Lower Thames Crossing

Last updated

Invisible Square.svg
Mapscaleline.svg
10km
6miles
M25-LTC overlay.svg
Red pog.svg
A127
Red pog.svg
LTC/M25
Red pog.svg
A13
Red pog.svg
A2
Red pog.svg
Tunnel Portal
Red pog.svg
Tunnel Portal
Greater London UK location map 2.svg
Invisible Square.svg
Red pog.svg
Lower Thames Crossing
Lower Thames Crossing
Location Kent/Thurrock/Havering/Essex
Proposer Department for Transport
Project website National Highways - Lower Thames Crossing
StatusProposed
TypeRoad
Cost estimate£9 billion
Start date2026
Completion date2031

The Lower Thames Crossing is a proposed road crossing of the Thames estuary downstream of the Dartford Crossing that links the counties of Kent and Essex, and its proposed approaches. If built it would pass through the districts of Thurrock and Gravesham, supplementing the Dartford route. The approximately 14.3-mile (23.0 km) route is being assessed by the Planning Inspectorate. [1]

Contents

First proposed in the late 2000s, the crossing is designed to relieve the pressure on the existing A282 Dartford Crossing. [2] The proposed route would connect the M25 motorway and A13 north of the river to the M2 motorway south of the river. [3] If built, the crossing would have the longest road tunnel in the UK at 2.6 miles (4.2 km). [4] The road number A122 has been identified for the proposed road. [5]

The crossing is estimated to cost approximately £9 billion and would take about six years to build following the granting of planning permission. [6] A planning application was submitted in 2020, and withdrawn. A new planning application was submitted in November 2022, with the planning process expected to take 18 months to complete. [1]

Background

Described as "a crucial part of the country’s strategic road network", [7] the Dartford Crossing is the only fixed road crossing of the River Thames east of Greater London. Although officially designated as the A282, the crossing is considered part of the M25 motorway orbital route around London. Last expanded in 1991 with the opening of the Queen Elizabeth II Bridge, the crossing is the busiest estuarial route in the United Kingdom, with an average daily use of around 160,000 vehicles. [8] The crossing has high levels of congestion, especially at peak times - with high levels of air pollution impacting neighbouring Thurrock and Dartford. [9] A variety of additional crossings downstream of the Dartford Crossing have been proposed.

Until 2024, there was a ferry service operating between Gravesend and Tilbury, [10] which predominantly carries foot passengers and bicycles, Monday to Saturday. [11]

History

An additional Thames crossing downstream from Dartford was first considered in the Roads for Prosperity white paper in 1989, noting that it would "[relieve the] east side of the M25 between Kent and Essex". [12]

The Lower Thames Crossing (LTC) was recommended for further investigation in the 2002 ORBIT Multi-Model Study, which examined orbital transport problems around London. [13] [14]

In 2008, Metrotidal Ltd proposed the "Medway-Canvey Island crossing", a £2–4 billion combined road and rail tunnel between Medway and Canvey Island that would include a surge-tide barrier and a tidal power plant, which was supported by Kent County Council, Essex County Council, the Thames Gateway South Essex Partnership and the Department for Transport. [15] Following delays in any proposal being put forward by central government, Essex and Kent County Councils intend to create a joint proposal for the construction of a crossing. [16]

In January 2009, the Department for Transport published a study regarding potential ways to address capacity issues crossing the Thames. This included short term measures to improve the existing Dartford Crossing, as well as evaluation of future crossings in the long term. [17] The study considered five corridors that could provide a future crossing of the Thames, with options A, B and C to be investigated in further detail. [17]

The study also identified a lack of demand for additional passenger rail or rail freight capacity to cross the river beyond projects already under construction/completed, noting the High Speed 1 and Crossrail projects would provide cross-river capacity between London and Kent. [17]

In October 2010, a study commissioned by Kent County Council proposed that the northern end of the crossing should bypass the M25 and continue on to connect to the M11 (and Stansted Airport) directly. [18] This would presumably be an adaptation of Option C.

