Adriatic railway

Last updated

Adriatic railway (Ancona–Lecce)
Stazione Ancona.jpg
Ancona railway station
Overview
StatusOperational
Line number103, 104, 132, 133
Locale Apulia, South-East Italy
Termini
Service
System Rete Ferroviaria Italiana (RFI)
Operator(s) Ferrovie del Sud Est
History
Opened1860
Technical
Line length594 km (369 mi)
Number of tracks Double track
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification Electrified at 3000 V DC
Route map

Contents

km
BSicon STR.svg
BSicon BHF.svg
203.996
Ancona
BSicon tSTRc2.svg
BSicon tSTR3a@f.svg
BSicon tSTR2a@f.svg
BSicon STRl-.svg
BSicon tSTRc3.svg
to Ancona Marittima
 
BSicon tSTR+1e@g.svg
BSicon tSTRc14.svg
BSicon tSTR+4.svg
Ancona artificial tunnel
 
BSicon STRf.svg
BSicon tSTRg.svg
Vallemiano tunnel (4971 m)
BSicon tSTRa@g.svg
BSicon tSTR.svg
BSicon tSTR2e@f.svg
BSicon STRc3.svg
BSicon tSTRc2.svg
BSicon tSTR3.svg
Castellano tunnel (1569 m)
BSicon STRc1.svg
BSicon STR+4.svg
BSicon tSTR+1e@g.svg
BSicon tSTRc4.svg
BSicon BHF.svg
209.500
Varano
BSicon HST.svg
210.473
Ancona Stadio
BSicon HST.svg
214.724
Camerano-Aspio
BSicon HST.svg
219.816
Osimo-Castelfidardo
BSicon BHF.svg
227.498
Loreto
BSicon HST.svg
231.809
Porto Recanati
BSicon HST.svg
240.591
Potenza Picena-Montelupone
BSicon BHF.svg
246.701
Civitanova Marche-Montegranaro
BSicon ABZgr.svg
BSicon BHF.svg
253.199
Porto Sant'Elpidio
BSicon BHF.svg
262.295
Porto San Giorgio-Fermo
BSicon BHF.svg
272.533
Pedaso
BSicon BHF.svg
280.583
Cupramarittima
BSicon HST.svg
283.969
Grottammare
BSicon BHF.svg
288.489
San Benedetto del Tronto
BSicon BHF.svg
293.273
Porto d'Ascoli
BSicon ABZgr.svg
BSicon BHF.svg
302.190
Alba Adriatica-Nereto-Controguerra
BSicon HST.svg
305.978
Tortoreto Lido
BSicon BHF.svg
312.355
Giulianova
BSicon ABZgr.svg
BSicon BHF.svg
321.660
Roseto degli Abruzzi
BSicon HST.svg
326.266
Scerne di Pineto
BSicon BHF.svg
330.730
Pineto-Atri
BSicon BHF.svg
337.137
Silvi
BSicon BHF.svg
342.987
Montesilvano
BSicon BHF.svg
349.969
Pescara
BSicon HST.svg
351.309
Pescara Porta Nuova
BSicon ABZgr.svg
BSicon HST.svg
352.527
Pescara Tribunale
BSicon BHF.svg
359.097
Francavilla al Mare
BSicon HST.svg
364.358
Tollo-Canosa Sannita
BSicon TUNNEL1.svg
Nuovo Riccio (2799 m)
BSicon exSTR+r.svg
BSicon STR.svg
BSicon exBHF.svg
BSicon BHF.svg
371.883
Ortona
BSicon exSTRl.svg
BSicon eABZgr.svg
BSicon exLLSTR2.svg
BSicon exLLSTRc3.svg
connection RFI-FAS
BSicon TUNNEL1.svg
BSicon exLLSTRc1.svg
BSicon exLLSTR+4.svg
Moro (2011 m)
BSicon STR.svg
BSicon exLSTRe.svg
Vacated former alignment
BSicon TUNNEL1.svg
BSicon exLSTRa.svg
Cintioni (2088 m)
BSicon exSTR+l.svg
BSicon TBHFxo.svg
BSicon exABZg+r.svg
378.137
San Vito-Lanciano
BSicon xKRWg+l.svg
BSicon KRWgr.svg
BSicon exLSTRe.svg
BSicon TUNNEL1.svg
San Giovanni (9311 m)
BSicon BHF.svg
BSicon exLSTRa.svg
388.379
Fossacesia-Torino di Sangro
BSicon TUNNEL1.svg
BSicon exLLSTRc2.svg
BSicon exLLSTR3.svg
Diavolo (5200 m)
BSicon STR.svg
BSicon exLLSTR+1.svg
BSicon exLLSTRc4.svg
BSicon HST.svg
398.908
Casalbordino-Pollutri
BSicon STR.svg
BSicon exLLSTR2.svg
BSicon exLLSTRc3.svg
BSicon TUNNEL1.svg
BSicon exLLSTRc12.svg
BSicon exLLSTR3+4.svg
Sinello (2312 m)
BSicon STR.svg
BSicon exLLSTR+1.svg
BSicon exLLSTRc4.svg
BSicon BHF.svg
404.972
Porto di Vasto
BSicon STR.svg
BSicon exLLSTR2.svg
BSicon exLLSTRc3.svg
BSicon TUNNEL1.svg
