Inverness and Perth Junction Railway

Last updated

Inverness and Perth Junction Railway
NJ0151 Inverness and Perth Junction Railway.jpg
A stretch of the former trackbed near Muir of Logie, Aberdeenshire
Overview
Locale Scotland
Dates of operation1 June 18631 February 1865
Successor Highland Railway
Technical
Track gauge 1,435 mm (4 ft 8+12 in)
Route map

Contents

BSicon -CONTgq.svg
BSicon exv-STR+lf.svg
BSicon -STRq.svg
BSicon l-HST.svg
BSicon exvSTR+rf-.svg
BSicon -CONTfq.svg
BSicon exlvHST@G-.svg
BSicon exlv-HST@G.svg
BSicon exSPLe.svg
Forres
(triangular station)
BSicon exHST.svg
Rafford
BSicon exHST.svg
Dunphail
BSicon exHST.svg
Dava
BSicon exHST.svg
Castle Grant Platform
BSicon exSTR.svg
BSicon exCONTg.svg
BSicon exHST.svg
BSicon exSTR.svg
Grantown-on-Spey (West)
BSicon exSTR.svg
BSicon exHST.svg
Grantown-on-Spey (East)
BSicon exSTR.svg
BSicon exHST.svg
Ballifurth Farm Halt
BSicon exSTR.svg
BSicon exHST.svg
Nethy Bridge
BSicon KHSTxa.svg
BSicon exSTR.svg
Broomhill
BSicon eKRWg+l.svg
BSicon exKRWr.svg
Boat of Garten Junction
BSicon HST.svg
Boat of Garten
BSicon lCONTf4.svg
BSicon v-STR+4.svg
BSicon dSTR.svg
BSicon dSTR.svg
BSicon edHST.svg
Aviemore (Speyside)
BSicon dBHF-L.svg
BSicon dKBHFxe-R.svg
Aviemore
BSicon xv-SHI2g+r.svg
BSicon eHST.svg
Kincraig
BSicon HST.svg
Kingussie
BSicon HST.svg
Newtonmore
BSicon HST.svg
Dalwhinnie
BSicon GIPl.svg
BSicon eHST.svg
Dalnaspidal
BSicon eHST.svg
Struan
BSicon eHST.svg
Black Island Platform
BSicon HST.svg
Blair Atholl
BSicon eHST.svg
Killiecrankie
BSicon HST.svg
Pitlochry
BSicon exKHSTa.svg
BSicon STR.svg
Aberfeldy
BSicon exHST.svg
BSicon STR.svg
Grandtully
BSicon exHST.svg
BSicon STR.svg
Balnaguard Halt
BSicon exKRWl.svg
BSicon eKRWg+r.svg
Aberfeldy Junction
BSicon eHST.svg
Ballinluig
BSicon eHST.svg
Guay
BSicon eHST.svg
Dalguise
BSicon HST.svg
Dunkeld & Birnam
BSicon CONTf.svg

The Inverness and Perth Junction Railway (I&PJR) was a railway company that built a line providing a more direct route between Inverness and the south for passengers and goods. Up to the time of its opening, the only route was a circuitous way through Aberdeen. The I&PJR was built from a junction with the friendly Inverness and Aberdeen Junction Railway at Forres to the Perth and Dunkeld Railway at Dunkeld.

It opened for traffic in 1863. The northern part of its route crossed wild and sparsely populated terrain, and the high summits on the line were challenging for the locomotives of the day. In 1865 the Company merged with the Inverness and Aberdeen Junction Railway, together forming the Highland Railway.

A short branch to Aberfeldy was built by the company 1865, and this closed in 1965.

Towards the end of the century the Highland Railway came under political pressure from competing railway proposals, and agreed to build a shorter route between Inverness and Aviemore, connecting back to the original line there. This opened in 1898. The original route from Forres to Aviemore closed in 1965, but the direct line from Inverness to Perth continues in operation as the Highland Main Line.

