Lara Super Thermal Power Station | |
---|---|
Country | India |
Location | Raigarh, Chhattisgarh |
Coordinates | 21°44′57″N83°27′56″E / 21.74917°N 83.46556°E |
Status | Commissioned |
Owner | National Thermal Power Corporation |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Nameplate capacity | 1600;MW |
External links | |
Website | ntpc.co.in |
Lara Super Thermal Power Station is a coal-fired power project located near village Lara, Taluk Pussore, Raigarh district in Indian state of Chhattisgarh. The power plant is one of the coal based power plants of NTPC. [1] The coal requirement will be obtained from Talaipalli coal block Mand Raigarh Coalfield and water requirement will be sourced from Mahanadi River through Saradih Barrage. [2]
Lara Super Thermal Power Project has an installed capacity of 1600 MW. [3]
Stage | Unit Number | Capacity (MW) | Date of Commissioning | Status |
---|---|---|---|---|
1st | 1 | 800 | September 30, 2019 | Commissioned [4] |
1st | 2 | 800 | July 20, 2020 | Commissioned [5] |
Solar power in India is an essential source of renewable energy and electricity generation in India. Since the early 2000s, India has increased its solar power significantly with the help of various government initiatives and rapid awareness about the importance of renewable energy and sustainability in the society. In order to decrease carbon dioxide emissions, reduce reliance on fossil fuels, with coal being the primary source of electricity for the nation at present, bolster employment, economy and make India energy independent by making self-reliant on renewable energy, the Ministry of New and Renewable Energy was formed in 1982 to look after the country's activities to promote these goals. These collaborative efforts, along with global cooperation with the help of International Solar Alliance (ISA) since 2015 for promoting solar energy worldwide while also taking care of India, have made India one of the world's fastest adopters of solar power, making it the third-largest producer of solar power globally as of 2024, after China and the United States.
NTPC Ramagundam, a part of National Thermal Power Corporation, is a 2,600 megawatt (MW) Super thermal power station situated at Ramagundam in Peddapalli district in Telangana, India. It is the current largest power station in South India. It is the first ISO 14001 certified "Super Thermal Power Station" in India.
Rihand Super Thermal Power Project is located at Renukut, Sonebhadra in Sonbhadra district in Indian state of Uttar Pradesh. The power plant is one of the coal based power plants of NTPC Limited.
NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
Korba Coalfield is located in Korba district in the Indian state of Chhattisgarh in the basin of the Hasdeo River, a tributary of the Mahanadi.
Sipat Super Thermal Power Station is located at Sipat in Bilaspur district in state of Chhattisgarh. The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited.
The Vindhyachal Thermal Power Station is located in Singrauli district in the Indian state of Madhya Pradesh. One of the coal-fired power stations of NTPC, it is the largest power station in India, and the 10th largest coal-fired power station in the world, with an installed capacity of 4,760 MW. The coal for the power plant is sourced from the Nigahi mines, and the water is sourced from the discharge canal of the Singrauli Super Thermal Power Station. The power plant is estimated to have been the coal-fired power plant which emitted the second most carbon dioxide in 2018, after Bełchatów Power Station, at 33.9 million tons, and relative emissions are estimated at 1.485 kg per kWh.
Simhadri Super Thermal Power Plant is a coal-fired power plant located in the outskirts of Visakhapatnam city in the Indian state of Andhra Pradesh. The power plant is one of the coal fired power plants of NTPC, a Government of India enterprise. The coal for the power plant is sourced from Kalinga Block of Talcher Coal fields in Odisha. The plant is a national asset, and power generated is shared between multiple states, as the operator is national. Power generated by units 1 and 2, making up for 1,000 MW, is dedicated to power distribution companies owned by the Government of Andhra Pradesh and Telangana. The remaining 1,000 MW, generated by units 3 and 4, is allocated to the states of Odisha, Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and Puducherry as per their shares as decided in PPA.
NTPC Kanti also known as George Fernandes Thermal Power Plant Station is located in Kanti, Muzaffarpur, Bihar. George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013.
Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.
Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar. NTPC Barh is located barely four kilometres (2.5 mi) east of the Barh sub-division on National Highway-31 in Patna district. The project has been named a mega power project, and is owned by Indian energy company National Thermal Power Corporation.
Kudgi Super Thermal Power Station is a power station located at Kudgi village of Basavana Bagewadi Taluq in Bijapur district, Karnataka in Indian state of Karnataka. This is one of the coal based thermal power plants of NTPC Limited.
Jindal Tanmar Thermal Power Plant is a coal-based thermal power plant located in Tamnar village near Raigarh town in Raigarh district in the Indian state of Chhattisgarh. The power plant is operated by the Jindal Power Limited which is a subsidiary of Jindal Steel and Power.
Nabinagar Super Thermal Power Project is a coal-based thermal power plant located at Sivanpur village in Ankorha in Nabinagar taluk in Aurangabad district, Bihar. It was conceptualised in 1989 by the then Chief Minister of Bihar Satyendra Narayan Sinha who sent the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to then Prime Minister of India Rajiv Gandhi; but the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it.
Gadarwara Super Thermal Power Station is a coal based thermal power project located at near by Gangai village in Gadarwara Tehsil in Narsinghpur District in Indian state of Madhya Pradesh. The power plant is one of the coal based power plants of NTPC Limited. are the critical equipment supplier.
Darlipali Super Thermal Power Station at Darlipali village in Sundargarh district in Indian state of Odisha. The power plant is one of the coal based power plants of NTPC Limited. Coal will be obtained from Dulanga and Pakri Barwadih Coal Block and water supply will be sourced from the Hirakund Reservoir on the Mahanadi River through a pipeline at over a distance of about 30.0 km from project site. Plant is under construction by Bharat Heavy Electrical Limited (BHEL), L&T Power.
The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.
Telangana Super Thermal Power Project(TSTPP) is in Telangana, India. The power plant is under construction with power capacity of 1600 MW (2x800 MW) in first phase and in total planned capacity of 4000 MW. It is the coal based power plant of National Thermal Power Corporation. It is being built near Ramagundam city in Peddapalli District. The first Unit, 800MW, was inaugurated by PM Modi on 3 October 2023. The second unit was inaugurated by PM Modi on 4 March 2024.
Khurja super thermal power project or Khurja STPS is an under construction 1320 megawatt, coal-fired supercritical power plant at Khurja in Bulandshahr, Uttar Pradesh, India. The project is the first thermal power project by THDC Ltd, projected to cost ₹12676 crores. It is a two unit power plant, with the first unit expected to be completed by September 2024 and the second by December 2024.