Great Northern Railway (Ireland) Class V | |||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
|
The Great Northern Railway V class steam locomotives were 4-4-0 three-cylinder compound locomotives built in 1932 by Beyer, Peacock & Company for the Great Northern Railway (Ireland).
The V class was intended for the GNR's most important passenger service, the Dublin – Belfast expresses. The S and S2 Classes that had previously served the route were giving trouble as boiler pressure had been raised to increase power and performance. This increased maintenance (particularly with broken crank axles) and as a result the boiler pressure was brought back down. This obliged the GNR to develop a more powerful engine.
George Glover designed the resultant ‘V’ class with on-site experience learnt from the design teams for the British LMS Compound 4-4-0 compound locomotives.
The locomotives were ordered from Beyer, Peacock & Company and delivered in 1932. They cost £5,847, which was £3,000 less than the SG3 Class 0-6-0s built ten years before. Beyer, Peacock built only the locomotives; the GNR itself built the tenders at its works in Dundalk.
The GNR named the locomotives after birds of prey: 83 Eagle, 84 Falcon, 85 Merlin, 86 Peregrine, and 87 Kestrel. The V class were the first three-cylinder compound locomotives in Ireland. They had a round-topped firebox and Stephenson valve gear and weighed 103 tons 11 cwt including tender. The result was an engine that looked dramatically larger than their predecessor the S Class. This led to the unfounded rumour among railway workers that they had been designed for use in the USSR. As the GNR's only compound locomotives they were often called simply "The Compounds".
They were introduced for the accelerated Dublin – Belfast schedule, on which they reduced running times by up to 22 minutes. However, as for the S Class before them, the demanding timetable resulted in severe maintenance problems: hot axle boxes, connecting rod problems and boiler re-tubes. As a result, the boiler pressure was reduced by 50 lbf/in2, [1] reducing tractive effort by 20%.
No. 87 Kestrel was the first to be rebuilt in 1946 and was the first GNR loco to receive a Harland and Wolff-built square topped Belpaire firebox. Merlin had one fitted in 1950 with its old boiler rebuilt as a spare.
The V Class was chosen to haul the new Enterprise non-stop service between Dublin and Belfast in August 1947. The premium service was limited to seven bogie coaches. In the early 1950s the ‘Pounders’ shared most of the heavy main line work with the newer VS Class but, with the introduction of new British United Traction DMUs in 1957, the class was relieved of its main duties.
In October 1958 the former GNR, by then the Great Northern Railway Board or GNRB, was split between Northern Ireland's Ulster Transport Authority (UTA) and the Republic's CIÉ. Nos. 83, 86 and 87 went to the UTA and Nos. 84 and 85 to CIÉ. The letters ‘UT’ or ‘CIE’ were stencilled on the front buffer beams. CIÉ withdrew steam traction in 1963 and subsequently all but No. 85 Merlin were scrapped.
Merlin spent its final years as a spare in Dundalk works, occasionally hauling a Dublin train. The Ulster Folk and Transport Museum rescued her from the scrapyard in 1965, acquiring its (minus tender) for £600. It was stored variously at Inchicore, Amiens Street, Dundalk, Adelaide locomotive shed in Belfast and Lisburn before finally moving to the museum's gallery at Witham Street, Belfast, in 1969. Displayed here until 1976, it was moved to Harland and Wolff for a comprehensive overhaul organised by the Museum, the Railway Preservation Society of Ireland (RPSI) and Lord Dunleath. On completion in 1982 it was moved to the RPSI's Whitehead headquarters.
Merlin was officially returned to traffic on 30 June 1986 heading an official Belfast – Dublin Enterprise that September. Itrepeated the trip on the 40th anniversary of the Enterprise the following August, hauling the same length train as in 1947 (seven bogie coaches) and matching the timings of the original run.
Having received a further overhaul in the 1990s, Merlin continued to be leased by the RPSI and used on the main line until its boiler certificate expired in 2004. The locomotive has been overhauled since 2009 and returned to service early in 2014. [2]
Since returning to service in 2013, it has proven very unreliable, with several high-profile failures and has never managed to make it from Dublin to Rosslare and back without some sort of failure. This is unlike the other RPSI locos, 171, 4 or indeed 186 and 461. [3] [4] [5]
No. | Name | 1958 owner | 1958 No. | Withdrawn | Notes |
---|---|---|---|---|---|
83 | Eagle | UTA | 83X | 1960 | |
84 | Falcon | CIÉ | — | 1959 | |
85 | Merlin | CIÉ | 85N | 1963 | Preserved |
86 | Peregrine | UTA | 86X | 1961 | |
87 | Kestrel | UTA | 87X | 1960 |
An 00 gauge model of No. 85 Merlin is currently available as an etched-brass kit from Studio Scale Models. It includes transfers, brass etches and cast white metal parts. [6]
The CIE 141 Class locomotives were built in 1962 by General Motors Electro Motive Division (EMD) in the United States. Numbered B141 to B177, they were an updated version of the 121 Class locomotives, mechanically very similar but with cabs at each end.
Enterprise is the cross-border inter-city train service between Dublin Connolly in the Republic of Ireland and Belfast Grand Central in Northern Ireland, jointly operated by Iarnród Éireann (IE) and NI Railways (NIR). It operates on the Belfast–Dublin railway line.
