Slamannan Railway

Last updated

Contents

Slamannan Railway
BSicon CONTg.svg
BSicon exSTRc2.svg
BSicon eABZg3.svg
Bo'ness Low Junction
BSicon exSTR+1.svg
BSicon HUB2.svg
BSicon exSTRc4.svg
BSicon eKHSTxe.svg
BSicon HUBc3.svg
Manuel
BSicon dCONTgq.svg
BSicon eABZq+l.svg
BSicon eABZqr.svg
BSicon HUBc1.svg
BSicon xKRZu.svg
BSicon HUB4.svg
BSicon eHSTq.svg
BSicon dCONTfq.svg
BSicon exSTR2.svg
BSicon exSTRc3.svg
BSicon exHST.svg
Causewayend
BSicon exKDSTaq.svg
BSicon exdSTRc1.svg
BSicon exdSTRq.svg
BSicon exABZ2+4r.svg
BSicon exSTR+c3.svg
Sheildhall Branch Jn
BSicon exSTRc1.svg
BSicon exABZg+4.svg
Causewayend Jn
BSicon exHST.svg
Bowhouse
BSicon exSTRc2.svg
BSicon exABZg3.svg
Standburn Branch Jn
BSicon exKDST1.svg
BSicon exSTR+c4.svg
Roughrigg Colliery
BSicon exABZg+l.svg
BSicon exCONTfq.svg
Arrow Blue Right 001.svg
Bathgate
Branch
(MR)
BSicon exBS2+l.svg
BSicon exBS2c4.svg
Bathgate
Branch
(MR)
BSicon exSTR.svg
BSicon CONTg.svg
BSicon exSTR.svg
BSicon eHST.svg
Bathgate (Upper)
BSicon exSTR.svg
BSicon exSTR+l.svg
BSicon eABZgr+r.svg
BSicon exSTR.svg
BSicon exHST.svg
BSicon STR.svg
Bathgate (Lower)
BSicon exSTR.svg
BSicon exSTR.svg
BSicon CONTf.svg
BSicon exSTR.svg
BSicon exABZg+l.svg
BSicon exKDSTeq.svg
Coulston Branch
BSicon exSTR.svg
BSicon exHST.svg
Westfield
BSicon exBS2l.svg
BSicon exBS2r.svg
BSicon exHST.svg
Blackston Junction
BSicon exHST.svg
Avonbridge
BSicon exKDSTaq.svg
BSicon exdSTRq.svg
BSicon exABZgr.svg
Jawcraig Branch
BSicon exHST.svg
Glenellrig
BSicon exHST.svg
Slamannan
BSicon exSTRc2.svg
BSicon exABZg3.svg
Slamannan Junction
BSicon exCONT1.svg
BSicon exSTR+c4.svg
BSicon exHST.svg
Longriggend
BSicon exHST.svg
Arden
BSicon exHST.svg
Whiterigg
BSicon exSTR+c2.svg
BSicon exCONT3.svg
BSicon exSTRc2.svg
BSicon exABZ3+1g.svg
BSicon exSTRc4.svg
Dykehead Junction
BSicon exSTRc2.svg
BSicon exHST3+1.svg
BSicon exSTRc4.svg
Arbuckle
BSicon exdCONT1-.svg
BSicon exSTRc4.svg

The Slamannan Railway was an early mineral railway between the north-eastern margin of Airdrie and Causewayend on the Union Canal, near Linlithgow, Scotland.

The Slamannan Railway was built to give access for minerals from pits in the Slamannan area to market in Glasgow (over connecting railways) and Edinburgh (over the Union Canal), and it also briefly provided an early passenger connection between Glasgow and Edinburgh in association with other railways and the canal. It had a rope-worked incline at Causewayend.

The line opened on 31 August 1840. It crossed very thinly populated moorland, and it was dependent on promised mineral extraction on its own route, but this proved disappointing, and traffic was limited by the extended route over other railways westward, and transshipment to the canal eastward. It was never successful commercially, and in 1848 it combined with other companies, forming the Monkland Railways.

None of the route is still in use, and much of it near Airdrie has been obliterated by modern open-cast mineral extraction.

