Barun Sengupta metro station

Last updated

Barun Sengupta

বরুণ সেনগুপ্ত
Kolkata Metro Logo.svg
Ritwik Ghatak metro Station 03.jpg
General information
Location Science City, Uttar Panchanagram, East Topsia, Dhapa, Kolkata - 700105
Coordinates 22°31′58″N88°23′45″E / 22.5328605°N 88.3957647°E / 22.5328605; 88.3957647
Owned byMetro Railway, Kolkata
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
ParkingYes
History
OpenedUnder Construction. Expected to open in 2024. [1]
Electrified750 V DC third rail
Services
Preceding station Kolkata Metro Logo.svg Kolkata Metro Following station
Ritwik Ghatak
towards Kavi Subhash
Orange Line Beleghata
towards Jai Hind
Location
Barun Sengupta metro station

Barun Sengupta (also known as Science City ), is a station of Line 6 of the Kolkata Metro located in the Topsia area of ​Kolkata, West Bengal, India, serving Topsia and Uttar Panchanagram areas. [2] The name of the station has been given on the famous tourist spot, Science City. The station is elevated above the Eastern Metropolitan Bypass.

Contents

History

This project was sanctioned in the budget of 2010–11 by Mamata Banerjee with a project deadline of six years. [3] The execution of this project has been entrusted to RVNL at a cost of Rs 3951.98 crore. [4] It will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport. In October 2011, an initial tender was awarded for the construction of the Metro Corridor from Kavi Subhash metro station to VIP Bazar metro station. [5] [3] In January 2012, the construction of the metro station along with the metro line started. The construction of the station was stopped in 2015 due to land dispute at Tagore Park culvert and a pair of footover bridges. [6] The construction of the station started again in May 2017. [7] [8] [9] [10]

A week later after inauguration and a day after commercial run started on Kavi Subhash-Hemanta Mukhopadhyay section, in March 2024, RVNL announced the completion of a 76 m (249 ft) viaduct gap after construction of a single-span open-web girder steel bridge over the disputed Tagore Park culvert. This completed the viaduct upto Beleghata metro station.

Station

Structure

Barun Sengupta Metro Station is an elevated metro station and has a total of 3 levels. Station entrances and exits begin or end at the first level or ground level. Second-level or L1 or intermediate level houses station fare control, station agents, metro vending machines, crossovers, etc. The third level or L2 or the final level houses the platforms and rail tracks. The station is 200 meters long and 25 meters wide. [11] [9] [12] [13]

The station has four entrances and exits. The station is being built with state-of-the-art technology. In addition to staircases, it will be equipped with lifts and escalators. The station also has drinking water and toilet facilities. [11] [9] [12] [14]

Power and signal systems

Like other stations and lines of Kolkata Metro, this station has 750 volt DC powered third rail. The electricity system will be used to operate the train.

Train movement at this station will be managed by communication based train control signaling system. With this signal system, trains can be operated at intervals of 90 seconds.

Services

Services have not started from this station. Currently the station is under construction and is set to be opened in 2024. [15] [7]

Connections

See also

Related Research Articles

<span class="mw-page-title-main">Kolkata Metro</span> Rapid transit system in Kolkata, India

The Kolkata Metro is a rapid transit system serving the city of Kolkata and the wider Kolkata Metropolitan Region in West Bengal, India. Opening in 1984, it was the first operational rapid transit system in India, beside being the second busiest and fourth-longest metro network in India. As of March 2024, it has four operational lines: the 32.33 km (20.09 mi) Line 1 from Dakshineswar to Kavi Subhash, 13.9 km (8.6 mi) Line 2 from Salt Lake Sector V to Howrah Maidan, 7.75 km (4.82 mi) Line 3 from Joka to Majerhat and 5.4 km (3.4 mi) Line 6 from Kavi Subhash to Hemanta Mukherjee for a total of 59.38 km (36.90 mi). Two other lines are in various phases of construction and planning. The system has a mix of underground, at-grade and elevated stations using both broad-gauge and standard-gauge tracks. Trains operate between 06:55 and 22:30 IST and the fares range from ₹5 to ₹50.

