Race to the North

Last updated

Main news item in the Glasgow Herald, 23 August 1895. The image shows the top section of the full report. The Railway Race Glasgow Herald, 23 August 1895.jpg
Main news item in the Glasgow Herald , 23 August 1895. The image shows the top section of the full report.

The Race to the North was the name given by the press to occasions in two summers of the late 19th century when British passenger trains belonging to different companies would literally race each other from London to Edinburgh over the two principal rail trunk routes connecting the English capital city to Scotland – the West Coast Main Line which runs from London Euston via Crewe and Carlisle and the East Coast Main Line route from London King's Cross via York and Newcastle. The "races" were never official and publicly the companies denied that what happened was racing at all. Results were not announced officially and the outcomes have since been hotly debated. In the 20th century there were also occasions of competition for speed on the two routes.

Contents

Background

East and west coast railway routes at the time of the "Races" Race to the North-pathtext.svg
East and west coast railway routes at the time of the "Races"

The late nineteenth century was a boom time for the railways in Britain with many independent companies operating but with poor coordination between the companies' lines. Gradually merger and other formal agreements were made so that travel across the country became feasible. For the first time long-distance rail travel could be afforded by the general public. [2] By the 1880s two consortia in particular provided services between London and Edinburgh using separate routes on the east and west coasts of Britain terminating in London at King's Cross and Euston stations, and in Edinburgh at Waverley and Princes Street stations. Great Northern Railway (GNR) and North Eastern Railway (NER) ran the East Coast service with London & North Western Railway (LNWR) and Caledonian Railway (CR) on the West Coast. The companies each had territories where they owned the track or had legally enforcible running rights on some other tracks. At the "borders" between these companies' territories – York and Carlisle – locomotives were always changed (and they were generally changed at intermediate points also) but passengers did not necessarily have to change carriage. [3]

In 1888, driven by commercial rivalry, the East Coast and West Coast consortia started competing fiercely over the speed of their express services over these two routes. [3]

By the 1890s, an east coast route had been established further north through Scotland over the Forth and Tay bridges allowing the North British Railway (NBR) to provide a reasonably direct Edinburgh to Aberdeen service so as to extend the East Coast consortium's King's Cross to Scotland route. Although NBR owned the track from further south at Berwick-on-Tweed, NER had running rights to Edinburgh. Caledonian already had a route connecting Carlisle and Aberdeen via Stirling and Perth. In 1895 a second "race" broke out but this time with the added excitement of arriving at the same station in Aberdeen. Indeed, after some 500 miles from London, the two routes converged to being in sight of each other just before Kinnaber Junction from where there was a single track to Aberdeen. [4]

In 1901, the Midland Railway and North British Railway ran an accelerated London St Pancras to Edinburgh Waverley express. East Coast responded by speeding up and West Coast briefly joined in. Although the press hoped for a new "Race", nothing came of it. [5]

London to Edinburgh, 1888

From 1885 the main London to Edinburgh services were as follows. [3]

RouteEast CoastEast CoastM & N.B. [note 1] West Coast
1885 timetable
Passenger class1st & 2nd1st, 2nd & 3rd1st & 3rd1st, 2nd & 3rd
London depart10:0010:1010:3510:00
Edinburgh arrive19:00 43.7 mph 20:1020:4220:00 40.0 mph
August 1888 record time [6] 1st, 2nd & 3rd
Edinburgh arrive17:27 52.8 mph17:38 52.4 mph
Subsequent scheduled time [7]
Edinburgh arrive18:15 47.7 mph18:30 47.0 mph

In 1885, the east coast express service comprised GNR from King's Cross stopping at Grantham and York and then NER stopping at Newcastle, Berwick and Edinburgh Waverley – a distance of 393.2 miles (632.8 km). On the west coast, LNWR from Euston stopped at Willesden, Rugby, Crewe, Preston and Carlisle followed by Caledonian stopping at two stations in Scotland before Edinburgh Princes Street – 399.7 miles (643.3 km). [8] Even the fastest run (Grantham to York) was slower than 50 mph (80 km/h). [9]

The East Coast had a very strong hold on the traffic and this was consolidated further in November 1887, when the railways announced that the Special Scotch Express [note 2] would also take 3rd class passengers. [10] West Coast, faced with dwindling traffic, took a decisive step. Delaying their announcement to the last minute, they stated in June 1888 that the Day Scotch Express would now arrive in Edinburgh an hour earlier, at 19:00. [11] On 1 July the East Coast arrival time became 18:30, with the lunch stop at York being reduced from 30 to 20 minutes – on 1 August West Coast matched this time, cutting out stops between Carlisle and Edinburgh, but East Coast, seemingly in anticipation, started arriving at 18:00 on the same day. [12] West Coast were determined to match this time and decided to run two separate trains with fewer carriages – the racing train travelled non-stop from Euston to Crewe. [13] [note 3]

GNR Stirling 4-2-2 Eight-foot Single 4-2-2 GNR 1001.jpg
GNR Stirling 4-2-2 Eight-foot Single