Origins

Map of the canals and coal railways in Central Scotland in 1840 Coal railways 1840.gif
Map of the canals and coal railways in Central Scotland in 1840

In the first decades of the nineteenth century, there was a considerable increase in coal and iron ore extraction, and of iron smelting, in the general area of Coatbridge and Airdrie, and improvements in the efficiency of the process of iron manufacture led to accelerating demand for coal and iron ore, which in turn emphasised the weakness of the means of transport of the heavy materials. In 1771 the Monkland Canal had opened between the Airdrie pits and Glasgow, and it was followed by the Forth and Clyde Canal in 1790. In 1826 the Monkland and Kirkintilloch Railway (M&KR) was opened, conveying the minerals to the canal at Kirkintilloch for onward transport to Glasgow and Edinburgh.

In 1828 the Ballochney Railway gave access from pits north and east of Airdrie to the M&KR and thence onward to the canal; and in 1831 the Garnkirk and Glasgow Railway was opened, giving a more direct rail connection to Glasgow, but terminating at Townhead canal wharf there. In 1831–2 the Edinburgh and Dalkeith Railway opened, giving access from pits in the Eskbank and Dalhousie areas to Edinburgh and Leith.

Coal and iron deposits were being worked on a small scale in the Slamannan area, about halfway between Airdrie and Linlithgow; it was then in Stirlingshire, now in Falkirk District. Seeing the success of the other railways, businessmen interested in the pits promoted a railway to open up their own district, and they formed the Slamannan Railway Company. It was to run from a junction with the Ballochney Railway near Arbuckle, north-east of Airdrie, to a wharf on the Union Canal at Causeway End (nowadays spelt Causewayend), 23 miles (38 km) from Edinburgh. Thus it would give transport access for pits on the line to Glasgow (over the Ballochney and Monkland and Kirkintilloch lines) and to Edinburgh, by transshipping to the Union Canal at Causewayend. [1]

The promoters anticipated a relatively frequent horse-drawn one-coach passenger service between Airdrie and Causewayend. The undulations on the route would allow the horse to ride on the downhill sections:

The drawing horse [would be] carried behind the coach in a covered stable waggon. In this way a single Horse would be enabled to perform the journey from Airdrie to Causewayend with a Passenger Carriage once a day, and allowing for spare Horses, five opportunities per day could be given at the expense of maintaining six Horses, with the means of conveying from 130 to 140 Passengers each way daily. [2]

The Company is authorised

The company was incorporated on 3 July 1835 with a share capital of £86,000 and loan capital of £20,000. The proprietors had presented the Bill to Parliament with the minimum of publicity, and no subscription list had been prepared. Thomas Grahame had said that "The scheme is so obviously advantageous that the subscriptions would be easily filled up." [1]

The Act specified that work on construction could not start until the estimated cost of construction was fully subscribed, and this forced a delay until mid-1836, and first contracts were not let until October. John Benjamin Macneill (later to be called "the Father of the Irish railway system") was appointed principal engineer [3] and Thomas Telford Mitchell was Resident Engineer. [1] [4]

At the Annual General Meeting in February 1838 it was reported that one of the two construction contractors had failed to achieve the required output, and part of his contract was taken over by the Company directly; however a year later it was stated that both contractors had failed to achieve the required progress, and moreover that almost the whole of the subscribed capital had been expended. A further Act of Parliament was obtained in July 1839, authorising total share capital of £140,000 and the usual additional one-third of the value in borrowings. [1] [5]

The construction process had been painful, the company "suffered during construction from 'considerable difficulty' in obtaining land, procrastinating contractors, high material costs, and problems of money raising in the deepening depression of the late 1830s" [6]

The engineer Macneill reported to the committee of management that the nearby Wishaw and Coltness Railway had experienced difficulties with horse haulage by independent operators, referring to "the great confusion which always takes place on railways where a great number of horses are employed by persons of different interests". Prompted by Macneill, the thoughts of the Committee turned to locomotive haulage, and to the possibility of a through passenger service between Glasgow and Edinburgh. This would require the co-operation of three other railways—the Garnkirk and Glasgow Railway (G&GR), the M&KR and the Ballochney Railway (BRly)—as well as the Union Canal Company. The M&KR was not encouraging.

