Glasgow Central Railway

Last updated

Glasgow Central Railway
Overview
Headquarters Glasgow
LocaleScotland
Dates of operation10 August 188831 May 1889
Successor Caledonian Railway
Technical
Track gauge 1,435 mm (4 ft 8+12 in)
Route map

Contents

BSicon CONTg.svg
BSicon HST.svg
Newton
BSicon xABZgl.svg
BSicon kABZq2.svg
BSicon kSTRc3.svg
BSicon kSTR2+r.svg
BSicon kSTRc3.svg
BSicon exkSTRc2.svg
BSicon exSTR.svg
BSicon exkSTR3+l.svg
BSicon xkKRZq+4o.svg
BSicon kSTR+4.svg
BSicon exSTR+r.svg
Kirkhill Junction
BSicon exkABZg+1.svg
BSicon STR.svg
BSicon CONTf.svg
BSicon WASSERq.svg
BSicon exhKRZWae.svg
BSicon WASSER+r.svg
BSicon STR.svg
BSicon CONTgq.svg
BSicon xABZg+r.svg
BSicon WASSER.svg
BSicon STR.svg
BSicon HST.svg
BSicon WASSER.svg
BSicon STR.svg
Carmyle
(joint with R&CR)
BSicon xABZg2.svg
BSicon WASSER.svg
BSicon STRc3.svg
BSicon HST.svg
Cambuslang
(CJR)
BSicon STRc1.svg
BSicon exSTR.svg
BSicon lMKRZ2+4u.svg
BSicon STR2+4.svg
BSicon WASSER.svg
BSicon STR+c3.svg
River Clyde
BSicon exHST.svg
BSicon WASSER.svg
BSicon STRc1.svg
BSicon ABZg+4.svg
Tollcross
BSicon exHST.svg
BSicon WASSER.svg
BSicon STR.svg
Parkhead Stadium
BSicon exSTR.svg
BSicon WASSER.svg
BSicon vSHI2gl-.svg
Rutherglen Central Junction
BSicon exSTR.svg
BSicon WASSER.svg
BSicon vHST-eHST.svg
Rutherglen
joint with CJR
BSicon exSTR.svg
BSicon WASSER.svg
BSicon STR.svg
BSicon vSTR+2-.svg
BSicon dSTR2.svg
BSicon cdSTRc3.svg
Rutherglen North & West Junctions
BSicon exSTR.svg
BSicon WASSER.svg
BSicon lhSTRa@f.svg
BSicon STR.svg
BSicon cSTRc1.svg
BSicon dCONT4-.svg
BSicon exSTR.svg
BSicon lhSTRc2e.svg
BSicon STRc2.svg
BSicon WASSERl.svg
BSicon MSTR3.svg
BSicon hSTR3.svg
BSicon WASSERq.svg
River Clyde
BSicon exCONTgq.svg
BSicon exKRZu.svg
BSicon ABZ1+fxr.svg
BSicon STRc4.svg
BSicon lhSTRc4e.svg
BSicon exSTR.svg
BSicon HST.svg
Dalmarnock
BSicon exHST-L.svg
BSicon HST-R.svg
Bridgeton
BSicon xKRWg+l.svg
BSicon KRWr.svg
BSicon eHST.svg
Glasgow Green
BSicon eHST.svg
Glasgow Cross
BSicon BHF.svg
Argyle Street
BSicon BHF.svg
Glasgow Central
(Low Level)
BSicon HST.svg
Anderston
BSicon ABZgl.svg
BSicon CONTfq.svg
BSicon HST.svg
Stobcross
BSicon xABZgl.svg
BSicon kSTR2+r.svg
BSicon kSTRc3.svg
BSicon WASSER+l.svg
BSicon exhKRZWae.svg
BSicon dWASSERq.svg
BSicon MFADEf.svg
BSicon kLLSTR+4.svg
BSicon MFADEf.svg
BSicon LWASSER.svg
BSicon exHST.svg
Kelvinbridge
BSicon exHST.svg
Botanic Gardens
BSicon exHST.svg
Kirklee
BSicon exSTR.svg
BSicon MFADEg.svg
BSicon exLSTR.svg
BSicon exkABZg2.svg
BSicon exSTR.svg
Kirklee Junction
BSicon exkSTRc1.svg
BSicon exSTR.svg
BSicon exkSTRl+4.svg
BSicon exSTR+l.svg
BSicon exABZr+r.svg
Bellshaugh Jn│Dawsholme Jn
BSicon MFADEg.svg
BSicon LWASSER.svg
BSicon exSTR.svg
BSicon exSTR.svg
BSicon exKHSTe.svg
Dawsholm
BSicon WASSERl.svg
BSicon exhKRZWae.svg
BSicon exhKRZWae.svg
BSicon dWASSERq.svg
River Kelvin
BSicon exBS2l.svg
BSicon exBS2r.svg
Maryhill Central North Junction
BSicon exHST.svg
Maryhill Central
BSicon exCONTf.svg

