The Polloc and Govan Railway was an early mineral railway near Glasgow in Scotland, constructed to bring coal and iron from William Dixon's collieries and ironworks to the River Clyde for onward transportation.
When the Clydesdale Junction Railway was projected in the nineteenth century, it used part of the alignment of the Polloc line to reach Glasgow from Rutherglen, and that part of the route is in use today as the main access to Glasgow Central station from the Motherwell direction.
John Dixon came from Sunderland to Glasgow and established coal pits at Knightswood and Gartnavel, in what are now the western suburbs of Glasgow. About 1750 he purchases a glassworks at Dumbarton, and to transport his coal to the works, he built a wooden waggonway from the pit mouth to Yoker. The coal was loaded into barges, which went down with the ebb tide to Leven. By 1785 the glassworks was the largest in the United Kingdom, consuming 1,500 tons of coal per annum. [1]
A newspaper correspondent wrote in 1852:
The coal from the pits of the Woodside district about the middle of the last century was mostly consumed at the glass works at Dumbarton. My informant says that there was at this time a wooden tram road commencing at the Woodsise coal pits which crossed the Dumbarton Road, and extended to a quay situated on the river, nearly opposite to Renfrew, from which quay the coals were shipped by gabberts to Dumbarton. I do not think that this tram road existed in my day, but about 70 years ago, I walked on the tram road from the Little Govan Coal Works to the Coal Quay, then situated on the south banks of the river at the grounds lately of Todd and Higginbotham, and I rather think that the Dumbarton Glass Works Company were at that time interested in the Little Govan Coal Works as well as the Woodside Coal Works.
The Knightswood pit became exhausted and Dixon acquired mineral rights in the Little Govan estate. Between 1775 and 1778, [1] his son William Dixon built a line from Govan coal pits to Springfield on the south bank of the Clyde. At that time "Govan" extended to the south-east of the city; the coal pits were in the area bounded by the present-day M74, Polmadie Road and Aikenhead Road. "Springfield" was a quay on the south bank of the Clyde, immediately west of West Street, although Wherry Wharf was the actual quay used. The alignment of the waggonway was broadly south-east to north-west, skirting round the south of the built up area of the time, and the approach to the Clyde was along what became West Street. Privately built and not requiring Parliamentary authority, this became known as the Govan Waggonway.
Dixon built it on the principle familiar to him from Tyneside, with timber cross-sleepers and timber rails, and wagons with flanged wheels were pulled by horses. [2] [3]
In 1810 the Glasgow, Paisley and Johnstone Canal was nearing completion, with its Glasgow termination at Port Eglinton; this faced the west side of Eglinton Street immediately south of, and opposite, the Cumberland Street junction; the area is long since built over. According to Paterson (page 207), "On 1 August 1811, William Dixon (Junior), coalmaster, bought 1,242 square yards of ground from the Corporation of Glasgow of building a tramway on which to convey coal from his Govan pits to the Ardrossan Canal basin at Port Eglinton." [4] The main line of the waggonway was of course already long established, and this must refer to Dixon's intention to build a short connecting branch to the canal basin.
Dixon later built an ironworks a little to the west of the Govan coal pit, in the area immediately east of the point where Cathcart Road crosses the M74. From the flames issuing from the furnaces the works became known as Dixon's Blazes. The Govan coal pits had expanded with surface equipment over a wide area; the ironworks was connected to the pits by local tramways, but the coal and iron needed to transported further afield. The Govan Waggonway, with wooden rails and horse traction, was technologically inadequate. By 1830 railways using stone block sleepers and cast iron rails were well established technology, and Dixon commissioned Thomas Grainger and John Miller to design a conversion of his waggonway to a railway. Grainger and Miller had been responsible for several of the "coal railways" in central Scotland, notably the Monkland and Kirkintilloch Railway, opened in 1826. [5] The track gauge was 4 ft 6in, which Grainger and Miller had adopted on most of the other lines. [6]
Polloc and Govan Railway Act 1830 | |
---|---|
Act of Parliament | |
Long title | An Act for making and maintaining a Railway from the Lands of Polloc and Govan to the River Clyde, at the Harbour of Broomielaw, in the County of Lanark, with a Branch to communicate therefrom. |
Citation | 11 Geo. 4 & 1 Will. 4. c. lxii |
Dates | |
Royal assent | 29 May 1830 |
Text of statute as originally enacted |
On 29 May 1830, the Polloc and Govan Railway was authorised as a public company by an act of Parliament, the Polloc and Govan Railway Act 1830 (11 Geo. 4 & 1 Will. 4. c. lxii), with capital of £10,000 and authorised borrowing of £5,000. [7]