A first railway for Inverness

The Inverness and Perth Junction Railway in 1863 Inv & Perth Jn.png
The Inverness and Perth Junction Railway in 1863

As railway construction gathered pace further south, a railway eventually reached Aberdeen along the east coast in 1850. By this time it was commonly understood that any town needed a railway connection if it was to thrive, and a town that failed to get one was doomed. [1]

Interested parties in Inverness gave thought to getting a railway connection of their own, as they were aware of the commercial and social benefits. However the topographical obstacle of the Monadhliath Mountains obstructed any route running directly southward, and it was obvious that for the time being, such a railway was impracticable. They contented themselves with reaching Aberdeen, which at least would give them a connection to the south, albeit by a considerably roundabout route. [2]

Joseph Mitchell Joseph mitchell.jpg
Joseph Mitchell

Joseph Mitchell was an engineer based in Inverness, and his dynamic approach coupled with that of business interests in the Burgh, encouraged the development of a practical scheme to reach Aberdeen. Even that was a significant challenge, and the first step recommended by Mitchell, was an eastward railway to Nairn along the coast. The Inverness and Nairn Railway got its authorising Act of Parliament on 24 July 1854. The future southward trajectory was clearly indicated: the draft Bill was entitled "The Inverness to Perth Railway Section from Inverness to Nairn (or northern section)". [3] The Nairn line opened on 5 November 1855. [4]

Connecting to Aberdeen

Dalguise Viaduct, built in 1863 Dalguise viaduct (geograph 3418380).jpg
Dalguise Viaduct, built in 1863

Extending from Nairn to Aberdeen was the next step, but this was daunting in its magnitude; an alliance with interests in Aberdeen seemed a possible way forward. After much difficult negotiation, the Great North of Scotland Railway was formed and built a line from Aberdeen to Keith, opening to that place on 10 October 1856. [4] [5] At the western end, the Inverness and Aberdeen Junction Railway (I&AJR) was formed to build from Nairn to Keith; the I&AJR was authorised by Parliament on 21 July 1856; [6] that section opened on 18 August 1858. [6] From that date the I&AJR worked the Inverness and Nairn Railway, but for the time being the latter company retained its independent existence. The I&AJR later absorbed the Inverness and Nairn Railway on 17 May 1861. [7]

Turning south

Although this was useful progress, a more direct southward route was still sought, and the technical development of locomotive power had greatly improved, rendering a route climbing over high passes in the mountains at least feasible. The point at which such a line would strike south had originally been intended to be Nairn, but the commercial value of fishing interests further east on the I&AJR was a significant factor, and the southward starting point was altered to be Forres. A prospectus for the formation of the line was issued in 1860. [8]

The Inverness and Perth Junction Railway was formed by Act of Parliament on 22 July 1861, with share capital of £654,000. [9] The route was to involve two summits at high altitude in crossing the mountains. The line would run to Dunkeld and join the existing Perth and Dunkeld Railway there; the P&DR ran from its "Dunkeld" station (actually in Birnam) to Stanley on the Scottish North Eastern Railway, and running powers into Perth were granted. The 103-mile route from Forres to Aviemore was extremely thinly populated, generating very little intermediate traffic. [10] It had a summit altitude at Druimuachdar of 1,484 feet; the summit at Dava was 1,052 feet above sea level. [11] The Inverness and Aberdeen Junction Railway would work the line. [8]

A view of the Broomhill platform and station buildings looking towards Boat of Garten Broomhill Strathspey.JPG
A view of the Broomhill platform and station buildings looking towards Boat of Garten

Despite the difficult terrain, there were relatively few major engineering works needed, although a large number of ordinary underbridges were required. The construction needed 8 viaducts, 126 bridges over rivers and streams and 119 over roads. [12] Construction was swift, and the line opened in stages: Dunkeld to Pitlochry on 1 June 1863, Forres to Aviemore on 3 August 1863, and the final section from Aviemore to Pitlochry on 9 September 1863. [10] [13]

The train service was four trains each way daily, one of which conveyed goods; the journey time was between 6 hours and 6hrs 50 minutes. [14]

Joseph Mitchell later recorded that the construction of the line had cost £798,111; land acquisition was £70,000 and parliamentary and preliminary engineering expenses amounted to £50,893: a lower cost per mile than comparable lines. He was also critical of the directors of the company for opening the line before everything was ready and before critical staff had been trained, and there was much disruption to operation in the first few days. [14]

