Line 27 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 15 [1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Chongqing Rail Transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Chongqing Rail Transit Corporation Limited | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 56 km (35 mi) [1] (Bishan to Huimin) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25kV AC [2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 140 km/h (87 mph) [2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line 27 of Chongqing Rail Transit is a rapid transit line in Chongqing, China.
Line 27 (Bishan to Huimin section) will be 56 kilometres (35 mi) long, all stations except Bishan will be located underground. [1] Trains will run at a maximum speed of 140 kilometres per hour (87 mph). [2] [3] Line 27 trains will through operate with the Bitong Line and continue to Tongliangxi in Tongliang District. [4] [5] The line will feature passing loops for express services. [6]
Construction started in February 2022. [2]
Construction of the Yangtze River Tunnel of Line 27 (about 800 meters long) started in May 2024. [1]
Line name | Station No. | Station name [7] | Connections | Location | |
---|---|---|---|---|---|
English | Chinese | ||||
Bitong line | Tongliangxi | 铜梁西 | Tongliang | ||
Tongliang Longcheng Paradise Walk | 铜梁龙城天街 | ||||
Sci-Tech Innovation Center | 科创新城 | ||||
Qinglong | 庆隆 | ||||
Dalu | 大路 | Bishan | |||
Qinglonghu | 青龙湖 | ||||
Hebian | 河边 | ||||
Bicheng | 璧城 | ||||
Bitong line / Line 27 | Bishan | 璧山 | Line 1 Bishan Tram [a] | ||
Line 27 | Huxi | 虎溪 | 17 | Shapingba | |
Daxuecheng South | 大学城南 | 15 | |||
Zhaishanping | 寨山坪 | ||||
Xiyong | 西永 | 7 | |||
Ciqikou | 磁器口 | Line 1 | |||
Shapingba | 沙坪坝 | Line 1 Line 9 Loop line CYW | |||
Shiqiaopu | 石桥铺 | Line 1 Line 5 | Jiulongpo | ||
Chongqing Medical University | 重医 [8] [9] | Yuzhong | |||
Chongqing Station | 重庆站 | 18 CQW | |||
Nanbinlu | 南滨路 [10] | Nan'an | |||
Nanping | 南坪 | Line 3 10 | |||
Guangfu Ave. | 广福大道 | ||||
Chongqing East Station | 重庆东站 | 6 24 Chongqingdong | |||
Line 27 East ext. | Huimin | 惠民 [1] [11] | |||
Line 13 of the Beijing Subway is a metro line that serves the northern suburbs of Beijing. On a map, Line 13's route is shaped like an inverted U that arcs north of the city and connects residential suburbs in Haidian, Changping, and Chaoyang Districts with the 2nd Ring Road and Line 2 at Xizhimen and Dongzhimen. With the exception of Dongzhimen and a tunnel between Xi'erqi and Longze, all of Line 13's tracks and stations are located on the surface or elevated above ground. The line is 40.85 km (25.38 mi) and 16 of its 17 stations are on the surface. Line 13's color is yellow. During rush hour, the section between Xizhimen and Wudaokou Stations was reported in 2013 to be the second most congested section in the Beijing subway network, operating at 130% capacity.
The Chongqing Rail Transit is the rapid transit system in the city of Chongqing, China. In operation since 2005, it serves the transportation needs of the city's main business and entertainment downtown areas and inner suburbs. As of December 2023, CRT consisted of eleven lines, with a total track length of 523.68 km (325 mi). Lines 1, 4, 5, 6, 9, 10, 18, the Loop line and Jiangtiao line are conventional heavy-rail metro lines, while Lines 2 and 3 are high-capacity monorails. To keep up with urban growth, construction is under way on Line 18 and several other lines, in addition to extensions to Lines 5, 6 and 10.
