General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Coordinates | 45°24′34″N75°43′19″W / 45.40944°N 75.72194°W | ||||||||||
Platforms |
| ||||||||||
Tracks | 3 (+1 under construction) | ||||||||||
Construction | |||||||||||
Parking | No | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened |
| ||||||||||
Rebuilt | 2020–2024 (Line 2) | ||||||||||
Services | |||||||||||
| |||||||||||
Future services | |||||||||||
|
Bayview is an O-Train interchange station in Ottawa, Ontario, Canada, connecting the Confederation Line (Line 1) and Trillium Line (Line 2).
The station opened on October 15, 2001. It was built as an infill station between Tunney's Pasture and LeBreton (now Pimisi), with a pair of elevated bus platforms at the western end of Albert Street. Beneath it was the first O-Train station, the northern terminus of the Trillium Line, located on a stub-end track branching off from the railway line. [1] Paved asphalt footpaths connected the two stops on opposite sides of the Transitway and the train platform.[ citation needed ]
On January 17, 2016, the transitway platforms closed for conversion to light rail, with all buses diverting via Albert Street. The station reopened on September 14, 2019, as an intermediate stop on the first phase of the Confederation Line, making Bayview an important rapid transit transfer point. [2] [3]
On September 16, 2017, the eastbound bus stop of Bayview Station was moved 300m west to facilitate the construction of the Trinity Development at 900 Albert Street. [4]
During the reconstruction of the station, the original Line 2 O-Train station was closed and a new platform was constructed to the north, underneath the Line 1 station.[ citation needed ]
During the Stage 2 south expansion, the original Line 2 platform was extended to accommodate the longer trains that would be used on the line, and a second platform was added for operational flexibility. A pedestrian bridge was also constructed from east to west over the Line 2 platforms, intended to connect with the future development at 900 Albert.[ citation needed ]
The station, named for the nearby Bayview Road (now Bayview Station Road), is close to Tom Brown Arena. It is intended as a catalyst for large redevelopment including condos, hotels and the city's future tallest office and residential tower at 900 Albert. Plans also exist for converting a 1940s warehouse into a film studio and build an attached 15 storey "innovation hub".[ citation needed ]
The Confederation Line station is an elevated side platform station. A ticket barrier at platform level on the south (eastbound) platform provides access to Albert Street. Under the station, a concourse connects the two platforms with the single Trillium Line platform, and also contains a ticket barrier giving access to a footpath connecting the built-up area south of the station with the greenspace to its north. [5] As part of the Stage 2 Trillium Line expansion, the existing Line 2 platform will be extended to accommodate longer trains. A second track and platform will also be built to the east of the existing tracks. [6]
The station features two artworks: Cascades by Pierre Poussin, a set of two large sculptures located in the greenspace surrounding the station, and As the Crow Flies by Adrian Göllner, a linear sculpture running atop the barrier between the two tracks on the Confederation Line platform level. [5]
The following routes serve Bayview as of October 25, 2023. Bus stops at Bayview are located outside of the O-Train fare-paid zone. [7]
O-Train | |
E1 | Shuttle Express |
R1 R2 | O-Train replacement bus routes |
98 39 | Rapid routes |
N75 | Night routes |
40 11 | Frequent routes |
55 162 | Local routes |
284 | Connexion routes |
405 | 300s: Shopper routes 400s: Event routes 600s: School routes |
Additional info:
|
Stop | Routes |
---|---|
O-Train (west) | |
O-Train (east) | |
A (Albert St. West) | R1 2 16 N57 61 N61 63 66 75 N75 |
B (Albert St. East) | R1 2 16 N57 61 N61 63 66 75 N75 |
OC Transpo is the organisation that operates and plans public transport in the city of Ottawa, Canada. OC Transpo's system includes bus rapid transit, light rail, conventional bus routes, and door-to-door paratransit.