The Glasgow Central Railway was a railway line built in Glasgow, Scotland by the Caledonian Railway, running in tunnel east to west through the city centre. It was opened in stages from 1894 and opened up new journey opportunities for passengers and enabled the Caledonian Railway to access docks and industrial locations on the north bank of the River Clyde. An intensive and popular train service was operated, but the long tunnel sections with frequent steam trains were smoky and heartily disliked.

The network paralleled the North British Railway routes in the area, and after nationalisation of the railways the line declined and was closed in stages from 1959 to 1964.

In 1979 the central part of the route was reopened as an electrically operated passenger railway, the Argyle Line; this was greatly popular and enhanced connecting routes to west and east made this a valuable link through the city once more. The Argyle Line section is in heavy use today, but the other parts remain closed.

History

First main lines in Glasgow

System map of the Glasgow Central Railway Glasgow Central Rly.gif
System map of the Glasgow Central Railway

In 1845 the Caledonian Railway was authorised to build its line from Glasgow and Edinburgh to Carlisle. This was a main line railway, with no thought of local travel within the cities. By acquiring interests in other lines, the Caledonian soon had three terminal stations in Glasgow: Buchanan Street, South Side, and Bridge Street. None of these was very convenient to the city centre for passengers, and goods to and from shipping on the River Clyde was carted through the streets.

The Edinburgh and Glasgow Railway (E&GR) terminated at Queen Street, a cramped terminal convenient for the city but with no access to the quays.

The Caledonian set about getting access to the Clyde at Broomielaw by sponsoring the nominally independent General Terminus and Glasgow Harbour Railway which constructed berthing a short distance downstream from Glasgow Bridge on the south side, and built a railway to it from Gushetfaulds (Larkfield Junction). The construction was finished by December 1848 but it connected to the Clydesdale Junction Railway which was only completed the following year. The General Terminus represented considerable progress in bulk handling of minerals, but it was still limited in capacity, as the vessels had to lie alongside the bank, and the improvements to the navigation of the Clyde had not yet been completed. Nonetheless the General Terminus had an effective monopoly of rail-borne export of minerals for many years.

At this period the rapid industrialisation of Glasgow led to an influx of workers into the city centre: Glasgow became "the second city of the British Empire" [1] and the more affluent moved to suburbs: Charing Cross, Hillhead and the Botanic Gardens area. There was still no recognisable suburban railway.

In 1858 the Glasgow, Dumbarton and Helensburgh Railway (GD&HR) opened its line from the E&GR at Cowlairs, on the north-east of Glasgow, looping round to the north and running north of the Clyde to Dumbarton and on to Helensburgh. The circuit round the north of Glasgow was a roundabout route but it succeeded in connecting Dunbartonshire [note 1] into the railway network. The company was absorbed by the E&GR in 1862 and the E&GR was itself absorbed to form the North British Railway in 1865. Accordingly, the Caledonian was losing out to a bitter competitor. [2]

In 1870 the City of Glasgow Union Railway bridged the Clyde and the so-called "bus trains", frequent services with closely spaced stops, were instituted. The City Union Line was a joint scheme between the NBR and the Glasgow and South Western Railway, another competitor. [1]

