 1890, after the arrival of the Caledonian Railway Ardrossan lines 1890.gif
Ardrossan lines in 1890, after the arrival of the Caledonian Railway

Some of the early rationale in building the line had been to pre-empt incursion into the area by the rival Caledonian Railway. On 4 September 1888 the Lanarkshire and Ayrshire Railway (L&AR), worked by the Caledonian Railway, opened its line to Ardrossan. At first it used a temporary connection to the G&SWR line there, as its own pier facility was not ready; [6] but on 30 May 1890 it was fully operational, at Montgomerie Pier.

There were then two railway-connected piers in Ardrossan, and the Firth of Clyde steamer services were in competition. The Caledonian Railway and it subsidiary the Caledonian Steam Packet Company were successful in abstracting 75% of the G&SWR trade. [6] Some remarkable accelerations in throughout (rail and steamer) journey times were advertised by both companies, and the G&SWR further responded by planning a shortening of its route to Fairlie to improve passenger journey times, by building a new line from Dalry, but an 1890 Parliamentary Bill was thrown out.

By contrast, Ardrossan Harbour was heavily involved in handling bulk cargo, and the harbour was considerably extended in this period, the new facility opening on 12 April 1891.

In 1891 the G&SWR obtained Parliamentary approval to own and operate its own steamers; previously services had been run in conjunction with independent operators. [2] [6]

A second attempt to get approval for a Dalry-to-Fairlie line was rejected in 1892, and for a few years attention was elsewhere. In 1897 the Caledonian Railway re-opened the issue by purchasing Largs Pier. The G&SWR Largs station was in the centre of the town, not close to the pier, and its railway route from Glasgow was very indirect. The implication was that there would be a revived proposal for the CR to build a shorter line to Largs, and the G&SWR responded with a proposed line from Kilmacolm to Largs via Inverkip, proposed in 1899. The company secured authorisation purchase Largs Harbour, but the new railway was never built.

Competition remained fierce, but by 1910 it became possible to agree a traffic sharing arrangement; the Arran ferry service would be operated by one company at a time, in alternate years; this was agreed in March 1910 between the G&SWR and the Caledonian Steam Packet Company. [2]

Chronology

The Ardrossan Railway was opened from Kilwinning to Ardrossan (as well as the Doura colliery branches) as a horse drawn goods line in 1834; passenger operation probably commenced in 1834. It was closed for regauging and upgrading, and re-opened on 17 August 1840.

A southward connection was made before 1856 from the Doura branch at Byrehill Junction towards Ayr at Dubbs Junction. An extensive iron works was established in the north-east quadrant of the Ayr and Doura lines where they crossed, rail served from both lines.

It was extended by the G&SWR from Ardrossan (Holm Junction) to West Kilbride in March 1878 for goods trains, and on 1 May 1878 for passengers. It made a triangular junction with the existing line at Ardrossan; the apex nearer the Pier was Castlehill Junction and that nearer West Kilbride was Parkhouse Junction. Passenger trains ran to Ardrossan and reversed there to continue to West Kilbride until South Beach station was opened in 1883.

The G&SWR further extended the line from West Kilbride to Fairlie on 1 June 1880, and from there to Fairlie Pier on 1 July 1882; finally the line was extended to Largs on 1 June 1885.

When the L&AR line was opened, at first it used the G&SWR Ardrossan Pier by running to "Ardrossan" (town) station, [note 3] reversing there. [2]

The Doura branch was closed some time between 1938 and 1956.

Topography

Locations in italic were not passenger stations. Stations in bold are open at the present day.

Kilwinning to Largs.

Byrehill Junction to Dubbs Junction.

Ardrossan, Holm Junction, to Ardrossan Pier. The line was shortened back at Ardrossan Pier on 15 June 1987.

Ardrossan, Parkhouse Junction to Castlehill Junction. Closed 30 September 1969.

Fairlie Pier Branch. Line closed to passengers 1 October 1971; part of the line is still in place to allow access to a Ministry of Defence facility in the area. It is referred to as Admiralty Siding but is shown as temporarily out of use currently (2014). [7]

Note: the L&AR station at Ardrossan Harbour was called Ardrossan Pier at first, and then Montgomerie Pier from 1921. It was not used for passenger purposes during World War II. In 1947 a connection was made east of Stevenston enabling through running from Montgomerie Pier to the G&SWR line, and the L&AR line east of that point was closed then. [8] [9]

Electrification

The line was electrified and resignalled in 1986 as part the AyrLine electrification programme. Electric working commenced between Kilwinning and Ardrossan in November 1986, and was extended to Largs in January 1987. [10] The passenger route from a point immediately south of Ardrossan South Beach to Largs was reduced to single track. The former Up Line was retained as a non-electrified "Up Freight Line", serving the facilities at the Hunterston Terminal, which are on both sides of the main line. [7]

The present day

Passenger trains on the route are operated by ScotRail. There is typically an hourly service from Glasgow to Largs and an hourly service from Glasgow to Ardrossan Harbour, phased to give a 30-minute interval service between Kilwinning and South Beach.