At the eastern end the terminal was in lands in the ownership of the Trustees of Hutcheson's Hospital, [note 1] "whereby the fair advantage which the measure was calculated to produce might be secured to the institution". [8] Robertson also shows a short westward spur from Eglinton Street towards Shields Bridge; this is referred to as the "Polloc Estate branch" by Robertson. The total length of the lines authorised was 0.85 miles (main line) and 0.34 miles (branches), a total of nearly 2 km. [5]
Polloc and Govan Railway Act 1831 | |
---|---|
Act of Parliament | |
Long title | An Act for amending an Act passed in the Eleventh Year of the Reign of His late Majesty King George the Fourth, for making and maintaining a Railway from the Lands of Polloc and Govan to the River Clyde; and to alter and extend the Powers of the Company of Proprietors of the said Railway. |
Citation | 1 & 2 Will. 4. c. lviii |
Dates | |
Royal assent | 23 August 1831 |
Text of statute as originally enacted |
Polloc and Govan Railway Act 1837 | |
---|---|
Act of Parliament | |
Long title | An Act to continue, for certain Purposes, the Powers of Two Acts for making and maintaining the Polloc and Govan Railway. |
Citation | 7 Will. 4 & 1 Vict. c. cxviii |
Dates | |
Royal assent | 15 July 1837 |
The line opened on 22 August 1840, [9] "from Rutherglen to the Broomielaw Harbour", after two further acts of Parliament were obtained, the Polloc and Govan Railway Act 1831 (1 & 2 Will. 4. c. lviii) and the Polloc and Govan Railway Act 1837 (7 Will. 4 & 1 Vict. c. cxviii), authorising considerably more capital: £36,000 in share value. [5] Cobb suggests that the 1840 opening was from Polmadie Bridge, i.e. Dixon's ironworks and coalpits, with an eastward extension to a station at Rutherglen in 1842. [4] [6] [1]
The Caledonian Railway (CR) opened its main line from Glasgow in 1849; the route was from Townhead over the Glasgow, Garnkirk and Coatbridge Railway (GG&CR), an extended successor to the earlier Garnkirk and Glasgow Railway, which had been built as a coal line. The GG&CR had been upgraded but the route was roundabout. A shorter route between Motherwell and Glasgow had been promoted earlier; it obtained authority by an act of Parliament, the Clydesdale Junction Railway Act 1845 (8 & 9 Vict. c. clx), on 31 July 1845, and was called the Clydesdale Junction Railway. The CR made provisional arrangements to lease the Polloc and Govan line on 29 January 1845, and soon afterwards to lease the Clydesdale Junction line itself. [9] The CR purchased the Polloc and Govan Railway on 18 August 1846, and William Dixon received 2,400 CR shares in payment. [note 2] [9] The CR upgraded the Polloc and Govan and regauged it to standard gauge, [6] and used its alignment for part of the route: it formed an end-on junction with the line at Rutherglen. At Eglinton Street the new line diverged to the north and terminated at the Southside railway station, which was shared with the Glasgow, Barrhead and Neilston Direct Railway.
On 30 March 1849 the General Terminus opened; it was a large goods handling depot on the River Clyde, immediately to the west of the Polloc and Govan's "Broomielaw" terminal at Windmillcroft, and superseding it. [9] The obsolete rails in West Street remained in place for another eighteen years: on 14 March 1867 an act of Parliament[ which? ] was obtained to lift part of the line, in West Street to the River Clyde. [4] [9] [10]
The Clydesdale Junction Railway was absorbed by the Caledonian Railway. [10] [11]
The Caledonian Railway (CR) was a major Scottish railway company. It was formed in 1845 with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.
The Argyle Line is a suburban railway located in West Central Scotland. The line serves the commercial and shopping districts of Glasgow's central area, and connects towns from West Dunbartonshire to South Lanarkshire. Named for Glasgow's Argyle Street, the line uses the earlier cut-and-cover tunnel running beneath that thoroughfare.
The Monkland Canal was a 12+1⁄4-mile-long (19.7 km) canal designed to bring coal from the mining areas of Monklands to Glasgow in Scotland. In the course of a long and difficult construction process, it was opened progressively as short sections were completed, from 1771. It reached Gartcraig in 1782, and in 1794 it reached its full originally planned extent, from pits at Calderbank to a basin at Townhead in Glasgow; at first this was in two sections with a 96-foot (29 m) vertical interval between them at Blackhill; coal was unloaded and carted to the lower section and loaded onto a fresh barge. Locks were later constructed linking the two sections, and the canal was also connected to the Forth and Clyde Canal, giving additional business potential.
The Glasgow, Yoker and Clydebank Railway was a railway company that opened in 1882, giving a rail connection to shipyards and other industry that developed in what became Clydebank. At first it was a purely local line, connecting only at Stobcross with the North British Railway, but as industry developed in the area it served it became increasingly important.