Amalgamation to form the Highland Railway

The Inverness and Perth Junction Railway absorbed the Perth and Dunkeld Railway on 28 February 1864 under an Act of 1863, [13] [15] and it amalgamated with the Inverness and Aberdeen Junction Railway on 1 February 1865; and the combined company changed its name to the Highland Railway on 29 June 1865 (by the Highland Railway Act). [16] [15] The I&AJR had already absorbed the Inverness and Ross-shire Railway, by Act of 30 June 1862. [9] [17] [18]

At Perth the Scottish North Eastern Railway used the General station, controlled by the Scottish Central Railway (SCR). As guests of the SNER, the Inverness and Perth Junction Railway trains used the General station too. Clearly the SCR had an effective monopoly, and exploited it fully in their usage charges, which were £10,000 in 1865 increasing annually. The SNER and the I&PJR objected to this, without effect, and at one time the Inverness company considered building an independent line from Murthly to Perth; naturally the SCR objected to this, and the scheme did not proceed. For a short time the SNER established a station, Perth Glasgow Road, and terminated its trains there; passengers had to transfer to the General station for onward travel by walking through the street. Arbitration followed, managed by the Great Western Railway, and a limit of £5,000 in perpetuity, was determined. [19]

Aberfeldy branch

An Act authorised the Strathtay and Breadalbane Railway to build from the Inverness and Perth line at Ballinluig to Aberfeldy; it received the Royal Assent in 1846, [20] in anticipation of an early Inverness and Perth line, but that was not constructed, and the powers were suspended by Act of 10 June 1847. [21]

When the I&PJR was constructed, the I&PJR company itself built a branch line to Aberfeldy, from Ballinluig over much the same course as the earlier powers. There were 41 bridges in the nine mile route, which was the most expensive construction per mile in the eventual Highland system. [22] It was 8+34 miles long, and opened on 3 July 1865. There was an intermediate station at Grandtully. [9] [23] An additional station was opened at Balnaguard on 2 December 1935.

The entire Aberfeldy branch was closed on 3 May 1965. [24]

Double track on the main line

As the end of the nineteenth century approached, train weights on the main line increased considerably with faster, heavier and more frequent passenger trains. The working of banking engines down the gradient after assisting trains up to the summits compounded line capacity difficulties, and it was time to improve matters. The Highland Railway (Additional Powers) Act was passed on 6 August 1897 empowering the company to double the line from Stanley Junction to Aviemore. At Aviemore the new direct line to Inverness (see below) was already under construction. New capital to the amount of £750,000 was part of the authorisation, although much of this was probably allocated to the constriction of the direct line. [25]

By 2 July 1900 doubling had been completed from Blair Atholl to the crossing loop at Dalnacardoch, and was through to Dalnaspidal by 13 May 1901. In the meantime, it had been decided to carry the double track as far as the County March crossing loop, and this was reached on 10 June 1901. The section from County March to Dalwhinnie was completed by 17 May 1910. "County March" had been a crossing place, and the name was now replaced by Druimuachdar Summit. Although the Parliamentary powers were extended in 1905 and again in 1915, no more doubling of the existing route was carried out. [25]

Inverness and Aviemore Direct Railway

In time, the eastward sweep from Inverness to Aviemore was seen to be an unnecessary complication, particularly as increasing traffic volumes came from the Dingwall section. Moreover, the Great North of Scotland Railway was known to be planning a new line from Elgin, Moray to Inverness, and the West Highland Railway was planning an approach up the Great Glen from Fort William. Parliament was expected to be sympathetic to those proposals if the Highland Railway was not improving its line for the benefit of its own customers.