North Clyde developments

From 1872 the Clyde Trustees undertook an ambitious project to build a large dock at Stobcross, on marshland on the north bank downstream. This became the Queen's Dock, and it opened in 1874. [3]

The North British Railway built a connecting line to it, leaving the GD&HR line at Maryhill and running south and then east. It took a wide circuit to reach Stobcross because of contours and housing development. This was the Stobcross Railway. Traffic started on 20 October 1870, and it formed an important goods artery for NBR. The Caledonian Railway were granted running powers to reach the dock from Sighthill, a long and difficult transit over NBR tracks, and the NBR placed every obstacle in the way of the Caledonian. [1]

Next the NBR sponsored another nominally independent company, the Glasgow, Yoker and Clydebank Railway, which left the GD&HR line near Jordanhill and ran to industrial locations, especially shipyards, on the Clyde. It opened in 1882. Finally the Glasgow City and District Railway was promoted, also by the NBR, to build a through east to west sub-surface line connecting the Coatbridge line and the Dumbarton line. It opened in 1886 and although expensive to construct, it was an immediate success. The North British Railway now had a decent suburban network in Glasgow and on the North bank of the Clyde, and the Caledonian had almost nothing.

The Glasgow Central Railway

The Caledonian clearly had to do something, and an independent engineer, Charles Forman, proposed a solution: a Glasgow Central Railway should be built on an east-west axis, connecting Maryhill in the north west of the city with Dalmarnock, on a short branch from Rutherglen on the main line, in the south east. It would run through the city centre south of the NBR line and have station facilities at the Caledonian's Glasgow Central terminal, as well as giving direct access to Stobcross and the Queen's Dock, still an important dock area. The Caledonian thought this was a good idea, and encouraged the development of the scheme. At this time the line that became the Liverpool Overhead Railway was being designed. The solution of building an urban railway over the streets in the central area seemed attractive and relatively cheap, and on that basis the Glasgow Central Railway obtained parliamentary authorisation on 10 August 1888. [2] [4] [5]

Business interests and public opinion in Glasgow only now realised what was being proposed, and a considerable outcry; so vehement was it that the Caledonian reconsidered, and a further Act was sought and obtained the following year, altering the plan to a sub-surface line like the NBR line. Getting the Act was one thing, but the detailed engineering of a sub-surface railway through the centre of the city, with large buildings that could not be disturbed, was daunting. The Caledonian decided to take the work into its own hands, still employing the engineering firm that conceived the scheme, and the company was absorbed on 31 May 1890. No physical work had started at that time. [2] [5]

Notwithstanding the difficulties, the idea of the line was so attractive that a branch was proposed, running from Bridgeton Cross via Tollcross to Carmyle (on the Caledonian's Rutherglen and Coatbridge line and on to Newton on the main line. This extension, often informally referred to as the Tollcross line, was authorised by Act of Parliament on 25 July 1890. [1] [2]

The first sod was cut on 11 June 1890 by Master J. B. Montgomerie Fleming, son of J. B. Fleming of Kelvinside. [6] Construction was prodigiously difficult: five out of seven miles were underground; and the city authorities were now alerted to the need to demand proper respect for the aesthetics of the city streets, and they paid close attention to the plans and practices of the company. The new Botanic Gardens was of especial architectural interest as a result. The Caledonian issued £950,000 of special stock to fund the construction. [5]

Opening

In the final stages of construction the section from Maryhill to Stobcross opened to mineral traffic (to Queens Dock) on 26 November 1894. [7] (The Lanarkshire and Dumbartonshire opened from Maryhill to Balornock Junction on the same day.) [5] Passenger trains started to run from Rutherglen to Glasgow Cross on 1 November 1895, [8] and the entire line opened to all traffic on 10 August 1896. [9] 130 trains passed through the line each way. Central Station had two island platforms, and four through tracks. The Tollcross section opened throughout on 1 February 1897. [10]

