Solway Junction Railway | |||
---|---|---|---|
Overview | |||
Locale | Scotland | ||
Continues as | Caledonian Railway | ||
History | |||
Opened | 13 September 1869 | ||
Closed | 27 April 1931 | ||
Technical | |||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) | ||
|
Solway Junction Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Solway Junction Railway was built by an independent railway company to shorten the route from ironstone mines in Cumberland to ironworks in Lanarkshire and Ayrshire.
It opened in 1869, and it involved a viaduct 1 mile 8 chains (1.8 km) long crossing the Solway Firth, as well as approach lines connecting existing railways on both sides.
The viaduct was susceptible to damage from floating ice sheets, and the rising cost of repairs and maintenance, and falling traffic volumes as the Cumberland fields became uncompetitive, led to closure of the viaduct in 1921. The viaduct and the connecting railways were dismantled, and now only the shore embankments remain.
In the late 1850s, business interests were concerned to improve transport facilities for iron ore being mined in the area of Canonbie, in south Dumfriesshire close to the English border. Their intention was to bring the mineral to Annan Harbour (on the north shore of the Solway Firth), from where it could be forwarded by coastal shipping. They approached James Brunlees, a civil engineer with experience of coastal works. He advised against the scheme, which would have partly duplicated the Glasgow and South Western Railway (G&SWR) route, but he put them in touch with business people in Cumberland, who had engaged him to plan a railway from Cumberland iron deposits to a new harbour at Bowness, on the south shore of the Solway.
The two groups conferred, and revised their plans; they projected a railway that would cross the Solway by a viaduct, connecting existing railways on both sides of the Solway. At the time there was heavy iron ore traffic from Cumberland to Lanarkshire and Ayrshire ironworks, running by rail via Carlisle and the Caledonian Railway, the Glasgow and South Western Railway, or by coastal shipping. 92,000 tons of iron ore was exported from Cumberland to Scotland in 1863. The viaduct route would save considerable mileage and avoid congestion at Carlisle. The viaduct was to be the longest in Europe, [1] and overall the line from Kirtlebridge to Brayton would be just over 20.4 miles long – including branches the total length would be about 25 miles (40 km). Brunlees was the designing engineer for both viaduct and line. [2] [3]
Solway Junction Railway Act 1864 | |
---|---|
Act of Parliament | |
Citation | 27 & 28 Vict. c. clviii |
Dates | |
Royal assent | 30 June 1864 |
Text of statute as originally enacted |
The parliamentary examination of the Dumfries and Cumberland (Solway Junction) Railway Bill took place in the 1864 session. The G&SWR objected to the scheme as tending to capture their traffic and divert it onto the Caledonian: this opposition was overruled, however, [3] and the company was authorised (as the Solway Junction Railway) by the Solway Junction Railway Act 1864 (27 & 28 Vict. c. clviii) on 30 June 1864, with capital of £320,000 and predicted cost of £315,000. [4] [5] The first chairman of the company was James Dees of Whitehaven; [6] he was soon succeeded by Alexander Brogden. [7]
Solway Junction Railway (Deviation) Act 1865 | |
---|---|
Act of Parliament | |
Long title | An Act to enable the Solway Junction Railway Company to make certain Deviations in their authorized Line; and for other Purposes. |
Citation | 28 & 29 Vict. c. clxxxvi |
Dates | |
Royal assent | 29 June 1865 |
Text of statute as originally enacted |
Solway Junction Railway Act 1867 | |
---|---|
Act of Parliament | |
Citation | 30 & 31 Vict. c. cxvi |
Dates | |
Royal assent | 15 July 1867 |
Text of statute as originally enacted |
A further act of Parliament, the Solway Junction Railway (Deviation) Act 1865 (28 & 29 Vict. c. clxxxvi) was passed allowing deviations of the line in Cumberland. [8] In 1866 two bills were brought forward. A bill for a line from Brayton to join the Whitehaven Junction at Flimby (thus making the SJR independent of the Maryport and Carlisle) did not match its advance notice and was therefore rejected by Parliament, [9] but led to a satisfactory agreement with the M&C. [10] [11] An Act was also passed authorising an increase in capital of £60,000 and further borrowing of £20,000: it also permitted the North British and the G&SWR to subscribe £100,000 each, should they so wish. [11] A further act of Parliament, the Solway Junction Railway Act 1867 (30 & 31 Vict. c. cxvi), was obtained; instead of running parallel to the Silloth railway (leased by the North British Railway), the Solway Junction would use running powers over it between Kirkbride and Abbey Holme. [12] The 1867 act (as well as removing the opening span from the viaduct design) also confirmed the agreement with the Maryport and Carlisle and allowed the Caledonian to subscribe on the same basis as the North British and the G&SWR. [13] The Caledonian, alarmed at the possibility of the lucrative iron ore traffic being diverted off its system, acted (unlike the other companies) on the implicit invitation. In September 1867, an agreement whereby the Caledonian subscribed to £60,000 of 5% preference shares in the Solway Junction and operated the line was ratified by the shareholders of both companies. [14] [15] [lower-alpha 1]