This schedule started on 6 August, Bank Holiday, with the press now taking full notice, crowds turning out at Euston and bookmakers taking bets on the results. [13] To the surprise of the experts on that first day the LNWR locomotive to Crewe was the 25-year-old Problem class Waverley 2-2-2 single. [note 4] Another surprise was that Caledonian ran its brand new and unique No. 123 4-2-2 single and this locomotive was used every day of the series. In fact, both trains used to arrive in Edinburgh earlier than scheduled and reporters would guess which train would arrive first and then would race the mile length of Princes Street in hansom cabs in the hope of seeing the other train arrive. The results were cabled to the New York Herald for reporting the next day. [15] By 13 August East Coast booked an arrival time of 17:45, omitting the stop at Berwick and averaging 59.3 mph (95.4 km/h) between Newcastle and Edinburgh. [16] On the same day West Coast abandoned any timetable at intermediate stations and the train left as soon as it was able. In this way they beat the East Coast "record" even before it had been made. Worse, East Coast arrived later than scheduled although they made amends on 31 August, arriving at 17:27. [6] On both lines the overall speed had been over 52 mph (84 km/h). However, on 14 August the companies held a conference in London and it was agreed that minimum journey times of 7¾ hours (East Coast) and 8 hours (West Coast) would be adhered to during the rest of that month and then times would be increased by 30 minutes. [17]

Throughout the period, the Midland Railway, who had recently completed the Settle and Carlisle Line, and the North British Railway (NBR) on the Waverley Line were faced with a longer route – from London St Pancras via Manchester and Carlisle to Edinburgh Waverley – with many curves and gradients and so they were unable to be competitive on speed. [18]

Forth Bridge, under construction George Washington Wilson.jpg
Forth Bridge, under construction

Thus the racing came to an end after August and the end of the holidays, although there were now 29 express trains a day between London and Scotland (in both directions) compared to 16 in 1885. [19] A new prospect was appearing however, and the Pall Mall Gazette wrote: "The main cause confronts us when we see those three stupendous towers of steel which loom above the horizon of Edinburgh. When the Forth Bridge is finished the North Western and Caledonian will have to struggle hard if they wish to retain much of the traffic to Dundee or Aberdeen". [20]

The companies' locomotives and trains in the 1880s

Innovations in steam locomotive design included the introduction of compound locomotives and bogies rather than axle leading wheels. The railway companies had their own individual locomotive works and locomotive designers. [3] [21] [22]

On the East Coast route, GNR locomotives ran on what was then the fastest line in the world, but the " Flying Scotsman " service [note 2] was not their fastest train – it was 49 mph (79 km/h) compared to 54 mph (87 km/h) on routes with more competition. A wide variety of locomotives were in use – the Patrick Stirling 4-2-2 "8-foot" singles, complemented with his 2-2-2 "7-foot 6" singles, were outstanding for speed and reliability, being capable of 75 mph (121 km/h) on flat terrain. The latest express NER engines were Tennant 2-4-0s [note 5] and the T. W. Worsdellvon Borries compound Worsdell 'F' 4-4-0s which were powerful, although not so fast. [23] [note 6] Having compound engines required the development of stronger steel coupling rods for fast running, and the 4-4-0s developed from 2-4-0s when it was found that a front bogie gave greater high speed stability. [26] The East Coast route had no severe gradients and was slightly shorter than the west. [23]

Up to the 1880s, the LNWR's rail services were relatively slow and local, and their express locomotives had been designed for economy rather than speed. As somewhat of an exception, John Ramsbottom's "Lady of the Lake" 2-2-2 single [note 7] hauled the Irish Mail for which the contract stipulated a minimum average speed of 42 mph (68 km/h) and even this could be a problem – the load on the train was important and third class passengers were excluded to keep the load down and the speed up. The Precedent Class 2-4-0s were exceptional for the time, and would eventually turn out to have a good turn of speed. Francis Webb compound steam engines were starting to be introduced but were not yet notably powerful or economic. Regarding the principal express Caledonian locomotives, Dugald Drummond 4-4-0s were good for ascending hills but were untested for speed. Their earlier locomotives needed to be run double-headed on larger trains. A new locomotive, the Single No. 123 4-2-2, was introduced but still untested. [note 8] For the West Coast line, the climbs to top of Shap and Beattock were the steepest gradients. [27]

For the 1888 accelerations, the West Coast companies willingly double-headed their express trains and so had power in hand. On the GNR, the Stirling Single engines did not allow double-heading and the new third class passengers were creating a greater load. The Caledonian Railway now ran two separate trains north from Carlisle, to Glasgow and Edinburgh, though these were single-headed. However, the journey time improvements came from cutting waiting times and delays as much as by raising running speed. [28] The NER was an exception by being able to raise their average speed from about 49 to 58 mph (79 to 93 km/h), and it was later by double-heading their trains that East Coast gained a decisive advantage. Trains ran lightly loaded, typically with only four or five carriages. [29]

London to Aberdeen, 1895

The railways arrived in Aberdeen in 1850 and an east coast through service was instituted in 1855, taking 17½ hours from London, [30] reduced by 1889 to nearly 13 hours. With the opening of the Forth Bridge in 1890, the distances from London to Aberdeen were 523.2 miles (842.0 km) and 539.7 miles (868.6 km) on east and west coast routes. [31] The timetables for the main expresses were as follows. [32]

East CoastDaytimeOvernightWest CoastDaytimeOvernight
1890 timetable
King's Cross depart10:0020:00Euston depart10:0020:00
Edinburgh depart18:5505:30
Dundee depart20:3007:00
Aberdeen arrive22:20 42.4 mph08:55 40.5 mphAberdeen arrive22:55 41.8 mph08:50 42.0 mph
August 1895 record time
Aberdeen arrive04:40 60.4 mphAberdeen arrive04:32 63.2 mph
Subsequent scheduledtime
Aberdeen arrive06:20 50.6 mphAberdeen arrive07:00 49.1 mph