The Transitway is a bus rapid transit (BRT) network operated by OC Transpo in Ottawa, Ontario, Canada. It comprises a series of bus-only roadways and reserved lanes on city streets and highways. The dedicated busways ensure that buses and emergency vehicles on the Transitway rarely intersect directly with regular traffic, making it possible to run quickly and consistently, even during rush hour traffic. OC Transpo operates a network of rapid routes which use the Transitway to connect communities with the O-Train light rail system. Additional bus routes also use segments of the Transitway.
Lees is an OC Transpo light rail transit station in Ottawa, Ontario, Canada. It had previously been a transitway station, which closed in January 2016 and was converted into an O-Train station.
uOttawa is a light rail transit (LRT) station on the O-Train Confederation Line, located on the University of Ottawa campus.
Hurdman is a major station on Ottawa's O-Train Confederation Line, and bus rapid transit (BRT) system, transitway.
Greenboro is a transitway stop and future O-Train Trillium Line station in Ottawa, Ontario, Canada. It is located at Bank Street and Johnston Road at the north end of the South Keys shopping complex. The station has a 678-space paid park and ride lot. The bus terminus was opened with the southern transitway on September 2, 1995.
The Trillium Line, also called O-Train Line 2, is a diesel light rail transit (DLRT) service in Ottawa, Ontario, Canada, operated by OC Transpo. The line has been closed since May 2020 for service expansion.
Tremblay is an O-Train station on the Confederation Line in Ottawa, Ontario which serves the Ottawa train station, connecting to Via Rail Corridor inter-city rail services and a daily Ontario Northland bus service to Sudbury and Sault Ste. Marie. The station opened on September 14, 2019 to replace the former Transitway bus rapid transit station known as Train Station.
Tunney's Pasture is the western O-Train light rail terminal train station in Ottawa, Ontario.
St-Laurent is a station on the Confederation Line of Ottawa's O-Train, and on the system's bus network and is located at St. Laurent Boulevard and the Queensway.
Cyrville is a station on the Confederation Line of Ottawa's O-Train light metro system, located at Cyrville Road and near the Queensway.
South Keys station is the southernmost station of the Southeast Transitway in Ottawa. The station is located in the South Keys neighbourhood, behind the south end of the South Keys Shopping Centre, and between Bank Street and the Airport Parkway. The Transitway station was opened for bus service on September 2, 1995.
Bayshore is a station on the transitway in Ottawa, Ontario, served by OC Transpo buses. It is located in the western transitway section at the Bayshore Shopping Centre in the neighbourhood of Bayshore.
Fallowfield station or Fallowfield Train Station is an inter-city passenger railway station and bus rapid transit station located at 3347 Fallowfield Road in the suburban neighbourhood of Barrhaven in Ottawa, Ontario, Canada.
The Confederation Line, also called O-Train Line 1, is a light rail line operated by OC Transpo in Ottawa, Ontario, Canada, as part of the city's O-Train light rail system. It opened on September 14, 2019, and is O-Train's second line. It operates on an east–west route, with a segment under Queen Street in the downtown core, complementing the north–south Trillium Line that operates to the west of the downtown core. Using light rail rolling stock and technology, the Confederation Line is completely grade separated.
The O-Train is a light rail rapid transit system in Ottawa, Ontario, Canada, operated by OC Transpo. The system consists of two lines: the electrically-operated Confederation Line, running east to west, and the diesel-operated Trillium Line, running north to south. Both lines are currently being extended as part of the Stage 2 project, with new segments being phased in between 2024 and 2027.
Pimisi is a light rail station on the Ottawa Confederation Line as part of the O-Train network.
Lyon is an underground light rail station on the Confederation Line of the O-Train in Ottawa located in the western portion of Ottawa's downtown, specifically at Lyon Street and Queen Street, the latter being the street the line runs under within Ottawa's downtown core.
Limebank is an under construction terminal station on the Trillium Line in Ottawa, Ontario. When constructed, it will be the southern terminus of the Stage 2 O-Train expansion and is scheduled for completion in 2024. The station will be elevated with two side platforms and is located southwest of the intersection of Limebank and Earl Armstrong roads. OC Transpo Rapid bus routes 74 and 99 will connect to this station once revenue service begins in 2024.
Media related to Bayview station at Wikimedia Commons