In October 2012, plans were announced for the London Resort theme park near Swanscombe. Commenting on road and motorway access to the park, Kent County Council highways chief Councillor Brian Sweetland said that he was looking at a significant variation to Option B: "The possibility of a new Thames Crossing at the Swanscombe peninsula must now be taken very seriously". [19]

In April 2017, the Secretary of State for Transport Chris Grayling confirmed Option C as the preferred route for the Lower Thames Crossing. [20]

In November 2017, Highways England announced that its 'current thinking' for the design of the route encompassed a number of changes from that of the original public consultation: the route would now avoid a landfill site near Ockendon; the junction with the A13 would be redesigned and the junctions with the A128 and A226 would be removed. Furthermore, the A2 would be widened from its junction with the new crossing approach road to Junction 1 of the M2. [21]

In March 2018, Tim Jones in his position as LTC Project Director confirmed that the proposed LTC would not resolve all the problems both north and south of the river. [22]

In July 2019, Highways England said they expected to submit a planning application in summer 2020 and had a target for road opening of 2027. [23] On 26 October 2020, Highways England submitted a Development Consent Order (DCO) for the project. [24] However, it was withdrawn the following month after the planning inspectorate asked for more information regarding environmental impact and construction plans. [4]

Proposed routes 2009

In January 2009, the Department for Transport proposed three major options to increase capacity east of London over the River Thames to be built downstream of the existing Dartford Crossing and an additional proposal to increase capacity at the Dartford Crossing. [17]

There were three additional route options identified:

Following the first stage of location identification and appraisal, the 2009 study concluded that the three locations (A, B and C) offered the greatest benefits in terms of relieving congestion at the existing crossing and should be assessed further. Locations D and E were discounted due to either not meeting the traffic objective to relieve congestion, or providing very limited relief at the existing Dartford Crossing, as well as poor to low value for money.

2020 proposals

Highways England issued revised proposals in 2020 based on the previous Option C. The proposed route would run from the M25 at North Ockendon to the A2 at Thong, including an intermediate junction with the A13 and A1089 roads. The route would be 14.3 miles (23 km) including 2.6 miles (4.3 km) in twin tunnels with three traffic lanes, and would be an all-purpose trunk road rather than a motorway. [25] Construction was expected to take six years. [26]

In April 2021, Highways England announced that they had split the construction of the road into three sections. [27] [28] Two contractors would build the roads north and south of the tunnel, at a cost of £1.3 billion and £600 million respectively. [27] Another contractor would build the tunnel, at a cost of £2.3 billion. [28] This would allow construction of the project to begin immediately after the DCO process is completed. [27]

The crossing was slated to cost between £6.4 billion and £8.28 billion, [29] but investment in local roads is also likely to be necessary to deal with the predicted increases in traffic once the crossing opens. [30] The cost of the proposed LTC is currently more expensive per mile than the HS2 project which is currently predicted to cost £307 million per mile of track, [31] the LTC at current predicted costing would be nearly £573.5 million per mile. [32] In November 2022, it was announced that the expected cost had risen to £9 billion. [33]

In October 2020, Highways England submitted their application for a Development Consent Order (DCO) for the proposed Lower Thames Crossing. After submission, the Planning Inspectorate requested details missing from the application, as well as more information on construction plans and the environmental impact of the scheme from Highways England. [34] [35] In November 2020, Highways England were advised that the Planning Inspectorate would not accept the application. [36] Following this feedback, Highways England instead chose to withdraw the DCO application and carry out further work for a resubmission in 2021. [37] On 20 March 2021, the 120 day internal deadline was missed. [38] In summer 2022, a further local consultation took place, [39] with a new DCO application submitted in November 2022. [1] The DCO process is expected to take around 18 months, which will include public hearings. [1]

Construction

In January 2023, Balfour Beatty was announced as the contractor for the £1.2 billion Roads North of the Thames contract to construct 10 miles (16 km) of highways connecting the M25 at Junction 29 and the A13 with the northern side of the proposed tunnel. [40] In July 2023, Skanska was announced as the contractor for the £450 million Kent Roads contract to construct 3.7 miles (6.0 km) of roads connecting the A2/M2 to the southern side of the proposed tunnel. [41] In December 2023, a joint venture (JV) of Bouygues and J. Murphy & Sons was announced as the contractor for the £1.3 billion Tunnels and Approaches contract to construct the tunnel, tunnel systems and approach roads. [42] To save costs, the Bouygues-Murphy JV intends to use one tunnel boring machine for both tunnel bores, turning it around and reusing it. [42]

Subject to agreement on the DCO and 18 months of detailed design and pre-construction planning, construction work is estimated to take around 6 to 7 years. [43] In March 2023, it was announced that the planned completion date of 2029 had been pushed back by two years. At this point, £800 million had already been spent on the project. [44] As of December 2023, the target date for completion is 2032. [42]