At the beginning of 1893, the West Coast accelerated the Day Scotch Express to arrive at 22:25 and devised a scheme for delaying its rivals at Kinnaber Junction, where Caledonian operated the signal box. The booked time at Dubton, the Caledonian line signalbox before Kinnaber, was six minutes before the time booked for Kinnaber although the journey only took two minutes. The Dubton signalman would offer the train to Kinnaber at its booked Dubton time at the latest – which might be earlier than its actual time. The Kinnaber signalman would accept the train thus keeping the signals against North British. The North British train was only given clearance if it actually passed the North British Montrose signal box before the Dubton booking time. By this means until the NBR realised what was happening and complained, the Caledonian could take priority even with its rival already waiting at Kinnaber. [33]

1912 Railway Clearing House Junction Diagram showing railways converging at Kinnaber Junction Arbroath, Kinnaber & Montrose railways.jpg
1912 Railway Clearing House Junction Diagram showing railways converging at Kinnaber Junction

In the event, competition focussed on the overnight expresses. East Coast soon changed its timetable to arrive at Aberdeen at 08:15 and West Coast followed suit with 08:05. However, whereas West Coast ran a reliable service, North British were often late because of slow changes of engine at Waverley station, [note 9] and a tortuous and undulating run from there northwards on a line that was partially single track. [note 10] By June 1893, East Coast had a booked arrival time of 07:35 and West Coast 07:50. However, if the North British train was slightly late it would be beaten to Kinnaber Junction and not be able to pass the Caledonian train. [35] Caledonian owned the line from Kinnaber to Aberdeen but NBR held running rights (Caledonian required running rights over a very short section of NBR line at Monklands, Lanarkshire). [36]

By 1 July 1895, these times had been brought forward to 07:20 (East) and 07:40 (West). This involved NER reaching Edinburgh in 8 hours 13 minutes, in breach of the 1888 agreement not to take less than 8½ hours. [note 11] In practice West Coast, stopping at seven intermediate stations on its route and pulling trains of 15 to 17 carriages, was frequently arriving later than 08:00. Without prior warning, on 15 July, West Coast widely advertised a new arrival time of 07:00, reducing the intermediate stops to five, and next morning the train actually arrived at 06:47 and on the next run 06:21 was achieved. [37] Inevitably, the East Coast announced a new arrival time of 06:45, which although earlier than the West Coast booked time, was nevertheless beaten by the actual West Coast arrivals. There were urgent communications within the East Coast consortium about whether to try and negotiate their way out of the developing race until on 25 July the Marquis of Tweedale, NBR chairman, wired John Conacher, NBR general manager "My opinion is our best policy is to beat them at any cost...". [38] The NBR train arrived at 06:23, two minutes ahead of the new booked time, only to find the rival train had arrived 06:06. [39]

From the beginning of August, the newspapers were reporting on what they called the "Race to the North" and Kinnaber Junction, until that time an unknown outpost, was analysed in detail. [40] Crowds gathered at the various stations. Even in the early hours of the morning men, women and children gathered at Carlisle Citadel station to join the excitement. For the newspapers sensation required not just speed but also potential disaster and the dangers were debated. At Cupar in Fife the permanent-way gang was called out each night to correct the rails after the express had passed round the curve at speed – the displacement was about three inches.

19/20 August 1895

Unusually, on 18 August East Coast arrived at Aberdeen first. This was achieved by reducing the number of carriages to seven at most, by not allowing passengers to get on or off the train at intermediate stations south of Dundee, [note 12] and by making greater time allowances for keeping the line clear of other traffic. The companies' internal telegrams make no bones about calling it a "race". The next night, sworn to secrecy, three elite railway journalists were invited to travel. After measuring a speed of 81.5 mph (131.2 km/h) approaching the S curves at Portobello (where the speed limit was 15 mph) they were flung to the floor and the train was still going 64 mph (103 km/h) entering Waverley station. The engines were changed in two minutes but a station official kept the train waiting another 8½ minutes. Time was more than made up by Dundee and there was no problem at Kinnaber so the train arrived at Aberdeen at 05:30. The Caledonian train had got in 16 minutes earlier – with only four carriages. [41] [42]

20–23 August 1895

On the night of 20/21 August, both trains made exceptionally good time. NBR had decided to split their train at Waverley with the slower part not due to reach Aberdeen until 06:25. A "considerable number of people" at Dundee station were there to cheer, even at 03:42. [43] Approaching Kinnaber Junction just before dawn at four in the morning, the trains could be seen from each other across the Montrose Basin. North British passed Montrose signal box at 04:22 but Caledonian had reached Dubton at 04:21 and so, receiving a clear line, made its Aberdeen arrival at 04:58 with an average speed from start to finish of over 60 mph (97 km/h). [44]

Caledonian Railway postcard showing engine driver John Souter and the Lambie No. 17 4-4-0, 23 August 1895. John Souter, Caledonian Railway, 1895.jpg
Caledonian Railway postcard showing engine driver John Souter and the Lambie No. 17 4-4-0, 23 August 1895.

By this time, the leading newspapers had reporters at all the stations to telegraph in their accounts of the night. Crowds thronged the platforms. On 21/22 August, NER put in a particularly strong performance averaging 66.2 mph (106.5 km/h) between Newcastle and Edinburgh, a distance of 124.4 miles (200.2 km). NBR were quickly out of Waverley and beat Caledonian to Kinnaber by 15 minutes, arriving in Aberdeen at 04:40. A "leading official" of LNWR stated "We don't admit that we're racing at all. We only claim that it's possible for us to arrive in Aberdeen at the same time as the trains of the East Coast Railway...". [45] Both trains had averaged over 60 mph London to Aberdeen. NBR general manager John Conacher telegraphed his GNR counterpart Sir Henry Oakley "After this morning's achievement I think we ought to revert to advertised time ... There is a feeling here that rivalry has gone far enough already...". That afternoon the press were told that East Coast would in future arrive at 06:20 – the competitive racing was over. [46]