Opening at last

Eventually the contractors' difficulties were overcome, and on 30 July 1840 the Directors, some shareholders, Directors of the Union Canal, and some engineers made a special journey throughout from the Garnkirk and Glasgow Railway's Townhead depot to Edinburgh over the G&GR, M&KR, BRly, the Slamannan line itself, and after transferring to a boat, the Union Canal. The railway part of this journey took 95 minutes to "Causeyend" (Causeway End) and

"By one of the swift passage boats the party were conveyed from Causeyend to Edinburgh in two hours and a half—the whole journey from Glasgow to Edinburgh being thus performed in four hours with the utmost ease and pleasure." [7]

The Directors of the Union Canal had subscribed some of the Slamannan capital and its parliamentary costs, and evidently saw collaboration with the Slamannan as being the future. They were evidently persuaded by this demonstration run, for on 4 August they ordered a larger passenger boat for the new intercity trade. The arrival in "Edinburgh" was of course at the canal's basin at Port Hopetoun, some distance from the city centre.

On 5 August 1840 the line opened, with a daily passenger train each way.

Operation

Passenger

At first, the passenger trade seemed to boom, with the daily train leaving Townhead at 10:15 a.m. and the westbound journey starting by boat at 7:00 a.m. An omnibus ran from the centre of Edinburgh to connect, departing at 6:45 a.m. Fares were 7s 6d (first class and cabin on the boat), and 5s (second class and steerage). The journey took something over four hours, comparable with the stagecoach transit; a throughout boat trip over the Union Canal and the Forth and Clyde Canal continued in operation for the time being, taking 7½ hours. By October the Union Canal had procured a second boat and there were now two railway-and-canal journeys each way daily.

This was now the principal means of travel between the two great cities, involving a canal boat trip, the transit of three rope-worked inclines over four railway companies, and a railway running on stone block sleepers and, west of Arbuckle, finding a path among horse-drawn coal trains.

It was not long before a businessman started to operate a coach direct from Princes Street in Edinburgh to Causewayend, cutting 45 minutes off the journey (at a premium price) and of course by-passing the canal transit altogether. This proved popular, and the G&GR (apparently the driving force in this joint operation) encouraged the development of the stagecoach connection: the stagecoach operator would offer a fare reduction in return for being the favoured connection at the Edinburgh end. The Union Canal had provided considerable financial support to the Slamannan company in its early days and it was now being squeezed out. Reliability of the westbound canal trip seems to have been poor, and on 5 November 1841, the Slamannan board decided that the westbound train would leave at the advertised time whether or not the connecting boat had arrived. As this made the boat-and-railway journey practically impossible, the G&GR stopped selling through tickets for that journey, and the poor Union Canal had to try to reinvigorate its intercity business over the Forth and Clyde Canal instead.

Nonetheless the railway transit was also under threat, and a fare reduction in December 1841 did little to stave off the approaching doom: on 21 February 1842 the Edinburgh and Glasgow Railway opened its railway (to Haymarket). As a relatively modern, fast and direct line, it put an end to the Slamannan's through passenger service. [1]

Mineral and goods

By contrast the mineral traffic was disappointing at the beginning; of course it relied on as-yet unproven pits in the area being developed. Moreover, all the trade to Edinburgh involved a transshipment to the canal at Causewayend. There was practically no goods (non-mineral) traffic. Thus in 1841 mineral receipts were £1,271 (from 26,776 tons) compared with £6,174 from passengers. The mineral tonnage climbed steadily, rising to 74,130 tons in 1845, still woefully weak. [1] [8]

Locomotives

At first the Company operated two locomotives on passenger duties; it seems that until March 1842 one of them worked exclusively below the Ballochney's inclines, to and from Townhead. In this period there was one goods engine operating, although the sparse traffic levels led to only one engine at a time being required for duty from 1842.

The locomotive stock included Borealis from the Rowan Company and two Fairbairn locomotives, Thistle and Rose.

After the opening of the Edinburgh and Glasgow Railway

The Slamannan Railway had been built with high hopes of revolutionising transport between Glasgow and Edinburgh, as well as gaining access to rich new mineral fields. It was disappointed in both respects, and the opening of the Edinburgh and Glasgow Railway (E&GR) in 1842 seemed to be a hammer blow to the Slamannan company, with their primitive sleeper block railway and a suddenly out-of-date track gauge. [9] Although the line gave access for the first time to isolated moorland communities, the traffic brought little money in. [10]

In the best ways of management, the directors saw this as an opportunity: if they could connect to the E&GR with its more efficient connections to Edinburgh and elsewhere, they could enhance the traffic they carried. At Causewayend they were close to the E&GR and a connecting line there was the solution.