The viaduct was effectively a trestle construction with 193 spans of 30 feet (9.14 m); each pier consisted of five cast iron columns of hollow section, 12 inches (305 mm) diameter; the outer columns were raked, acting as buttresses to the three inner load-bearing columns. The columns were founded on iron tubular piles that were driven by a steam pile driver, after an unsuccessful attempt to screw them in to the substrate. Originally, the viaduct was to be of 80 30-foot spans, the railway being carried on a solid embankment as far as the low-water mark on either side. A 36-foot opening span was to be provided to allow the passage of small craft to the upper Solway ( chiefly to Port Carlisle); [16] the Board of Trade however objected to so major an obstruction to tidal flows and required a 50-foot opening span to allow the passage of steam tugs. The promoters accepted both objections at first, [17] but the Solway Junction Railway Act 1867 made no provision for an opening span, the promoters arguing that the traffic of Port Carlisle was negligible and should not be allowed to compromise the viaduct design. This argument won the day; although the Board of Trade confirmed its earlier stand that the traffic of Port Carlisle was not negligible, [18] Parliament was persuaded that it was insignificant in comparison to the projected traffic over the viaduct and as built the viaduct made no provision for ships to pass through it; this ended any commercial use of the harbour at Port Carlisle.
The cost of the viaduct and approach embankments was £100,000. It had 193 spans with 2,892 tons of cast iron for the piles and columns, and 1,807 tons of wrought iron in the superstructure; it was wide enough to take double track (if this was later required) but only single-track was laid. The greatest engineering difficulty on the line turned out not to be the construction of the viaduct, but the mile and a quarter (2 km) section of line over Bowness Moss on the Cumberland side. The Moss in its natural state was a raised mire "unsafe for cattle and horses", and considerable works had to be put in hand to establish a stable trackbed.
A trial trip was made on 26 June 1869, ahead of the Board of Trade inspection [19] and freight traffic started on 13 September 1869, with three mineral trains each way daily. [20] The line opened to passengers between Kirtlebridge and Bowness on 8 March 1870, [21] but the Board of Trade inspector would not approve passenger traffic over the Bowness Moss section until he was persuaded it had been adequately consolidated by goods traffic. After re-inspection on 23 July 1870 it was passed for passenger use: the first passenger train over the line (28 July 1870) was a 'special' from Aspatria to an agricultural show at Dumfries. [22] A regular passenger service - four trains a day between Kirtlebridge and Brayton, with intermediate stations at Annan and Bowness - began on 8 August 1870. [23] The station at Abbey Junction opened 31 August 1870. [24]
Solway Junction Railway Act 1873 | |
---|---|
Act of Parliament | |
Citation | 36 & 37 Vict. c. cxlv |
Dates | |
Royal assent | 21 July 1873 |
Text of statute as originally enacted |
The mineral traffic never came up to the original expectations; by March 1871 the board were regretting that a fall-off in the volume of iron ore being sent into Scotland meant less traffic and lower revenues than anticipated. In the previous half-year revenue receipts had been £3741, working expenses £3487, and interest due on debentures £4036. [25] In 1873 the SJR sold the line between Annan and Kirtlebridge to the Caledonian for £84,000, the Caledonian paying a further £40,000 for land: the Solway Junction Railway Act 1873 (36 & 37 Vict. c. cxlv) authorising this was also used to restructure the SJR's debt; its debentures were now to pay 3.5% rather than 5%. [26] The reduction in interest due was largely irrelevant; by March 1877, operating revenue in the previous half-year was still only £4560, and an operating profit of £1046 allowed a 2% per annum dividend to be paid on the debentures. [27] In the mid-1870s Spanish iron ore became readily and cheaply available and was shipped direct to Ayrshire ports, competing with Cumbrian ore. The SJR also subsequently alleged that it had been deliberately starved of much of the remaining traffic by the Maryport and Carlisle and the Caledonian, who continued to route traffic by Carlisle unless (and in some cases despite being) explicitly routed over the SJR by the consignee. [28] The iron traffic in the first half of 1878 was only one-third of that in 1877, the receipts for the half-year were under £2700 and the net operating profit was £104. [29] Arrears of interest on debentures was by then over £8,000. [30] There was a slight recovery, and by 1880 a dividend was again being paid on debentures, but the arrears of interest were accumulating. The company was therefore in no financial state to withstand the loss of the viaduct and a need for major expenditure to repair it.