BSicon exLLSTRc12.svg
BSicon exLLSTR3+4.svg
Vasto (6824 m)
BSicon STR.svg
BSicon exLLSTR+1.svg
BSicon exLLSTRc4.svg
BSicon BHF.svg
416.405
Vasto-San Salvo
BSicon BHF.svg
427.034
Montenero-Petacciato
BSicon BHF.svg
439.437
Termoli
BSicon ABZgr.svg
BSicon BHF.svg
446.279
Campomarino
BSicon BHF.svg
456.728
Chieuti-Serracapriola
BSicon DST.svg
465.204
P.M. Ripalta
BSicon DST.svg
472.446
P.M. Lesina
BSicon HST.svg
479.869
Poggio Imperiale
BSicon BHF.svg
484.081
Apricena
BSicon STR+k2.svg
BSicon kSTR3+l.svg
BSicon exSTR+l.svg
BSicon kABZg+1.svg
BSicon exSTR.svg
BSicon BHF.svg
BSicon exSTR.svg
495.031
497.579
San Severo
BSicon eABZgl.svg
BSicon exSTRr.svg
BSicon BHF.svg
511.961
Rignano Garganico
BSicon dSTR+r-.svg
BSicon SHI3l.svg
BSicon SPLa.svg
BSicon dSHI3+r.svg
BSicon dKBHFe-L.svg
BSicon vBHF-M.svg
BSicon dBHF-R.svg
526.027
Foggia
BSicon dSHI1c2.svg
BSicon vSHI1r.svg
BSicon dSTRl.svg
BSicon v-STR+3~G.svg
BSicon dSTR3-.svg
BSicon v-STR.svg
BSicon BHF.svg
536.309
Incoronata
BSicon BHF.svg
545.661
Orta Nova
BSicon BHF.svg
560.292
Cerignola Campagna
BSicon eABZgr.svg
BSicon BHF.svg
577.692
Trinitapoli-San Ferdinando di Puglia
BSicon eBHF.svg
581.554
Margherita di Savoia-Ofantino
BSicon eABZgl.svg
BSicon ABZg+r.svg
BSicon KXBHFa-L.svg
BSicon XBHF-R.svg
593.919
Barletta
FNB / FS
BSicon STRc2.svg
BSicon STR3.svg
BSicon nSTR3+l.svg
BSicon ABZgnr.svg
BSicon LSTR+1.svg
BSicon STRc4.svg
BSicon BHF.svg
606.513
Trani
BSicon LSTRe.svg
BSicon BHF.svg
614.534
Bisceglie
BSicon BHF.svg
623.875
Molfetta
BSicon BHF.svg
630.190
Giovinazzo
BSicon HST.svg
636.337
Enziteto Catino
since 1993 [1]
BSicon BHF.svg
637.074
Bari Santo Spirito
BSicon LSTRa.svg
BSicon HST.svg
639.055
Bari Palese-Macchie
BSicon LSTRl.svg
BSicon SHI4grq.svg
BSicon KRZu.svg
BSicon STR+r.svg
BSicon SHI4+lq.svg
BSicon KRZo.svg
BSicon ABZg+r.svg
from Bitonto via Bari Airport
BSicon SPLa.svg
BSicon LSTR.svg
643.467
Cabina Lamasinata
BSicon vKRZu.svg
BSicon ABZg+r.svg
BSicon dYRD.svg
BSicon dSTR.svg
BSicon LSTR.svg
Bari Lamasinata
BSicon vSTR-HST.svg
BSicon LSTR.svg
644.650
Bari Zona Industriale
BSicon vDST.svg
BSicon LSTR.svg
645.647
Bari Parco Nord
BSicon v-ABZgr+r.svg
BSicon dSTR.svg
BSicon LSTR.svg
BSicon uKSTRaq.svg
BSicon mvKRZu.svg
BSicon mvSHI1+l-STR+ro.svg
BSicon 4HUBa@G~FFq.svg
BSicon 4HUBa@Gq.svg
BSicon vBHF.svg
BSicon 4HUBe@Fq.svg
BSicon mvKBHFe.svg
BSicon 4HUBe@F~GGq.svg
648.616
Bari Centrale
BSicon vSTRr-SHI1r.svg
BSicon HST.svg
650.145
Bari Marconi
since 1992 [2]
BSicon BHF.svg
650.715
Bari Parco Sud
BSicon BHF.svg
660.069
Bari Torre a Mare
BSicon BHF.svg
667.771
Mola di Bari
BSicon BHF.svg
681.575
Polignano a Mare
BSicon BHF.svg
689.160
Monopoli
BSicon BHF.svg
702.989
Fasano
BSicon BHF.svg
710.146
Cisternino
BSicon BHF.svg
722.894
Ostuni
BSicon BHF.svg
731.875
Carovigno
BSicon BHF.svg
747.836
San Vito dei Normanni
BSicon ABZg+r.svg
BSicon BHF.svg
759.539
Brindisi
BSicon eABZgnl.svg
Branch to Brindisi harbour
BSicon ABZgnl.svg
BSicon nKDSTeq.svg
Brindisi power station
BSicon BHF.svg
769.473
Tuturano
BSicon HST.svg
776.562
San Pietro Vernotico
BSicon BHF.svg
783.303
Squinzano
BSicon HST.svg
787.504
Trepuzzi
BSicon BHF.svg
794.332
Surbo
BSicon SPLa.svg
BSicon vSTR-DST.svg
3.571
Surbo Fascio Merci
BSicon SPLe.svg
BSicon ABZg+r.svg
BSicon BHF.svg
797.903
Lecce
BSicon STR.svg
km
Source: Italian railway atlas [3]

