Kelvin Valley Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Scotland | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1878 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Successor line | North British Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | 1951 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 11+1⁄2 miles (18.5 km) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Kelvin Valley Railway was an independent railway designed to connect Kilsyth, an important mining town in central Scotland, with the railway network. It connected Kilsyth to Kirkintilloch and thence over other railways to the ironworks of Coatbridge, and to Maryhill, connecting onwards to the Queen's Dock at Stobcross.
The line opened in 1878. The hoped-for passenger traffic never developed, but the coal traffic from Kilsyth to the River Clyde was buoyant for many years. Motor bus competition had greatly reduced the passenger use of the line, and it closed to passengers in 1951. The mineral traffic was also declining and, in 1966, the line closed completely. None of it is active for rail purposes now.
Kilsyth had become an important quarrying and mining centre, as well as having a chemical works and coke ovens. Iron ore extraction was largely controlled by James Baird and his company, Baird Brothers of Gartsherrie. The ore was taking on an increasing importance as the best of the ores in the Monklands were being exhausted. [1] [2]
Kilsyth was close to the Forth and Clyde Canal and Bairds had created an extensive mineral tramway system connecting their pits and the canal, [3] but in the railway age, the remoteness of the nearest main line was a serious disadvantage.
Local promoters set about creating a railway to rectify the problem: the destination for the minerals was to be Coatbridge and Maryhill. Coatbridge was the centre of iron smelting, and it was to be reached by connecting to the Campsie Branch of the North British Railway near Birdston; the Campsie branch later became part of the Glasgow to Aberfoyle Line. From the Campsie branch, the routing was to the Monkland and Kirkintilloch Railway. Maryhill gave access to the River Clyde: the Stobcross Railway was being prepared to serve what became the Queen's Dock on the north bank of the Clyde. Onward shipborne transport from there would obviously be possible. The promoters also hoped that high class residences would be built along the line, creating residential travel to business in Glasgow. [4]
In 1873 a prospectus was issued for the Kelvin Valley Railway, and considerable local support was generated. The North British Railway agreed to work the line, but the NBR was not enthusiastic about the prospects for the line, and only acquiesced to keep the rival Caledonian Railway out of the area.
The Kelvin Valley Railway was incorporated by Act of Parliament on 21 July 1873, for a line from Kilsyth to Maryhill and a short spur line to the Campsie branch at Birdston. The authorised capital was £90,000. [5]
The independent company failed to generate the subscriptions necessary to construct the line, particularly in the face of the manifest reluctance of the NBR. Baird Brothers already had an extensive mineral tramway network in the Kilsyth area serving their mines and smelters, and they were no strangers to the use of their power to influence events. They threatened to promote a railway running eastward from Kilsyth to join the Caledonian Railway branch at Denny. The transit for their mineral traffic to Glasgow would have been longer, but from the NBR's point of view the whole of the business would be lost to a competitor.
The NBR now promoted a Kilsyth Railway. This was to run through Strathkelvin from Kilsyth to Birdston, joining the Campsie branch there and giving access to both Coatbridge and Glasgow over their own lines; and the proposal also included an eastward line to reach Falkirk and to join the Caledonian at Bonnybridge; clearly the latter was intended to exclude the Caledonian Railway from further incursion. The Kilsyth Railway was authorised by Act of Parliament on 13 July 1876.
Having secured authority for this entirely tactical railway, the NBR now came to terms with Baird Brothers and the Kelvin Valley promoters, and it was agreed to build the Kelvin Valley line generally as originally planned, only deviating near Kilsyth to adopt the Kilsyth Railway alignment, as this suited Baird Brothers better. This compromise was ratified by Parliament on 17 May 1877, when the Kilsyth Railway was dissolved. The NBR subscribed £30,000 to the Kelvin Valley and agreed to work the line for 50% of gross receipts, provisionally guaranteeing 5.25% on capital. [6] [5] [4] [7]
The North British Railway saw that Kilsyth was the only place on the line of any commercial interest, and it proceeded to build the line through Strathkelvin from Kilsyth to Birdston, giving access to its own network via Kirkintilloch. That section was opened on 1 June 1878. This opened up access for minerals from Kilsyth to the new Queen's Dock on the Clyde, via Lenzie and over the Stobcross Railway, and of course passengers could travel to Glasgow via Lenzie.