<span class="mw-page-title-main">Kavi Subhash metro station</span> Kolkata Metros Blue & Orange Line interchange and terminal station

Kavi Subhash is the at-grade southern terminus and interchange metro station of the North-South corridor and Bypass Corridor of Kolkata Metro in Kolkata, West Bengal, India. It is named after poet Subhash Mukhopadhyay. This station was opened to public on the auspicious day of Mahalaya in 2010.

<span class="mw-page-title-main">Kolkata Metro Line 1</span> Transit line of rapid transport in Kolkata, India

The Line 1, Blue Line, also known as North–South Metro of the Kolkata Metro, is a rapid transit system serving Kolkata in Indian state of West Bengal. It consists of 26 operational stations from Dakshineswar to Kavi Subhash. Nine of the stations are elevated, 2 at-grade and the remaining 15 are underground, with a total distance of 32.13 km (19.96 mi). The line connects Dakshineswar and New Garia and uses 5 ft 6 in broad gauge rolling stock. Dakshineswar was opened on 22 February 2021 is an elevated station located 4.1 km (2.5 mi) north of Noapara. It was the first underground railway to be built in India, with the first operations commencing in October 1984 and the full stretch that was initially planned being operational by February 1995. On 28 December 2010, it became the 17th zone of the Indian Railways. Being the country's first, and a completely indigenous process, the construction of the Kolkata Metro was more of a trial-and-error affair, in contrast to the Delhi Metro, which has seen the involvement of numerous international consultants. As a result, it took nearly 23 years to completely construct around 15 km (9.3 mi) underground railway from Birpara up to Tollygunge Metro Station.

<span class="mw-page-title-main">Kolkata Metro Line 3</span> Transit line in Kolkata, India

Kolkata Metro Line 3 or the Purple Line is a line of the Kolkata Metro. The 6.5 kilometres (4.0 mi) stretch from Joka to Taratala of the 15.08 kilometres (9.37 mi) line was inaugurated on 30 December 2022 before being extended to Majerhat on 6 March 2024. The route will span 15.08 kilometres (9.37 mi) from Joka in the south, to Esplanade in the north with a future extension of 3.39 kilometres (2.11 mi) to Diamond Park from Joka. It will connect Kolkata Metro Line 1 at Park Street in central Kolkata and run in parallel up to Esplanade in central Kolkata where it will connect Kolkata Metro Line 2 also. Line 3 is being built by Rail Vikas Nigam Limited.

<span class="mw-page-title-main">Kolkata Metro Line 6</span> Transit line in Kolkata, India

Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro, in the Indian state of West Bengal, is a rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. It currently operates between Kavi Subhash and Hemanta Mukhopadhyay. This stretch will be one of the most important stretches of the metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. The total distance of this route will be 29.87 km (18.56 mi).

<span class="mw-page-title-main">Satyajit Ray metro station</span> Metro station in Kolkata, India

Satyajit Ray is a metro station of the Kolkata Metro Line 6 in Chak Garia, E.M. Bypass, Kolkata, India. The station is named in honour of the great Bengali filmmaker Satyajit Ray. The elevated structure is located above the Eastern Metropolitan Bypass with the Satyajit Ray Film and Television Institute and the Baghajatin Peerless Hospital on the eastern side and the Hiland Park condominium on the western side. This metro station would serve the neighbourhoods of Baghajatin, Chak Garia, Survey Park and Santoshpur of South Kolkata.

<span class="mw-page-title-main">Central Park metro station</span> Kolkata Metros Green Line metro station

Central Park is an elevated metro station on the East-West corridor of the Green Line of Kolkata Metro, which is an eastern neighbourhood of Kolkata, West Bengal, India. The elevated structure is located above the 3rd Avenue between Central Park and Bikash Bhawan. This station serves the Central Park and other government offices situated in Sector I, Salt Lake.

