Line 3 (O-Train)

Last updated
Line 3
O-Train Line 3.svg
Overview
StatusUnder construction
Owner City of Ottawa
Locale Ottawa, Ontario
Stations27 (23 shared with line 1)
Website Line 3 (OC Transpo)
Service
Type Light rail
System O-Train
Depot(s) Corkstown Yard
Rolling stock Alstom Citadis Spirit
History
Planned opening2027 (2027) [1]
Technical
Line length39.5 km (25 mi)
CharacterAt-grade, underground
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 1,500 V DC from overhead catenary
Operating speed80 km/h (50 mph)
Signalling Thales SelTrac CBTC

Line 3 is an under construction urban rail line on the O-Train network in Ottawa, Ontario. It is expected to open in 2027. [1]

Contents

History

In November 2013, the City of Ottawa released its new transportation master plan, [2] which included plans to build 35 kilometres (22 mi) of new rapid transit and 19 new stations. This also included plans to extend the Confederation Line westward to Bayshore station. In February 2017, the city announced an extension westward to Moodie Drive from Bayshore station. [3] This totals an extension of 11 stations and 15 kilometres (9.3 mi) westward. [4] Stage 2 will add a new light maintenance and storage facility along Corkstown Road, west of Moodie station.

Construction on Line 3 began in the second quarter of 2019, as the first segment of Line 1 became operational. While the western expansion of the O-Train was initially expected to be complete by 2026, [5] the city stated in August 2024 that the full system could be operational by 2027. [1] Construction is currently ongoing, for implementation of the city's plan to address the current gap in service between Dominion station and Lincoln Fields station where buses travel on the Kichi Zibi Mikan a little over 4 kilometres (2.5 mi) without stopping. [6] The plan calls for burying trains for most of the route, creating a shorter, straighter alignment. The new route will also include two new LRT stations in an urban area with intensification opportunities.

The line was initially considered to be part of the Confederation Line but was given its own number and colour in November 2020. [7]

Route and stations

Route

Line 3 will run parallel to Line 1 for most of its route, splitting at Lincoln Fields and continuing west towards Moodie.

Stations

Line 3 will feature 27 stations, from Trim in the east to Moodie in the west. 23 of the stations will be shared with Line 1.

StationNotes
Stage 2 West
Westboro Will replace the existing Transitway station. Serves high-density residential and Westboro Village
Kichi Zìbì Will replace Dominion station. The station will be renamed Kichi Zìbì to better associate with the region's Algonquin heritage, the nearby Kitchissippi lookout and the City ward of the same name
Sherbourne New station will be below-grade, built as part of a cut-and-cover tunnel along the Byron Linear Tramway Park at Sherbourne Road
New Orchard New station will be below-grade, built as part of a cut-and-cover tunnel along the Byron Linear Tramway Park near New Orchard Avenue
Lincoln Fields Will replace the existing Transitway station. This station will be a major transfer point between the Algonquin (Line 1) and Moodie (Line 3) branches of the Confederation Line. It will include a fare-paid transfer zone as well as public washrooms.
Stage 2 West, Moodie Branch (Line 3)
Queensview Will be located near OC Transpo's Pinecrest garage between Queensview drive and the 417. A pedestrian bridge across the 417 is also being constructed to directly link to the station; although it will be completed before the LRT is operational, it will not be open to the public until the beginning of train service.
Pinecrest Will be located just west of Pinecrest Road and south of the existing Transitway station
Bayshore Will replace the existing Transitway station
Moodie Will replace the newly built Transitway station. A new maintenance and storage facility will be built beyond this station on the west side of Moodie Drive
Stage 2 East
Montréal Will replace existing at-grade Transitway request stops and be built across Montreal Road in a newly constructed and widened Regional Road 174 overpass
Jeanne d'Arc Will replace the existing station and be built in the median of Highway 174 below Jeanne d'Arc Boulevard
Convent Glen New station will be built in the median of the 174 below Orléans Boulevard
Place d'Orléans Will replace existing Transitway station and be built in the median of the 174 and connect to the existing pedestrian bridge to connect to the Park and Ride and the Place d'Orleans Shopping Centre. This will be a major transfer station for riders living in Orléans and it will include a fare-paid transfer zone, with an additional pedestrian overpass constructed to provide direct between the bus and train platforms in the zone. It will also include public washrooms.
Trim Will be located in the median of the 174 and connect to the existing park-and-ride south of the 174 via a new pedestrian bridge. In the longer term, there are plans to construct an additional pedestrian bridge to link the station with the communities north of the 174.

Long-term expansion plans

Station [8] Notes
Wesley Clover ParksA future side platform station is protected along the guideway being constructed for the Stage 2 West expansion, west of the terminus at Moodie station and in close proximity to the Moodie Yard LMSF. If constructed, it would be used for special events only at Wesley Clover Parks on the other side of Corkstown Road.