Route

Approximate location of the north tunnel portal, taken in 2012 Track near Bowaters Farm (geograph 3188133).jpg
Approximate location of the north tunnel portal, taken in 2012
View of the area where the southern tunnel portal will be constructed, taken in 2006 Spoiled for Choice - geograph.org.uk - 145591.jpg
View of the area where the southern tunnel portal will be constructed, taken in 2006

The proposed route involves a twin-bore tunnel crossing under the River Thames east of Gravesend and Tilbury, linked north of the river by a new road to the M25 between junctions 29 and 30 while south of the river the new road will directly join the A2 at Thong east of Gravesend. [45] It will run west of Shorne, not to the east, as a result of consultations. [46] The tunnel itself would be 4km long and 16m in diameter, which would make it the largest and longest road tunnel in the UK. [28]

There would be three junctions: Orsett on the A13, Thong on the A2 and north-bound slip roads on the M25 at junction 29. Junctions have been removed on the A226 south of Chalk and on the A128 at Chadwell St Mary in Essex. [47]

Environmental impact

The Woodland Trust opposes the project and expects twelve ancient woodlands and fifteen veteran trees to be close to or within the development boundary. Some of these are within the Shorne and Ashenbank Woods, a Site of Special Scientific Interest. However, the Trust states that Highways England have not disclosed how many habitats will be affected by the project, and calls for them to release this information. [48] Highways England say that new trees will be planted to compensate for the lost ancient woodlands, [49] which "is not a direct replacement for lost or damaged trees or woodland". [50]

Essex Wildlife Trust is also opposed. The Trust acknowledges that a bored tunnel avoids direct impact on the wetlands and coastal habitats of the Thames estuary, but states that habitats will be destroyed at the site of the northern entrance to the tunnel. It states that the project will fragment habitats and the noise and light pollution it causes will reduce the remoteness and tranquility of the area. The Trust is also concerned that the project will increase car dependency and induce demand, and that as a result it will not decrease congestion and will lead to increased carbon dioxide emissions. [51]

Traffic modelling by Highways England predicts that constructing the Lower Thames Crossing would reduce the number of cars using the Dartford Tunnel. However, the total number of cars crossing the Thames (via the Lower Thames Crossing and the Dartford Tunnel) would increase. [52] In addition to this, modelling predicts that the Dartford Tunnel would still be operating above capacity. [53]

Mitigation

Highways England have stated that the road will be the "most environmentally sustainable road project delivered in the UK". [54] Proposed landscaping and mitigation includes planting over 260 hectares of woodland, converting farmland to new habitats and building green bridges across the road. [55] [49]

Carbon dioxide emissions

Highways England initially refused to release emissions figures. However, in response to a freedom of information request in December 2020 it was revealed that construction of the Lower Thames Crossing is expected to release two million tonnes of carbon dioxide. A further 3.2 million tonnes would be emitted by traffic created by the road over sixty years of operation. [56] The Woodland Trust claims that the carbon emissions of the road scheme are expected to be amongst the highest of any major road scheme currently developed by National Highways. [57]

Perspectives

Supporters of the project include the UK Government, business groups, trade organisations and major transportation hubs such as the Port of Dover. [58] [59] According to the Federation of Small Businesses, 83% of local businesses surveyed support the proposed crossing. [60] Some local authorities support the proposed crossing, despite expressing specific concerns regarding environmental impacts. [61] [62]

Some campaign groups support the principle of a new crossing of the Thames, but not the chosen route. The Thames Crossing Action Group prefers new, longer tunnels at Dartford that would allow long-distance traffic on the M25 to bypass the existing Dartford Crossing. [63]

Two local authorities, Thurrock Borough Council and Gravesham Borough Council oppose the project. [64] Environmental groups such as Greenpeace, [65] Woodland Trust, [48] Kent Wildlife Trust [51] and Campaign to Protect Rural England have expressed their opposition to the project on environmental grounds. [66]

See also

Related Research Articles

<span class="mw-page-title-main">M25 motorway</span> Circular motorway around Greater London

The M25 or London Orbital Motorway is a major road encircling most of Greater London. The 117-mile (188-kilometre) motorway is one of the most important roads in the UK and one of the busiest. Margaret Thatcher opened the final section in 1986, making the M25 the longest ring road in Europe upon opening. The Dartford Crossing completes the orbital route but is not classed as motorway; it is classed as a trunk road and designated as the A282. In some cases, including notable legal contexts such as the Communications Act 2003, the M25 is used as a de facto alternative boundary for Greater London.