Slamannan Junction Railway

Bo'ness and connections to the Slamannan Railway and the E&GR Boness and Slamannan new.gif
Bo'ness and connections to the Slamannan Railway and the E&GR

The E&GR was persuaded to subscribe half the cost of the connecting link, and a nominally independent company, the Slamannan Junction Railway was promoted in parliament, getting its act on 4 July 1844. It was to run from Bo'ness Junction (later renamed Manuel High Level, near Myrehead) on the E&GR main line, to Causewayend, forming an east-to-south connection.

Its application to Parliament had been supported jointly by the E&GR and the Slamannan Company, and shortly after obtaining its act, the shareholders sold the company to the E&GR. So the E&GR built the line, on the standard gauge; the work was finished by January 1847, but it did not come into operation until August 1847 when the Slamannan had converted its gauge. [1]

Attempted take over and change of gauge

The Edinburgh and Glasgow Railway started negotiations in 1844 to take over the various Monkland coal railways; and at the same time they applied for permission to change to the gauge of the track to standard. [11] However, in May 1846, the Edinburgh and Glasgow Railway was refused permission to amalgamate and it decide to withdraw on 31 December 1846. The Caledonian Railway had by that time taken over the Wishaw and Coltness Railway and the Garnkirk and Glasgow Railway, as part of its plan to get access to Glasgow over those lines. [12]

The Slamannan Railway, together with the Ballochney Railway and the Monkland and Kirkintilloch Railway obtained authorisation to change to standard gauge and completed the process on 26 July and 27 July 1847. [12]

In 1847 a branch was opened to a pit at Jawcraig. [13]

Amalgamation to form the Monkland Railways and after

On 14 August 1848 the Slamannan Railway merged with the Monkland and Kirkintilloch Railway and the Ballochney Railway to become the Monkland Railways. [14] [15]

A 4.5-mile (7 km) extension—the Slamannan and Borrowstounness Railway—was built to Bo'ness, opening on 17 March 1851. [14] The 26 June 1846 Act of Parliament authorising this extension, also allowed the railway to lease the harbour at Bo'ness but this lease was not followed through. [14]

Under the Monkland Railways the connections to the E&GR improved the Slamannan main line's value, and some of the mineral deposits became commercially viable at last. A number of branch lines were opened to serve those remote from the Slamannan main line, and numerous tramways and private mineral lines extended the reach of the branches further. In 1855 a more ambitious branch, to Bathgate, was opened, from Blackston Junction (often also spelt Blackstone Junction). [13] This was no passenger branch: it turned south away from the passenger station, and led to the important chemical works on the south of the town.

The terrain crossed by the railway never encouraged significant local passenger traffic, and in this period the passenger train service continued at a moderate level.

The commercial performance of the Monkland Railways improved a little, but they were unable to compete against the more modern railways, and a sale to the E&GR became the best way forward. The Monkland Railways were absorbed by the Edinburgh and Glasgow Railway, ratified by Act of Parliament dated 5 July 1865, and the sale was effective from 31 July 1865. [14] A day later (on 1 August 1865) the Edinburgh and Glasgow Railway was absorbed into the North British Railway.

Engineering

The track gauge originally adopted was 4 ft 6 in, to conform to the gauge of the adjoining railways. A single line was laid with space for subsequent doubling. Rails of 50 lb per yard with a parallel single-headed profile were used. Stone blocks were used for sleepers although some timber sleepers were used also. There was an area of very poor ground at Arden Moss, where longitudinal timber bearers on cross-timbers were used in effect forming floating rafts:

The line at the western end passes over a flow-moss from 30 to 40 feet deep, for a distance of 2 miles. Here the rails had to be literally floated on rafts of timber, and continued floating for some time after the trade had commenced, until at length, by continued pouring in of hard material—such as gravel, stones, &c.—this part of the road is now comparatively firm and solid. It had, however, for some months after the trains commenced to run, a very singular, and to many, an alarming appearance,—the engines and carriages, as they went along, causing a deflection of the platforms or rafts, of from 2 to 3 feet, which gradually rose to their proper level behind the train, exactly like a sluggish wave, as soon as the whole had passed over. [16]

The inclined plane at Causewayend was 800 yards (732 m) long. Murdoch, Aitken & Co supplied a 50-horsepower (37 kW) stationary engine, and Thomas Nicholson of Dundee provided the rope and "a cask of patent oil".

