Hisar Junction railway station

Last updated

Hisar Junction
Express train and Passenger train station
General information
LocationRailway Road, Hisar, Haryana
India
Coordinates 29°09′07″N75°43′28″E / 29.1519°N 75.7244°E / 29.1519; 75.7244
Elevation212 metres (696 ft)
Owned by Indian Railways
Line(s) Bathinda–Rewari line
Ludhiana–Bikaner line
Platforms6
Tracks8
Construction
Structure typeAt-ground
Platform levels1 (ground level)
ParkingYes
Bicycle facilitiesYes
Architectural stylesimple
Other information
StatusFunctioning
Station codeHSR
Zone(s) North Western Railway zone
Division(s) Bikaner
Fare zone North Western Railway zone
ClassificationPassenger and freight
History
Opened1873
ElectrifiedYes
Location
India Haryana location map.svg
Red pog.svg
Hisar Junction
Location within Haryana
India location map.svg
Red pog.svg
Hisar Junction
Hisar Junction (India)

Hisar Junction railway station (railway code: HSR) is an A-category railway station, [1] under the Bikaner railway division of North Western Railway zone of Indian Railways, located at Hisar city in Hisar district of Haryana state of India. The station consists of 6 platforms, with 6 broad-gauge mostly electrified tracks of Bathinda–Rewari line and Jakhal–Hisar–Sadalpur line, going in 4 directions at an average speed of 120 km/h. Hisar is one of the 400 stations to be redeveloped with international and private partners for modernization on international standards and optimizing the commercial opportunities. In 2024, the station had 60 passenger and good trains, and 8,000 daily passenger traffic, 2 overhead foot bridges, 2 escalators and one elevator. [2]

Contents

Location

The railway station is about 2 km (1.2 mi) from the bus station along the National Highway 9, 6 km (3.7 mi) from the Hisar Airport, 2 km (1.2 mi) from the town centre and main market area, 2 km (1.2 mi) from the Chaudhary Charan Singh Haryana Agricultural University, 5 kilometres (3.1 mi) from the Guru Jambheshwar University of Science and Technology, 7 km (4.3 mi) from the Lala Lajpat Rai University of Veterinary and Animal Sciences, 4 km (2.5 mi)from the Blue Bird Lake, 1 km (0.62 mi) from Mahabir Stadium, 180 km (110 mi) from the New Delhi railway station, 167 km (104 mi) from the Indira Gandhi International Airport, and 235 km (146 mi) from the Chandigarh International Airport. Under the NCR Proposed Transport Plan, a high-speed rail Delhi–Hisar Regional Rapid Transit System (RRTS) link is also planned.

History

As of September 4, 2025, there are four broad-gauge railway lines at the station: Bathinda–Rewari line with Hisar–Bhatina section in the north and Rewari–Hisar section in the south east directions, Jakhal–Hisar line in the north-east and Hisar–Sadalpur line in the south-west direction. [3] The Hisar station itself has 6 platforms and 8 tracks to accommodate trains on these four lines. The railway station is a part of Western Dedicated Rail Freight Corridor, to be developed as an export-oriented industrial unit. [4]

In 1873 during the British Raj, the Rajputana–Malwa Railway extended the 1,000 mm (3 ft 3+38 in)-wide metre-gauge Delhi–Rewari line to Hisar, [3] and then to Bhatinda in 1883–84, connecting it all the way to Karachi via Delhi–Karachi line. [5] The metre-gauge Hisar–Sadulpur link was converted to broad gauge in 2009. [6] In 2013, track doubling and electrification of Hisar–Rewari track via Hansi and Bhiwani commenced, which was completed in 2016. In 2017, the Hisar–Bhatinda via Sirsa electrification was under progress.

In 1911–13, the broad-gauge Hisar–Sadalpur line connecting Hisar with Jodhpur–Bathinda line at Sadulpur (Rajgarh) in Rajasthan was built. In 1913, Ludhiana–Jakhal line via Sangrur, built in 1901 (possibly by the Southern Punjab Railway Company) [7] was extended to Hisar, thus forming the Ludhiana–Jakhal–Hisar–Sadalpur link which connected with Jodhpur–Bikaner–Sadalpur–Bathinda line at Sadalpur (Rajgarh) and Delhi–Fazilka line at Jakhal. [3] Earlier in 1983, an agreement for the construction, working and maintenance of the railway line was signed between the British Raj and the native princely states of Jind State, Malerkotla State and Patiala State to construct the broad-gauge Ludhiana–Dhuri–Jakhal line which was situated partly in British territory and partly in the territory lying in these native states. [8] In 2017, Hisar–Ludhiana via Barwala and Jakhal electrification by the Rail Vikas Nigam Limited is already under progress. In 2017, Hisar–Sadalpur and to Bikaner proposal for the track electrification was also approved. After conversion to electric, the trains would move at an average speed of 120 km/h, instead of earlier 70 km/h speed of diesel engines.