<span class="mw-page-title-main">Dartford Crossing</span> Tunnel and bridge between Kent and Essex, UK

The Dartford–Thurrock River Crossing, commonly known as the Dartford Crossing and until 1991 the Dartford Tunnel, is a major road crossing of the River Thames in England, carrying the A282 road between Dartford in Kent in the south and Thurrock in Essex in the north.

<span class="mw-page-title-main">Blackwall Tunnel</span> Pair of road tunnels underneath the River Thames in London

The Blackwall Tunnel is a pair of road tunnels underneath the River Thames in east London, England, linking the London Borough of Tower Hamlets with the Royal Borough of Greenwich, and part of the A102 road. The northern portal lies just south of the East India Dock Road (A13) in Blackwall; the southern entrances are just south of The O2 on the Greenwich Peninsula. The road is managed by Transport for London (TfL).

<span class="mw-page-title-main">A2 road (England)</span> Road in southern England

The A2 is a major road in south-east England, connecting London with the English Channel port of Dover in Kent. This route has always been of importance as a connection between London and sea trade routes to Continental Europe. It was originally known as the Dover Road. The M2 motorway has replaced part of the A2 as the strategic route.

<span class="mw-page-title-main">M20 motorway</span> Motorway in Kent, England

The M20 is a motorway in Kent, England. It follows on from the A20 at Swanley, meeting the M25, and continuing on to Folkestone, providing a link to the Channel Tunnel and the ports at Dover. It is 50.6 miles (81.4 km) long. Although not signposted in England, this road is part of the European route E15. It is also used as a holding area for goods traffic when traffic across the English Channel is disrupted, such as Operation Stack and Operation Brock.

<span class="mw-page-title-main">A12 road (England)</span> Road in England

The A12 is a major road in Eastern England. It runs north-east/south-west between London and the coastal town of Lowestoft in the north-eastern corner of Suffolk, following a similar route to the Great Eastern Main Line until Ipswich. A section of the road between Lowestoft and Great Yarmouth became part of the A47 in 2017. Between the junctions with the M25 and the A14, the A12 forms part of the unsigned Euroroute E30. Unlike most A roads, this section of the A12, together with the A14 and the A55, has junction numbers as if it were a motorway.

<span class="mw-page-title-main">Borough of Dartford</span> Borough & Non-metropolitan district in England

The Borough of Dartford is a local government district in the north-west of the county of Kent, England. Its council is based in the town of Dartford. It is part of the contiguous London urban area. It borders the borough of Gravesham to the east, Sevenoaks District to the south, the London Borough of Bexley to the west, and the Thurrock unitary authority in Essex to the north, across the River Thames. The borough was formed on 1 April 1974 by the merger of the Municipal Borough of Dartford, the Swanscombe Urban District, and part of the Dartford Rural District. The 2011 Census had a population of 97,365 which increased to 116,800 in the 2021 census.

<span class="mw-page-title-main">A13 road (England)</span> Major road in England

The A13 is a major road in England linking Central London with east London and south Essex. Its route is similar to that of the London, Tilbury and Southend line via Rainham, Grays, Tilbury, Stanford-Le-Hope & Pitsea, and runs the entire length of the northern Thames Gateway area, terminating on the Thames Estuary at Shoeburyness. It is a trunk road between London and the Tilbury junction, a primary route between there and Sadlers Hall Farm near South Benfleet, and a non-primary route between there and Shoeburyness.

<span class="mw-page-title-main">A27 road</span> Major road in southern England

The A27 is a major road in England. It runs from its junction with the A36 at Whiteparish in the county of Wiltshire, follows the south coast of Hampshire and West Sussex, and terminates at Pevensey in East Sussex.

<span class="mw-page-title-main">Lakeside Shopping Centre</span> Shopping mall in Essex, England

Lakeside Shopping Centre is a large out-of-town shopping centre located in West Thurrock, Essex just beyond the eastern boundary of Greater London. It was constructed on the site of a former chalk quarry. The first tenants moved into the complex in 1988 and it was completed in 1990, being opened on 25 October of that year by Princess Alexandra of Kent, Marcus Bradford and Angus Ogilvy. New spaces in the red car park were added as recently as October 2019.