In the winter of 1874-75 longitudinal cracks appeared in a few columns; water was getting inside and freezing in cold weather. This happened on eleven load-bearing columns (which were replaced) and about twenty 'rakers' which were 'clipped'. To prevent any repetition, half-inch holes were drilled just above the high-water mark. Some braces were also broken by the impact of floating ice, but no columns were damaged. [31]
In January 1881 an exceptionally cold spell lasted most of the month, and ice accumulated in the upper estuary and the rivers feeding it. Sheets of ice up to six inches formed; fragments of these sheets rode over each other and froze together, leading to the formation of blocks of ice up to six feet (two metres) thick. [31] As the cold spell ended, the ice began coming down upon the viaduct about 25 January, but there was no damage to the structure until 29 January when much more ice was coming down. The maximum speed of water through the viaduct (at half-ebb) was about eight to ten miles an hour and the shock of ice floes hitting the piers could clearly be felt by anyone standing on the bridge; the noise could be heard a mile away. On the morning of 29 January three rakers and one load-bearing column were found to be damaged. The damage was assessed, running repairs made, and trains allowed to proceed over the viaduct under caution. [31] Over the course of 30 January, a number of piers gave way under repeated shocks; by the morning of 31 January it was found that five piers, consisting of five pillars each, were completely demolished, and that a great many single pillars in other piers had given way. [32] The ice continued to come down in large shoals, and inflict further damage; until, by 3 February:
The damage to the pillars begins at a distance of 400 yards from the English coast and extends in varying degree to about 100 yards from the Scotch side. In the intervening distance between these points there are altogether 44 entire piers gone, two of them double piers of 10 columns each; and other pillars have been broken at intervals in other places, making the total number of pillars broken over 300. In some places where piers are completely swept away the spans remain in position, but there are two complete gaps in the bridge where piers, girders, plates and railway have completely disappeared. These two breaches in the structure measure together between 300 and 400 yards. [33]
The winter of 1879-1880 had seen the Tay Bridge disaster, which the subsequent Board of Trade Inquiry (at which Brunlees had appeared as an engineer with considerable experience of the successful design of iron viaducts) had blamed on shoddy workmanship and egregious design decisions by Thomas Bouch. Sir Joseph Pease MP, noting that Brunlees had described the viaduct "as exactly the same in construction as the Tay Bridge" put a question in parliament to Joseph Chamberlain the President of the Board of Trade: "
whether this Bridge was inspected previous to its opening by an engineer appointed by the Board of Trade; and, if so, whether such engineer reported upon the danger which might arise from the pressure of floating ice; and, what steps he intends to take before the Solway Bridge is again opened for traffic in order to secure public safety, in the case of a second bridge of the same construction, which has proved to be unable to stand the pressure of storms or flood, and which have been both duly inspected by officers of the Board of Trade previously to their being opened for public traffic?" [34] [lower-alpha 2]
Major Marindin of the Railway Inspectorate conducted an enquiry to establish the cause of failure and hence make appropriate recommendations on the appropriate design of a reconstructed Solway Viaduct. He reported that failure was not due to the pressure of a large mass of ice piled up and jammed against the structure, but was a result of cumulative piecemeal failures of individual columns hit by ice floes:
when the momentum which would be acquired by a piece of ice twenty-seven yards square and in places six feet thick (the dimensions of one piece actually measured), upon a tide running at ten miles an hour is considered, it is not surprising that cast iron columns twelve inches in diameter, seven-eighths of an inch in thickness, which owing to the long-continued frost were in a very brittle state were unable to resist the shock. ... the close proximity of the piers prevented the ice from getting away so quickly as if the spans had been wide … masses of ice unable to escape were again and again dashed by the tide against the piers which they were unable to pass ... the floating blocks struck and broke column after column, until at last the whole of a pier succumbed after being destroyed piecemeal.
