This article needs additional citations for verification .(August 2015) |
Coatbridge Branch | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Scotland | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | ScotRail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1871 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.
It opened in 1871 connecting an existing network in the Monklands to a College station (later High Street) in Glasgow. This enabled mineral traffic to reach quays on the River Clyde, and passenger traffic was given a considerable boost when the Glasgow City and District Railway opened in 1886, connecting the Coatbridge line with the North Clyde network west of Glasgow.
The line is open today, handling a considerable suburban passenger traffic and through trains to Edinburgh on the Bathgate route.
In the first decades of the nineteenth century there was increased demand for coal in Glasgow, for domestic and industrial purposes. There were limited local supplies, and the Monkland Canal had been bringing coal in from the Monklands pits. In 1826 the Monkland and Kirkintilloch Railway was opened to modernise the transport of the mineral, bringing it to the Forth and Clyde Canal. The line was horse-operated with primitive permanent way, but it was successful in its objectives. Other so-called coal railways followed in the district: the Garnkirk and Glasgow Railway being the first line to reach Glasgow from the Monklands, opening in 1831. It was followed by the Wishaw and Coltness Railway, opening from 1833.
The discovery of substantial reserves of blackband iron ore and the development of the hot blast method of iron smelting revolutionised the iron industry and its centre was in Coatbridge, vastly enhancing the fortunes of the local railways.
The Edinburgh and Glasgow Railway opened its main line in 1842, intersecting the Monkland and Kirkintilloch Railway. In 1845 there was a frenzy of railway promotion in Scotland, and the Caledonian Railway was authorised, to build a line between Edinburgh, Glasgow and Carlisle. To save the cost of building a new route into Glasgow, the Caledonian arranged to take over the Garnkirk and Glasgow Railway and the Wishaw and Coltness Railway, running its main line over them. This gave the Caledonian Railway a roundabout route from Coatbridge to Glasgow, opened in 1848. The Monkland and Kirkintilloch Railway did not join the Caledonian Railway group, and instead aligned with other coal railways (the Ballochney Railway and the Slamannan Railway) to form the Monkland Railways in 1848. For the time being the Monkland Railways had no direct connection to Glasgow, although there was a connection with the E&GR at Kirkintilloch Junction (later Lenzie). Although it developed numerous branches and new lines, these mostly had an eastwards emphasis. The Monkland Railways were absorbed by the Edinburgh and Glasgow Railway on 31 July 1865.
In 1846 the North British Railway opened its first line, between Edinburgh and Berwick-upon-Tweed. It saw itself as a trunk line, joining with English railways to form a through route to London. Subsequent acquisitions and openings emphasised the easterly orientation, until on 1 August 1865 the NBR amalgamated with the Edinburgh and Glasgow Railway, so that it now had a Glasgow terminal, at Queen Street. The Monkland Railways had been absorbed by the E&GR the previous day, so now the NBR had a presence at Coatbridge as well. The amalgamations gave the NBR excellent connectivity eastwards from Coatbridge, but the awkward route towards Glasgow remained; this was important because much iron ore and finished iron was exported from quays in Glasgow, and from Ayrshire ports. [1] [ page needed ] Moreover, the best of the Monklands coal and iron deposits had been worked out; the emphasis on the mineral extraction was shifting to south Lanarkshire, in Caledonian Railway territory. [2] [ page needed ]
The NBR set about closing the gap by building a line running directly west from Sunnyside Junction, Coatbridge to Glasgow. The route became practicable because of the promotion of the City of Glasgow Union Railway. This was being done by the NBR jointly with the Glasgow and South Western Railway, and the CoGUR was constructing a line crossing the River Clyde in Glasgow. In the early days there were ideas of through express passenger services between the North British Railway (former E&GR line) and the G&SWR routes, although this concept was not much developed, and the majority of the CoGUR was absorbed by the G&SWR. However, there was to be a large modern goods depot at College (later High Street). Hitherto the NBR had been much criticised for its poor goods facilities in the city; and through mineral train workings to the General Terminus and Glasgow Harbour Railway and the Ayrshire ports were to be enabled. The CoGUR line opened in 1871 as far as Bellgrove; the onward section to Sighthill took several more years.