<span class="mw-page-title-main">Bluewater Shopping Centre</span> Shopping mall in Kent, England

Bluewater Shopping Centre is an out-of-town shopping centre in Stone, Kent, England, just outside the M25 motorway ring, 17.8 miles (28.6 km) east south east of London's centre. Opened on 16 March 1999 in a former chalk quarry after ten years of building works, the site occupies 240 acres (97 ha) and has a sales floor area of 154,000 m2 (1,600,000 ft2) over three levels, making it the fifth-largest shopping centre in the UK. Elsewhere in Europe only Istanbul's Cevahir Mall and Vienna's (Vösendorf) Shopping City Süd are bigger. The floor plan is a triangular shape with 210 stores, including 3 anchors, 50 cafés and restaurants, and a 17-screen cinema. The centre employs 7,000 people and serves over 27 million visitors a year. A main rival is the Lakeside Shopping Centre and its two retail parks in West Thurrock, Essex, just across the River Thames, 8 miles (13 km) away by road or 3.2 miles (5.1 km) as the crow flies.

<span class="mw-page-title-main">Dartford</span> Human settlement in England

Dartford is the principal town in the Borough of Dartford, Kent, England. It is located 18 mi (29 km) south-east of Central London and is situated adjacent to the London Borough of Bexley to its west. To its north, across the Thames estuary, is Thurrock in Essex, which can be reached via the Dartford Crossing. To its east lies the Borough of Gravesham and to the south the district of Sevenoaks.

<span class="mw-page-title-main">Silvertown Tunnel</span> Tunnel under construction below the Thames between Sivertown and North Greenwich

The Silvertown Tunnel is a road tunnel under construction beneath the River Thames between the Greenwich Peninsula and west Silvertown.

<span class="mw-page-title-main">London Ringways</span> Series of proposed ring roads around London

The London Ringways were a series of four ring roads planned in the 1960s to circle London at various distances from the city centre. They were part of a comprehensive scheme developed by the Greater London Council (GLC) to alleviate traffic congestion on the city's road system by providing high-speed motorway-standard roads within the capital, linking a series of radial roads taking traffic into and out of the city.

<span class="mw-page-title-main">A226 road</span> Road in southeast England

The A226 road travels in a west–east direction in southeast London and north Kent, from Crayford in the London Borough of Bexley, through Dartford, Gravesend to Strood. It is about 15.7 miles in length.

<span class="mw-page-title-main">National Cycle Route 1</span> Cycle route in the United Kingdom

National Cycle Route 1 is a route of the National Cycle Network, running from Dover to Tain. The 1,264 mi-long (2,034-kilometre) cycle-path is located in the United Kingdom.

<span class="mw-page-title-main">London Resort</span> Proposed theme park in Kent, United Kingdom

The London Resort is a proposed theme park and resort in Swanscombe, Kent, first announced on 8 October 2012 and since repeatedly delayed.

The River Medway Cable Tunnels are a pair of tunnels carrying high-voltage electricity transmission lines beneath the lower River Medway between the Isle of Grain and Chetney Marshes, Kent.