In condemning Bouch's Southesk viaduct for defective foundations after rigorous testing, Colonel Yolland (the head of the Railway Inspectorate) had also stated his opinion that "piers constructed of cast-iron columns of the dimensions used in this viaduct should not in future be sanctioned by the Board of Trade." [37] [lower-alpha 3] Marindin's report noted that "This disaster furnishes a very convincing proof of the unreliability of small cast-iron columns when used for the piers of viaducts in positions where they are likely to be exposed to any blow or sudden shock" but drew a slightly different conclusion: that "it would be far better in future to avoid any such mode of construction." Consequently, Marindin stopped well short of requiring any reconstruction of the viaduct to use only wrought-iron columns: "I do not, however, consider that the reconstruction of this viaduct need be objected to provided due care is taken, either by the erection of timber ice fenders or by the substitution of wrought iron rakers of sufficient strength to withstand the blows of the floating ice, to guard the cast iron bearing columns from any such danger… And it is worthy of consideration whether it would not be better to increase the width of the spans at the centre of the channel, so as to permit the ice to pass more freely than it does at present."
Reconstruction of the viaduct began in the summer of 1882: in the rebuilt viaduct, the three inner columns in each pier were still cast-iron, but the two outer 'rakers' were each a single wrought-iron tube filled with concrete and provided with timber ice fenders. The original raker foundation piles were retained, but cast-iron clips were bolted around them, and the annulus between clips and pile filled with cement. [38] Although by August 1883 the viaduct reconstruction was sufficiently far advanced that construction traffic was run over it, [38] passenger services over the line did not resume until 1 May 1884. [39]
Solway Junction Railway Act 1882 | |
---|---|
Act of Parliament | |
Citation | 45 & 46 Vict. c. clxxxviii |
Dates | |
Royal assent | 10 August 1882 |
Text of statute as originally enacted |
The Solway Junction Railway obtained the Solway Junction Railway Act 1882 (45 & 46 Vict. c. clxxxviii) allowing it to raise another £30,000 to fund the reconstruction of the viaduct, the additional debt taking precedence over all previous borrowings or shares, including £60,000 of preference shares held by the Caledonian. The SJR wished to grant the North British running powers and did not want to raise the money by further indebtedness (and dependency) to the Caledonian, which they believed was using its lease of the SJR to damage the interests of SJR shareholders. The Caledonian was prepared to lend the £30,000 as a 4% first-debenture stock, taking precedence over the SJR's debentures and its existing preference shares, but only if the NBR were not given running powers over the SJR. [40] The Caledonian subsequently went to court, obtaining a judgment that its agreement of 1867 with SJR under which the Caledonian had first refusal on any further issue of SJR stock precluded the SJR raising the money by other means, such as mortgages. [41] The SJR, arguing that clauses in its 1882 act if correctly interpreted removed the Caledonian's right of first refusal, went to the Appeal Court, which found in their favour; [42] The Caledonian took the case to the House of Lords, the final judgment (in July 1884) being that the Caledonian was not entitled to insist that their offer to take up first-debenture stock denied the SJR the right to consider other means of raising the money; the Caledonian appeal was therefore dismissed with costs, provided that the SJR promised that whatever means of raising the money they decided upon, the Caledonian would have first refusal. [43]
The SJR also sought to lessen its dependence on the Maryport and Carlisle, but was unsuccessful. Clauses in the SJR's 1882 bill which would have given it running powers from Brayton to Maryport were rejected. In 1883 the SJR promoted a bill for a line to run from Brayton to Bassenthwaite Lake on the Cockermouth, Keswick and Penrith Railway and the Cleator and Workington Junction Railway promoted a bill to build a line from Calva Junction, immediately north of Workington, to Brayton. Either line would have given the SJR the possibility of through traffic that could not be intercepted by the M&CR, and both were opposed by the M&CR. [44] The SJR's bill was defeated, [45] and whilst the C&WJR got its act of Parliament[ which? ] it then came to a compromise with the M&CR which dashed the SJR's hopes; the new line ran from Calva Junction only to Linefoot, on the Derwent branch of the M&CR, the M&CR granting the C&WJR running powers between there and Brayton.
