Arapuni Power Station

Last updated

Arapuni Dam
Arapuni power station.JPG
Arapuni power station, as seen from the Arapuni Suspension Bridge
New Zealand (relief map).png
Disc Plain red.svg
Location of Arapuni Dam in New Zealand
CountryNew Zealand
Location Lake Arapuni, Waikato River
Coordinates 38°4′17″S175°38′36″E / 38.07139°S 175.64333°E / -38.07139; 175.64333
Purpose Power
StatusOperational
Opening date1929
Dam and spillways
Impounds Waikato River
Reservoir
Creates Lake Arapuni
Arapuni Power Station
Operator(s) Mercury Energy
Turbines 8× Francis turbines
Installed capacity 197 MW (264,000 hp)
Annual generation 805 GWh (2,900 TJ)

Arapuni Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is owned and operated by Mercury Energy, and is the seventh and penultimate hydroelectric power station on the Waikato River. It is also the oldest currently generating, the first government-built, and the largest capacity single hydroelectric power station on the Waikato River. The two power houses that make up the Maraetai Power Station have a larger combined capacity however. [1]

Contents

Arapuni, due to its proximity to Hamilton, plays an important part in voltage support and frequency keeping in the city and the wider Waikato region. Continuous improvement and refurbishment of the station's generation equipment ensures Arapuni remains efficient. [2]

The powerhouse and dam at Arapuni are under protection of the Historic Places Trust, becoming Category I Historic Places in November 1987 and August 1991 respectively. [3] [4] [5] It is one of the few generating power stations in New Zealand to be listed on the register.

History

Arapuni was the first government-built hydroelectric station on the Waikato River, and the second after the privately owned Horahora Power Station that was decommissioned in 1947 on the filling of Lake Karapiro.

Initial surveying of the site began in 1916, but in 1920, the surveying was halted due to lack of government funds to progress the project. Construction of Arapuni finally began in 1924, but repeated heavy rain and the resulting floods dogged the early works. The station, complete with three turbines and provisions for a fourth, was commissioned in mid-1929. Shortly after commissioning, Arapuni was closed for two years while a water seepage problem was investigated and the headrace lined. The station, with the addition of a fourth turbine, was recommissioned in May 1932.

The Arapuni Gorge during the construction of the power station, 1929 Arapuni gorge during the implementation of the Arapuni hydro-electric power scheme, ca 1929.jpg
The Arapuni Gorge during the construction of the power station, 1929

The Arapuni Suspension Bridge, just downstream from the power station, was opened in 1926. It gave access from 'top camp' (which eventually became the Arapuni township) on the true right to the power station construction site on the true left of the Waikato River. [6]

Originally, electricity from Arapuni was stepped up to 110,000 volts and transmitted along two transmission lines (one single-circuit and one double-circuit) to Penrose substation in Auckland, with intermediate substations at Hamilton and Bombay. Electricity was also supplied into the Horahora system via a 110,000/50,000 volt interconnecting transformer. In 1934, a 110,000 volt line was commissioned from Arapuni to Stratford in Taranaki, connecting the station to the Mangahao-Waikeremoana system and on to the lower North Island. [7]

In 1934, increasing demand for electricity resulted in Arapuni being extended. The powerhouse was doubled in size, and provisions for four more turbines were made. Turbines 5 and 6 were commissioned four years later in 1938. The last two turbines were commissioned in 1946 to meet the increasing demand for electricity following World War II.

In 1990, a $50 million repair, refurbishment and upgrade project was completed, the first stage of which involved construction of a diversion channel. [8] In 2000 it was determined that the historic seepage problem had worsened, interim repairs were carried out while a more permanent solution was devised and this took the form of a $20 million engineering project, which was carried out in 2005–07. [9] [10] In 2001, work was completed on four of Arapuni's turbines to increase capacity from 24.7 megawatts (33,100 hp) to 26.7 megawatts (35,800 hp) each and to improve their peak efficiency. [3]

Cultural references

The creation of the Arapuni dam and hydroelectric station is described at length in Robin Hyde's novel Nor the Years Condemn (1938). The novel's narrator describes the Waikato River as a living being that views the dam as an "insolence." [11] Referring to the discovery of the water seepage problem identified shortly after the commissioning of the dam, the main character suggests that it was a consequence of disrespect for Māori land:

Ah, she won't ever be any good. She won't work, because she isn't lucky.... We took this country off the Maoris, didn't we? You wait and see if they haven't put some kind of tapu on Arapuni. [12]

Related Research Articles

<span class="mw-page-title-main">Waitaki River</span> River in the South Island of New Zealand

The Waitaki River is a large braided river in the South Island of New Zealand. It drains the Mackenzie Basin and runs 209 kilometres (130 mi) south-east to enter the Pacific Ocean between Timaru and Oamaru on the east coast. It starts at the confluence of the Ōhau and Tekapo rivers, now at the head of the artificial Lake Benmore, these rivers being fed by three large glacial lakes, Pukaki, Tekapo, and Ōhau at the base of the Southern Alps. The Waitaki flows through Lake Benmore, Lake Aviemore and Lake Waitaki, these lakes being contained by hydroelectric dams, Benmore Dam, Aviemore Dam and Waitaki Dam. The Waitaki has several tributaries, notably the Ahuriri River and the Hakataramea River. It passes Kurow and Glenavy before entering the Pacific Ocean. The River lends its name the Waitaki District on the south side of the river bank.