That evening (22 August) at Euston station there was the usual excitement. West Coast wanted to regain the advantage and next morning the Yorkshire Post were able to report "A Sensational Achievement by the West Coast Express". [47] Pulling only three carriages and leaving out the stop at Stirling, Aberdeen was reached at 04:32. [48] A Caledonian Railway publicity postcard of the time shows the figure of their engine driver John Souter standing alone by his locomotive at Aberdeen station. This picture is belied by the report in the Daily Sketch – "Driver Souter, who has all along been in charge of this engine, is the railway hero of the moment ... There was much excitement at Aberdeen on the great day, the train being waited for by a crowd of spectators. Souter and his stoker were borne shoulder-high...". [49]

In his 1958 book about the series of races, Oswald Nock wrote of the 22/23 August journey, "And at that astonishing average speed of 63.3 mph made sixty-three years ago the London–Aberdeen record still stands today". [50] [note 13]

The companies' locomotives and trains in the 1890s

LNWR Improved Precedent ("Jumbo") class No. 790 Hardwicke - a participating locomotive. LNWR Jumbo class locomotive 790 Hardwicke (Howden, Boys' Book of Locomotives, 1907).jpg
LNWR Improved Precedent ("Jumbo") class No. 790 Hardwicke – a participating locomotive.

Between 1888 and 1895, better-built bogie carriages were becoming available. LNWR had started introducing improved 60 ft (18 m) rails and were still the only company with water troughs. [54] There had also been some important development in express locomotive design.

The GNR had the same locomotives as before, but the NER had made considerable changes. Improved piston valves were introduced generally. The large and heavy Worsdell M 4-4-0 was introduced, designed specifically towards speed – apart from the early models, these had compound cylinders. [note 14] These achieved the highest average speeds of all, including 74 mph (119 km/h) over a 13-mile (21 km) stretch. The Worsdell J class 4-2-2 was converted from compound to simple expansion working. [note 15] The NBR had four classes of 4-4-0, the earliest by Drummond [note 16] and the rest by Matthew Holmes. [note 17] . [59]

For the LNWR, Webb compound engines were dominant and were being developed further for the fast three cylinder Teutonic 2-2-2-0 capable of well over 80 mph (130 km/h). It retained uncoupled driving wheels but had a larger boiler and good steam flow design. The Improved Precedent ("Jumbo") 2-4-0 was as fast but could not take such a heavy load. [60] The Caledonian Railway was still running the Drummond 4-4-0s but now complemented by the Lambie version with increased boiler pressure and estimated by Nock to have averaged 75 mph (121 km/h) over an 11 miles (18 km) stretch. [61]

In August up until the time of the serious racing, the express trains ran 8 to 15 carriages ("comparatively light", up to 175 long tons (178  t )) with the LNER and Caledonian double-heading when there were more than about 12 carriages. GNR never ran double-headed, pulling up to 190 long tons (190 tonnes). [62] Then during the crucial period, the East Coast ran six carriages (one bogie sleeping carriage, three six-wheeler carriages, two brake vans) and the West Coast, single-heading, ran four passenger bogie carriages, about 95 long tons (97 tonnes). North of Edinburgh and Perth both trains were reduced by one carriage. Thus passenger accommodation was very comparable. Changing of engines could be done in as little as 90 seconds. [63]

Fastest runs

Oswald Nock summarised the four fastest runs in the following table. He chose stretches of line roughly equal in length and level in aggregate. Each contained one "severe slack" that required slow running. He notes that on Hardwicke's run the train also had the same average speed over a more difficult section of 75.8 miles (122.0 km) over Shap summit. [64]

Whyte
class
Load
long tons
Ratio
engine/train
weight
LocationDistance
miles
Time
minutes
Average
speed
mph (km/h)
GNRStirling No. 775 4-2-2 1012.98 BarkstonNaburn 74.365.7567.7 (109.0)
NERWorsdell M No. 1620 4-4-0 1012.8Longhirst–Dunbar 75.066.7567.3 (108.3)
LNWRPrecedent Hardwicke 2-4-0 72.52.95 Minshull VernonCarnforth 73.464.568.3 (109.9)
CRLambie No. 17 4-4-0 72.52.46 Stanley Junc.–Ferryhill Junc.82.069.071.3 (114.7)

Nock picks out another exceptional run of a rather different nature. In the early hours of 22 August, the NBR Holmes No. 293 4-4-0 left Waverley for Dundee with a load of 86 tons. The run, starting and finishing from at rest unlike the runs tabulated above and involving severe curves and other speed restrictions, took 59 minutes for the 59.2 miles (95.3 km), a speed of 60.2 mph (96.9 km/h). [note 18] Nock, writing towards the end of the steam era in 1958, says that since World War I no train had done the run in less than 80 minutes. [66] [note 19]

Aftermath of the 1895 races

North British considered restarting the competition with Conacher writing to Oakley "Although I share to the full your opinion regarding the childishness of the whole business ... I am quite prepared to run another train as much like theirs as possible, when I have no doubt we could again shew our superiority". To achieve the high speeds very few carriages could be pulled and so a second, longer, slower train had to follow on behind. There was no benefit to the public in arriving so very early and, apart from the publicity, it made no financial sense. For all these reasons the racing was not resumed. In a leading article The Engineer magazine concluded "One gratifying result of the race will be perhaps to silence the boasting of the American press. The far-famed Empire State Express has been thoroughly beaten...". [67]

In July 1896, a West Coast overnight express took the curve at Preston excessively fast and derailed. One person was killed and the train was wrecked. Two "Jumbos" had been double-heading the train and the enquiry found that the only experience either driver had on the line had always involved stopping at Preston. To reassure the public, agreement was reached to slow the runs from London to Edinburgh and Glasgow to take a minimum time of eight hours. This agreement, which gave much the same journey time as in 1889, lasted into the early 1930s, removing any impetus towards improving express train performance or scheduling. [68] [69]

Later rivalry

With the end of specially staged train races, later rivalries between the West Coast and East Coast routes centred on timetabled services based largely on improvements in traction technologies.