The deep water terminal at Hunterston provides a considerable volume of heavy mineral traffic on the line, some of which uses the Byrehill Junction spur to reverse at Barassie en route to English destinations.

Related Research Articles

<span class="mw-page-title-main">Glasgow and South Western Railway</span> British pre-grouping railway company

The Glasgow and South Western Railway (G&SWR) was a railway company in Scotland. It served a triangular area of south-west Scotland between Glasgow, Stranraer and Carlisle. It was formed on 28 October 1850 by the merger of two earlier railways, the Glasgow, Paisley, Kilmarnock and Ayr Railway and the Glasgow, Dumfries and Carlisle Railway. Already established in Ayrshire, it consolidated its position there and extended southwards, eventually reaching Stranraer. Its main business was mineral traffic, especially coal, and passengers, but its more southerly territory was very thinly populated and local traffic, passenger and goods, was limited, while operationally parts of its network were difficult.

<span class="mw-page-title-main">Ayrshire Coast Line</span> Line within the Strathclyde suburban rail network in Scotland

The Ayrshire Coast Line is one of the lines within the Strathclyde suburban rail network in Scotland. It has 26 stations and connects the Ayrshire coast to Glasgow. There are three branches, to Largs, Ardrossan Harbour and Ayr, all running into the high level at Glasgow Central.

<span class="mw-page-title-main">Ardrossan</span> Town and sea port in Scotland

Ardrossan is a town on the North Ayrshire coast in southwestern Scotland. The town has a population of 10,670 and forms part of a conurbation with Saltcoats and Stevenston known as the 'Three Towns'. Ardrossan is located on the east shore of the Firth of Clyde.

<span class="mw-page-title-main">Paisley Gilmour Street railway station</span> Railway station in Renfrewshire, Scotland

Paisley Gilmour Street railway station is the largest of the four stations serving the town of Paisley, Renfrewshire, Scotland, and acts as the town's principal railway station. The station is managed by ScotRail and serves the Ayrshire Coast Line and Inverclyde Line, 7+14 miles (11.7 km) west of Glasgow Central. The station is protected as a category B listed building.

The Glasgow, Dumfries and Carlisle Railway was a railway company in Scotland, which constructed the line from near Cumnock to Gretna Junction, forming the route from Glasgow to Carlisle via Dumfries, in association with other lines. Its promoters hoped it would form the only railway between central Scotland and England, but it lost out to rival companies.

<span class="mw-page-title-main">Kilwinning railway station</span> Railway station in North Ayrshire, Scotland

Kilwinning railway station is a railway station serving the town of Kilwinning, North Ayrshire, Scotland. The station is managed by ScotRail and is on the Ayrshire Coast Line 26 miles (42 km) south of Glasgow Central, as well as the Glasgow South Western Line 69 miles (111 km) north of Stranraer. British Transport Police maintain an office here.

<span class="mw-page-title-main">Stevenston railway station</span> Railway station in North Ayrshire, Scotland

Stevenston railway station is a railway station serving the town of Stevenston, North Ayrshire, Scotland. The station is managed by ScotRail and is owned by Network Rail. It's on the Ayrshire Coast Line, 29 miles (47 km) south west of Glasgow Central.

<span class="mw-page-title-main">Ardrossan South Beach railway station</span> Railway station in North Ayrshire, Scotland

Ardrossan South Beach railway station is one of three in the town of Ardrossan, North Ayrshire, Scotland. The station is managed by ScotRail and is on the Ayrshire Coast Line.

<span class="mw-page-title-main">West Kilbride railway station</span> Railway station in North Ayrshire, Scotland

West Kilbride railway station is a railway station that serves the village of West Kilbride, North Ayrshire, Scotland. The station is managed by ScotRail and is on the Ayrshire Coast Line.

<span class="mw-page-title-main">Fairlie railway station</span> Railway station in North Ayrshire, Scotland

Fairlie railway station serves the village of Fairlie, North Ayrshire, Scotland. The station is managed by ScotRail and is on the Ayrshire Coast Line.

The City of Glasgow Union Railway - City Union Line, also known as the Tron Line, was a railway company founded in Glasgow, Scotland, in 1864 to build a line connecting the railway systems north and south of the River Clyde, and to build a central passenger terminus and a general goods depot for the city. The through line, running from south-west to north-east across the city, opened in 1870–71, and the passenger terminal was St Enoch railway station, opened in 1876. The railway bridge across the Clyde was the first in the city.

The Lanarkshire and Ayrshire Railway (L&AR) was an independent railway company built to provide the Caledonian Railway with a shorter route for mineral traffic from the coalfields of Lanarkshire to Ardrossan Harbour, in Scotland.