Goods traffic was hugely important at the time, and was considerably simplified: instead of using running powers over the NBR from Sighthill to Stobcross, the trains could now run through the Central line, or alternatively via the Possil line of the L&DR. [2]

Early electrification proposals

Except at the extremities, the line ran through continuous tunnels and was operated by steam trains. (Some locomotives were fitted with condensing equipment.) 130 passenger trains ran each way daily, and heavy mineral traffic to Stobcross used the route. [5] The ventilation and lighting of the subsurface stations were poor, and the environment attracted much criticism. At this time technical development suggested that electric traction might be feasible. The Central London Railway was being constructed on that system (it opened in 1900) and of course street tramcars had been using electricity, not without problems at first.

The Caledonian decided to electrify the line, and electrification of the Glasgow Central Railway, the Tollcross line, and other railways was authorised by Parliament on 2 August 1898. As well as the immaturity of the technology there were some practical problems, chiefly the heavy mineral traffic which would have required an engine change on approaching the line and again at Stobcross. Having secured the powers, the Caledonian did not proceed with the idea, and the powers lapsed. [11]

Connections at the west end

The eastern end of the proposed railway fed into the Caledonian network towards Hamilton, Motherwell and Coatbridge. At the western end, it fed to the Queen's Dock at Stobcross, and to the important suburb at Maryhill, and also to nearby Dawsholm. Dawsholm was almost entirely industrial; for many years there had been an important textile printing works there [12] and a large corporation gasworks had been established there in 1871 and much extended later. [13] Much supplementary industry, including a chemical works, was being established there.

Dawsholm only lasted until 1908 as a passenger station, but it developed in its industrial significance, and the Caledonian built a six-road engine shed there which serviced most of the Central Railway's traction needs. [5]

Concurrently with the construction of the Glasgow Central Railway, the Caledonian was encouraging the promotion and building of the Lanarkshire and Dumbartonshire Railway. (The company used the spelling Dumbartonshire, although later usage for the county adopted a spelling with the letter "n".)

This was to link Balloch and Dumbarton with the north shore of the River Clyde to the Central line. The connection was at Stobcross, and also to a new through station at Maryhill continuing on to Possil and a junction at Balornock on the Caledonian main line from Buchanan Street. The route taken by the L&DR incorporated a large area of newly established heavy industry on North Clydeside and served rapidly developing residential areas.

The Lanarkshire and Dumbartonshire line opened progressively in the years 1894 to 1896, and with the Central line was operated as an integral part of the Caledonian Railway: at last the Caledonian had secured a suburban network in the north and west of Glasgow.

Post-war decline

From the outset, the Central Railway was found to be unattractive for passengers; the smoky atmosphere, and the dirty condition of the station and the trains were constantly commented upon. Street tramcars by contrast were frequent, clean, and had stops close to city destinations that the railway could not always match. The railways were nationalised in 1948, and the duplication of lines for passengers and goods was a disadvantage, now that competition was irrelevant. Some individual stations had already been closed. The line was closed to passengers between Maryhill and Stobcross on 2 November 1959, although goods and mineral traffic continued from the Possil line via Maryhill to the Queen's Dock until 14 August 1960; after that date a service to Kelvinbridge continued until 6 July 1964.

The NBR route to Helensburgh was selected for modernisation, and the route was electrified in 1960, causing a revolution in passenger convenience. This only exaggerated the negative perception of the Central Railway, and on 5 October 1964 the Central Railway network was closed to passenger traffic. The Possil line lost its goods traffic as well, as it simply paralleled the NBR route. A short section serving Tollcross from Carmyle was the only remnant, for goods trains, lasting until 4 April 1966.

Argyle Line

For some years, therefore, the line lay unused. Then in the 1970s the Glasgow political mood shifted in favour of rail transport. The Greater Glasgow Passenger Transport Authority decided to fund reopening of part of the Central Railway, as a passenger link line from a junction near Partick on the NBR electric line to Rutherglen. Financial authority was given in 1974, and on 1 November 1979 the new Argyle Line, as it was named, was opened. Public services started on 5 November 1979. The diverging junction at Partick leading to the Argyle Line was made a grade-separated junction: eastbound trains dived under the NBR line and converged with the westbound line at Stobcross, renamed Finnieston (and later renamed Exhibition Centre.)