London to Edinburgh, 1901

For its summer 1901 service, the Midland Railway and NBR consortium announced the 09:30 London St Pancras express – on the Settle & Carlisle and Waverley lines – would arrive in Edinburgh at 18:05, ten minutes before the GNR/NER Flying Scotsman. Concerned that a possibly delayed Midland train could lead to Portobello East junction becoming like Kinnaber, NER rescheduled their train for 18:02 and then earlier, ignoring the 1896 agreement. [70] [71] The press were anxious to promote this as another "Race to the North" and started publicising Caledonian arrival times as well. Indeed, Caledonian and then NER put on fast runs for a few days but NBR backed down, and the sparring came to an end. [71]

LNER and LMS

In 1923, under the Railways Act 1921 which grouped multiple railway companies together into four large ones, the ECML came under control of the amalgamated London and North Eastern Railway (LNER) whilst the WCML came under the London, Midland and Scottish Railway (LMS).

A LNER Class A4 LNER A4.jpg
A LNER Class A4

In 1927, the LNER started the famous non-stop Flying Scotsman express train from London King's Cross to Edinburgh. Speeds respected the old agreement and so were low, but time was gained through making the run non-stop over the whole distance of 393 miles (632 km). This was done by means of a special corridor tender which allowed engine crew changes at speed. However to show that the old rivalry was not dead, just prior to the inaugural date of the LNER train, the LMS thwarted them by running separate "non-stop" trains from London Euston to Glasgow (401 miles/645 km) and London to Edinburgh (399 miles/642 km). These were operated respectively by one of the new Royal Scot locomotives and by a standard LMS Compound 4-4-0 locomotive both with volunteer crews.

Following the successful launching of the German Flying Hamburger high-speed diesel railcar set in 1933 and the Bugatti cars in France, the LNER began to examine the possibilities of introducing similar trains for key services. [72] On examining German specifications, management concluded that better speed and accommodation should be possible using steam locomotive powered trains. To test the feasibility of this a high-speed trial was run in 1934 between London and Leeds using locomotive 4472 Flying Scotsman, then in modified A1 condition. During this run, the first fully authenticated speed of 100 mph (160 km/h) was reached. On a similar test run from London to Newcastle and back, A3 locomotive 2750 Papyrus reached 108 mph (174 km/h), a world record for a non-streamlined steam locomotive. When the streamlined London-Newcastle and Silver Jubilee service was inaugurated, the specially-built A4 Pacifics exceeded all records, starting with a top speed of 112 mph (180 km/h) on the inaugural run. The high-speed service was extended to Edinburgh in 1937 with the introduction of The Coronation .

The LMS Coronation Scot in 1937 Coronation scot BNF.jpg
The LMS Coronation Scot in 1937

The LMS again countered in 1937 with the London-Glasgow Coronation Scot streamlined train for which an updated Pacific locomotive type, the Princess Coronation Class, was also specially developed. These locomotives proved fully equal to the A4 and on a press run between Euston and Crewe, 6220 Coronation briefly snatched away the world speed record with a top speed of 114 mph (183 km/h). [73] The speed record however caused a scare; it was reached just 2 miles (3.2 km) south of Crewe railway station, and the train was unable to slow down sufficiently for the series of crossover points at the approach to the station, which it entered at 57 mph (92 km/h), well above the speed limit of 20 mph (32 km/h). The train stayed on the tracks, but nearly derailed, this caused enough alarm for the LMS not to make another attempt at a speed record. [74]

The following year on 3 July 1938, the LNER reclaimed the speed record, when 4468 Mallard set a new record of 126 miles per hour (203 km/h) on Stoke Bank. A record which still stands to this day. [75] The outbreak of World War II from 1939, and subsequent postwar nationalisation to form British Railways in 1948, curtailed further rivalry between the east and west coast routes.

British Rail

In 1979, British Rail set a new record of 3 hours 52 minutes on the 401-mile (645 km) length of the WCML between Euston and Glasgow with its experimental Advanced Passenger Train (APT). [76] This record for the northbound run still stands, although the southbound record was broken in 2006 by the APT's spiritual successor, the Class 390 Pendolino with a time of 3 hours 55 minutes, and an average speed of 102.4 mph (164.8 km/h). However, these times cannot be regularly achieved on the WCML under normal operating conditions as it requires other services on the line to be specially re-timed to give the train a non-stop express from Glasgow to London.

In contrast, the modern Flying Scotsman operated by London North Eastern Railway on the East Coast route, can achieve this within 3 hours 59 minutes on a normal service pattern, and with a stop at Newcastle – however, still making for an average speed of 98.7 mph (158.8 km/h).

The two routes today

When Britain's railways were privatised in the mid-1990s, the East Coast and West Coast routes were now once again operated by two different companies – GNER and Virgin Trains West Coast. Between 2015 and 2018, both routes operated under the Virgin Trains brand, albeit with Virgin Trains East Coast being mostly a Stagecoach Group operation. This ended in June 2018 when the East Coast franchise returned to public ownership, under the revived LNER name.