A canal basin and wharves were provided at Causewayend, paid for jointly by the Slamannan company and the Union Canal. [1]

The route

Map of the Slamannan Railway Slamannan map.gif
Map of the Slamannan Railway

The line ran from the northern branch of the Ballochney Railway at Arbuckle [note 1] to Causewayend, a distance of 12.5 miles (20 km). [14] [17]

Whishaw lists the "inclinations" on the route; only one is steeper than 1 in 100, at Causewayend where the line descends to the level of the canal at a gradient of 1 in 22. The length of this incline is 800 yards and it is "to be worked by a fixed engine of 50-horse power". This was a rope-worked inclined plane, where groups of wagons were hauled up or let down under the control of the rope.

Whishaw states that the rest of the line is "to be worked by locomotive engines".

"The level road-crossings are fifteen in number." [17]

Land was acquired for a double track line, although only single track was laid. The rails "are of the single parallel form [i.e. not fish-bellied] ... weighing 50 lbs to the yard lineal, and are fixed with 3-feet bearings in cast-iron chairs, the sockets of which are made to correspond exactly with the cross-section of the rails, so that keys are entirely dispensed with." [17]

"Both stone blocks and wooden sleepers are used for the permanent-way". [17]

"In passing over Arden Moss, for a length of 1½ miles, the rails are entirely laid on longitudinal timbers of red pine, having a scantling of 10 inches by 4 inches. These timbers rest on cross sleepers of beech, larch, or Scotch fir, which are 9 feet in length, and have a cross section of 12 inches by 6 inches, being placed at intervals of 3 feet." [17]

"The ballasting consists of broken freestone, 10 inches below [the level of the underside of] the blocks or sleepers." [17]

In 1844 a two-mile extension at Causeway End, to link it to the Edinburgh and Glasgow Railway was authorised. [15]

It was built to the track gauge of 4 ft 6 in (1,372 mm), then commonly used among similar railways in Scotland. [14]

The North British Railway and later

The attraction to the North British Railway of purchasing the Monkland lines was access to pits and iron works on the network, and in effect the Slamannan became a mineral branch line. The passenger service continued, no longer aspiring to be other than purely local, with (in 1895) an unbalanced service of three and four trains between Coatbridge and Manuel, taking about an hour for the journey. [18] In 1922 the service was pretty well the same. [19]

The coal extraction on the Slamannan's line declined in the twentieth century, and in 1930 the passenger service was discontinued, and the route was severed in the centre, becoming a branch from Manuel to Avonbridge at the east end, and from Airdrie to Slamannan at the west end. These lines too closed down and by 1964 everything had closed.

Paradoxically open cast mining has become widespread in the area around Arbuckle and the western extremity of the line, obliterating its course. The remainder of the route is relatively intact, crossing unpromising moorland which has seen little development.

Topography

The western extremity of the Slamannan Railway was Arbuckle. Taking that as a starting point, locations on the route are located as follows:

The Causewayend passenger station was later built on the east side of the canal, on the Slamannan and Borrowstounness Railway route to Bo'ness.

Notes

  1. Awdry says the point of connection was Airdriehill

Related Research Articles

<span class="mw-page-title-main">Caledonian Railway</span> British pre-grouping railway company

The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.

The Edinburgh and Glasgow Railway was authorised by Act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine, Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847.

The Edinburgh–Bathgate line is a railway line in East Central Scotland. It is also known as the Bathgate branch and was originally operated by the Edinburgh and Bathgate Railway. Except for the short section at the original Bathgate terminus, the main line is still in use, with a frequent passenger train service operated by ScotRail.