A new station was provided at Argyle Street; the platforms are below the centre of the street, and at the time it had not been pedestrianised. Accordingly, the access from the island platform descends to cross under the track, before rising to a street level building at the side of the street.

The Argyle line was a considerable success, and trains ran through from the Hamilton Circle and from Lanark, although the Lanark train was re-diverted to its previous route from Rutherglen to Glasgow Central high level station in 2013. There is a frequency of typically eight trains an hour through the line each way, operated by ScotRail.

Signalling

The signalling in the long and difficult tunnel section was conventional, using the Tyers Lock and Block system, but the signals themselves had no semaphore arms; instead they had a rising spectacle plate that exhibited the usual night time oil lamp colours to drivers. This subjected the Caledonian and its successor railway to criticism, as the smoky tunnel conditions, coupled with commonplace bunker-first running, led to difficulty for drivers. The intensive train service and the occasional failure of the lock and block system seems to have encouraged signalmen to adopt irregular practices to deal with the failures. The purpose of the lock and block system is to prevent signalmen from accepting a train until a preceding train has passed and the signals restored to danger. Collisions resulted from the irregular practice when a train failed in section and signalmen assumed that it had passed unnoticed, and irregularly released the system.

A remarkable innovation with a form of power signalling was installed at Stobcross. The station was in a very cramped site already heavily built up. At the east end, where the line emerged from the tunnel section, there was a sharp curve and a signal box had to be located there: "Stobcross East". At the location where the signal box had to be located to allow the signalman to observe the passage and location of trains, there was inadequate space for a conventional box. The solution adopted was to build a master-and-slave system: a staffed signal box was placed where visibility of trains was convenient, and a dependent box with full interlocking was placed in a convenient space, but where visibility was poor. The latter box was normally unstaffed, and it was operated by hydraulic power from the staffed box, which contained the block instruments.

The innovation was not a success, and in 1909 it was replaced by a conventional signalbox arrangement. [11]

Some of the signals in the tunnel section were disc signals and some semaphore signals at stations between the tunnels had foreshortened arms.

In 1956 modern colour light signalling was installed on the line, controlled from Stobcross and Bridgeton, with track circuit control in between. This enabled the closure of boxes at Dalmarnock, Glasgow Green, Glasgow Cross, Glasgow Central, Anderston Cross and Partick Central No.2. Each signal had an electric detonator placer. [14]

Accidents

The special conditions of intensive working in the tunnel sections made the task difficult. Signalmen and drivers were under pressure to work the heavy train service efficiently, in the most challenging of conditions.

To avoid stopping passenger trains in tunnel sections, a relaxation of the rules was in force permitting the clearance of the home signal (protecting entry to a station area) without bringing the train quite or nearly to a stand. The consequence of this was that drivers rarely encountered any home signal at danger, and some were accustomed to fail to look out for it. Many of the signals were of miniature arm or disc type, and the tunnel signals were oil lamps of inconsistent performance. Bunker-first or tender first running and the smoky tunnel conditions made signal spotting difficult. Out of sequence running and the heavy running of special goods and excursion trains added to the signalmen's load.

A rear-end collision took place near Anderston Cross in 1900. A signalman irregularly used a cancelling key, which negated the controls of the lock-and-block system, and he allowed a second train into the section. [15]

In 1939 a side-swiping collision took place at Stobcross. Two trains had been simultaneously accepted up to the converging junction from the west; this was improper as there was no overlap available. One of the trains overran the home signal which was at danger. [16]

In 1949 a rear-end collision took place at Glasgow Cross; a passenger train driven by an experienced driver ran through several stop signals standing at danger; low standards of attention to signalling equipment maintenance were exposed, and it was clear that drivers were used to running through the line without being able to see many of the signals. [17]

In 1951 a rear-end collision took place at Stobcross; a signalman worked the block instruments irregularly, and there were two wrong-side defects in the lock and block system that enabled this. [18]

In 1952 a rear-end collision took place at Bridgeton Cross; a train stalled in the section and a signalman thought the train had passed and that the Lock-and-Block apparatus had failed; he improperly released the lock and signalled a following train through. [19]

Topography

Original line

For much of its route the line was in a shallow cut-and-cover tunnel, and gradients were imposed by the road levels. Glasgow Central station was in a dip to enable the footbridge between platforms to cross the line, below the main station above.