See also

Notes

  1. Midland Railway and North British Railway.
  2. 1 2 The Special Scotch Express was called the Flying Scotsman even at the time although the train was not officially given this name until 1924.
  3. At the time the longest run in Britain ever attempted. Made possible by water troughs which were only on the West Coast line.
  4. Also colloquially called "Lady of the Lake" after the most famous engine in the class. [14] A "single" is a steam engine with a single (and therefore large) pair of driving wheels.
  5. Henry Tennant was the NER general manager
  6. Marsden provides some detail on these two locomotives. [24] [25]
  7. Designed in 1859.
  8. The newly introduced No. 123 was the only locomotive used throughout.
  9. Until it was completely redeveloped in 1892 things at Waverley station had been worse; even express trains could be delayed by three hours. [34]
  10. Involving five tablet exchanges. See North British, Arbroath and Montrose Railway.
  11. Because the Caledonian route to Aberdeen did not pass via Edinburgh, they were unaffected by the agreement.
  12. So that the train did not have to wait for the booked departure time.
  13. This time was not broken until the InterCity 125 trains in the late 1970s. [51] In 2013 the London to Aberdeen overnight sleeper takes the West Coast route with a journey time of 10 hours 19 minutes, 52.3 mph (84.2 km/h) and is deliberately scheduled to arrive at a reasonable time. [52] Direct daytime trains take just over 7 hours, 73.7 mph (118.6 km/h) travelling on the East Coast route. [53] The two routes now meet at Dundee.
  14. See Marsden [55] [56]
  15. Marsden has a relevant article. [57]
  16. The same Dugald Drummond who was previously with Caledonian.
  17. See Marsden [58]
  18. The run on 19 August by the same locomotive was 64.25 minutes. [65]
  19. The fastest scheduled time in 2013, stopping at Edinburgh Haymarket, is 63 minutes.

Related Research Articles

<span class="mw-page-title-main">West Coast Main Line</span> Railway route in Britain

The West Coast Main Line (WCML) is one of the most important railway corridors in the United Kingdom, connecting the major cities of London and Glasgow with branches to Birmingham, Manchester, Liverpool and Edinburgh. It is one of the busiest mixed-traffic railway routes in Europe, carrying a mixture of intercity rail, regional rail, commuter rail and rail freight traffic. The core route of the WCML runs from London to Glasgow for 400 miles (644 km) and was opened from 1837 to 1881. With additional lines deviating to Northampton, Birmingham, Manchester, Liverpool and Edinburgh, this totals a route mileage of 700 miles (1,127 km). The Glasgow–Edinburgh via Carstairs line connects the WCML to Edinburgh. However, the main London–Edinburgh route is the East Coast Main Line. Several sections of the WCML form part of the suburban railway systems in London, Coventry, Birmingham, Manchester, Liverpool and Glasgow, with many more smaller commuter stations, as well as providing links to more rural towns.

<span class="mw-page-title-main">East Coast Main Line</span> Railway link between London and Edinburgh and London and Leeds

The East Coast Main Line (ECML) is a 393-mile long (632 km) electrified railway between its northern terminus at Edinburgh Waverley and southern terminus at London King's Cross station. The key towns and cities of Peterborough, Doncaster, York, Darlington, Durham and Newcastle are on the line. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road. The main line acts as a 'spine' for several diverging branches, serving destinations such as Cambridge, Leeds, Hull, ‹See TfM›Sunderland and Lincoln, all with direct services to London. In addition, a few ECML services extend beyond Edinburgh to serve other Scottish destinations, such as Stirling, Inverness, Aberdeen or Glasgow Central, although the principal London-Glasgow route is the West Coast Main Line (WCML).

<span class="mw-page-title-main">Caledonian Railway</span> British pre-grouping railway company

The Caledonian Railway (CR) was a major Scottish railway company. It was formed in 1845 with the objective of forming a link between English railways and Glasgow. It progressively extended its network and reached Edinburgh and Aberdeen, with a dense network of branch lines in the area surrounding Glasgow. It was absorbed into the London, Midland and Scottish Railway in 1923. Many of its principal routes are still used, and the original main line between Carlisle and Glasgow is in use as part of the West Coast Main Line railway.

<span class="mw-page-title-main">InterCity (British Rail)</span> 1966–1994 brand of British Rail

InterCity was a brand name introduced by British Rail in 1966 for its long-haul express passenger services.

<span class="mw-page-title-main">North British Railway</span> British pre-grouping railway company (1844–1922)

The North British Railway was a British railway company, based in Edinburgh, Scotland. It was established in 1844, with the intention of linking with English railways at Berwick. The line opened in 1846, and from the outset the company followed a policy of expanding its geographical area, and competing with the Caledonian Railway in particular. In doing so it committed huge sums of money, and incurred shareholder disapproval that resulted in two chairmen leaving the company.

<span class="mw-page-title-main">Waverley Route</span> Partially open railway line serving Edinburgh, Midlothian and Scottish Borders

The Waverley Route was a railway line that ran south from Edinburgh, through Midlothian and the Scottish Borders, to Carlisle. The line was built by the North British Railway; the stretch from Edinburgh to Hawick opened in 1849 and the remainder to Carlisle opened in 1862. The line was nicknamed after the immensely popular Waverley Novels, written by Sir Walter Scott.

<span class="mw-page-title-main">Perth railway station (Scotland)</span> Railway station in Perth, Scotland

Perth railway station is a railway station located in the city of Perth, Scotland, on both the Glasgow to Dundee line and the Highland Main Line. It is managed by ScotRail, who provide almost all of the services.

<i>Flying Scotsman</i> (railway service) London Kings Cross to Edinburgh Waverley passenger train

The Flying Scotsman is an express passenger train service that operates between Edinburgh and London, the capitals respectively of Scotland and England, via the East Coast Main Line. The service began in 1862 as the Special Scotch Express until it was officially adopted in 1924. It is currently operated by the London North Eastern Railway.