References

  1. 1 2 3 4 "Lower Thames Crossing: Plans accepted by the government". BBC News. 30 November 2022. Retrieved 14 December 2023.
  2. "Dartford River Crossing Study into Capacity Requirement". National Archives . Retrieved 10 April 2022.
  3. "Lower Thames Crossing - Route". Highways England . 25 June 2020. Retrieved 8 April 2021.
  4. 1 2 Horgan, Rob (27 November 2020). "Revealed: Reasons Lower Thames Crossing plans were pulled". New Civil Engineer. Retrieved 27 November 2020.
  5. Lower Thames Crossing - 6.3 Environmental Statement Appendices - Appendix 15.1 Carbon and Energy Plan. "The A122 road", accessed 28 January 2021
  6. "Lower Thames Crossing Project update Summer 2019" (PDF). Highways England . Summer 2019. Retrieved 8 April 2021.
  7. Francis, Paul (15 July 2014). "Two Thames crossing options". Kent Messenger. Retrieved 15 July 2014. Transport Secretary Patrick McLoughlin said: "As part of the M25 orbital route around London, the Dartford Crossing is a crucial part of the country's strategic road network."
  8. "Dartford Crossing". Institution of Civil Engineers (ICE). 16 April 2018. Retrieved 8 April 2021.
  9. "Dartford Crossing excluded from pollution assessments". BBC News. 6 March 2017. Retrieved 8 April 2021.
  10. "Transport – Ferry Services". Thurrock Council. Retrieved 1 October 2009.
  11. "Gravesend to Tilbury Passenger Ferry" . Retrieved 17 August 2017.
  12. Roads for Prosperity. The Department of Transport. p. Table 2.
  13. "The Orbit Multi-Modal Study:Developing a long-term sustainable management strategy for the M25" (PDF). Association for European Transport. 2003. Retrieved 1 October 2009.
  14. "M25 London Orbital Transport Study Reports". gov-news.org. 22 November 2002. Retrieved 1 October 2009.
  15. "Medway-Canvey Island Thames Crossing, United Kingdom". Road Traffic Technology. Retrieved 1 October 2009.
  16. "Time for Action on Lower Thames Crossing". Essex County Council . Retrieved 28 August 2009.
  17. 1 2 3 4 "Dartford River Crossing Study into Capacity Requirement". Department for Transport. 20 April 2009. Archived from the original (PDF) on 13 May 2010. Retrieved 27 June 2014.
  18. "New bridge over Thames 'should link with M11' in Essex". BBC. 25 October 2010. Retrieved 25 October 2010.
  19. Brian, Sweetland (8 October 2012). "Reaction to £2bn Paramount theme park for Kent". Kent Messenger.
  20. "Lower Thames Crossing Consultation". Highways England. 12 April 2017.
  21. "Lower Thames Crossing – In my area". roads.highways.gov.uk. Retrieved 6 November 2017.
  22. Tim, Jones (26 September 2018). ""...No the Lower Thames Crossing is not going to resolve all of the traffic problems both north or south of the river."".
  23. "Project update – 2018 consultation and next steps for the Lower Thames Crossing". Highways England . 22 July 2019. Archived from the original on 7 March 2020. Retrieved 7 March 2020.
  24. "Lower Thames Crossing planning application submitted". New Civil Engineer. 26 October 2020. Retrieved 26 October 2020.
  25. Highways England, Lower Thames Crossing Design Refinement Consultation https://highwaysengland.citizenspace.com/ltc/design-consultation/
  26. Gray, Brad (27 February 2021). "3 key ways the new £8bn crossing to Kent could affect Thurrock". EssexLive. Retrieved 30 March 2021.
  27. 1 2 3 Horgan, Rob (31 March 2021). "Race on for £1.9bn Lower Thames Crossing road building contracts". New Civil Engineer. Retrieved 8 April 2021.
  28. 1 2 3 Kennedy, Catherine (7 April 2021). "Shortlist announced for Lower Thames Crossing tunnel contract". New Civil Engineer. Retrieved 8 April 2021.
  29. "Road Investment Strategy 2: 2020–2025" (PDF). p. 90 actual doc page numbering or 96/131 pdf doc numbering.
  30. "Crossing to cost £6.8bn - without a penny for local roads". Kent Online. 19 December 2018. Retrieved 24 March 2021.
  31. Pratley, Nils (3 February 2020). "At £307m per mile of track, can the cost of HS2 be justified?". The Guardian.
  32. "LTC estimated cost per mile".
  33. Delaney, Sean (28 November 2022). "Lower Thames Crossing cost rises to £9 billion as Planning Inspectorate accepts project for review". KentOnline. Retrieved 10 March 2023.
  34. "Lower Thames Crossing planning application withdrawn". The Construction Index. 24 November 2020. Retrieved 6 April 2021.
  35. Horgan, Rob (27 November 2020). "Revealed: Reasons Lower Thames Crossing plans were pulled". New Civil Engineer. Retrieved 8 April 2021.
  36. Delaney, Sean (20 November 2020). "Lower Thames Crossing planning bid pulled". Kent Online. Retrieved 8 April 2021.