In fy 2013–14, a small museum was also set up in the waiting room and Rohtak–Hansi line was approved to complete the direct link from Delhi to Hisar, without the need to undergo the current Hansi–Bhiwani–Hisar detour, the line is under construction with a likely completion date by 2020.

In fy 2014–15, survey work for the new Uklana-Narwana line (29 km) and Hansi–Jind line (45 km) was also announced. [9] In fy 2017–18, the railway minister announced the annual union railway budget allocation to Haryana of INR 1,247 crore (US$200 million), to undertake the new 45 km long Hansi–Jind line at the cost of INR 900 crore (US$140 million) on a 50:50 equity share with the state, INR 25 lakh (US$40,000) for the surveys for new 55 km Jyotisar-Yamunanagar line (via Kurukshetra, Ladwa and Radaur) and for new 65 km Kaithal–Patiala line, installation of two escalators for the busiest platforms, notification of Hisar as one among the 400 stations to be redeveloped with international and private partners for modernization on international standards and optimizing the commercial opportunities, and electrification of the following six existing routes at the cost allocation of INR 511.52 crore (US$85 million) in fy 2017–18: Narwana–Kurukshetra line, Panipat–Jind line, Panipat–Rohtak line, Garhi Harsaru–Farukhnagar line (12 km within Gurgram), Rewari–Rohtak line and Rewri–Sadulpur-Hanumangarh line. In contrast, the average annual union rail budget allocation to Haryana for new works was INR 315 crore (US$47 million) and INR 635 crore (US$95 million) between 2009–10 to 2013–14 and between 2014–15 and 2016–17 respectively. [10]

In fy2018–19 budget on 9 March 2018, Captain Abhimanyu, Finance Minister of Haryana, announced that the government is in talks with Indian railway to introduce 200 km/h speed rail from Hisar to Delhi once the under-construction Rohtak–Hansi rail link is completed. [11]

In 2023, Rohtak–Hansi line was completed and regular scheduled goods train operation had started in December 2023. [12]

In January 2025, Northern Railway Zone was preparing DPR for a 25 km long Satrod-Dabra-Chiraud rail bypass for good trains and doubling of Hisar-Jakhal line. Earlier in 2024, the FSL (Final Location Survey) for these were completed. [2] [13]

Train service

Tracks

All the tracks from and around Hisar on the following routes have been electrified and converted to the broad gauge.