<span class="mw-page-title-main">Lake Karapiro</span> Reservoir in North Island

Lake Karapiro is an artificial reservoir lake on the Waikato River at Karapiro, 8 kilometres (5.0 mi) south-east of Cambridge in New Zealand's North Island. The lake was formed in 1947 by the damming of the Waikato River to store water for the 96-megawatt Karapiro power station. The lake is also one of two premier rowing venues in New Zealand and is the base for the country's high-performance rowing programme.

<span class="mw-page-title-main">Mercury Energy</span> New Zealand electricity generating and retailing company

Mercury NZ Limited is a New Zealand electricity generation and multi-product utility retailer of electricity, gas, broadband and mobile telephone services. All the company's electricity generation is renewable. Mercury has a pre-paid electricity product sub-brand GLOBUG. Mercury Energy is also the largest electricity retailer in New Zealand.

The Shoalhaven Scheme is a dual-purpose water supply and Pumped-storage Hydroelectricity scheme located on the South Coast region of New South Wales, Australia.

<span class="mw-page-title-main">Tumut Hydroelectric Power Station</span> Power stations in New South Wales, Australia

The Tumut Hydroelectric Power Stations is a series of three hydroelectric power stations on the Tumut River in New South Wales, Australia, that are part of the Snowy Mountains Scheme.

<span class="mw-page-title-main">Arapuni</span> Settlement in Waikato, New Zealand

Arapuni is a rural town centre on the Waikato river in the South Waikato District of New Zealand. The town sits next to the Arapuni Dam, a hydroelectric dam at Lake Arapuni commissioned in 1929. The Arapuni Power Station consists of eight turbines which give a total output of 196 MW, the largest of the power stations on the Waikato river. The Arapuni hydro station is owned and operated by Mercury Energy.

<span class="mw-page-title-main">Croton Dam (Michigan)</span> Dam in Newaygo County, Michigan

Croton Dam is an earth-filled embankment dam and powerplant complex on the Muskegon River in Croton Township, Newaygo County, Michigan. It was built in 1907 under the direction of William D. Fargo by the Grand Rapids - Muskegon Power Company, a predecessor of Consumers Energy. The 40-foot-high (12 m) dam impounds 7.2 billion U.S. gallons (6 billion imp. gal/27 billion L) of water in its 1,209-acre (489 ha) reservoir and is capable of producing 8,850 kilowatts at peak outflow. It was listed on the National Register of Historic Places in 1979.

The electricity sector in New Zealand uses mainly renewable energy, such as hydropower, geothermal power and increasingly wind energy. As of 2021, the country generated 81.2% of its electricity from renewable sources. The strategy of electrification is being pursued to enhance the penetration of renewable energy sources and to reduce greenhouse gas (GHG) emissions across all sectors of the economy. In 2021, electricity consumption reached 40 terawatt-hours (TW⋅h), representing a 0.2% increase compared to the consumption levels in 2010.

<span class="mw-page-title-main">Hydroelectric power in New Zealand</span>

Hydroelectric power in New Zealand has been a part of the country's energy system for over 100 years and continues to provide more than half of the country's electricity needs. Hydroelectricity is the primary source of renewable energy in New Zealand. Power is generated the most in the South Island and is used most in the North Island.

<span class="mw-page-title-main">Aratiatia Power Station</span> Dam in near Taupō

Aratiatia Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the first hydroelectric power station on the Waikato River, and is located 13 kilometres (8.1 mi) downstream of Lake Taupō. Aratiatia is owned and operated by Mercury Energy.

<span class="mw-page-title-main">Horahora Power Station</span> Dam

Horahora Power Station was an early hydroelectric power station on the Waikato River in New Zealand. It was the country’s first large-scale power station, completed in 1913. Initially built to service a gold mine, the power station was expanded to supply a significant part of the North Island. The power station remained in use until it was submerged by Lake Karapiro, which was formed to supply the larger Karapiro Power Station.

<span class="mw-page-title-main">Karāpiro Power Station</span> Dam in Near Cambridge, Waikato

The Karāpiro Power Station is a hydroelectric power station at Karapiro on the Waikato River, in the North Island of New Zealand. The power station lies on Lake Karapiro, a major rowing regatta venue. Karāpiro is 30 kilometres (19 mi) south-east and upstream from the city of Hamilton and approx. 9 kilometres from Cambridge. It is the last of the eight hydroelectric power stations on the Waikato River.