The NBR Coatbridge to Glasgow line therefore was planned to run to College in Glasgow. It was opened from Coatbridge to Bellgrove on 23 November 1870, and passenger trains were extended to Gallowgate on the C0GUR from 1 December 1870. On 1 February 1871 the line was finally extended to College. The NBR was at last able to discontinue running passenger trains from the Monklands to Buchanan Street station over the rival Caledonian Railway. [1] [ page needed ]
The NBR already had a line from Edinburgh via Bathgate to Coatbridge, partly inherited from the Monkland Railways, and this completed an Edinburgh to Glasgow route slightly shorter than the former E&GR main line; however curvature and gradients condemned the Bathgate and Coatbridge route to secondary status. [2] [ page needed ]
From 1 September 1872 through passenger trains from Ayr to Edinburgh via Bellgrove, Coatbridge and Bathgate were inaugurated. [3] [ page needed ] Several mineral lines radiated from the Coatbridge line to coal pits close to the line.
The migration of the centre of iron and coal extraction from the Monklands towards Hamilton and Bothwell put the activity in Caledonian Railway territory. The NBR wanted to access the area, and encouraged a nominally independent railway, the Glasgow, Bothwell, Hamilton and Coatbridge Railway to build a branch. It opened in 1877 (for passengers in 1878), diverging from the Coatbridge line at Shettleston.
The College station in Glasgow was on High Street, and this was not close to the commercial and residential districts of the city. Moreover, the NBR had routes west of the city, to Dumbarton and Helensburgh, and these too were badly connected into the NBR network. The NBR decided to undertake the construction of a sub-surface line running east to west through the city. This became the Glasgow City and District Railway (GC&DR), and it was opened on 15 March 1886. It ran from a location a little east of College, dropping into a new College station at a lower level, and then running through tunnel to Queen Street Low Level station and on to Stobcross, where it connected into the NBR network on the north bank of the River Clyde. The line was opened for passenger trains only, to minimise smoke nuisance at the stations. The opening enabled through running across the city, a move that was immensely popular with passengers.
The original College terminus was closed to passengers and the site was developed to further expand the College goods station.
The residential district of Bridgeton was of considerable importance at the time, and the NBR built a short branch to it from College; it diverged from the GC&DR line towards the north of the Coatbridge line and descended to pass southwards under the main line. It opened on 1 June 1892. The Glasgow and South Western Railway wished to access the Bridgeton terminus too, and built a connecting curve from the City of Glasgow Union Railway route to join the Bridgeton branch; it opened on 1 April 1893, but it was not popular, and the service was suspended on 1 February 1913, after which the tunnel section was sealed.
The main line railways of Great Britain were compulsorily "grouped" by the Railways Act 1921, effective in 1923. The North British Railway was a constituent of the new London and North Eastern Railway (LNER). The railways were further re-organised after World War II by nationalisation in 1948: the line became a part of the Scottish Region of British Railways.
By this time the coal and iron industries had undergone great change and decline, and the railway itself was unpopular in the face of alternative transport methods. It was decided in 1955 to modernise selected routes and the line was included in the plan: most of the former NBR network from Helensburgh to Airdrie was to be electrified. This was activated in 1960, although early technical difficulties with train-borne equipment resulted in temporary suspension. Nonetheless the new passenger train service was a considerable success.
By this time the through passenger service to Edinburgh via Bathgate had been terminated (in 1956) but some through freight continued to run east of Airdrie, though this too was closed down in the 1970s. In 2010 the Airdrie to Bathgate section was reopened as an electrified passenger route.
The Coatbridge branch is in use today from High Street (the renamed College through station) to Sunnyside Junction, carrying a heavy and well used passenger suburban service, with through semi-fast trains to Edinburgh, operated by ScotRail, part of the North Clyde Line.
The Caledonian Railway (CR) was a major Scottish railway company. It was formed in the early 19th century with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.
The North Clyde Line is a suburban railway in West Central Scotland. The route is operated by ScotRail. As a result of the incorporation of the Airdrie–Bathgate rail link and the Edinburgh–Bathgate line, this route has become the fourth rail link between Glasgow and Edinburgh.
The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followed a policy of expanding its geographical area, and competing with the Caledonian Railway in particular. In doing so it committed huge sums of money, and incurred shareholder disapproval that resulted in two chairmen leaving the company.
The Edinburgh and Glasgow Railway was authorised by act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine, Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847.
The Edinburgh–Bathgate line is a railway line in East Central Scotland. It is also known as the Bathgate branch and was originally operated by the Edinburgh and Bathgate Railway. Except for the short section at the original Bathgate terminus, the main line is still in use, with a frequent passenger train service operated by ScotRail.