It appears that the NBR had become the project manager for the scheme. The NBR put no emphasis on the western section of the line, from Birdston to Maryhill: opening it would in any case abstract revenue from their own lines on which the traffic was flowing. However agitation from the Kelvin Valley company – of course principally the Baird Brothers – motivated it to construct that section; it was open for goods traffic on 4 June 1879. The connection at Maryhill was not made, and the passenger stations and goods facilities at the stations were not ready: the NBR was evidently doing the minimum it was required to do.
At a shareholders' meeting on 25 September 1879, the reason emerged: £66,000 of NBR money had been subscribed to the Kelvin Valley; only £30,000 had been authorised by the shareholders. Moreover, NBR directors had been illegally trading in Kelvin Valley shares, and having made a loss of £1,400, they had been reimbursed out of NBR funds. [6]
The Maryhill connection was made on 1 October 1879, but the passenger service to Kilsyth was still routed through Kirkintilloch, except for a single journey each way between Maryhill and the one-platform halt at Torrance. The Torrance to Birdston section had no passenger service. Once again the KVR directors protested, and the NBR extended the Maryhill to Torrance train to Kilsyth from 29 October 1880. The additional revenue was negligible and the NBR discontinued the extended journey from 31 December 1880. [6] [4]
The KVR was absorbed by the North British Railway on 1 August 1885. [4] [8] The declared cost of constructing the line was £77,308. KVR shareholders were to receive a guaranteed 4% dividend for two years and thereafter 5% in perpetuity. [6]
The NBR opened the Glasgow City and District Railway in 1886, providing a through east-west sub-surface route through Glasgow. This hugely relieved the pressure on the cramped and congested Queen Street terminus, and the NBR was now able to establish a passenger service pattern over the Maryhill line. From 1886, trains generally started at Bridgeton Cross, running through Queen Street Low Level and Maryhill, to Torrance and Kilsyth. The previous passenger service through Lenzie and Kirkintilloch continued as well. However the passenger business on the routes remained very quiet, the residential development never having taken place. Sunday school excursions to the rural beauty spots on the line provided the most animated business.
Bairds internal tramway system connected both to the Kelvin Valley line at Kilsyth and the former Edinburgh and Glasgow Railway main line at Gartshore (a little west of Croy), but the company sent the bulk of its mineral traffic over the Kelvin Valley line to quays on the Clyde, and this proved to be the dominant source of income for the line.
On 2 July 1888 the Kilsyth and Bonnybridge Railway opened, running eastwards from the KVR station at Kilsyth, and connecting to the Caledonian Railway line at Larbert Junction, via Bonnybridge. [4]
The North British Railway became a constituent of the new London and North Eastern Railway (LNER) at the grouping of the railways of Great Britain, following the Railways Act 1921. By this time motor buses and improved roads were abstracting much passenger and goods traffic from the railway.
Nationalisation of the railways followed in 1948, and the line was part of British Railways Scottish Region. A review of heavily loss-making passenger services at this time included the Kelvin Valley line, and closure to passengers followed on 31 March 1951 for the Maryhill to Kilsyth service, and on 4 August 1951 [note 1] for the Kirkintilloch to Kilsyth trains. [9]
The line remained open for goods traffic for the time being. In 1958 driver training on new diesel multiple unit trains took place on the line. [10]
In 1960 an enthusiasts' railtour ran on the line, hauled by the preserved locomotive Glen Douglas, which is now housed in the Riverside Museum in Glasgow. In 1966 freight traffic ceased and the line was closed completely.
The line opened between Birdston Junction and Kilsyth on 1 June 1878, and between Maryhill and Birdston Junction on 1 October 1879.
Locations on the route were:
The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.
The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followed a policy of expanding its geographical area, and competing with the Caledonian Railway in particular. In doing so it committed huge sums of money, and incurred shareholder disapproval that resulted in two chairmen leaving the company.
The Edinburgh and Glasgow Railway was authorised by Act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine, Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847.
The Edinburgh–Bathgate line is a railway line in East Central Scotland. It is also known as the Bathgate branch and was originally operated by the Edinburgh and Bathgate Railway. Except for the short section at the original Bathgate terminus, the main line is still in use, with a frequent passenger train service operated by ScotRail.
The Stobcross Railway was a railway line in Glasgow, Scotland, built by the North British Railway to connect from Maryhill to the new dock being built at Stobcross; the dock became the Queen's Dock, opened in 1877. The line was opened first, in 1874, and gave the North British company access to the north bank of the River Clyde; there was a goods depot at Partick.