Indian Railway Line Status
Rail Line NameTrack Doubling StatusOHE Height Raising for Double-Stack Containers
Hisar-Jakhal-LudhianaYes. Hisar-Jakhal completion date of December 31, 2024. The Jakhal-Ludhiana section is already double-tracked. [14] (Status as of April 2021).Yes. High-rise OHE (7.45m contact wire height) on the Rewari-Hisar-Ludhiana feeder route to the Western DFC. [15]
Hisar-Loharu-Ratangarh-Jodhpur-BhiladiYes (2027). Doubling work is being executed in phases with a target completion date of 21 March 2027. [16] (Status as of April 2023).Yes. The North Western Railway has undertaken umbrella works to raise the height of road over bridges and other structures to facilitate double-stack container services on this route. [17] (Status as of March 2022).
Churu-JaipurThe Churu-Ratangarh doubling (completion date of 27 May 2025). [18] (Status as of August 2025).OHE height raising is implemented as part of a phased, ongoing effort on key freight corridors. [19] (Status as of June 2020).
Hisar-Sirsa-BathindaYes. Bhatinda-Bhildi (completion date of 31 March 2027). The Rajpura-Bathinda section, which connects to this line, has been fully doubled. [20] (Status as of August 2025).OHE height has been raised on major sections of this line to accommodate double-stack container trains, linking to the wider freight network in the region. [21] (Status as of June 2020).
Hisar-Hansi-Bhiwani-RewariYes. The new Hansi-Rohtak line is a double-track project. Bhiwani-Rohtak also doubled. [22] (Status as of July 2025).Yes. The OHE on this line, particularly on the sections connecting to the Western Dedicated Freight Corridor (WDFC), has been raised for the operation of electric-hauled double-stack container trains. [23] (Status as of January 2024).
Hansi-Rohtak-Bahadurgarh-DelhiYes. This entire section is a double-track line. [24] (Status as of April 2025).Yes. The OHE height has been raised on this critical corridor, as it is a part of the Delhi-Mumbai freight route. The Haryana Orbital Rail Corridor (HORC) is also being constructed to allow for double-decker trains, which require raised OHE. [25] (Status as of July 2025).
Delhi-Rohtak-Jind-BathindaYes. The Delhi-Rohtak section is a double-track line. Doubling of the Rohtak-Jind-Bathinda section is ongoing, with a sanctioned plan for the whole line. The Cabinet Committee on Infrastructure approved the electrification of this section in 2010. [26] (Status as of March 2025).Yes. The OHE height on this line has been raised to allow for the operation of double-stack container trains, particularly on the busy freight routes connecting to Bathinda. [27] (Status as of June 2020).
Narwana-Patiala-ChandigarhNo. This line is a single track and is primarily used for passenger and regional traffic. There are no public announcements regarding plans for its doubling. A survey for a new line between Patiala-Jakhal/Narwana was conducted in 2011 but was shelved. [28] (Status as of December 2016).No. No specific plans have been publicly announced for OHE height raising on this particular route for double-stack containers. [29] (Status as of March 2025).
Bhatinda-Bikaner-JaisalmerYes(in-progress, 2017 completion). Doubling work is in progress on some sections. The Bhatinda-Bhildi doubling project, which covers a significant part of this route, was approved and a foundation stone was laid in December 2024. The doubling of the Bikaner-Lalgarh section has been completed. [30] (Status as of December 2024).The OHE height for double-stack containers has been raised on specific freight routes within this network. [31] (Status as of December 2024).
Jaipur-Kota-IndoreYes. The Jaipur-Sawai Madhopur and Kota-Bina sections are double-tracked. The doubling of the Ratlam-Indore section is in progress to improve connectivity, and a new Railway Under Bridge (RUB) is under construction near Darrah Nullah to ease traffic. [32] (Status as of August 2025).Yes. The OHE height on key sections of this route has been raised to facilitate double-stack container operations, especially on the busy freight corridors linking the ports of Gujarat to Central India. [33] (Status as of January 2024).
Ghaziabad-Saharanpur-RishikeshYes. The Ghaziabad-Saharanpur section is a crucial double-track main line. The Saharanpur-Rishikesh branch line is a single track. A survey for the doubling of this branch line was sanctioned in 2023, with a DPR for a metro lite project on this route also in progress. [34] (Status as of August 2025).Yes. The OHE height on the Ghaziabad-Saharanpur main line has been raised to facilitate the operation of double-stack container trains. There are no such plans for the Saharanpur-Rishikesh branch line. [35] (Status as of March 2025).

Trains

In 2024, the Hisar station had 8,000 daily passenger traffic, 60 daily passenger and good trains. Direct passenger trains from Hisar are available for Delhi, Haridwar, Chandigarh, Jind, Kurukshetra, Bathinda, Ludhiana, Amritsar, Jammu, Katra, Mathura, Agra, Kanpur, Lucknow, Gonda, Gorakhpur, Agartala, Patna, Jalpaiguri, Guwahati, Lumding, Haflong, Prayagraj, Jaipur, Kota, Ajmer, Jodhpur, Bikaner, Ahmedabad, Vadodara, Mumbai, Goa, Udupi, Kannur, Kozhikode (Calicut), Coimbatore, Secunderabad, Jalgaon, Shegaon, Akola, Badnera, Wardha, Chandrapur, Kazipet, Sirsa, Bathinda and Firozpur. [2]