<span class="mw-page-title-main">Cobb Power Station</span> Hydroelectric power station in New Zealand

The Cobb Power Station is a hydroelectric facility on the Cobb River, in the Tasman District of New Zealand. The power station is located in Upper Tākaka, 112 km (70 mi) northwest of Nelson. Annual generation is approximately 190 gigawatt-hours (680 TJ). The initial stages of the construction of the station began as a privately-funded scheme in 1935, but the investor failed to raise the necessary capital. The national government took over building the station and the first power was produced in 1944, operating as a run-of-river station. A storage dam was completed in 1954. The resulting hydro lake is the highest in the country and at 596 m (1,955 ft), the station has New Zealand's highest hydraulic head of any power station.

<span class="mw-page-title-main">Atiamuri Power Station</span> Hydroelectric power station on the Waikato River in New Zealand

Ātiamuri Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the third of eight hydroelectric power stations on the Waikato River. The station can easily be seen from State Highway 1 between Taupō and Tokoroa.

<span class="mw-page-title-main">Maraetai Power Station</span> Dam in near Mangakino, Waikato

Maraetai Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the fifth of the eight hydroelectric power stations on the Waikato River, and at 360 MW, is the largest hydroelectric station on the Waikato.

<span class="mw-page-title-main">Whakamaru Dam</span> Dam in Lake Whakamaru

Whakamaru Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the fourth hydroelectric power station on the Waikato River.

<span class="mw-page-title-main">Arapuni Suspension Bridge</span> Bridge in South Waikato District

The Arapuni Suspension Bridge is located just downstream from the Arapuni Power Station on the Waikato River in the South Waikato District of New Zealand. The 152-metre (499 ft) suspension bridge in the bush-lined gorge was built in the mid-1920s to allow workers from the village of Arapuni to access the power station construction site.

<span class="mw-page-title-main">Waikato River Trails</span>

The Waikato River Trails is a combined walk- and cycleway along the Waikato River. Originally conceived and started by local politicians and trustees, in 2009 the trails became one of the seven Quick Start Projects that form the beginning of the New Zealand Cycle Trail. The trail is proposed to be 100 km long, out of which 50 km existed before the NZCT scheme was created. In mid-2011, work on the last sections of the cycle trail project sections was begun, while the official grand opening occurred early November 2011.

<span class="mw-page-title-main">Waipapa Power Station</span> Dam in Waikato River

Waipapa Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the sixth hydroelectric power station on the Waikato River. It is the smallest power station on the Waikato River.

<span class="mw-page-title-main">Onekaka Power Station</span> Hydro-electric power station in New Zealand

Onekaka Power Station is a small hydro-electric generating station on the Onekaka River, in Golden Bay / Mohua, New Zealand. The first power station on the river was built in 1928–29 to provide power for the Onekaka Ironworks. The original scheme included a concrete arch dam 10 m (33 ft) high, a penstock 1.25 km (0.78 mi) long, and a powerhouse containing a Boving pelton wheel, rated at 250 kW.

References

  1. "Hydro Generation". Mercury Energy. Retrieved 19 October 2019.
  2. "Arapuni Technical information - Mighty River Power Generation". Mighty River Power. Archived from the original on 16 May 2008. Retrieved 5 May 2009.
  3. 1 2 "About Arapuni - Mighty River Power Generation". Mighty River Power. Archived from the original on 27 September 2011.
  4. "Arapuni Powerhouse". New Zealand Heritage List/Rārangi Kōrero. Heritage New Zealand . Retrieved 5 May 2009.
  5. "Arapuni Dam". New Zealand Heritage List/Rārangi Kōrero. Heritage New Zealand . Retrieved 5 May 2009.
  6. "Arapuni Suspension Bridge". Historic Places Trust. Retrieved 16 January 2010.
  7. McLintock, Alexander Hare; by Victor Albert Le Page, B. A.; Taonga, New Zealand Ministry for Culture and Heritage Te Manatu. "Transmission Systems". An encyclopaedia of New Zealand, edited by A. H. McLintock, 1966. Retrieved 2 April 2020.
  8. "Arapuni Power Station and Dam". IPENZ. Archived from the original on 22 May 2010. Retrieved 30 December 2009.
  9. "Extreme Group Photo Gallery Arapuni Hydro Dam". Archived from the original on 14 October 2008. Retrieved 30 December 2009.
  10. Riley, Gavin (April 2007). "Arapuni task a world first". Contrafed Publishing. Archived from the original on 18 February 2012. Retrieved 30 December 2009.
  11. Hyde, Robin (1986). Nor the Years Condemn. Auckland: New Women's Press. p. 188.
  12. Hyde, Robin (1986). Nor the Years Condemn. Auckland: New Women's Press. pp. 200–201.

Further reading