In 1883 therefore steps were taken to build a shorter and more direct route from Inverness to Aviemore, the Inverness and Aviemore Direct Railway, informally known as the Carr Bridge route, in distinction to the designation of the original course as the Dava route. This was authorised on 28 July 1884. [26] The spelling Carr Bridge was used at first, generally superseded by Carrbridge after a short time. [25]

In any event, for the Highland Railway this was the most important development of the decade. The cut-off was 34+12 miles of new line between Aviemore and Inverness. The Highland Railway did not hasten to construct the authorised line, and eventually four extensions of time to complete the line were granted - two before and two during construction. [25]

The Direct Line was opened in stages: from Aviemore to Carr Bridge on 6 July 1892; from Carr Bridge to Daviot on 8 July 1897; and finally from Daviot to Inverness (Millburn Junction) on 1 November 1898. [27] The Direct Line had a new summit, at Slochd, 1,315 feet. [11]

Operational issues

The steep gradients on the line, both via Dava and via Carrbridge, required extensive double-heading of trains. The Highland Railway constructed a number of 0-6-4T locomotives for banking goods trains. In 1909, the North British Locomotive Company built four powerful 0-6-4 tank engines to the design of Peter Drummond, for use as banking engines. Four more were delivered in 1911. These were the HR's largest tank engines and worked mostly between Blair Atholl and Dalnaspidal on banking duties, and on local services between Blair Atholl and Perth. They were withdrawn between 1932 and the end of 1936. [28]

Until 1907 all goods trains on the line had an additional brake van in the middle of the train to ensure sufficient brake power on the downhill sections. Two dozen sprags were kept, spaced at intervals, beside the line near Slochd summit in case of emergencies. [29]

Closure of the Dava section

The Carrbridge route did not abstract all the through traffic from the Dava route, and many through trains continued to use it. However in time it became apparent that the retention of two lengthy mountain routes was unsustainable, and steps were taken to close the Dava route. It was closed on 18 October 1965, together with numerous intermediate stations on the remainder of the route. The original Inverness and Perth Junction Railway route between Aviemore and Stanley Junction continued to carry trains on the Inverness main line, which of course used the Carrbridge route north of Aviemore.

A goods service to Dallas Dhu distillery was continued to Forres East until 21 May 1967, and that short section of line was officially closed on 30 June 1967. Forres West curve was retained until 15 August 1966. The line from Aviemore to Boat of Garten continued in use for goods traffic until 16 June 1969. [24]

Strathspey Railway

Following closure of the section north of Aviemore, a heritage line called the Strathspey Railway has reopened the line north from Aviemore to Boat of Garten, and on the original Strathspey Railway to Broomhill, a distance of about ten miles.

Locations

Aberfeldy branch

Current operations

The part of the line between Aviemore and Stanley Junction continues in use in 2022, as part of the Highland Main Line; passenger services are operated by ScotRail. The Strathspey Railway heritage line operates between Aviemore and Broomhill.

Further reading

Claud Hamilton Ellis wrote a detailed description of the Dava route in the Railway Magazine, January 1934. It is entitled Inverness via Dava and is illustrated with numerous photographs taken by Hamilton Ellis.

O S Nock wrote a description of the line concentrating on operational and locomotive matters, entitled The Highland Main Line. It appeared in two parts in the Railway Magazine in January 1939 and April 1939.

Notes

    Related Research Articles

    <span class="mw-page-title-main">Highland Railway</span> Former British railway company

    The Highland Railway (HR) was one of the smaller British railways before the Railways Act 1921, operating north of Perth railway station in Scotland and serving the farthest north of Britain. Based in Inverness, the company was formed by merger in 1865, absorbing over 249 miles (401 km) of line. It continued to expand, reaching Wick and Thurso in the north and Kyle of Lochalsh in the west, eventually serving the counties of Caithness, Sutherland, Ross & Cromarty, Inverness, Perth, Nairn, Moray and Banff. Southward it connected with the Caledonian Railway at Stanley Junction, north of Perth, and eastward with the Great North of Scotland Railway at Boat of Garten, Elgin, Keith and Portessie.

    <span class="mw-page-title-main">Great North of Scotland Railway</span> Former Scottish railway company

    The Great North of Scotland Railway (GNSR) was one of the two smallest of the five major Scottish railway companies prior to the 1923 Grouping, operating in the north-east of the country. Formed in 1845, it carried its first passengers the 39 miles (63 km) from Kittybrewster, in Aberdeen, to Huntly on 20 September 1854. By 1867 it owned 226+14 route miles (364.1 km) of line and operated over a further 61 miles (98 km).