Bellgrove Railway Station is in the East End of Glasgow, Scotland, serving the city's Calton, Gallowgate and south Dennistoun neighbourhoods. The station is approximately 1 mile (1.6 km) to the east of Glasgow Queen Street, and is managed by ScotRail.
Coatbridge Sunnyside railway station serves the town of Coatbridge in North Lanarkshire, Scotland. The railway station is managed by ScotRail and is located on the North Clyde Line, 9 miles (14 km) east of Glasgow Queen Street.
The City of Glasgow Union Railway – City Union Line, also known as the Tron Line, was a railway company founded in Glasgow, Scotland, in 1864 to build a line connecting the railway systems north and south of the River Clyde, and to build a central passenger terminus and a general goods depot for the city. The through line, running from south-west to north-east across the city, opened in 1870–71, and the passenger terminal was St Enoch railway station, opened in 1876. The railway bridge across the Clyde was the first in the city.
The Bathgate and Coatbridge Railway, also known as the "New Monkland Line", was built by Monkland Railways. It opened on 28 July 1863. The line was absorbed into the Edinburgh and Glasgow Railway on 31 July 1865. The following day, the line became part of the North British Railway.
The Glasgow City and District Railway was a sub-surface railway line in Glasgow, Scotland, built to connect suburban routes east and west of the city, and to relieve congestion at the Queen Street terminus.
The Garnkirk and Glasgow Railway was an early railway built primarily to carry coal to Glasgow and other markets from the Monkland coalfields, shortening the journey and bypassing the monopolistic charges of the Monkland Canal; passenger traffic also developed early in the line's existence.
The Ballochney Railway was an early railway built near Airdrie, North Lanarkshire, Scotland. It was intended primarily to carry minerals from coal and ironstone pits, and stone quarries, in the area immediately north and east of Airdrie, to market, predominantly over the adjoining Monkland and Kirkintilloch Railway. Passengers were carried later.
The Slamannan Railway was an early mineral railway between the north-eastern margin of Airdrie and Causewayend on the Union Canal, near Linlithgow, Scotland.
The Monkland and Kirkintilloch Railway was an early mineral railway running from a colliery at Monklands to the Forth and Clyde Canal at Kirkintilloch, Scotland. It was the first railway to use a rail ferry, the first public railway in Scotland, and the first in Scotland to use locomotive power successfully, and it had a great influence on the successful development of the Lanarkshire iron industry. It opened in 1826.
The Monkland Railways was a railway company formed in 1848 by the merger of three "coal railways" that had been built to serve coal and iron pits around Airdrie in Central Scotland, and connect them to canals for onward transport of the minerals. The newly formed company had a network stretching from Kirkintilloch to Causewayend, near Linlithgow. These coal railways had had mixed fortunes; the discovery of blackband ironstone and the development of the iron smelting industry around Coatbridge had led to phenomenal success, but hoped-for mineral discoveries in the moorland around Slamannan had been disappointing. The pioneering nature of the railways left them with a legacy of obsolete track and locomotives, and new, more modern, railways were being built around them.
The Rutherglen and Coatbridge Railway was a railway line in Scotland built by the Caledonian Railway to shorten the route from the Coatbridge area to Glasgow. It opened in 1865. It was later extended to Airdrie in 1886, competing with the rival North British Railway. Soon after a further extension was built from Airdrie to Calderbank and Newhouse.
The Glasgow, Bothwell, Hamilton and Coatbridge Railway was a railway company in Scotland, built to serve coal and ironstone pits in the Hamilton and Bothwell areas, and convey the mineral to Glasgow and to ironworks in the Coatbridge area. It was allied to the North British Railway, and it opened in 1877. Passenger services followed.
The Kelvin Valley Railway was an independent railway designed to connect Kilsyth, an important mining town in central Scotland, with the railway network. It connected Kilsyth to Kirkintilloch and thence over other railways to the ironworks of Coatbridge, and to Maryhill, connecting onwards to the Queen's Dock at Stobcross.
The Wilsontown, Morningside and Coltness Railway was a railway opened in 1845, primarily for mineral traffic, although a passenger service was run sporadically. The line ran from a junction with the Wishaw and Coltness Railway at Chapel, to Longridge, in South Central Scotland, and it was extended to Bathgate in 1850 after takeover by the Edinburgh and Glasgow Railway. It was built to open up further coal deposits and to connect the Wilsontown Ironworks, although it did not actually reach Wilsontown. In common with the other "coal railways" with which it connected, it adopted the track gauge of 4 ft 6 in, often referred to as Scotch gauge.
The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.