Location list:

Dawsholm branch

  • Dawsholm; opened 1 October 1896; closed 1 May 1908;
  • Kirklee Junction;

Main line

  • Maryhill; opened 10 August 1896; renamed Maryhill Central 1952; closed 5 October 1964;
  • Kirklee Junction; see above;
  • Kirklee; opened 10 August 1896; closed 1 January 1917; reopened 2 June 1919; closed 1 May 1939;
  • Botanic Gardens; opened 10 August 1896; closed 1 January 1917; reopened 2 June 1919; closed 6 February 1939;
  • Kelvin Bridge; opened 10 August 1896; closed 1 January 1917; reopened 2 June 1919; closed 4 August 1952;
  • Stobcross; opened 1 May 1896; closed 3 August 1959;
  • Anderston Cross; opened 10 August 1896; closed 3 August 1959;
  • Glasgow Central; opened 10 August 1896; closed 5 October 1964;
  • Glasgow Cross; opened 1 November 1895; closed 5 October 1964;
  • Glasgow Green; opened 1 November 1895; closed 1 January 1917; reopened 2 June 1919; closed 2 November 1953;
  • Bridgeton Cross; opened 1 November 1895; closed 5 October 1964;
  • Dalmarnock; opened 1 November 1895; closed 5 October 1964.

Tollcross line

  • Bridgeton Cross; see above;
  • Parkhead; opened 23 November 1870; renamed Parkhead Stadium 1952; closed 5 October 1964;
  • Tollcross; opened 1 February 1897; closed 5 October 1964;
  • Carmyle; station on Rutherglen and Coatbridge line; closed 5 October 1964;
  • Carmyle Junction;
  • Newton; station on main line.

The line continued to Rutherglen using the London Road branch.

1979 line

Images

Related Research Articles

<span class="mw-page-title-main">North Clyde Line</span> Railway line in Glasgow City, Scotland, UK

The North Clyde Line is a suburban railway in West Central Scotland. The route is operated by ScotRail. As a result of the incorporation of the Airdrie–Bathgate rail link and the Edinburgh–Bathgate line, this route has become the fourth rail link between Glasgow and Edinburgh.

<span class="mw-page-title-main">Argyle Line</span> Suburban railway line running East-West through Glasgow

The Argyle Line is a suburban railway located in West Central Scotland. The line serves the commercial and shopping districts of Glasgow's central area, and connects towns from West Dunbartonshire to South Lanarkshire. Named for Glasgow's Argyle Street, the line uses the earlier cut-and-cover tunnel running beneath that thoroughfare.

<span class="mw-page-title-main">Exhibition Centre railway station</span> Railway station in Glasgow, Scotland

Exhibition Centre railway station, previously called Finnieston (1979–1986) and Stobcross (1894–1959) due to its location in the Stobcross area of the city, is a railway station in Glasgow on the Argyle Line. It serves the OVO Hydro, the SEC Centre and the SEC Armadillo which are accessible by adjoining footbridge from an island platform. The station suffers badly from congestion at concerts as most of Greater Glasgow can be reached from the station. There is a siding adjacent to Platform 2, that can be used as a turnback siding for trains terminating at Anderston or Glasgow Central Low Level. The line is served by Class 318s and Class 320s. Ticket gates are in operation.

<span class="mw-page-title-main">Maryhill railway station</span> Railway station in Glasgow, Scotland

Maryhill railway station is a railway station serving the Maryhill area of Glasgow, Scotland. It is located on the Maryhill Line, 4+34 miles (7.6 km) northwest of Glasgow Queen Street, a short distance east of Maryhill Viaduct and Maryhill Park Junction. It has two side platforms. Services are provided by ScotRail on behalf of Strathclyde Partnership for Transport.

