Telangana Super Thermal Power Project

Last updated

Telangana Super Thermal Power Project
Rstps4.jpg
Far view of NTPC Power Plant
Telangana Super Thermal Power Project
Location of the Telangana Super Thermal Power Project
Official nameTSTPP
CountryIndia
Location Telangana
Coordinates 18°45′18″N79°28′37″E / 18.75500°N 79.47694°E / 18.75500; 79.47694
StatusUnder construction
Construction began29 Jan 2016
Commission date Unit 1: 3 October 2023 [1]
Construction cost10598.98 Crores
Operator(s) NTPC
Thermal power station
Primary fuel Coal
Power generation
Nameplate capacity
  • 800 MW

Telangana Super Thermal Power Project(TSTPP) is in Telangana, India. The power plant is under construction with power capacity of 1600 MW (2x800 MW) in first phase and in total planned capacity of 4000 MW. [2] It is the coal based power plant of National Thermal Power Corporation. It is being built near Ramagundam city in Peddapalli District. [3] The first Unit, 800MW, was inaugurated by PM Modi on 3 October 2023. [4] [5] The second unit was inaugurated by PM Modi on 4 March 2024. [6]

Contents

Capacity

The first unit of 800MW was expected to be completed by the third quarter of 2020, [7] but construction was halted due to COVID-19. [8]

UnitCapacity (In MW)Date of Commissioningstatus
180005.09.2023Commissioned
2800Under construction

Related Research Articles

<span class="mw-page-title-main">Ramagundam</span> City in Telangana, India

Ramagundam is a city under municipal corporation in Peddapalli district of the Indian state of Telangana. It is the most populous city in the district and falls under the Ramagundam revenue division. It is located on the banks of the Godavari River. As of the 2011 census, the city had a population of 229,644, making it the 6th most populous in the state, and an urban agglomeration population of 242,979. It is located about 225 km from the state capital Hyderabad.

<span class="mw-page-title-main">Solar power in India</span>

India's solar power installed capacity was 73.32 GWAC as of 31 December 2023.

<span class="mw-page-title-main">NTPC Ramagundam</span> Coal-fired power plant in India

NTPC Ramagundam, a part of National Thermal Power Corporation, is a 2,600 megawatt (MW) Super thermal power station situated at Ramagundam in Peddapalli district in Telangana, India. It is the current largest power station in South India. It is the first ISO 14001 certified "Super Thermal Power Station" in India.

Deenbandhu Chhotu Ram Thermal Power Plant is located at Yamuna Nagar in Haryana. The power plant is one of the coal based power plants of HPGCL. It was jointly constructed by Reliance Energy Limited and Shanghai Electric (China) in a collaboration. This plant is named after Sir Chhotu Ram.

<span class="mw-page-title-main">NTPC Limited</span> National Thermal Power Corporation, Central Public Sector Undertaking coal mining

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">Simhadri Super Thermal Power Station</span> Building in India

Simhadri Super Thermal Power Plant is a coal-fired power plant located in the outskirts of Visakhapatnam city in the Indian state of Andhra Pradesh. The power plant is one of the coal fired power plants of NTPC, a Government of India enterprise. The coal for the power plant is sourced from Kalinga Block of Talcher Coal fields in Odisha. The plant is a national asset, and power generated is shared between multiple states, as the operator is national. Power generated by units 1 and 2, making up for 1,000 MW, is dedicated to power distribution companies owned by the Government of Andhra Pradesh and Telangana. The remaining 1,000 MW, generated by units 3 and 4, is allocated to the states of Odisha, Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and Puducherry as per their shares as decided in PPA.

<span class="mw-page-title-main">Madhya Pradesh Global Investors' Summit</span>

Global Investors Summit, officially the Invest Madhya Pradesh Global Investors Summit or GIS is a biennial business summit organized by Government of Madhya Pradesh in Indore, the commercial capital of central India to attract domestic and foreign investment for development of the state. Based on the theme– India's Growth Centre and aimed at bringing together business leaders, investors, corporations, thought leaders, policy and opinion makers; the summit serves as a perfect platform to understand and explore business opportunities in the State of Madhya Pradesh.

<span class="mw-page-title-main">Kanti Thermal Power Station</span>

NTPC Kanti also known as George Fernandes Thermal Power Plant Station is located in Kanti, Muzaffarpur, Bihar. George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013.

Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.

<span class="mw-page-title-main">Rampal Power Station</span> Coal-fired power station in Bangladesh

The Rampal Power Station is a 1320 megawatt coal-fired power station currently under construction at Rampal Upazila of Bagerhat District in Khulna, Bangladesh. The power plant is being constructed on an area of over 1834 acres of land, is situated 14 kilometres north of the world's largest mangrove forest Sundarbans which is a UNESCO World Heritage Site. It will be the country's largest power plant.

<span class="mw-page-title-main">Barh Super Thermal Power Station</span>

Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar. NTPC Barh is located barely four kilometres (2.5 mi) east of the Barh sub-division on National Highway-31 in Patna district. The project has been named a mega power project, and is owned by Indian energy company National Thermal Power Corporation.

Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000 MW Stage 1 was dedicated to nation by Prime Minister Narendra Modi on 21 August 2014.

Nabinagar Super Thermal Power Project is a coal-based thermal power plant located at Sivanpur village in Nabinagar taluk in Aurangabad district, Bihar. It was conceptualised in 1989 by the then Chief Minister of Bihar Satyendra Narayan Sinha who sent the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to then Prime Minister of India Rajiv Gandhi; but the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it.

North Karanpura Thermal Power Station is an upcoming coal-based thermal power plant located in Tandwa in the Simaria subdivision of the Chatra district, Jharkhand. The power plant is owned by NTPC Limited.

The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.

Katwa Super Thermal Power Station is located near Srikhanda Village, 8 km from Katwa town in West Bengal. The power plant is one of the coal based power plants of NTPC. It is under construction.

<span class="mw-page-title-main">Singareni Thermal Power Plant</span>

The Singareni Thermal Power Plant (STPP) is a coal-fired power station in Pegadapalli, a village in Jaipur mandal in Mancherial district of Telangana, India. The power plant has an installed capacity of 1200 MW, consisting of two 600 MW units, and is operated by the Singareni Collieries Company.

Patratu Super Thermal Power Project is under-construction. It is 4000 MW, situated in Patratu, Ramgarh district, Jharkhand. It will use 1500 acres out of 6300 acres available with the existing Patratu Thermal Power Station.

References

  1. "Prime Minister Modi to dedicate to nation development projects worth ₹8,000 crore at Nizamabad on 3 Oct". 2 October 2023.
  2. "NTPC chairman visits thermal power project site". The Hindu . 19 February 2016. Retrieved 24 March 2016.
  3. "Telangana Super-Thermal Power Project, Telangana, India". NS Energy.
  4. "Prime Minister Modi to dedicate to nation development projects worth ₹8,000 crore at Nizamabad on 3 Oct". South First. 2 October 2023.
  5. "PM Modi inaugurates 800 MW unit of NTPC's Telangana super thermal power project - ET EnergyWorld". The Economic Times . 3 October 2023. Retrieved 4 March 2024.
  6. "PM Modi to inaugurate, lay foundation stone for NTPC's power projects worth over ₹30000 cr - ET Government". The Economic Times . 4 March 2024. Retrieved 4 March 2024.
  7. "Cabinet approves Proposal for higher allocation of power to Home State from Under Construction Projects of NTPC Ltd". pib.gov.in. Retrieved 4 March 2024.
  8. "NTPC resumes power plant work in Telangana". The Times of India . 4 May 2020. Retrieved 4 March 2024.