The Adriatic railway (Italian: Ferrovia Adriatica) is the railway from Ancona to Lecce that runs along the Adriatic Coast of Italy, following it almost all of the way. It is one of the main lines of the Italian rail system and links the northern cities with the most important productive areas of central and southern Italy.

The railway was built by the Società per le Strade Ferrate Meridionali (Italian: Company for the Southern Railways, SFM), between 1863 and 1872. In 1906, management of the line was taken over by Ferrovie dello Stato Italiane. In 1933, the southernmost Lecce-Otranto segment of the line was turned over to the Ferrovie del Sud Est, which has maintained it to the present day.

History

Shortly after the proclamation of the Kingdom of Italy, the new government took over the granting of railway concessions, which, in prior years, had often been doled out in a haphazard manner by the different states and provisional dictatorial governments of the Italian Peninsula to various companies: canceling some, changing others and continually releasing new rights-of-way.

In November 1861 the Milan–Bologna railway line began operation, with the connection of the Milan-Piacenza line to the Piacenza-Bologna via a bridge – initially of wood but later replaced by an iron structure – across the river Po. This allowed trains from Turin and France to travel directly to the Adriatic coast along the Ancona-Bologna line, which itself had been built in November 1861 by the SFR, in what was then the Papal States.

The construction of an Adriatic line had long been desired, but had never come to pass: mainly because of the difficulty in reconciling the needs of the two countries – the Papal States and the Kingdom of the Two Sicilies – through whose territories the line would pass. The constitution of the kingdom of Italy in 1860 brought a resolution to this dilemma, and, as entrepreneurs in Piedmont and Lombardy desired access to Adriatic ports for closer and easier trade with Asia through the Suez Canal, construction would proceed rapidly following unification.