<span class="mw-page-title-main">Glasgow, Paisley, Kilmarnock and Ayr Railway</span> Railway in Scotland

The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) was a railway in Scotland that provided train services between Glasgow, Kilmarnock and Ayr. It opened its first line, between Glasgow and Ayr, in stages from 1839 to 1840. The section between Glasgow and Paisley was made jointly with the Glasgow, Paisley and Greenock Railway. Later it built a line from Dalry via Kilmarnock to Cumnock, linking there with the Glasgow, Dumfries and Carlisle Railway, and together forming a through route from Glasgow to Carlisle. The two companies merged to form the Glasgow and South Western Railway.

The Bathgate and Coatbridge Railway, also known as the "New Monkland Line", was built by Monkland Railways. It opened on 28 July 1863. The line was absorbed into the Edinburgh and Glasgow Railway on 31 July 1865. The following day, the line became part of the North British Railway.

<span class="mw-page-title-main">Garnkirk and Glasgow Railway</span>

The Garnkirk and Glasgow Railway was an early railway built primarily to carry coal to Glasgow and other markets from the Monkland coalfields, shortening the journey and bypassing the monopolistic charges of the Monkland Canal; passenger traffic also developed early in the line's existence.

The Ballochney Railway was an early railway built near Airdrie, Lanarkshire, now in Monklands, Scotland. It was intended primarily to carry minerals from coal and ironstone pits, and stone quarries, in the area immediately north and east of Airdrie, to market, predominantly over the adjoining Monkland and Kirkintilloch Railway. Passengers were carried later.

The Monkland and Kirkintilloch Railway was an early mineral railway running from a colliery at Monklands to the Forth and Clyde Canal at Kirkintilloch, Scotland. It was the first railway to use a rail ferry, the first public railway in Scotland, and the first in Scotland to use locomotive power successfully, and it had a great influence on the successful development of the Lanarkshire iron industry. It opened in 1826.

The Wishaw and Coltness Railway was an early Scottish mineral railway. It ran for approximately 11 miles from Chapel Colliery, at Newmains in North Lanarkshire connecting to the Monkland and Kirkintilloch Railway near Whifflet, giving a means of transport for minerals around Newmains to market in Glasgow and Edinburgh.

<span class="mw-page-title-main">Caledonian main line</span> Former railway line in Scotland

The Caledonian Railway main line in Scotland connected Glasgow and Edinburgh with Carlisle, via Carstairs and Beattock.

The Glasgow to Aberfoyle Line was a railway line in Scotland, built in stages, leaving the Edinburgh and Glasgow Railway near Lenzie. Tourist traffic was a dominant part of the motivation for building the line, and road tours to the Trossachs from Aberfoyle formed a significant part of the traffic.

The Monkland Railways was a railway company formed in 1848 by the merger of three "coal railways" that had been built to serve coal and iron pits around Airdrie in Central Scotland, and connect them to canals for onward transport of the minerals. The newly formed company had a network stretching from Kirkintilloch to Causewayend, near Linlithgow. These coal railways had had mixed fortunes; the discovery of blackband ironstone and the development of the iron smelting industry around Coatbridge had led to phenomenal success, but hoped-for mineral discoveries in the moorland around Slamannan had been disappointing. The pioneering nature of the railways left them with a legacy of obsolete track and locomotives, and new, more modern, railways were being built around them.

The Slamannan and Borrowstounness Railway was a railway built in Scotland in 1848 to extend the Slamannan Railway to the harbour at Borrowstounness on the Firth of Forth, and to connect with the Edinburgh and Glasgow Railway. It was not commercially successful, but in recent years part of it was taken over by the Scottish Railway Preservation Society, which operates the Bo'ness and Kinneil Railway.

The Rutherglen and Coatbridge Railway was a railway line in Scotland built by the Caledonian Railway to shorten the route from the Coatbridge area to Glasgow. It opened in 1865. It was later extended to Airdrie in 1886, competing with the rival North British Railway. Soon after a further extension was built from Airdrie to Calderbank and Newhouse.

<span class="mw-page-title-main">Coatbridge Branch (NBR)</span>

The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.

The Glasgow, Bothwell, Hamilton and Coatbridge Railway was a railway company in Scotland, built to serve coal and ironstone pits in the Hamilton and Bothwell areas, and convey the mineral to Glasgow and to ironworks in the Coatbridge area. It was allied to the North British Railway, and it opened in 1877. Passenger services followed.