    <span class="mw-page-title-main">Highland Main Line</span> Railway line in Scotland

    The Highland Main Line is a railway line in Scotland. It is 118 mi (190 km) long and runs through the central Scottish Highlands, mainly following the route of the A9, and linking a series of small towns and villages with Perth at one end and Inverness at the other. Today, services between Inverness and Edinburgh, Glasgow and London use the line. At Inverness the line connects with the Far North Line, the Aberdeen-Inverness Line and the Kyle of Lochalsh Line. All trains are diesel-powered.

    <span class="mw-page-title-main">Aviemore railway station</span> Railway station in Highland, Scotland

    Aviemore railway station serves the town and tourist resort of Aviemore in the Highlands of Scotland. The station, which is owned by Network Rail (NR) and managed by ScotRail, is on the Highland Main Line, 83 miles 31 chains from Perth, between Kingussie and Carrbridge, and is also the southern terminus of the Strathspey preserved railway.

    <span class="mw-page-title-main">Nairn railway station</span> Railway station in the Highlands of Scotland

    Nairn railway station is a railway station serving the town of Nairn in Scotland. The station is managed and served by ScotRail and is on the Aberdeen to Inverness Line, between Forres and Inverness Airport, measured 128 miles 72 chains (207.4 km) from Perth via the former Dava route. It is a category B listed building.

    <span class="mw-page-title-main">Forres railway station</span> Railway station in Moray, Scotland

    Forres railway station serves the town of Forres, Moray in Scotland. The station is managed and served by ScotRail and is on the Aberdeen–Inverness line, between Nairn and Elgin, measured 119 miles 42 chains (192.4 km) from Perth via the Dava route.

    <span class="mw-page-title-main">Dunkeld & Birnam railway station</span> Railway station in Perth and Kinross, Scotland

    Dunkeld & Birnam railway station serves the town of Dunkeld and village of Birnam in Perth and Kinross, Scotland. It is located on the Highland Main Line, 15 miles 31 chains (24.8 km) north of Perth and is the first stop on the line north of there, before Pitlochry. Most services are operated by ScotRail, who also manage the station. LNER and Caledonian Sleeper also call some services here.

    <span class="mw-page-title-main">Inverness and Nairn Railway</span> Scottish railway line

    The Inverness and Nairn Railway was a railway company that operated between the burghs in the company name. It opened its line in 1855 and its passenger business was instantly successful. At first it was not connected to any other line. However it was seen as a first step towards connecting Inverness and Central Scotland, via Aberdeen and when feasible, directly southwards.

    Dalcross was a railway station located at Dalcross, to the east of Inverness, Scotland. It opened in 1855 and closed in 1965. A new station in Dalcross was opened on 2 February 2023.

    The Inverness and Ross-shire Railway was a Scottish railway company formed in 1860 to build a line from Inverness to Invergordon. It opened in 1862 as far as Dingwall and in 1863 to Invergordon. It was extended to a Bonar Bridge station in 1864. It provided the basis for later extensions that eventually reached Thurso, forming the Far North Line. The Dingwall and Skye Railway branched off at Dingwall to reach the Kyle of Lochalsh.

    The Inverness and Aviemore Direct Railway was a section of railway built by the Highland Railway to provide a shorter and more direct route between Inverness and Aviemore, carrying its main line traffic to Perth and the south.

    The Perth and Dunkeld Railway was a Scottish railway company. It was built from a junction with the Scottish Midland Junction Railway at Stanley, north of Perth, to a terminus at Birnam, on the south bank of the River Tay opposite Dunkeld.

    The Inverness and Aberdeen Junction Railway (I&AJR) was a railway company in Scotland, created to connect other railways and complete the route between Inverness and Aberdeen. The Inverness and Nairn Railway had opened to the public on 7 November 1855 and the Great North of Scotland Railway (GNoSR) was building from Aberdeen to Keith. The I&AJR opened, closing the gap, on 18 August 1856.