The Chengdu Metro is the rapid transit system of Chengdu, the capital of Sichuan, China. With the opening of Line 1 on 27 September 2010, the system had thirteen subway lines and one light rail line. It has subsequently undergone rapid expansion. Since the opening of Lines 6, 8, 9, and 17 on 18 December 2020, the Chengdu Metro is the 4th longest metro system in the world.
Urban rail transit in China encompasses a broad range of urban and suburban electric passenger rail mass transit systems including subway, light rail, tram and maglev. Some classifications also include non-rail bus rapid transport.
Line 7 of the Beijing Subway is a rapid transit line in Beijing. It runs parallel and to the south of Line 1 and Batong line, from the Beijing West railway station in Fengtai District to Universal Resort in Tongzhou District. Like Line 6, Line 7 provides additional relief to the overcapacity Line 1 adding another east–west trunk line to the Beijing Subway network. The line uses 8-car Type B trains. Line 7's color is light orange.
Line 1 of CRT runs westwards from Chaotianmen to Bishan. Line 1 began operation on 28 July 2011.
CRT Line 6 is the second heavy rail subway line in Chongqing, as well as being the longest rapid transit line in China, at 85.6 km (53.19 mi) long. It opened with provisional revenue service on September 28, 2012, and connects Nan'an, Yuzhong, and Jiangbei districts in central Chongqing.
Line 11 of the Beijing Subway is a rapid transit line of the Beijing Subway. The line opened between Jin'anqiao and Xinshougang on December 31, 2021, and between Jin'anqiao and Moshikou on December 30, 2023. Line 11's color is grapefruit.
Line 4 of Ningbo Rail Transit is a rapid transit line in Ningbo. It starts from Cicheng Town, Jiangbei District, and ends near Dongqian Lake in Yinzhou District. The project was approved on November 5, 2013 and opened on December 23, 2020. Construction of Line 4 started in 2011 with the groundbreaking of the North Ring Elevated Expressway with the second deck of the structure being used for Line 4 trains. The rest of the line started construction on November 30, 2015. The line will initially use 36 sets of six car B-type trains with a maximum service speed of 80 km/h (50 mph).
Line 22 (Pinggu line) of the Beijing Subway is a rapid transit line under construction in Beijing and Hebei Province.
Chongqing Suburban Railway is a commuter rail transit system in construction in Chongqing, China. According to the Comprehensive Transport Plan of Chongqing Main City Zone, the system will have a total of 14 lines.
The Loop line of Chongqing Rail Transit is a rapid transit loop line in Chongqing, China. The line is also known as Line 0.
Line 4 of Chongqing Rail Transit is a rapid transit line in Chongqing, China.
Line 19 of the Hangzhou Metro is a rapid transit line in Hangzhou. The line was opened on 22 September 2022.
Line 9 of CRT is a rapid transit line in Chongqing, China.
Bishan is a station on Line 1 of Chongqing Rail Transit in Shuanglong Avenue, Bicheng Subdistrict, Bishan District, Chongqing Municipality, China. The station opened on December 30, 2019. It is CRT's first station to be built outside of the Metropolitan Area of Chongqing.
Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport East to Longquan Railway Station. Phase 1 is 27.74 km long with 24 stations, all underground. Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h. Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.
Line 17 of the Chengdu Metro is a metro line in Chengdu. The whole line will be 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.
Jiangtiao line of Chongqing Suburban Railway is a suburban rapid transit line in Chongqing, China. The initial section of Jiangtiao line from Tiaodeng to Shengquansi opened on 6 August 2022.
Line S5 (Chengdu Metro), also known as Chengdu-Meishan Line and shortened as Chengmei Line or Meishan Line, is a metro line in Chengdu, China. The line starts from Honglian Station, Line 19 ,Tianfu New Area, Chengdu, and ends at Meishan East Railway Station (Metro & National Railway), Dongpo, Meishan. The line is 59 km long, has 5 underground stations and 8 elevated/ground stations. Construction started on Sep 26, 2022, and is expected to open in Dec 2026.