The Edinburgh and Glasgow Railway was authorised by act of Parliament on 4 July 1838. It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine, Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847.

The Scottish Region (ScR) was one of the six regions created on British Railways (BR) and consisted of ex-London, Midland and Scottish Railway (LMS) and ex-London and North Eastern Railway (LNER) lines in Scotland. It existed from the creation of BR in 1948, and was renamed to ScotRail in the mid-1980s.

<i>Caledonian Sleeper</i> Overnight sleeper trains between London and Scotland

Caledonian Sleeper is the collective name for overnight sleeper train services between London and Scotland, in the United Kingdom. It is one of only two currently operating sleeper services on the railway in the United Kingdom – the other being the Night Riviera, which runs between London and Penzance.

<span class="mw-page-title-main">Caledonian Railway Single</span> Scottish steam locomotive

Caledonian Railway Single No. 123 is a preserved Scottish steam locomotive. The unique 4-2-2 was built by Neilson and Company in 1886, works No. 3553, as an exhibition locomotive. In 1914 it was placed on the Caledonian Railway duplicate list, and renumbered 1123. It entered London, Midland and Scottish Railway service in 1923 and the LMS renumbered it 14010 and gave it the power classification 1P. During the 1920s it was allocated to working the directors' saloon, but it was returned to ordinary service in 1930. The locomotive was withdrawn in 1935, by which time it was the last single-wheeled express engine running in Britain, and set aside for preservation.

<span class="mw-page-title-main">Montrose railway station</span> Railway station in Angus, Scotland

Montrose railway station serves the town of Montrose in Angus, Scotland. The station overlooks the Montrose Basin and is situated on the Dundee–Aberdeen line, 90 miles (144 km) north of Edinburgh Waverley, between Arbroath and Laurencekirk. There is a crossover at the north end of the station, which can be used to facilitate trains turning back if the line south to Arbroath is blocked.

<span class="mw-page-title-main">Carstairs railway station</span> Railway station in South Lanarkshire, Scotland

Carstairs railway station serves the village of Carstairs in South Lanarkshire, Scotland and is a major junction station on the West Coast Main Line (WCML), situated close to the point at which the lines from London Euston and Edinburgh to Glasgow Central merge. Constructed originally by the Caledonian Railway, the station is managed today by ScotRail who also operate most services which serve the station; it is also served by one TransPennine Express service per day between Manchester Airport and Glasgow Central and one Caledonian Sleeper service each way per day between Glasgow Central and London Euston. All other services by TransPennine Express and services operated by Avanti West Coast, CrossCountry and London North Eastern Railway pass the station, but do not stop.

<span class="mw-page-title-main">Glasgow–Edinburgh via Carstairs line</span> Railway line connecting Glasgow and Edinburgh

The Glasgow–Edinburgh via Carstairs line is a main railway route which connects the Scottish cities of Glasgow and Edinburgh, by means of their respective sections of the West Coast Main Line (WCML).

<span class="mw-page-title-main">Aberdeen Railway</span> Historical railway line in Scotland linking Aberdeen and Guthrie

The Aberdeen Railway was a Scottish railway company which built a line from Aberdeen to Forfar and Arbroath, partly by leasing and upgrading an existing railway.

<span class="mw-page-title-main">Caledonian main line</span> Former railway line in Scotland

The Caledonian Railway main line in Scotland connected Glasgow and Edinburgh with Carlisle, via Carstairs and Beattock.

<span class="mw-page-title-main">North British, Arbroath and Montrose Railway</span> Railway line in Scotland

The North British, Arbroath and Montrose Railway was a company established by Act of Parliament in 1871 to construct and operate a railway line from north of Arbroath via Montrose to Kinnaber Junction, 38 miles (61 km) south of Aberdeen. The company was originally a subsidiary of the North British Railway but was absorbed into its parent in 1880.

The East Coast Joint Stock (ECJS) was a fleet of passenger railway coaches in the UK jointly owned by the Great Northern Railway (GNR), the North Eastern Railway (NER) and the North British Railway (NBR). These were the main operators of the East Coast Main Line prior to the creation of the London and North Eastern Railway at grouping in 1923.

<span class="mw-page-title-main">Carlisle railway history</span>

Carlisle, in North West England, formed the focus for a number of railway routes because of the geography of the area. At first each railway company had its own passenger and goods station, but in 1847 passenger terminal facilities were concentrated at Citadel station, which is in use today. Goods facilities remained dispersed, and goods wagons passing through were remarshalled, incurring delay and expense.