As early as May 1861, a detailed and complex feasibility study was presented to the Chamber of Deputies for new railways in southern Italy that were considered of vital importance. In particular, the construction of a railway along the Adriatic coast from Ancona to Brindisi and Otranto was seen as essential, as these ports were considered by many [4] to be on the verge of becoming Europe's "door to the East." At that time, several European countries were competing for the privilege of transporting the Imperial Indian Mail train (referred to in Italy as the Valigia delle Indie), in hopes of sharing in the profits of the trade between England and its vast colonial empire. [5] In July 1862, Count Pietro Bastogi, former Finance Minister of the Kingdom of Italy succeeded in putting together a consortium of 92 bankers with the huge sum (at that time) of 100 million gold lire of capital from entirely Italian sources. [6] The Società per le Strade Ferrate Meridionali (Italian: 'Company for the Southern Railways', SFM) moved quickly to build the rail line, completing the Brindisi-Lecce segment by 1866. The Lecce-Otranto segment was delayed by bitter controversies which prevented the choice of a route for many years. The last stretch of 19 miles from Maglie to Otranto was not complete until 20 September 1872.

The new Adriatic Railway allowed, for the first time, relatively rapid travel between the south and the north-central regions of Italy. In 1866, in fact, there were no railways on the Tyrrhenian coast south of Eboli. Vittorio Emanuele II on 9 November 1863 inaugurated the line with his train ride from Pescara to Foggia, following hurried work to finish the track. The public opening was postponed until 25 April 1864. In the proceedings of the first legislature of the Kingdom of Italy, the parliamentarian Leopoldo Galeotti wrote hopefully that "before long the port of Brindisi, reborn to a new life, will bring within her breast the Indian Mail, a sure sign that the commerce of the world will be drawn a second time to our seas. In a few days, thanks to the great industry of Southern Company, despite the obstacles of every kind that had to be overcome, locomotives will arrive at the port of Brindisi." [7] In September 1871 the completion of the Fréjus Rail Tunnel allowed the luxury Peninsular Express (from the same company that operated the famous Orient Express) to complete the London-Brindisi trip in 47 hours via Calais and Paris. [8]

The line was built in record time using the easiest and least demanding engineering methods (tunnels and viaducts), often near the sea. Weather was a significant cause of work interruptions, due to the heavy storms that frequently batter the Adriatic coast.

21st century: Double track

The line was reoriented in 2004, with double tracking, for the stretch from Lesina to Apricena (saving about 2.5 km), while at the end of 2005, the railway between Ortona and Vasto Casalbordino and between the Port of Vasto and Vasto / San Salvo were also realigned; for the dual purpose of eliminating the multiple curves in the old section, and reducing the danger posed by storm surges and coastal erosion.

Between 2002 and 2006 the track between Brindisi and Lecce was doubled, followed by the segment between Bari Centrale and Fasano. In 2007 the segment between San Severo and Apricena was also given double track.

The only stretch of the Adriatic line that remains single track is from Termoli to Lesina, which is the bottleneck of the line.

Features

A notable aspect of the Adriatic line is the almost total absence of tunnels, with the exception of the Pescara-Vasto segment, where there are seven, including three with a length greater than 5000 m. The railway is almost entirely double track, and is DC electrified to 3000 V.

Developments

In 2023, Rete Ferroviaria Italiana has estimated the cost of a new Bologna-Ancona-Pescara-Foggia-Bari high-speed line, with trains travelling at up to 300 kilometres per hour, at between EUR 40 and 50 billion. By contrast, the cost of speeding up the existing line, with trains travelling up to 200 kilometres per hour, amounts to EUR 5 billion. [9]

See also

References

Footnotes

  1. Oltre Santo Spirito. In: ″I Treni″ Nr. 144 (January 1994), p. 6–7.
  2. Impianti FS. In: ″I Treni Oggi″ Nr. 131 (November 1992), p. 6.
  3. Railway Atlas 2017, pp. 55, 61, 66, 72, 73, 79–81, 86, 87, 92.
  4. Annali Universali di Statistica by Giuseppe Sacchi, Vol. CXLV, prima. Milano series, 1 st quarter 1861
  5. Ernesto Petrucci The '48 and the railway question in the Papal States on page 19, History and Future 1/2002
  6. Gian Guido Turchi, 150 di ferrovia in Italia, in iTreni 97, Editrice ETR, Salò,1989
  7. La Prima Legislatura del regno d'Italia, Leopoldo Galeotti. Florence, Le Monnier, 1865
  8. Stefano Maggi, Tra pubblico e privato. La gestione delle ferrovie nell'800 e primo '900, in Tutto Treno & Storia 22, pp. 22, 23. Duegi Editrice, Albignasego, 2002
  9. "Alta velocità Adriatica, Rfi valuta l'ipotesi: Strisciuglio apre a una nuova rete" (in Italian). 15 December 2023. Archived from the original on 15 December 2023.

Sources