<span class="mw-page-title-main">City Center metro station</span> Kolkata Metros Green Line metro station

City Center is an elevated metro station on the east-west corridor of the Green Line of Kolkata Metro that serves the City Center shopping mall area in Salt Lake City, Kolkata, West Bengal, India. This metro station is located near Labony Estate, Salt Lake.

<span class="mw-page-title-main">Salt Lake Stadium metro station</span> Kolkata Metros Green Line metro station

Salt Lake Stadium is an elevated metro station on the East-West corridor of the Green Line of Kolkata Metro in Kolkata, West Bengal, India. It serves the Vivekananda Yuba Bharati Krirangan and Kadapara area. The station is situated over EM Bypass, 800 m away from the Bengal Chemical metro station.

<span class="mw-page-title-main">Jai Hind metro station</span> Kolkata Metro station

Jai Hind is a metro station of Kolkata Metro. It will serve the city's main airport, the Netaji Subhas Chandra Bose International Airport.

<span class="mw-page-title-main">East West Metro Tunnel</span> First underwater metro tunnel in India

East West Metro Tunnel is a underwater river tunnel of Kolkata Metro in Kolkata, West Bengal. The river tunnel is constructed underneath Hooghly River. It is the biggest underwater river tunnel of India, which is made for metro rail service. The East West Metro Tunnel length is 10.8 km (6.7 mi) and width is 5.5 metres. A 520 m stretch of the tracks goes through a tunnel under the Hooghly River. The roof of the tunnel is about 30 metres from the ground level. The tunnel was completed in 2021. The tunnel is used by East West Metro Line for metro rail service by Kolkata Metro Rail Corporation and it was constructed by Afcons Infrastructure.

<span class="mw-page-title-main">Majerhat metro station</span> Metro station in Kolkata, India

Majerhat metro station is an operational metro station on Line 3 of Kolkata Metro. It is the terminal station of the first phase 1 of this line and the first and only station built over an existing railway network, from Joka to Majerhat. The line was sanctioned in India's railway budget of 2010–11, but due to various hurdles, construction was delayed and missed multiple deadlines. The most notable reason for delays was the Majerhat Bridge collapse in 2018.

<span class="mw-page-title-main">Dum Dum Cantonment metro station</span> Metro station in Kolkata, India

Dum Dum Cantonment is an elevated metro station of line 4 of Kolkata Metro. It is situated just beside the Dum Dum Cantonment railway station. This station was proposed in Line 4, in the budget of 2010–11. It is also the part of the integration of old line of Circular Railway from Dum Dum Cantonment to Jai Hind.

<span class="mw-page-title-main">MRT Line 1 (Dhaka Metro Rail)</span> Mass rapid transit line of Dhaka Metro

The MRT Line 1 is Dhaka's rapid transit line under construction. It will be the second of the Dhaka Metro Rail system and will be operated by Dhaka Mass Transit Company Limited (DMTCL). Its construction started in February 2023. It is scheduled to open in December 2026.

<span class="mw-page-title-main">Jyotirindra Nandi metro station</span> Metro station in Kolkata, India

Jyotirindra Nandi is a metro station of Line 6 of the Kolkata Metro. The station serves Mukundapur, Santoshpur and Ajoy Nagar areas outlying the E.M. Bypass section of the city.

<span class="mw-page-title-main">Kavi Sukanta metro station</span> Metro station in Kolkata, India

Kavi Sukanta is a station of Line 6 of the Kolkata Metro in Kalikapur, a southern neighbourhood of Kolkata, India, serving the areas of Kalikapur, Haltu, Prince Anwar Shah Road and Nandi Bagan. The station is named in honour of the revolutionary Bengali poet Sukanta Bhattacharya.

<span class="mw-page-title-main">Hemanta Mukhopadhyay metro station</span> Metro station in Kolkata, India

Hemanta Mukhopadhyay is a Metro station of Line 6 of the Kolkata Metro at Ruby Crossing, serving the areas of E.M. Bypass, Kasba and Anandapur. The station is named in honour of the Indian Bengali playback singer Hemanta Mukhopadhyay.