The Stobcross Railway was a railway line in Glasgow, Scotland, built by the North British Railway to connect from Maryhill to the new dock being built at Stobcross; the dock became the Queen's Dock, opened in 1877. The line was opened first, in 1874, and gave the North British company access to the north bank of the River Clyde; there was a goods depot at Partick.
The Whiteinch Railway was a railway line opened in 1874 in Scotland to connect industrial premises that had developed in the area with the Stobcross Railway, giving access to the main line network. It was opened for goods and mineral traffic, and was extended by the Whiteinch Tramway which fed directly into the factories and works.
The Lanarkshire and Dumbartonshire Railway was a railway company in Scotland. It was promoted independently but supported by the Caledonian Railway, and it was designed to connect Balloch and Dumbarton with central Glasgow, linking in heavy industry on the north bank of the River Clyde. From Dumbarton to Balloch the line would have closely duplicated an existing railway, and negotiation led to the latter being made jointly operated, and the L&DR terminated immediately east of Dumbarton, trains continuing on the joint section.
The Glasgow, Paisley, Kilmarnock and Ayr Railway (GPK&AR) was a railway in Scotland that provided train services between Glasgow, Kilmarnock and Ayr. It opened its first line, between Glasgow and Ayr, in stages from 1839 to 1840. The section between Glasgow and Paisley was made jointly with the Glasgow, Paisley and Greenock Railway. Later it built a line from Dalry via Kilmarnock to Cumnock, linking there with the Glasgow, Dumfries and Carlisle Railway, and together forming a through route from Glasgow to Carlisle. The two companies merged to form the Glasgow and South Western Railway.
The Clydesdale Junction Railway company was formed to build a railway connecting Motherwell and Hamilton with Glasgow, in Scotland.
The General Terminus and Glasgow Harbour Railway was authorised on 3 July 1846 and it opened, in part, in December 1848.
The Monkland and Kirkintilloch Railway was an early mineral railway running from a colliery at Monklands to the Forth and Clyde Canal at Kirkintilloch, Scotland. It was the first railway to use a rail ferry, the first public railway in Scotland, and the first in Scotland to use locomotive power successfully, and it had a great influence on the successful development of the Lanarkshire iron industry. It opened in 1826.
The Caledonian and Dumbartonshire Junction Railway (C&DJR) was a Scottish railway opened in 1850 between Bowling and Balloch via Dumbarton. The company had intended to build to Glasgow but it could not raise the money.
The Caledonian Railway main line in Scotland connected Glasgow and Edinburgh with Carlisle, via Carstairs and Beattock.
The Rutherglen and Coatbridge Railway was a railway line in Scotland built by the Caledonian Railway to shorten the route from the Coatbridge area to Glasgow. It opened in 1865. It was later extended to Airdrie in 1886, competing with the rival North British Railway. Soon after a further extension was built from Airdrie to Calderbank and Newhouse.
The Coatbridge Branch of the North British Railway was a railway built to connect the important coal and iron industrial districts of Coatbridge and Airdrie directly to Glasgow for the North British Railway.
The Shotts Line is a suburban railway line in Scotland linking Glasgow Central and Edinburgh Waverley via Shotts. It is one of the four rail links between the two cities.
The Glasgow, Bothwell, Hamilton and Coatbridge Railway was a railway company in Scotland, built to serve coal and ironstone pits in the Hamilton and Bothwell areas, and convey the mineral to Glasgow and to ironworks in the Coatbridge area. It was allied to the North British Railway, and it opened in 1877. Passenger services followed.
Fireworks village, also known as Govan Colliery Houses, was a company village in Scotland belonging to the Dixon family who ran the Govan Iron Works and Govan Colliery. The inhabitants were chiefly coal miners and their families who worked in the Govan Colliery. The company also built a Methodist church and a school. At the time, its location was a short distance outside the City of Glasgow, the largest town in Scotland; no trace now remains in the 21st century, with the site occupied by the now inner-city neighbourhood of Govanhill
This article describes the Caledonian Railway from its conception down to the year 1850.
The Caledonian Railway branches in North Lanarkshire built on the Caledonian Railway main line, which opened in 1848. In the following years the considerable increase of iron production and coal extraction in North Lanarkshire led to a progressive expansion of branch lines in the area between the eastern margin of Glasgow and Bellside in the east, and between Coatbridge, Airdrie and Motherwell. Mineral traffic was dominant and for some years passenger operation followed the construction of some of the mineral connections. In 1861 the Rutherglen and Coatbridge line was opened, extended later to Airdrie, rivalling the established Monkland Railways route. In 1869 the connection from Cleland to Midcalder was opened, connecting mineral sites but also forming a new passenger route to Edinburgh.