Solway Junction Railway (Transfer) Act 1895 | |
---|---|
Act of Parliament | |
Long title | An Act to transfer the Solway Junction Railway to the Caledonian Railway Company and for other purposes. |
Citation | 58 & 59 Vict. c. cxxxii |
Dates | |
Royal assent | 6 July 1895 |
Text of statute as originally enacted |
In 1889, a faction of the SJR board, after a couple of stormy shareholder meetings [46] and proxy battles, ousted other directors and secured agreement by shareholders to a deal with the Caledonian; the Caledonian would take up the £30,000 first debenture stock at 3½%, provide half the SJR's directors, and for half the traffic receipts would meet both the operating and maintenance costs of the SJR. [47] The SJR was also have the option (which in due course they exercised) of converting the £60,000 of preference stock originally subscribed by the Caledonian into £90,000 of SJR ordinary stock. The agreement came into force in June 1889, and subsequently supported by the Caledonian's private act of Parliament[ which? ] of 1890. [48] This effectively ended the existence of the Solway Junction Railway as an independent entity, although it was not until 1895 that it was amalgamated with the Caledonian, by the Solway Junction Railway (Transfer) Act 1895 (58 & 59 Vict. c. cxxxii). The company, however, survived; SJR shares and stock held by the Caledonian were cancelled, and the rest were converted not into Caledonian securities, but into a new SJR security paying 3% a year, financed by an annual payment of £4,500 a year from the Caledonian. [49] Grateful SJR shareholders voted the directors £100 each and the secretary £1000; that Christmas the chairman gave £70 of his £100 'for distribution among the men' (estimated to number about 50) . [50]
In 1914 an assessment of the maintenance needs of the viaduct was carried out. The long metal structure exposed to a marine atmosphere had deteriorated and £15,500 would need to be expended in maintenance work. The work was suspended on the outbreak of World War I, which saw increased use of the viaduct for iron-ore and pig-iron traffic from West Cumbria to Scotland. [51] It was announced that stations south of the viaduct were to be closed from 1 February 1917 [52] but this decision was promptly rescinded [53] The creation of a large munition works at Eastriggs, to the east of Annan, gave the line additional traffic; including (in May 1917) the Royal Train, carrying King George and Queen Mary on a four-day tour of that and other munitions factories. [54]
The Yorkshire Post reported in May 1921 that the Caledonian had closed the branch for both goods and passenger traffic; an engineering inspection of the viaduct had concluded that it was 'defective, and unsafe for the traffic' (but it was also said that the closure had been accelerated by the current miners' strike): all stations south of the Solway were therefore closed. [55] When a local MP asked a parliamentary question on the closure in July 1921, the Minister of Transport said that the Caledonian were awaiting an abatement in post-war prices before they could consider the necessary repairs; the traffic the viaduct might carry was now much reduced, and such as remained could easily be routed via Carlisle. [51] The estimated cost of repair was £70,000. [56] In 1926, the London Midland and Scottish Railway confirmed that it had no intention of ever resuming passenger services on the Solway Junction. [57]
In the time between closure and demolition the viaduct was used as a de facto footbridge across the Firth by trespassing pedestrians –most notably on Sundays, when drinking establishments in Bowness were permitted to open but those in Annan were not. [58]
Any future use of the viaduct was impossibly expensive, and after a period of dormancy, in 1933 arrangements were made to demolish it. Arnott, Young and Company purchased the bridge and dismantled it; much of the material found a second use, and some of the metal was used by the Japanese forces in the Sino-Japanese War. During the work three men lost their lives when attempting extraction of one of the piles; the men were inexperienced in boat work and their boat was caught in strong currents and capsized.
The dismantling of the viaduct was completed by November 1935, but sections of the pier foundations remained in the bed of the estuary. The section of railway between the south end of the viaduct and Kirkbride Junction was dismantled as part of the process.