  37. "Planning Inspectorate Meeting Note" (PDF).
  38. Horgan, Rob (22 March 2021). "Resubmission of Lower Thames Crossing planning application misses 120 day target". New Civil Engineer. Retrieved 11 April 2021.
  39. "Local refinement consultation has now closed". National Highways . 21 June 2022. Archived from the original on 14 August 2022. Retrieved 14 August 2022.
  40. Horgan, Rob (23 January 2023). "Balfour Beatty wins £1.2bn Lower Thames Crossing contract". New Civil Engineer. Retrieved 14 December 2023.
  41. Hakimian, Rob (18 July 2023). "Skanska wins £450M Kent roads contract on Lower Thames Crossing". New Civil Engineer. Retrieved 14 December 2023.
  42. 1 2 3 Hakimian, Rob (7 December 2023). "Bouygues-Murphy JV wins £1.3bn Lower Thames Crossing tunnelling contract". New Civil Engineer. Retrieved 14 December 2023.
  43. Hakimian, Rob (10 March 2023). "Lower Thames Crossing and other major road schemes delayed due to 'challenging economic headwinds'". New Civil Engineer. Retrieved 14 December 2023.
  44. "Lower Thames Crossing project delayed by two years". BBC News. 9 March 2023. Retrieved 10 March 2023.
  45. Morby, Aaron. "Route picked for £8bn Lower Thames Crossing | Construction Enquirer". constructionenquirer.com. Retrieved 12 April 2017.
  46. Sandhu, Rajdeep (12 April 2017). "Thames Crossing to go east of Gravesend on Wednesday 12 April 2017". BBC News. 20:07. Retrieved 12 April 2017.{{cite web}}: CS1 maint: location (link)
  47. "Executive summary" (PDF). Improvements and major road projects:Lower Thames Crossing. Highways England. Retrieved 12 April 2017.
  48. 1 2 "Lower Thames Crossing risk to ancient woods". Woodland Trust. Retrieved 8 April 2021.
  49. 1 2 "Lower Thames Crossing Environmental Impacts Update" (PDF). Highways England. 2020. Retrieved 26 October 2020.
  50. "Ancient woodland, ancient trees and veteran trees: advice for making planning decisions". gov.uk. Retrieved 27 October 2022.
  51. 1 2 "Lower Thames Crossing | Kent Wildlife Trust". Kent Wildlife Trust . Retrieved 8 April 2021. Kent Wildlife Trust is opposed to these plans as they will result in the loss of irreplaceable ancient woodland.
  52. "Lower Thames Crossing Traffic Forecasting Report" (PDF). Highways England. 2018. Retrieved 26 October 2020.
  53. "'Dartford Crossing will still be over capacity'". Kent Online. 25 March 2021. Retrieved 30 March 2021.
  54. Arminas, David (1 April 2021). "More tenders for Lower Thames Crossing". World Highways. Retrieved 8 April 2021. The successful bidders and their supply chains will help make the Lower Thames Crossing the most environmentally sustainable road project ever delivered in the UK, according to Highways England.
  55. England, Highways (3 July 2020). "Lower Thames Crossing - Environment - Highways England". highwaysengland.co.uk. Retrieved 8 April 2021.
  56. "Climate change: Lower Thames Crossing CO2 impact figures revealed". BBC News. 6 December 2020. Retrieved 6 December 2020.
  57. "Ancient woods and trees threatened by Lower Thames Crossing". Woodland Trust. Retrieved 14 November 2022.
  58. "Lower Thames Crossing - Support for the Crossing - Highways England". Highways England . 18 March 2021. Retrieved 8 April 2021.
  59. Powley, Tanya (12 April 2017). "Government backs new Thames crossing to east of London". Financial Times . Retrieved 8 April 2021.
  60. "Over 80% of local businesses support the Lower Thames Crossing". Highways England . 18 March 2021. Retrieved 8 April 2021.
  61. "Lower Thames Crossing position statement". Kent County Council . 2020. Retrieved 8 April 2021.
  62. Critchell, Matthew (17 March 2020). "'£6.8bn crossing will be jobs boost' - Basildon Council backs Lower Thames Crossing". Basildon Echo. Retrieved 8 April 2021.
  63. "Frequently Asked Questions". Thames Crossing Action Group. 13 July 2018. Retrieved 8 April 2021.
  64. "Joint statement on Lower Thames Crossing Joint statement from Thurrock Council and Gravesham Borough Council". Thurrock Borough Council . 23 November 2020. Retrieved 8 April 2021. We have said all along that while we remain opposed to the project, we reluctantly and unfortunately accept the Lower Thames Crossing will go ahead.
  65. Gray, Brad (12 December 2020). "Fury as new Thames crossing could create a 'toxic triangle'". EssexLive. Retrieved 8 April 2021.
  66. "CPRE Protect Kent Lower Thames Crossing Consultation Response". CPRE Kent. 28 May 2013. Retrieved 8 April 2021.

51°26′57″N0°24′53″E / 51.4492°N 0.4147°E / 51.4492; 0.4147