Related Research Articles

<span class="mw-page-title-main">Line 3 Scarborough</span> Defunct light rapid transit line in Toronto, Canada

Line 3 Scarborough, originally known as Scarborough RT (SRT), is a defunct medium-capacity rapid transit line that was part of the Toronto subway system in Toronto, Ontario, Canada. The line ran entirely within the eastern district of Scarborough, encompassing six stations and 6.4 kilometres (4.0 mi) of mostly elevated track. It was connected with Line 2 Bloor–Danforth at its southwestern terminus, Kennedy, and terminated in the northeast at McCowan. Until its closure in July 2023, the system had a ridership of 3,908,000 per year.

<span class="mw-page-title-main">Line 4 Sheppard</span> Rapid transit line in Toronto, Ontario

Line 4 Sheppard is the newest and shortest rapid transit line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November 22, 2002, and has five stations along 5.5 kilometres (3.4 mi) of track, which is built without any open sections in the district of North York along Sheppard Avenue East between Yonge Street and Don Mills Road. All stations are wheelchair accessible and are decorated with unique public art.

<span class="mw-page-title-main">Toronto subway</span> Rapid transit system in Ontario, Canada

The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). The subway system is a rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of December 2024, three new lines are under construction: two light rail lines and one heavy rail line.

<span class="mw-page-title-main">OC Transpo</span> Public transit service in Ottawa, Ontario, Canada

OC Transpo is the primary public transport agency for the city of Ottawa, Ontario, Canada. operating bus rapid transit, light rail, conventional bus routes, and door-to-door paratransit in the nation's capital region.

<span class="mw-page-title-main">CTrain</span> Light rail transit system in Calgary, Alberta

CTrain is a light rail system in Calgary, Alberta, Canada. Much of the system functions as a high-capacity light metro, while in the downtown free-fare zone, trains run like a modern tram with a dedicated right-of-way. This subway-surface alignment is known as semi-metro.

<span class="mw-page-title-main">Transitway (Ottawa)</span> Bus rapid transit system in Ottawa, Canada

The Transitway is a bus rapid transit (BRT) network operated by OC Transpo in Ottawa, Ontario, Canada. It comprises a series of bus-only roadways and reserved lanes on city streets and highways. The dedicated busways ensure that buses and emergency vehicles on the Transitway rarely intersect directly with regular traffic, making it possible to run quickly and consistently, even during rush hour traffic. OC Transpo operates a network of rapid routes which use the Transitway to connect communities with the O-Train light rail system. Additional bus routes also use segments of the Transitway.

<span class="mw-page-title-main">Seoul Subway Line 7</span> Subway line in Gyeonggi-do, Incheon and Seoul, South Korea

Seoul Subway Line 7 of the Seoul Metropolitan Subway was built from 1990 to 1996 and was completed on August 1, 2000 ; the western section between Sinpung and Onsu was put into service on February 29, 2000. This north-south line does not run through the city centre but links Gangnam directly to the northeastern districts of Seoul. In 2019, Line 7 had an annual ridership of 380 million or 1.04 million passengers per day. Although most trains run between Jangam and Seongnam, some trains short turn at Onsu station and some trains start at Dobongsan station.

<span class="mw-page-title-main">Trillium Line</span> Rapid transit line in Ottawa, Ontario

The Trillium Line, also called O-Train Line 2, is a diesel light rail transit (DLRT) service, using main line trains. The line is in Ottawa, Ontario, Canada, and is operated by OC Transpo.

<span class="mw-page-title-main">Baseline station</span>

Baseline (Transitway) or Algonquin (O-Train) is a public transit station directly across from the main campus of Algonquin College in Ottawa's west end, near the intersection of Woodroffe Avenue and Baseline Road. Many Algonquin College students and Centrepointe residents use this station to get to various points in the city, and to and from the college. Several residential and business areas such as Centrepointe and College Square are also served by this station.

<span class="mw-page-title-main">VCC–Clark station</span> Metro Vancouver SkyTrain station

VCC–Clark is an elevated station on the Millennium Line of Metro Vancouver's SkyTrain rapid transit system. The station is named after the nearby Vancouver Community College (VCC) located in Vancouver, British Columbia, Canada and serves as the western terminus of the Millennium Line.

<span class="mw-page-title-main">Edmonton LRT</span> Light rail system in Edmonton, Alberta

Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the system has 29 stations on three lines and 37.4 km (23.2 mi) of track. Much of the system has a dedicated right-of-way, while in the downtown area, vehicles run underground. This subway-surface alignment is known as semi-metro. As of 2018, it was number seven on a list of the busiest light rail transit systems in North America, with over 113,000 daily weekday riders.