Beleghata, is a station of Line 6 of the Kolkata Metro located in the Topsia area of Kolkata, West Bengal, India, serving Beleghata and Metropolitan areas. The station is elevated above the Eastern Metropolitan Bypass.

<span class="mw-page-title-main">VIP Bazar metro station</span> Transit station in Kolkata, India

VIP Bazar is a station of Line 6 of the Kolkata Metro located in the Tagore Park area of Kolkata, West Bengal, India, serving Tiljala and VIP Nagar areas. The station is named after the nearby market called, VIP Bazar. The station is elevated above the Eastern Metropolitan Bypass. VIP Nagar and VIP Bazar are located next to the station.

<span class="mw-page-title-main">Ritwik Ghatak metro station</span> Transit station in Kolkata, India

Ritwik Ghatak, is a station of Line 6 of the Kolkata Metro located in the Topsia area of ​Kolkata, West Bengal, India, serving Topsia and Uttar Panchanagram areas. The name of the station has been given on the famous film director, Ritwik Ghatak. The station is elevated above the Eastern Metropolitan Bypass.

References

  1. Chakraborty, Ajanta (20 February 2023). "Rail Vikas Nigam Limited plans 4 km extension from Ruby Metro to Beliaghata by puja". The Times of India. Archived from the original on 22 February 2023. Retrieved 11 March 2023.
  2. Abbas, Ajmal (30 January 2023). "First phase of Kolkata Metro's Orange Line all set for launch; covers Kavi Subash to Hemanta Mukherjee in 7 minutes". TimesNow. Archived from the original on 30 January 2023. Retrieved 11 March 2023.
  3. ""Seven projects meant to change the face of Calcutta are entangled in a web of land politics and pandering. Metro explores the tunnel vision"". Telegraph india.
  4. ""Road Ahead….. Projects sanctioned"". mtp.indianrailways.gov.in. Retrieved 28 March 2024.
  5. ""Construction of VIP Bazar station begins after two years"".
  6. 1 2 "Airport-New Garia Metro: Site visit next week to bridge VIP Bazar gap". The Times of India. 12 March 2023. ISSN   0971-8257 . Retrieved 28 March 2024.
  7. "Man electrocuted at construction site". The Times of India. 19 February 2024. ISSN   0971-8257 . Retrieved 28 March 2024.
  8. 1 2 3 "শেষের মুখে কলকাতা মেট্রোর আরও ১ স্টেশনের কাজ! ভিতরটা কেমন হল? রইল 'ফার্স্ট লুক'". Hindustantimes Bangla (in Bengali). 28 September 2023. Retrieved 29 March 2023.
  9. "মেট্রোর পথ করতে নোনাডাঙায় সরছে পুরোনো ভিআইপি বাজার". Eisamay (in Bengali). Retrieved 28 March 2024.
  10. 1 2 MP, Team (30 September 2023). "Concreting work of Ritwik Ghatak Metro Station nears completion". www.millenniumpost.in. Retrieved 29 March 2024.
  11. 1 2 "Ritwik Ghatak Metro Station: ঋত্বিক ঘটক মেট্রো স্টেশন চোখ ধাঁধানো, কাজ প্রায় শেষ, কেমন হল? দেখুন". Aaj Tak বাংলা (in Bengali). Retrieved 29 March 2024.
  12. railanalysis3 (13 October 2023). "Kolkata Metro Update: The construction work of Ritwik Ghatak metro station of Kavi Subhash-Biman Bandar corridor going on in full swing". Rail Analysis India. Retrieved 29 March 2024.{{cite web}}: CS1 maint: numeric names: authors list (link)
  13. "নিউ গড়িয়া-বিমানবন্দর মেট্রো করিডোরে বড় খবর, নতুন স্টেশনের ছবি দেখুন". Eisamay (in Bengali). Retrieved 29 March 2024.