    The Strathspey Railway was a railway company in Scotland that ran from Dufftown to Boat of Garten. It was proposed locally but supported by the larger Great North of Scotland Railway (GNoSR), which wanted to use it as an outlet towards Perth. The GNoSR had to provide much of the funding, and the value of traffic proved to be illusory. The line opened in 1863 to Abernethy, but for the time being was unable to make the desired connection to the southward main line. Although later some through goods traffic developed, the route never achieved its intended purpose.

    The Keith and Dufftown Railway was a railway company in Scotland. Its line ran between Dufftown and Keith on the main line between Inverness and Aberdeen. The company was formed in 1857, but it struggled to attract investors and for some years was unable to proceed with construction.

    The Buckie and Portessie Branch was a railway branch line in Scotland, built by the Highland Railway to serve an important fishing harbour at Buckie, in Banffshire. It connected with the rival Great North of Scotland Railway at Portessie.

    Rafford railway station at Rafford was opened with the Inverness and Perth Junction Railway in 1863.

    <span class="mw-page-title-main">Broomhill railway station</span>

    Broomhill railway station or Broomhill for Nethy Bridge railway station is a reconstructed railway station on the former Highland Railway main line which was originally built to serve the small villages of Nethy Bridge and Dulnain Bridge in Strathspey. It is at present the eastern terminus of the Strathspey Steam Railway.

    <span class="mw-page-title-main">Dava Way</span> Trail in Moray, Scotland, UK

    The Dava Way is a 38 km (24 mi) long-distance path that mostly follows the route of the former Highland Railway between Grantown and Forres. The railway line, built as a route between Inverness and Perth, opened in 1863 and closed in 1965. The route was reopened as a long distance path in 2005. It is listed as one of Scotland's Great Trails by NatureScot, and links directly to two further Great Trails: the Moray Coast Trail and the Speyside Way. It is currently the shortest of the Great Trails, but can be combined with sections of the Moray Coast Trail and Speyside Way to form a 153 km (95 mi) circular route known as the Moray Way. About 5,000 people use the path every year, of whom about 400 complete the entire route.

    References

    1. John Thomas and David Turnock, A Regional History of the Railways of Great Britain: Volume 15, North of Scotland, David and Charles, Newton Abbot, 1989, ISBN 0 946537 03 8, page 314
    2. Thomas and Turnock, pages 217 and 218
    3. Thomas and Turnock, page 222
    4. 1 2 Thomas and Turnock, pages 315 and 316
    5. H E Vallance et al, The Highland Railway, David & Charles, Newton Abbot, 1938, extended edition 1985, ISBN 0-946537-24-0, pages 15 and 16
    6. 1 2 Thomas and Turnock, page 169
    7. Vallance et al, page 19
    8. 1 2 Neil T Sinclair, The Highland Main Line, Atlantic Publishers, Penryn, 1998, ISBN 0 906899 96 6, page 22
    9. 1 2 3 E F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, pages 329 and 330
    10. 1 2 Vallance et al, pages 24 and 25
    11. 1 2 Vallance et al, page 197
    12. Thomas and Turnock, page 234
    13. 1 2 Carter, page 260
    14. 1 2 Sinclair, page 26 to 28
    15. 1 2 Vallance et al, pages 28 and 29
    16. Ross, page 44
    17. Carter, page 318
    18. Vallance et al, page 32
    19. Thomas and Turnock, page 115
    20. Carter, page 147
    21. Carter, page 597
    22. Sinclair, page 30
    23. Thomas and Turnock, page 125
    24. 1 2 Vallance et al, page 188
    25. 1 2 3 4 Ross, pages 103 and 104
    26. Vallance et al, page 175
    27. Thomas and Turnock, page 317
    28. Ross, page 155
    29. D L G Hunter, The Highland Railway in Retrospect, Moorfoot Publishing, Edinburgh, 1988, ISBN 0 906606 14 4, page 12
    30. 1 2 M E Quick, Railway Passenger Stations in England, Wales and Scotland: A Chronology, version 5.03, September 2021, Railway and Canal Historical Society, electronic download, alphabetically laid out