The section of line between Abbey Junction and Brayton continued in use, as part of the Maryport and Carlisle section, until closure after 4 February 1933.
Passenger trains ceased operating on the northern section between Kirtlebridge and Annan from 27 April 1931. A twice-weekly goods service ran to Annan from the G&SWR line, reversing at a headshunt towards the former viaduct. This arrangement was discontinued in January 1955. [2]
During World War II an RAF airfield was created near Creca, north of Annan, and part of the original line from Kirtlebridge to that point was reinstated. [59] [60] The line was dismantled some time in the 1960s.
In 1959 Chapelcross nuclear power station was opened; the location is on the east side of the former line about halfway between Kirtlebridge and Annan, close to the RAF station site. It is likely that the RAF station line was used to bring in construction materials. Liquid effluent from the power station was discharged into the Solway Firth at Annan and at least the final part of the railway alignment was used to route the effluent pipes. The power station is no longer operational, having closed in 2004.
The Solway Junction Railway decided from the outset to work its own line. It acquired four locomotives from Neilson and Company. Nos. 1 and 2 were 0-4-2 well tanks and nos. 3 and 4 were 0-4-2 tender engines. In 1868 two further locomotives were ordered; nos 5 and 6 were 0-6-0 tender engines, also from Neilson; they never bore their SJR numbers, going straight to the Caledonian Railway numbering series. The final locomotive considered to belong to the SJR route was a small-wheeled 0-6-0 saddle tank, built by Manning Wardle and acquired second hand for shunting work. In January 1872 it was disposed of to the Wigtownshire Railway. [2]
The line ran south from Kirtlebridge on the Caledonian Railway Main Line through undulating country to Annan Shawhill station. The line descended to the Solway viaduct, and a west-to-south spur from the G&SWR Annan station trailed in. At the south side of the Solway, Bowness station was reached, and the line then passed across the marshy terrain, then reaching Whitrigg, before connecting with the Carlisle and Silloth Bay Railway at Kirkbride Junction. The through route used that railway as far as Abbey Junction, from where the Solway Junction Railway's own route ran via Bromfield to Brayton, where it joined the Maryport and Carlisle Railway route. [2]
Locations on the line were:
(Note: locations in italic were not passenger stations.)
The Furness Railway (Furness) was a railway company operating in the Furness area of Lancashire in North West England.
The Maryport & Carlisle Railway (M&CR) was an English railway company formed in 1836 which built and operated a small but eventually highly profitable railway to connect Maryport and Carlisle in Cumberland, England. There were many small collieries in the area and efficient access to the harbour at Maryport was important.
The Cumbrian Coast line is a rail route in North West England, running from Carlisle to Barrow-in-Furness via Workington and Whitehaven. The line forms part of Network Rail route NW 4033, which continues via Ulverston and Grange-over-Sands to Carnforth, where it connects with the West Coast Main Line.
The Cockermouth, Keswick and Penrith Railway (CK&PR) was an English railway company incorporated by act of Parliament on 1 August 1861, to build a line connecting the town of Cockermouth with the London and North Western Railway (LNWR) West Coast Main Line at Penrith. Arrangements for the use of the stations at either end were included. Passenger and goods traffic was worked by the LNWR and mineral traffic by the North Eastern Railway, both of whom had shares in the company. The line was 31+1⁄2 miles (50.7 km) in length, and had eight intermediate stations.
Workington railway station is a railway station serving the coastal town of Workington in Cumbria, England. It is on the Cumbrian Coast Line, which runs between Carlisle and Barrow-in-Furness. It is owned by Network Rail and managed by Northern Trains.
Bromfield is a village and civil parish in Cumbria, in the north of England.
Annan is a railway station on the Glasgow South Western Line, which runs between Carlisle and Glasgow Central via Kilmarnock. The station, situated 17 miles 51 chains (28 km) north-west of Carlisle, serves the town of Annan in Dumfries and Galloway, Scotland. It is owned by Network Rail and managed by ScotRail.
Bowness-on-Solway is a village in Cumbria, England. It is situated to the west of Carlisle on the southern side of the Solway Firth estuary separating England and Scotland. The civil parish had a population of 1,126 at the 2011 census. The western end of Hadrian's Wall is a notable tourist destination, though the Wall itself is no longer to be seen here above ground. The west end of the Hadrian's Wall Path is marked by a pavilion on the small coastal cliff at Bowness. The village is part of the Solway Coast Area of Outstanding Natural Beauty.