The Kelvin Valley Railway was an independent railway designed to connect Kilsyth, an important mining town in central Scotland, with the railway network. It connected Kilsyth to Kirkintilloch and thence over other railways to the ironworks of Coatbridge, and to Maryhill, connecting onwards to the Queen's Dock at Stobcross.

The Wilsontown, Morningside and Coltness Railway was a railway opened in 1845, primarily for mineral traffic, although a passenger service was run sporadically. The line ran from a junction with the Wishaw and Coltness Railway at Chapel, to Longridge, in South Central Scotland, and it was extended to Bathgate in 1850 after takeover by the Edinburgh and Glasgow Railway. It was built to open up further coal deposits and to connect the Wilsontown Ironworks, although it did not actually reach Wilsontown. In common with the other "coal railways" with which it connected, it adopted the track gauge of 4 ft 6 in, often referred to as Scotch gauge.

This article describes the Caledonian Railway from its conception down to the year 1850.

The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.

References

  1. 1 2 3 4 5 6 7 8 Don Martin, The Monkland & Kirkintilloch and Associated Railways, Strathkelvin District Libraries and Museums, Glasgow, 1995, ISBN   0 904966 41 0
  2. Slamannan Railway Prospectus, October 1835, quoted in Martin
  3. Brees, Samuel Charles (1838). Railway practice: a collection of working plans and practical details of construction in the public works of the most celebrated engineers comprising tunnels and tunnel fronts, turnpike road bridges... ornamental bridges, with various designs for iron rails and framing... aqueducs, turn-tables, cranes, and railway depots, with sheds, &c . on the several railways, canals, and other public works throughout the kingdom; as the London and Birmingham...Slamannan, and Wishaw and Coltness railways and the elegant aqueduct of the Lancaster Canal over the River Lune. A series of original designs for every description of railway works, in various styles of architecture, completes the volume. London: J. Williams. pp. 91–106. Retrieved 3 February 2018.
  4. Whishaw; he spells Macneill "M'Neill", the common orthography for "Mac" surnames at the time.
  5. The Railway Chronicle, 20 May 1848, quoted in Robertson
  6. Reports of the Committee of Management of the Slamannan Railway, 8 February 1838 and 7 February 1837, quoted in Robertson
  7. Glasgow Herald, 3 August 1840, quoted in Martin
  8. Robertson
  9. David Turnock, The Historical Geography of Scotland Since 1707, Cambridge University Press, Cambridge, 1982, ISBN   0 521 24453 6
  10. John Thomas revised J S Paterson, A Regional History of the Railways of Great Britain: Volume 6, Scotland, the Lowlands and the Borders, David and Charles, Newton Abbot, 1984, ISBN   0 946537 12 7
  11. David Ross, The North British Railway: A History, Stenlake Publishing Limited, Catrine, 2014, ISBN   978 1 84033 647 4
  12. 1 2 John Thomas, A Regional History of the Railways of Great Britain: volume VI: Scotland: The Lowlands and the Borders, David & Charles, Newton Abbot, 1971, ISBN   0-7153-5408-6
  13. 1 2 Col M H Cobb, The Railways of Great Britain – A Historical Atlas, Ian Allan Publishing Limited, Shepperton, 2003, ISBN   07110 3003 0
  14. 1 2 3 4 5 6 Christoper Awdry, Encyclopaedia of British Railway Companies, Patrick Stephens Limited, Wellingborough, 1990, ISBN   978-1-85260-049-5
  15. 1 2 Henry Grote Lewin, Early British Railways: a Short History of their Origin & Development, 1801–1844,The Locomotive Publishing Co Ltd., London, 1925, OCLC 11064369.
  16. The Topographic, Statistical and Historical Gazetteer of Scotland, volume second, A Fullarton & Co, Edinburgh, 1847
  17. 1 2 3 4 5 6 Francis Whishaw, The Railways of Great Britain and Ireland Practically Described and Illustrated, John Weale, London, 1842, reprinted 1969 by David & Charles Reprints, Newton Abbot, ISBN   0-7153-4786-1
  18. Bradshaw's General Steam Navigation and Railway Guide, 12th mo, (December) 1895, reprinted by Middleton Press, Midhurst, 2011, ISBN   978 1 908174 11 6
  19. Bradshaw's General Railway and Steam Navigation Guide, 7th mo, (July) 1922, reprinted by Guild Publishing, London, 1985

Sources

Further reading