<span class="mw-page-title-main">Kelvindale railway station</span> Railway station in Glasgow, Scotland

Kelvindale railway station is a railway station that serves the Kelvindale suburb of Glasgow, Scotland. It was opened on 26 September 2005 by Bill Butler, the then Member of Parliament in the Scottish Parliament and Councillor Alistair Watson. A bronze plaque records the event. The station is 5+12 miles (8.9 km) north of Glasgow Queen Street on the Maryhill Line.

<span class="mw-page-title-main">Carmyle railway station</span> Railway station in Glasgow, Scotland

Carmyle railway station is located in the Carmyle area of Glasgow. It is on the Whifflet Line, 5.5 miles (8.9 km) east of Glasgow Central railway station. Services are provided by ScotRail.

<span class="mw-page-title-main">Bridgeton railway station</span> Railway station in Glasgow, Scotland

Bridgeton railway station serves the Bridgeton district of Glasgow, Scotland and is a station on the Argyle Line, 1+34 miles (2.8 km) south east of Glasgow Central. The station is operated by ScotRail who also provide all train services.

The Glasgow, Yoker and Clydebank Railway was a railway company that opened in 1882, giving a rail connection to shipyards and other industry that developed in what became Clydebank. At first it was a purely local line, connecting only at Stobcross with the North British Railway, but as industry developed in the area it served it became increasingly important.

The Stobcross Railway was a railway line in Glasgow, Scotland, built by the North British Railway to connect from Maryhill to the new dock being built at Stobcross; the dock became the Queen's Dock, opened in 1877. The line was opened first, in 1874, and gave the North British company access to the north bank of the River Clyde; there was a goods depot at Partick.

The Whiteinch Railway was a railway line opened in 1874 in Scotland to connect industrial premises that had developed in the area with the Stobcross Railway, giving access to the main line network. It was opened for goods and mineral traffic, and was extended by the Whiteinch Tramway which fed directly into the factories and works.

The City of Glasgow Union Railway - City Union Line, also known as the Tron Line, was a railway company founded in Glasgow, Scotland, in 1864 to build a line connecting the railway systems north and south of the River Clyde, and to build a central passenger terminus and a general goods depot for the city. The through line, running from south-west to north-east across the city, opened in 1870–71, and the passenger terminal was St Enoch railway station, opened in 1876. The railway bridge across the Clyde was the first in the city.

The Lanarkshire and Dumbartonshire Railway was a railway company in Scotland. It was promoted independently but supported by the Caledonian Railway, and it was designed to connect Balloch and Dumbarton with central Glasgow, linking in heavy industry on the north bank of the River Clyde. From Dumbarton to Balloch the line would have closely duplicated an existing railway, and negotiation led to the latter being made jointly operated, and the L&DR terminated immediately east of Dumbarton, trains continuing on the joint section.

The Glasgow City and District Railway was a sub-surface railway line in Glasgow, Scotland, built to connect suburban routes east and west of the city, and to relieve congestion at the Queen Street terminus.

The Glasgow, Dumbarton and Helensburgh Railway was independently sponsored to build along the north of the River Clyde. It opened in 1858, joining with an earlier local line serving Balloch. Both were taken over by the powerful North British Railway in 1865, and for some time the line was the main route in the area. As industry developed other lines were opened to serve it, and the line formed the core of a network in the area.

The Rutherglen and Coatbridge Railway was a railway line in Scotland built by the Caledonian Railway to shorten the route from the Coatbridge area to Glasgow. It opened in 1865. It was later extended to Airdrie in 1886, competing with the rival North British Railway. Soon after a further extension was built from Airdrie to Calderbank and Newhouse.

<span class="mw-page-title-main">Coatbridge Branch (NBR)</span>

The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.

The Switchback was a railway line in the East End of Glasgow, Scotland, constructed by the Caledonian Railway (CR). Connecting the lines at Rutherglen on the south side of the city with Robroyston on the north side, this route also served a number of industrial sidings and rail yards.