<span class="mw-page-title-main">Line 5 Eglinton</span> Light rail line under construction in Toronto, Ontario

Line 5 Eglinton, also known as the Eglinton Crosstown LRT or the Crosstown, is a light rail transit line that is under construction in Toronto, Ontario, Canada, to expand and improve public transportation in the Greater Toronto Area. Owned by Metrolinx and operated by the Toronto Transit Commission (TTC), the line will be part of the Toronto subway system. The Crosstown was conceived in 2007 during the administration of Toronto mayor David Miller as part of Transit City, a large-scale transit expansion plan. The line is being constructed in two phases.

The Eglinton East LRT (EELRT), also known as Line 7 Eglinton East and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough. It was originally part of Transit City, a 2007 plan to develop new light rail lines along several priority transit corridors in the city.

<span class="mw-page-title-main">Line 6 Finch West</span> Under construction light rail line in Toronto, Ontario

Line 6 Finch West, also known as the Finch West LRT, is a light rail transit line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The 10.3-kilometre (6.4 mi), 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber Polytechnic in Etobicoke. The line will operate in a dedicated above-ground right-of-way, much of it within Finch Avenue, segregated from street traffic. The line will use transit signal priority and standard gauge rather than the broad Toronto gauge. The line is forecast to carry about 14.6 million rides a year or 40,000 a day by 2031 and will replace the 36B Finch West bus route, which is one of the three busiest bus routes in Toronto. In 2023, Line 6 was expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion. In early December 2024, Councillor Jamaal Myers, chairman of the TTC board, stated that the TTC did not expect Line 6 to open before June 2025 at the earliest. Metrolinx, the project owner, has not announced an opening date.

<span class="mw-page-title-main">Confederation Line</span> Light metro line in Ottawa, Ontario

The Confederation Line, also called O-Train Line 1, is a urban rail line operated by OC Transpo in Ottawa, Ontario, Canada, as part of the city's O-Train system. It opened on September 14, 2019, and is O-Train's second line. It operates on an east–west route, with a segment under Queen Street in the downtown core, complementing the north–south Trillium Line that operates to the west of the downtown core. Despite using light rail rolling stock and technology, the Confederation Line is completely grade separated. Having full grade separation and CBTC train control, this line can be categorised as a light metro.

<span class="mw-page-title-main">Valley Line (Edmonton)</span> Light rail line in Edmonton, Alberta

The Valley Line is a low-floor urban light rail line in Edmonton, Alberta, Canada. The 13.1-kilometre (8.1 mi) line runs southeast from downtown at 102 Street stop to Mill Woods Town Centre at Mill Woods stop and connects to the Capital and Metro lines at Churchill station, downtown. The line is being constructed in phases, with phase 1 being the current open 12-station portion between 102 Street and Mill Woods that commenced operations on November 4, 2023. The second phase, consisting of the 14-kilometre (8.7 mi), 16-station portion between 102 Street and Lewis Farms, began construction in 2021 and is expected to be completed in 2028. Upon completion, the entire Valley Line is expected to serve more than 100,000 commuters daily, nearly matching the current Capital Line and Metro Line in terms of capacity and ridership.

<span class="mw-page-title-main">O-Train</span> Rapid transit system in Ottawa, Ontario

The O-Train is a light rail system in Ottawa, Ontario, Canada, operated by OC Transpo. The system consists of three lines: the electrically-operated Confederation Line, running east to west; and the diesel-operated Trillium Line, running north to south, as well as the Airport Link. Line 1 is currently being extended as part of the Stage 2 project, with new segments being phased in between 2025 and 2027.

<span class="mw-page-title-main">Urban rail transit in Canada</span> List of Canadian passenger rail systems confined to urban areas

Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.

References

  1. 1 2 3 Glass, Marlo. "Ottawa LRT west extension could be ready for passengers by 2027, city says". Ottawa Citizen. Retrieved August 3, 2024.
  2. "Transportation Master Plan". City of Ottawa. Archived from the original on August 10, 2015. Retrieved March 2, 2015.
  3. Willing, Jon (February 17, 2017). "'The west is finally in': $3.6B rail package includes LRT to Moodie Drive". Ottawa Citizen. Retrieved August 19, 2017.
  4. "Stage 2 – East, West and South". City of Ottawa. 2015. Retrieved August 1, 2015.
  5. Porter, Kate. "Western Stage 2 LRT construction now 17 months behind". CBC News. Retrieved November 3, 2022.
  6. "Unsatisfied with City proposal partially bury western extension". Ottawa Citizen. Archived from the original on June 19, 2013. Retrieved June 12, 2013.
  7. Lord, Craig (November 26, 2020). "Ottawa LRT: OC Transpo finalizes station names, transit map for Stage 2". Global News. Retrieved January 10, 2025.
  8. "Project Agreement – Schedule 15-2 Part 1" (PDF). City of Ottawa.