The Cockermouth & Workington Railway was an English railway company which built and operated a railway between the Cumberland towns of Workington and Cockermouth. The railway opened for service in 1847, and ran from the Whitehaven Junction Railway station at Workington to a station at Cockermouth near the bridge over the Derwent. A single-tracked line of eight and a half miles length, its revenue came largely from the transport of coal from the pits of the lower Derwent valley to the port at Workington for shipment by sea. The Marron extension of the Whitehaven, Cleator and Egremont Railway and the Derwent Branch of the Maryport and Carlisle Railway were both constructed to link with the C&WR and together give an alternative route for the northward movement of haematite ore from the Cumberland ore-field. The completion of the Cockermouth, Keswick and Penrith Railway made the C&WR part of a continuous through route between South Durham and the Cumberland orefield. These developments both improved the potential profitability of the C&WR, and made control of it important to bigger companies wishing to maximise the iron-ore traffic over their lines: the C&WR was absorbed by the London and North Western Railway in 1866.
Annan Shawhill was a station on the Solway Junction Railway at Annan in Dumfries and Galloway, Scotland. The branch line ran between a junction with the Caledonian Railway Main Line at Kirtlebridge, across the Glasgow South Western Line, over the Solway Viaduct into Cumberland, England. The station opened for passenger services in 1870. Passenger services were withdrawn in the early 1930s when the cost of maintaining the Solway Viaduct was deemed too high to sustain. Although the line to England was removed, the Scottish part of the branch to Annan Shawhill remained opened for freight until it was finally closed in the 1950s.
The Whitehaven, Cleator and Egremont Railway was an English railway company which built and operated a standard gauge railway in Cumberland, England intended to open up the hematite orefield to the south-east of Whitehaven. It opened for goods traffic in 1855 and for passenger traffic in 1857.
Great Broughton railway station briefly served the village of Great Broughton, near Cockermouth in Cumberland, England.
There were two interlinked railways on the south shore of the Solway Firth.
Bowness was a station which served Bowness-on-Solway, a village in Cumbria on the English side of the Solway Firth. The station opened on 8 August 1870 by the Caledonian Railway on a line constructed from the Caledonian Railway Main Line at Kirtlebridge across the Glasgow South Western Line, then forming the Solway Junction Railway over the Solway Viaduct to Brayton. The line opened for freight from 13 September 1869.
Whitrigg was a railway station on the Bowness Moss which served Whitrigg, a hamlet in Cumbria on the English side of the Solway Firth. The station opened on 8 August 1870 by the Caledonian Railway on a line constructed from the Caledonian Railway Main Line at Kirtlebridge across the Glasgow South Western Line, then forming the Solway Junction Railway over the Solway Viaduct to Brayton. The line opened for freight on 13 September 1869.
Bromfield was a railway station which served Bromfield, a small settlement in Cumbria on the English side of the Solway Firth. The station opened in 1873 by the Caledonian Railway on a line constructed from the Caledonian Railway Main Line at Kirtlebridge across the Glasgow South Western Line, then forming the Solway Junction Railway over the Solway Viaduct to Brayton. The line opened for freight trains on 13 September 1869.
Brayton was a railway station which served as the interchange for the Solway Junction Railway (SJR) with the Maryport and Carlisle Railway (M&CR); it also served nearby Brayton Hall and district in Cumbria. The station was opened by the M&CR and became a junction station in 1870 on the 25 mile long SJR line.
Kirtlebridge railway station was a station which served the rural area around Kirtlebridge and Eaglesfield, north of Annan in Dumfriesshire, Scotland; the location is now within the area of Dumfries and Galloway unitary council.
Linefoot railway station, sometimes referred to as Linefoot Junction and sometimes as Linefoot Goods, briefly served the scattered community around the crossroads at Linefoot, near Cockermouth in Cumberland, England.
Carlisle, in North West England, formed the focus for a number of railway routes because of the geography of the area. At first each railway company had its own passenger and goods station, but in 1847 passenger terminal facilities were concentrated at Citadel station, which is in use today. Goods facilities remained dispersed, and goods wagons passing through were remarshalled, incurring delay and expense.