The Kelvin Valley Railway was an independent railway designed to connect Kilsyth, an important mining town in central Scotland, with the railway network. It connected Kilsyth to Kirkintilloch and thence over other railways to the ironworks of Coatbridge, and to Maryhill, connecting onwards to the Queen's Dock at Stobcross.

The Kilsyth and Bonnybridge Railway was a railway line in central Scotland, built to exploit the mineral extractive industries in the area; it opened in 1888. A passenger service was run, but bus competition overwhelmed it after 1920 and the passenger service closed in 1935. The goods and mineral traffic continued, but it was dependent on the industries it served, and when they declined so did the business on the railway; it closed in 1964 and none of it is now in railway use.

The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.

References

  1. 1 2 3 4 Smith, W. A. C.; Anderson, Paul (1993). An Illustrated History of Glasgow's Railways. Caernarfon: Irwell Press. ISBN   1 871608 33 3.
  2. 1 2 3 4 5 John Thomas revised J. S. Paterson, A Regional History of the Railways of Great Britain: Volume 6, Scotland, the Lowlands and the Borders, David and Charles, Newton Abbot, 1984, ISBN   0 946537 12 7
  3. John Riddell, The Clyde, The Fairlie Press, Fairlie, 1988, ISBN   1 871209 00 5
  4. E. F. Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959
  5. 1 2 3 4 5 6 David Ross, The Caledonian: Scotland's Imperial Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1840 335842
  6. "The Glasgow Central Railway. Cutting First Sod" . Glasgow Herald. Scotland. 11 June 1890. Retrieved 4 February 2017 via British Newspaper Archive.
  7. "Opening of New Glasgow Railways" . Dundee Evening Telegraph. Scotland. 24 November 1894. Retrieved 4 February 2017 via British Newspaper Archive.
  8. "Opening Of The Glasgow Central Railway" . Dundee Advertiser. Scotland. 2 November 1895. Retrieved 4 February 2017 via British Newspaper Archive.
  9. "Opening of Glasgow Central Railway" . Falkirk Herald. Scotland. 12 August 1896. Retrieved 4 February 2017 via British Newspaper Archive.
  10. "Public Companies and Stocks" . Dundee Advertiser. Scotland. 6 March 1897. Retrieved 4 February 2017 via British Newspaper Archive.
  11. 1 2 Jim Summers, Signalling the Caledonian, Lightmoor Press, Lydney, 2014, ISBN   978 1899 889 914
  12. Alexander Thomson, Random Notes and Rambling Recollections of Drydock, the Dock, Or Kelvindock, All Now Known by the More Modern Name of Maryhill, 1750-1894, Kerr & Richardson, Maryhill, 1895
  13. Canmore, Glasgow, Skaethorn Road, Dawsholm Gasworks, web page at http://canmore.org.uk/site/44130/glasgow-skaethorn-road-dawsholm-gasworks, the Royal Commission on the Ancient and Historical Monuments of Scotland
  14. Railway Magazine September 1957 pp. 609-612
  15. Board of Trade, Accident Returns: Extract for the Accident at Anderston Cross on 25th August 1900, 1900
  16. Ministry of Transport, Report on the Accident at Stobcross West Junction on 22nd February 1939, Her Majesty's Stationery Office, 1939
  17. Ministry of Transport, Report on the Accident which occurred on 31st January 1949, at Glasgow Cross in the Scottish Region British Railways, Her Majesty's Stationery Office, 1949
  18. Ministry of Transport, Report on the Collision which occurred on 9th June 1951 at Stobcross in the Scottish Region British Railways, Her Majesty's Stationery Office, 1951
  19. Ministry of Transport, Report on the Collision which occurred on 18th August 1952 between Dalmarnock and Bridgeton Cross in the Scottish Region British Railways, 1952, Her Majesty's Stationery Office, 1953

Notes

  1. At the time the common spelling was Dumbartonshire and some railways used that spelling in their titles.

Sources