References

Citations

  1. Our Aberdeen Correspondent (23 August 1893). "The Railway Race". Glasgow Herald. Retrieved 1 May 2013.{{cite news}}: |last= has generic name (help)
  2. Nock 1958, Chapter II. The Years of Manoeuvre.
  3. 1 2 3 4 Nock 1958, Chapter III. The Rivals and their Prospects.
  4. Nock 1958, pp. 14–16 & Chapter VII 1895 – Building Up.
  5. Nock 1958, Chapter X The Aftermath.
  6. 1 2 Nock 1958, p. 47.
  7. Nock 1958, p. 48.
  8. Nock 1958, pp. 23, 26, 33, 36–37.
  9. Nock 1958, p. 33.
  10. Nock 1958, pp. 34–35.
  11. Nock 1958, pp. 35, 37.
  12. Nock 1958, pp. 37–41.
  13. 1 2 Nock 1958, p. 42.
  14. Musson, Mike. "Rugby Shed: lnwrrm349". Rugby Shed. warwickshirerailkways.com. Archived from the original on 4 March 2016. Retrieved 4 May 2013.
  15. Nock 1958, p. 43-44.
  16. Nock 1958, p. 45.
  17. Nock 1958, pp. 46–48.
  18. Nock 1958, pp. 23, 26.
  19. Nock 1958, p. 61.
  20. Nock 1958, p. 62, quoting the Pall Mall Gazette.
  21. Nock 1958, Chapter IV The 'Eighty-Eight'.
  22. Nock 1958, Chapter V. Locomotive Performance in 1888.
  23. 1 2 Nock 1958, pp. 28–30.
  24. Marsden, Richard. "The T.W.Worsdell Class D22 (NER Class F) 4-4-0 Locomotives". London & North Eastern Railway Encyclopedia. Archived from the original on 4 March 2013. Retrieved 3 May 2013.
  25. Marsden, Richard. "The Tennant E5 (NER '1463') 2-4-0 Locomotives". London & North Eastern Railway Encyclopedia. Archived from the original on 23 January 2013. Retrieved 3 May 2013.
  26. Marsden, Richard. "LNER 2-4-0 Locomotives". London & North Eastern Railway Encyclopedia. Archived from the original on 25 February 2013. Retrieved 3 May 2013.
  27. Nock 1958, pp. 23–27, 30.
  28. Nock 1958, pp. 36–39.
  29. Nock 1958, pp. 43–47.
  30. Tomlinson 1914, p. 737.
  31. Nock 1958, p. 63.
  32. Nock 1958, pp. 64, 66.
  33. Nock 1958, pp. 67–68.
  34. McKean 2007, p. 324.
  35. Nock 1958, p. 66.
  36. Mullay 2010, p. 134.
  37. Nock 1958, pp. 73–77.
  38. Nock 1958, p. 79.
  39. Nock 1958, pp. 78–80.
  40. "Railway Race to Scotland. How the Signals are Worked at Kinnaber" . Aberdeen Journal . 28 August 1895. Retrieved 30 June 2014 via British Newspaper Archive.
  41. Nock 1958, pp. 87–103.
  42. "Railway Race to Scotland". Poverty Bay Herald (New Zealand). 8 October 1895. Retrieved 5 May 2013. Page 4. Quoting a "Special correspondent of the Times" writing on 20 (and 21) August 1895.
  43. McKean 2007, pp. 315–316, quoting The Scotsman, 22 August 1895.
  44. Nock 1958, pp. 105–112.
  45. "The Race to the North" . Sheffield Independent. 23 August 1895. p. 4. Retrieved 28 June 2014 via British Newspaper Archive.
  46. Nock 1958, pp. 111–119.
  47. Nock 1958, p. 119.
  48. Nock 1958, pp. 119–121.
  49. Nock 1958, pp. 120–121.
  50. Nock 1958, p. 121.
  51. Gray, Alastair McIntosh (1989). A History of Scotland: Modern Times. Book 5 (Updated ed.). Oxford: Oxford University Press. p. 24. ISBN   978-0199170630.
  52. "Caledonian Sleeper. Timetables" (PDF). First ScotRail. p. 12. Retrieved 16 April 2013.[ permanent dead link ]
  53. "Weekday Northbound Train Timetables December 2012 to May 2013" (PDF). East Coast. 2012. Archived (PDF) from the original on 24 January 2013. Retrieved 17 April 2013.
  54. Nock 1958, p. 85,130.
  55. Marsden, Richard. "The W. Worsdell Class D17 (NER Class M1 & Q) 4-4-0 Locomotives". London & North Eastern Railway Encyclopedia. Archived from the original on 12 April 2013. Retrieved 3 May 2013.
  56. Marsden, Richard. "The W. Worsdell Class D19 (NER M / 3CC) 4-4-0 Locomotive". London & North Eastern Railway Encyclopedia. Archived from the original on 5 March 2012. Retrieved 3 May 2013.
  57. Peirson, Malcolm. "Compounds". London & North Eastern Railway Encyclopedia. Richard Marsden. Archived from the original on 3 December 2013. Retrieved 4 May 2013.
  58. Marsden, Richard. "The Holmes D31 (NBR Class M) 4-4-0 Locomotives". London & North Eastern Railway Encyclopedia. Archived from the original on 18 November 2012. Retrieved 3 May 2013.
  59. Nock 1958, pp. 70–72, 88, 114.
  60. Nock 1958, p. 69.
  61. Nock 1958, pp. 69, 110, 120, 140.
  62. Nock 1958, pp. 85–87, 135.
  63. Nock 1958, pp. 90, 107, 108, 111.
  64. Nock 1958, pp. 150, 151.
  65. Nock 1958, p. 100.
  66. Nock 1958, pp. 148–149.
  67. Nock 1958, pp. 122–128.
  68. Nock 1958, p. 130.
  69. Mullay 2010, p. 143.
  70. Nock 1958, p. 131.
  71. 1 2 Mullay 2010, p. 142.
  72. Brown F.A.S., "Nigel Gresley, Locomotive Engineer", Ian Allan Publishing, London 1961
  73. Clay J.F. & Cliffe J., "West Coast Pacifics", Ian Allan, London 1976, pp 99–105
  74. "Trackside Classic – 1938 LMS Princess-Coronation Pacific No 6229 Duchess Of Hamilton – Greatness Out Of Chaos". Curbside Classic. Retrieved 20 February 2023.
  75. Semmens, P.W.B. (1989). Speed on the East Coast Main Line. Patrick Stephens. p. 64. ISBN   978-0850599305.
  76. Train smashes speed record BBC News 30 July 2003

Works cited

Further reading