The Dalry and North Johnstone Line was a branch of the Glasgow and South Western Railway (G&SWR) in Renfrewshire and Ayrshire, Scotland, connecting the stations in Elderslie and Dalry via a route running parallel to the existing line built by the Glasgow, Paisley, Kilmarnock and Ayr Railway. This provided additional line capacity for Ayrshire Coast and Kilmarnock services. The loop line was used for passenger services until the mid-1960s, when it was closed by the Beeching Axe. The majority of the line's trackbed has since been absorbed into the Sustrans National Cycle Network.

<span class="mw-page-title-main">Glasgow, Paisley, Kilmarnock and Ayr Railway</span> Railway in Scotland

The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) was a railway in Scotland that provided train services between Glasgow, Kilmarnock and Ayr. It opened its first line, between Glasgow and Ayr, in stages from 1839 to 1840. The section between Glasgow and Paisley was made jointly with the Glasgow, Paisley and Greenock Railway. Later it built a line from Dalry via Kilmarnock to Cumnock, linking there with the Glasgow, Dumfries and Carlisle Railway, and together forming a through route from Glasgow to Carlisle. The two companies merged to form the Glasgow and South Western Railway.

The Glasgow, Barrhead and Kilmarnock Joint Railway was a railway jointly owned by the Caledonian Railway and the Glasgow and South Western Railway, completed in 1873, and giving the latter a shorter access to its Carlisle main line. A branch to Beith was also built.

<span class="mw-page-title-main">Ardrossan Railway</span>

The Ardrossan Railway was a railway company in Scotland, whose line was built in the mid-19th century. It primarily ran services between Kilwinning and Ardrossan, as well as freight services to and from collieries between Kilwinning and Perceton. The line was later merged with the Glasgow and South Western Railway, and is today part of the Ayrshire Coast Line.

The Glasgow, Paisley and Greenock Railway (GP&GR) was an early Scottish railway, opened in 1841, providing train services between Greenock and Glasgow. At the time the River Clyde was not accessible to sea-going ships, and the intention was to compete with river boats that brought goods to and from the city. In fact passenger traffic proved surprisingly buoyant, and connecting steamer services to island resorts in the Firth of Clyde provided a very great source of business.

The Ayr and Dalmellington Railway was a railway company in Scotland, which connected the growing ironworks community around Dalmellington with Ayr, in Ayrshire, Scotland. Its route was originally planned by the Ayrshire and Galloway Railway as part of a scheme to link Ayr with Castle Douglas, but lack of funds limited the construction to a very short section connecting the iron and coal pits of the Dalmellington Iron Company with its iron works, opening in 1849.

The Ayr and Maybole Junction Railway (A&MJR) was a railway in Ayrshire, Scotland that provided services between Ayr and Maybole. It opened in 1856 and was seen as a link in providing a through line between Glasgow and Portpatrick, then the ferry port for the north of Ireland.

The Glasgow and South Western Railway operated a number of cross-country lines in Ayrshire.

References

  1. C J A Robertson, The Origins of the Scottish Railway System, 1722 - 1844, John Donald Publishers Ltd, Edinburgh, 1983, ISBN   0-85976-088-X, page 68
  2. 1 2 3 4 5 6 David Ross, The Glasgow and South Western Railway: A History, Stenlake Publishing Limited, Catrine, 2104, ISBN   978 1 84033 648 1
  3. David Ross, The Caledonian—Scotland's Imperial Railway—A History, Stenlake Publishing Ltd, Catrine, 2013, ISBN   978 184 033 5842, pages 56 and 57
  4. Bradshaw's General Steam Navigation and Railway Guide, 3rd mo, (March) 1850, reprinted by Middleton Press, Midhurst, 2012, ISBN   978 1 908174 13 0
  5. Stephenson Locomotive Society, The Glasgow and South Western Railway, 1850 - 1923, 1950
  6. 1 2 3 John Thomas revised J S Paterson, A Regional History of the Railways of Great Britain: Volume 6, Scotland, the Lowlands and the Borders, David and Charles, Newton Abbot, 1984, ISBN   0 946537 12 7
  7. 1 2 Network Rail, Scotland Route Sectional Appendix Module SC4
  8. Col M H Cobb, The Railways of Great Britain -- A Historical Atlas, Ian Allan Publishing Limited, Shepperton, 2003, ISBN   07110 3003 0
  9. M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002
  10. J C Gillham, The Age of the Electric Train, Ian Allan Ltd, London, 1988, ISBN   0 7110 1392 6

Notes

  1. By Act of 23 July 1840.
  2. The Glasgow, Kilmarnock and Ardrossan Railway, capital £750,000.
  3. For many years the stations at Ardrossan were not separately identified.

Sources