Present status

See also

References

  1. Food stalls will be re-auctioned, original text, Rajasthan Patrika , 15 Mar 2018.
  2. 1 2 3 अंतरिम बजट 2024: हिसार रेल बाईपास व जाखल तक दोहरी लाइन के फाइनल सर्वे को मंजूरी, इन प्रोजेक्ट पर बनी सहमति, amarujala.com, 2 Feb 2024.
  3. 1 2 3 Haryana Gazetteers Organization (1987). "Gazetteer of India: Haryana, Hisar, pp.127–128" (PDF). Chandigarh: Controller of Printing and Stationery. Archived from the original (PDF) on 1 May 2014. Retrieved 14 March 2016.
  4. "DMIC-Haryana". DelhiMumbaiIndustrialCorridor.com. Archived from the original on 6 September 2013. Retrieved 30 June 2012.
  5. "Gazetteer of India, Haryana, Hisar" (PDF). Haryana Government. Communications, page 135. Archived from the original (PDF) on 1 May 2014. Retrieved 10 May 2014.
  6. "Overview of Bikaner Division" (PDF). Indian Railways. Archived from the original (PDF) on 8 May 2014. Retrieved 6 May 2014.
  7. "Chapter VII – Communications" . Retrieved 26 February 2014.
  8. Sharma, Suresh K (February 2006). Haryana: Past and Present. New Delhi: Mittal Publications. p. 220. ISBN   81-8324-046-1 . Retrieved 26 February 2014 via Google Books.
  9. Hisar MP meets railway minister, seeks more train for his constituency, Times of India , 4 February 2016.
  10. Haryana bagged big bonanza of rail projects worth 1247 crors, Face2News, 5 February 2017.
  11. Faster connectivity from Hisar to Delhi, Outlook , 9 Mar 2018.
  12. Hisar News: हांसी-महम-रोहतक रेलवे लाइन पर अब नियमित दौड़ेंगी मालगाड़ियां, Amar Ujala, 26 December 2023.
  13. Hisar rail bypass, haryanaekhabar.com, 7 January 2025.
  14. "Firozpur-Bhatinda and Jakhal - Hisar Doubling Line Project". India Investment Grid. 1 April 2021.
  15. "Decision to be taken for high rise OHE on Rewari-Manheru- Hisar-Ludhiana". India Rail Info. Ministry of Railways. 11 January 2013.
  16. "Railways Lays Foundation for Jodhpur-Jaipur Doubling Project". Indian Infrastructure. 23 April 2024.
  17. "Raising / rebuilding of road over bridges to facilitate running of double stack containers (Umbrella Work 2021-22)". North Western Railway. 31 March 2022.
  18. "Churu - Ratangarh Doubling Project [42.81 Km] in Churu (Rajasthan)". India Investment Grid. 8 August 2025.
  19. "Double Stack Container Trains - Answer". Parliament of India. 14 May 2024.
  20. "Bhatinda - Bhildi via Sirsa Doubling Line Project". India Investment Grid. 5 August 2025.
  21. "Indian Railways creates a new world benchmark by successfully running 1st Double Stack Container Train..." Press Information Bureau. 11 June 2020.
  22. "Highlights of Railway Budget 2023-24" (PDF). Indian Railways. 27 February 2023.
  23. "Western Dedicated Freight Corridor (WDFC)" (PDF). Dedicated Freight Corridor Corporation of India Ltd. 10 January 2024.
  24. "Haryana Orbital Rail Corridor". HORC. 12 April 2025.
  25. "Haryana Orbital Rail Corridor". HORC. 10 July 2025.
  26. "GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAJYA SABHA UNSTARRED QUESTION NO. 3278". Sansad. 28 March 2025.
  27. "Indian Railways creates a new world benchmark..." Press Information Bureau. 11 June 2020.
  28. "Surveyed/sanctioned railway projects for Punjab". Rajya Sabha. 2 December 2016.
  29. "Electrification of Railway Lines". Lok Sabha. 26 March 2025.
  30. "Centre lays foundation stone and inaugurates various rail projects in Rajasthan and Gujarat". Indian Infrastructure. 19 December 2024.
  31. "Centre lays foundation stone and inaugurates various rail projects in Rajasthan and Gujarat". Indian Infrastructure. 19 December 2024.
  32. "New rly under bridge to ease traffic at Darrah Nullah". Times of India. 6 August 2025.
  33. "Double Stack Container Trains - Answer". Parliament of India. 25 January 2024.
  34. "Electrification and Doubling of Railway Lines". Lok Sabha. 8 August 2025.
  35. "Electrification and Doubling of Railway Lines". Lok Sabha. 11 March 2025.
  36. 1 2 Indian Railways pink book hisar railway station got many special gifts gm will come to inspect, haryanaekhabar.com, 15 May 2025.
  37. Hisar News: रेलवे स्टेशन पर शुरू हुआ प्रधानमंत्री भारतीय जनऔषधि केंद्र, Amar Ujala, 14 AUg 2025.
  38. It is a pleasure to start the train from Hisar to Chandigarh but these shortcomings need to be removed, haryanaekhabar.com, 21 May 2025.
  39. 1 2 haribhoomi.com Railway bypass track of 25 km from Hissar's Satrod to Chiraud, 7 Jan 2025.
  40. हरियाणा के इस रेलवे स्टेशन पर बनेगा आधुनिक मिलिट्री यार्ड, देश की सुरक्षा होगी और मजबूत, Punjab Kesari, 12 August 2025.
  41. New superfast train will run between rohtak and hisar deepender singh hooda news hard work has paid off, haryanaekhabar.com, 21 May 2025.