The Glasgow Central Railway was a railway line built in Glasgow, Scotland by the Caledonian Railway, running in tunnel east to west through the city centre. It was opened in stages from 1894 and opened up new journey opportunities for passengers and enabled the Caledonian Railway to access docks and industrial locations on the north bank of the River Clyde. An intensive and popular train service was operated, but the long tunnel sections with frequent steam trains were smoky and heartily disliked.
The Lanarkshire and Dumbartonshire Railway was a railway company in Scotland. It was promoted independently but supported by the Caledonian Railway, and it was designed to connect Balloch and Dumbarton with central Glasgow, linking in heavy industry on the north bank of the River Clyde. From Dumbarton to Balloch the line would have closely duplicated an existing railway, and negotiation led to the latter being made jointly operated, and the L&DR terminated immediately east of Dumbarton, trains continuing on the joint section.
The Garnkirk and Glasgow Railway was an early railway built primarily to carry coal to Glasgow and other markets from the Monkland coalfields, shortening the journey and bypassing the monopolistic charges of the Monkland Canal; passenger traffic also developed early in the line's existence.
The Monkland and Kirkintilloch Railway was an early mineral railway running from a colliery at Monklands to the Forth and Clyde Canal at Kirkintilloch, Scotland. It was the first railway to use a rail ferry, the first public railway in Scotland, and the first in Scotland to use locomotive power successfully, and it had a great influence on the successful development of the Lanarkshire iron industry. It opened in 1826.
The Caledonian and Dumbartonshire Junction Railway (C&DJR) was a Scottish railway opened in 1850 between Bowling and Balloch via Dumbarton. The company had intended to build to Glasgow but it could not raise the money.
The Glasgow to Aberfoyle Line was a railway line in Scotland, built in stages, leaving the Edinburgh and Glasgow Railway near Lenzie. Tourist traffic was a dominant part of the motivation for building the line, and road tours to the Trossachs from Aberfoyle formed a significant part of the traffic.
The Monkland Railways was a railway company formed in 1848 by the merger of three "coal railways" that had been built to serve coal and iron pits around Airdrie in Central Scotland, and connect them to canals for onward transport of the minerals. The newly formed company had a network stretching from Kirkintilloch to Causewayend, near Linlithgow. These coal railways had had mixed fortunes; the discovery of blackband ironstone and the development of the iron smelting industry around Coatbridge had led to phenomenal success, but hoped-for mineral discoveries in the moorland around Slamannan had been disappointing. The pioneering nature of the railways left them with a legacy of obsolete track and locomotives, and new, more modern, railways were being built around them.
The Glasgow, Dumbarton and Helensburgh Railway was independently sponsored to build along the north of the River Clyde. It opened in 1858, joining with an earlier local line serving Balloch. Both were taken over by the powerful North British Railway in 1865, and for some time the line was the main route in the area. As industry developed other lines were opened to serve it, and the line formed the core of a network in the area.
The Rutherglen and Coatbridge Railway was a railway line in Scotland built by the Caledonian Railway to shorten the route from the Coatbridge area to Glasgow. It opened in 1865. It was later extended to Airdrie in 1886, competing with the rival North British Railway. Soon after a further extension was built from Airdrie to Calderbank and Newhouse.
The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.
Bonnybridge railway station was a railway station serving the village of Bonnybridge in central Scotland. The station was located on a short branch off the Caledonian Railway line from Coatbridge to Larbert.
The Glasgow, Bothwell, Hamilton and Coatbridge Railway was a railway company in Scotland, built to serve coal and ironstone pits in the Hamilton and Bothwell areas, and convey the mineral to Glasgow and to ironworks in the Coatbridge area. It was allied to the North British Railway, and it opened in 1877. Passenger services followed.
The Kilsyth and Bonnybridge Railway was a railway line in central Scotland, built to exploit the mineral extractive industries in the area; it opened in 1888. A passenger service was run, but bus competition overwhelmed it after 1920 and the passenger service closed in 1935. The goods and mineral traffic continued, but it was dependent on the industries it served, and when they declined so did the business on the railway; it closed in 1964 and none of it is now in railway use.
The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.
The Grangemouth branch railways served Grangemouth docks on the Firth of Forth, Scotland, connecting the docks to the main line railway network. The first line was opened in 1860. The docks and the branch line developed considerably, and a second branch line was opened in 1911. Grangemouth docks was exceptionally busy during World War I, supplying the Grand Fleet.