The Great Northern Railway (Ireland) (GNR(I) or GNRI) was an Irish gauge (1,600 mm (5 ft 3 in)) railway company in Ireland. It was formed in 1876 by a merger of the Irish North Western Railway (INW), Northern Railway of Ireland, and Ulster Railway. The governments of Ireland and Northern Ireland jointly nationalised the company in 1953, and the company was liquidated in 1958: assets were split on national lines between the Ulster Transport Authority and Córas Iompair Éireann.
The Railway Preservation Society of Ireland (RPSI) is a railway preservation group founded in 1964 and operating throughout Ireland. Mainline steam train railtours are operated from Dublin, while short train rides are operated up and down the platform at Whitehead, County Antrim, and as of 2023, the group sometimes operates mainline trains in Northern Ireland using hired-in NIR diesel trains from Belfast. The RPSI has bases in Dublin and Whitehead, with the latter having a museum. The society owns heritage wagons, carriages, steam engines, diesel locomotives and metal-bodied carriages suitable for mainline use.
The Great Northern Railway of Ireland (GNRI) AEC Class were Associated Equipment Company (AEC)–engined diesel multiple units that operated InterCity and suburban services on the GNRI and later Ulster Transport Authority (UTA) systems between 1950 and 1975. They were finally withdrawn in 1972. They were the inspiration for the CIÉ 2600 Class.
The Northern Counties Committee (NCC) Class U2 4-4-0 passenger steam locomotives consisted of 18 locomotives built for service in north-east Ireland. Ten of the engines were new builds supplied by the North British Locomotive Company (NBL) or constructed at the NCC's York Road works. The remainder were rebuilds of existing locomotives.
The SLNCR Lough Class was a class of 0-6-4T steam tank locomotives of the Sligo, Leitrim and Northern Counties Railway (SLNCR).
The GNR(I) Q Class 4-4-0 steam locomotives of the Great Northern Railway (Ireland) (GNR) were mainly used on cross-border mixed traffic duties between Dublin and Belfast, as well as the "Derry Road" between Portadown and Derry. It was designed for the GNR under the auspices of Charles Clifford and built by Neilson, Reid and Company, North British Locomotive Company and Beyer, Peacock and Company. The Q Class is slightly smaller than the GNR class S 4-4-0 but powerful enough to haul a rake of eight or more carriages.
The Dublin and South Eastern Railway 15 and 16 were a pair of 2-6-0 steam locomotives which were built for the heavy goods (freight) traffic on the Dublin to Wexford main line of the Dublin and South Eastern Railway (DSER). The two locomotives were built by Beyer, Peacock and Company at their Gorton Foundry in Manchester.
The GS&WR Class 101, classified as Class 101 or Class J15 by the Great Southern Railways, was a class of 0-6-0 steam locomotives designed for working goods traffic although they did, and were quite capable of, working branch and secondary passenger trains.
The Great Northern Railway (Ireland) class S was a class of five 4-4-0 steam locomotive that the Great Northern Railway introduced in 1913 to haul Belfast – Dublin express passenger trains. They were followed two years later by the three similar class S2 locomotives.
The LMS (Northern Counties Committee)Class B3 4-4-0 passenger steam locomotives were rebuilds of Belfast and Northern Counties Railway (BNCR) two-cylinder compound locomotives. They operated services throughout the NCC's 5 ft 3 in (1,600 mm) broad gauge system in the north-east of Ireland.
The Great Northern Railway (Ireland) SG and SG2 classes was one of the last designs of Charles Clifford. They were primarily intended for goods work, but the increased wheel diameter enabled effective passenger duties, managing heavy excursion trains with ease and speed.
The GNR(I) class U was a class of 4-4-0 steam locomotives built for the Great Northern Railway (Ireland).
The Córas Iompair Éireann (CIÉ) 2600 Class were Associated Equipment Company (AEC)–engined diesel multiple units that operated InterCity and suburban services on the CIÉ system between 1952 and 1975. Many were later converted for push–pull operation with diesel locomotives, finally being withdrawn when displaced by the electric Dublin Area Rapid Transit service in the mid-1980s.
The Córas Iompair Éireann/Iarnród Éireann 071 Class or Northern Ireland Railways 110 Class or Serbian Railways JŽ series 666 is a General Motors Electro-Motive Division EMD JT22CW series diesel-electric locomotive used in the Republic of Ireland, Northern Ireland and Serbia.
The two locomotives comprising the South Australian Railways J class were the only steam locomotives with a 0-6-0 wheel arrangement ever operated by the railway. They went into service in August 1875 and were condemned more than five decades later, in 1932 and 1934.
The Great Northern Railway (Ireland) (GNRI) VS class steam locomotives were 4-4-0 three-cylinder simple expansion steam locomotives built in 1948 by Beyer, Peacock and Company. They were procured in order to operate the Enterprise train service between Dublin and Belfast and were the last series of steam engines ordered by the company.
The Great Southern and Western Railway (GS&WR) Class 351 initially consisted of four 0-6-0 tender locomotives designed by Robert Coey for use on heavy freight trains on the main line. They were joined by four similar locomotives built in 1912 introduced by Richard Maunsell, these had detail differences such as larger cabs and higher running plates. They included an extended smokebox to which a Phoenix superheater was briefly trialed but abandoned. They were initially designated GS&WR Class 249 but were subsequently grouped into class 351.
The DSER 20 class was a class of three 4-4-2T locomotives operated by the Dublin and South Eastern Railway and later the Great Southern Railways and CIÉ.